Hi
Are there any limitations if we go with SAP SRM 5.5 Server as an add-on on ECC 6.0 compared to Implementation of SAP SRM 5.5 server on its own.
FYI-We just have one ERP Back-end system.
BTW, what is the difference between SAP SRM server 5.5 vs SAP SRM server 5.5 Plus.
Thanks in advance.
Thanks & Regards,
Anji
Hi
Summary:
You can use classic scenario in Add-on.
You can use self-service procurement and SUS in Add-on.
You cannot have Sourcing and other scenarios.
No migration from Add-on to Separate server available.
Best regards
Ramki
Similar Messages
-
SRM 5.0 as an Add on with ECC 6.0
Even i have the same question on how we would manage the distibution model when the SRM System is installed as an add on with ECC. Since being on the same client here are some of the Questions. I have also opened a new thread on this.
1.) How would the distribution model be distributed when on the same client?
2.) How would the Documents flow between two different systems?
3.) In an SUS-MM scenario, how would this be handled when installed on the same client?
4.) How would material and vendor replication facilitated?
Any thoughts would be highly appreciated !!
Thanks,
SundeepHi Sundeep,
I have answered for vendor replication here :
One Client Solution
For product category, material and material type replication, this is same process through activation of relevant objects in table mdsv_ctrl_opt_a
Then you have to trigger the replication through mds_load_cockpit
For SUS, you have to select SUS_ONE (instead of EBP_ONE) in table bbp_backend_dest
That all what i know so far
Kind regards,
Yann -
Add Approver button disabled for PO in sap srm when GR and IR are already posted
Hello Gurus,
One of my user has edited an old PO for which the GR and IR has already been posted in backend. Now the reason for editing was to change the expected value for 3 item and he changed the value the approver is still blank as for old PO's there was no approval required but later on the whole scenario changed and based on total value the approvers are decided now. But for this PO still its not showing the appovers and also the add approver button is disabled. Is there any way to enable the Add approver button. Also please let me know whether addition of approver is allowed after the GR and IR are posted in backend.
Thanks
Gaurav GautamSolved.
In Control Actions -> Configure Control of Actions on Header Level, it's not neccessary put the subtype equal to 0. -
SUS-MM Lanscape with SRM 5.0 as an Add-on with ECC6.0
All-
We are implementing SRM 5.0 as an add on with ECC 6.0. We are aware of all the constraints and those constraints do not matter within our scope. The open question that we have is that if SRM is installed as an Add on with ECC.
Can we also leverage the SUS-MM functionality within SRM, when installed as an Add on with ECC 6.0??
Any help would be appreciated.
SundeepMarcin,
FYI
http://help.sap.com/saphelp_erp2005/helpdata/en/index_srmaddon.htm
Sundeep -
How SAP ECC interface with SAP SRM
Hi all,
I need to know how SAP ECC System interface with SAP SRM in management of Catalogs and Contracts: how can I upload, for example, Catalogs which are on SAP ECC to SAP SRM?
Thanks, best regards,
MariaDear Maria Bonomo,
I have gone thorugh the following link and it seems to answer your query:
www.sceis.sc.gov/content/dnld/agydir-1B.pps
Hope this helps you.
Do award points if you found them useful.
Regards,
Rakesh -
Activate CCMS for SAP SRM with SAP DB
Hi!
I would like to monitor SAP SRM 5.0 (OS: Windows, DB: SAP DB, Version 7.6.04.11) from SAP Solution Manager.
I have the following problems:
a) it is not posible to execute the tocde DB50 on SAP SRM.
b) it is not possible to see the DB monitor of SAP SRM in SAP Solution
(SAP CCMS Monitor Templates --> Database --> empty)
c)The database is integrated in tcode DB59.
Unfortunately when I execute the connection test I get:
General Connection Data
Connection Name....: SRM
Database Name......: SRM
Database Server....: olda8002
tp Profiles........: no_longer_used
DBM User...........: CONTROL
Test Scope
1. Execute an external operating system command (DBMCLI)
2. Determine status using TCP/IP connection SAPDB_DBM (DBMRFC
command mode)
3. Determine status using TCP/IP connection SAPDB_DBM_DAEMON (DBMRFC
session mode)
4. Test the SQL connection (Native SQL at CON_NAME)
Application Server: olda8002_SRM_00 (Windows NT)
1. Connect. test with "dbmcli db_state"
Successful
2. Connect. test with command mode "dbmrfc db_state"
Unsuccessful system_failure
Name and Server : SRM - olda8002
DBMRFC Function : DBM_EXECUTE
Command : db_state
Error : System Error
Error Message : timeout during allocate / CPIC-CALL:
'ThSAPCMRCV' : cmRc=20 thRc=456#Timeout during connection setup
3. Connect. test with session mode "dbmrfc db_state"
Unsuccessful
communication_failure
Name and Server : SRM - olda8002
DBMRFC Function : DBM_CONNECT
Error : Communication Error
Error Message : Error when opening an RFC connection
4. Connect. test with "native SQL" ( SRM )
Successful
What I have done:
I have upgraded the server as well the client software to the version 7.6.04.11
Can someone help me with suggestion?
Could it be the issue with independent path on windows or do I miss some programs?
In tcode DB59 in Connection test the following values could not be determined:
DBMRFC Release (empty)
DBMCLI Release (empty)
Thank you
regards
ThomHello Thom,
"a) it is not possible to execute the tocde DB50 on SAP SRM."
-> Run /ndb50n with the database connection SRM created in /ndb59.
Please give more details about errors.
"b) it is not possible to see the DB monitor of SAP SRM in SAP Solution
(SAP CCMS Monitor Templates --> Database --> empty)"
-> First fix the database connection in /ndb59.
Please let me know the version/SP of the SAP Basis on SAP Solution Manager system.
"c)The database is integrated in tcode DB59."??
You posted that you created the database connection for the database.
On the application server < Application Server: olda8002_SRM_00 > run ::
/nsm49 ->dbmrfc -> execute -> post results
/nsm59 -> SRM connection -> test connection ->
1) What are DBSL Release/DBSL Patch on the appl. Server?
2) Update with output from the /nsm49 -> dbmcli tool ::
dbmcli -s dbm_getpath IndepProgPath
3) Check that Path env. Variable of the srmadm on olda8002 adjusted with
<IndepProgPath>/bin & <IndepProgPath>/pgm
4) Test TCP/IP connections in /nsm59::
SAPDB_DBM SAP DB dbmrfc server
SAPDB_DBM_DAEMON SAP DB dbmrfc server daemon
< According your information the test connection in /ndb59 failed for :
Determine status using TCP/IP connection SAPDB_DBM (DBMRFC
command mode)
& Determine status using TCP/IP connection SAPDB_DBM_DAEMON (DBMRFC
session mode) >
Run /ndb59 -> Connection test -> select the appl. Server -> Connection test
=> /nst11 && check errors in dev_rd at the end.
/nsm21 -> check the system errors.
/nst11 -> check the errors in the corresponding dev log of WP.
Do you have blank space in the IndepProgPath path name?
Thank you and best regards, Natalia Khlopina -
Replicating storage locations from SAP SRM
Dear Experts,
How to replicate the storage locations from ECC to SAP SRM? How you can restrict the selection of storage location in SAP SRM based on the plant selection? i.e. plant 1000 has three storage locations say 1001, 1002, 1003. Now, when the user selects the plant 1000 as delivery address in direct procurement scenario, then the system should allow only the three values in value help?
Thanks and regards,
RanjanHI Ranjan,
Did you try by removing 'Storage Locations" from Extended Attributes in PPOMA_BBP?
thanks,
Rahul Mandale -
Vendor Migration issue for SRM as add-on to ECC
Hello Experts,
I am working on SRM as add-on to ECC.
When I am trying to migrate vendors from ECC to SRM using MDS_LOAD_COCKPIT. Within monitor, all queues are 'green' indicating that data has successfully migrated to SRM.
But when I check vendors in trx- ppomv_bbp, i don't see any vendor being migrated from ECC. Neither the BPs are crated for these vendor masters.
I have configured all necessary configuration- i.e.
1) I have carried out necessary settings in tables-
mdsv_ctrl_opt_a
crmc_but_call_fu
v_tbc001
2) In addition, I have maintained backend Purchase Org in PPOMA_BBP.
3) I have checked RFC connections, definition of logical systems and
it seems to be alright.
Can anybody please guide if I am missing on any config or can point
me in right direction to investigate??
At SRM GUI, I tried making a local vendor using 'BBPMAININT' but end up in a short-dump.
Can you please help?
Thanks and Regards,
AmitHi,
if you problem is still existing, following might be possible solution. Try it.
Maintain Table BBP_MARKETP_INFO with corresponding Vendorroot ID (ex. VG50000....) that you already created in the PPOCV_BBP trx.
Hope it helps.
Regards
PM -
Hi All,
Can anybody please forward me the presentation for SRM as an Add on to ECC
6.0. Also please provide any other presentations giving overview of SRM activities
and configuration steps.
Regards,
SourabhClosed
-
General Understanding SRM as Add-On to ECC 6.0
Since I checked in this forum there is no configuration guide for SRM as Add-On available I have some general problems. Does SRM Add-On as single client installation with ECC 6.0 require replication and download of data objects and do I have to maintain the middleware parameters? If it is like this I understand why tere is no specific configration guide for SRM as Add-On!
In Detail:
When I configure SRM as Add-On do I have to replicate objects like product, product category, customizing (UOM), vendor from the backend as in stand alone implementation?
Do I also have to replicate organizational structure via report from the backend or can I use the organizational structure form the backend directly for the SRM?
Do I have to download the locations from the backend?
Rgds.
DieterHi
ECC 5.0 does not come with EBP or SRM. ECC 6.0 (ERP 2005) comes with SRM Server as an add-on. Only self service procurement and supplier enablement scenarios are supported. Not recommended for sourcing scenarios and multi-backend deployment options.
<u>Please look at http://help.sap.com/erp
Then click on SAP SRM for ERP.
you will find very good documentation here.</u>
<u>Please go through these detailed pointers for more information -></u>
http://help.sap.com/saphelp_srm50/helpdata/en/43/028c9ce2a35158e10000000a1553f7/frameset.htm
http://help.sap.com/saphelp_erp2005/helpdata/en/index_srmaddon.htm
What is hub deployment?
Re: SRM as ADD On in ECC6.0
SRM@ERP2005
Re: SAP SRM - ERP INTEGRATION
Re: SAP R/3 MM and Electronic external Catalog
SRM Server as an Add on to ERP 2005
SRM as an add-on to ERP 2005
Hope this will definitely help.
Regards
- Atul -
SUS when SRM is add-on for ECC
Gurus:
Did anyone implemented SAP Supplier Self-Service when you have SRM Add-on in ECC (SRM One Client Scenario)?
Any help is well appreciated.
Regards,
Vijay AlisettyIn a security point of view the production SUS should stay in a independent server. I think that you have to see this with the security team. The vendor's companies are going to do log-on in your SUS system (via web).
Two years ago, analyzing SRM versus SRM add-on SAP told us that materials with MRP are not supported with the add-on so the company decided to do not use the SRM add-on. SAP told us that contract management is not supported also with the add-on.
We did not use the SRM add-on for other motives (MRP). Did you asked SAP his advice using SUS with the add-on.
Hope to help you.
Marta -
Adding an Input field in Standard Webdynpro Component in SAP SRM
Hi Friends,
I want to add one input field in sap standard webdynpro component in SAP SRM MODULE
the component name is /SAPSRM/WDC_DODC_RFQ_H_BD
view name is V_DODC_RFQ_H_BD
Upon clicking on SAVE button , it shud save in database
what is the name of database table and how to solve this problem
Thnx
SriniHi Kumar,
By using Enhancement Framework you can do this.
How can we add a new field to the Standard Webdynpro application?
Also check this..
http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/700317da-bd79-2c10-368e-8f18bf5d8b81
Cheers,
Kris. -
Hi,
Could any one please explain the advantages of using SAP SRM over MM module. As per me we can de most of the activities in MM except some vendor related activities (and that even if SUS is used).
Thanks in advance.
Regards,
LalitHi Lalit,
All advantages of using SRM and MM module is in Plan-Driven Procurement documentation on service.sap.com/instguides -> SRM.
Generally planning in APO or MRP in an ERP system calculates the quantity and materials required. This requirement can be transffered to the EBP system. Requisitions from SAP Plant Maintanance or Project System are also possible requirements.
The requisitions are passed to EBP. If the data is complete and unique, purchase orders can be created automatically. If the data is missing, the proffesional purchaser has to complete the missing information in Sourcing or via Process Purchase Orders. An option for the professional buyer is to assign un-sourced PO to an RFQ and send it out for bids.
The proffesional purchaser completes the orders, assings source of supply, add or deletes item.
Once the order is complete it is issued automatically to R/3. XML is the upcoming medium, since the data can be automatically integrated in more and more supplier's systes, or You can send orders by e-mail, fax or print them.
Goods receipt is either done in EBP by supplier via an XML confirmation, by employee who requested the item by general goods recipient or in the backend system. Inventory is updated in backend.
The invoice is processed in EBP manually by the requestor or an accountant submitted by the supplier via an XML invoice, possibly from SUS or backend system.
You can also look in Self-Service Procurement documentation on:
http://help.sap.com/saphelp_srm50/helpdata/en/8d/f6a93e08503614e10000000a114084/frameset.htm
Regards,
Marcin Gajewski
Please assign points for useful answer. -
SAP SRM UI (NXP) - Work Processes remain running
Background:
Shopping carts are being processed through the new SAP SRM UI (NXP). On occasion, dialog Work Processes are left in 'running' status even when there is nothing happening in the front end.
It occurs for many standard programs, but when checking the WP details, all are pointing to the same class
/IWFND/CL_MGW_RUNT_RCLNT_PRXY and function module /IWBEP/FM_MGW_CHANGESET.
The /IWFND/*_LOG transactions aren't showing any errors or warning
I haven't found any relevant SAP notes.
Environment:
Oracle 11 on AIX
SRMNXP01 100 0002 SRM Add-on New Experience
GW_CORE 190 0003 SAP GW CORE 190
IW_BEP 200 0007 Backend Event Provider
IW_FND 240 0003 SAP IW FND 240
SAP_ABA 701 0013 Cross-Application Component
SAP_AP 700 0029
SAP_BASIS 701 0013 SAP Basis Component
SAP_BS_FND 701 0013 SAP Business Suite Foundation
SAP_BW 701 0013 SAP Business Warehouse
MDM_TECH 710_700 0009 MDM_TECH 710 : Add-On Installation
PI_BASIS 701 0013 Basis Plug-In
and some other bits and pieces (including SAP UI% and associated components)
QUESTION:
At the moment, I'm interested in a BASIS perspective; I want to ensure the platform (SRM_SERVER, GW_CORE, UI5, SRMNXP01, etc) is stable and functional. However, I'm not familiar with debugging / tuning / administrating the SAP Gateway (I still think SMG when I hear Gateway), so these may have fairly obvious answers to the right people, but ...
1) What or where should I be looking for further clues ? My first thoughts are around the available network connections.
2) Is there a transaction that provides real time monitoring of GW CORE ? I've found that the /IWBEP/VIEW_LOG and /IWFND/*_LOG transactions are only useful after the fact.
thanksHello Martin,
such hanging work processes can have many causes. Which AIX version do you have? Please take a look at the note
1873277 - Hanging Work processes on SAP Application Servers
if it can be relevant in your case.
Regards, Alwina -
Hello,
we are designing application architecture. Our landscape is:
- ECC 6.0
- SRM 5.0
- XI 7.0
We are thinking of using <b>XI as middleware even for those scenario in which in not required</b> (es. Contract Managament):
In particular every time we have a <b>communication based on IDOC</b> we want to use XI as communication middleware. Pure RFC integration will not use XI.
Has anyone some experience on this?
Thanks
antonioHi
<u>Some related Links -></u>
Re: Upgrade SRM on 4.7 to ECC 6.0
Re: EBP 3.0 Integration with ERP 2004
SRM@ERP2005
Re: SRM-R/3 Service Packages
Problem transferring deletion status to ERP from SRM
SRM 4.0 (SERVER 5.0) integration
Re: SRM add-on configuration
Re: Integration between SRM and 5 R/3 backends
RFC connection problem during SRM - R/3 integration
Re: ECC 5.0 & SRM / EBP
Re: SRM as ADD On in ECC6.0
<u>Please go through the following SAP OSS Notes, which will help -></u>
Note 963000 - Usage and release of SRM as AddOn to ECC in ERP2005
Note 863532 - Release Restrictions mySAP SRM 2005
Note 931020 - SRM connection to an ERP 2005 (ECC 600) back end
Note 917523 - Release note SRM Server 5.5 Support Package 05
Note 1014414 - SRM 5.0 SP stack 08(03/2007) SAPKIBKT08 release/info note
Note 872533 - FAQ - Middleware
Note 740536 - No objects in administration console
Note 874589 - SRM 4.0 connection to an ERP 2005 system
Note 862290 - Connection to ECC 5.0 back end
Note 995771 - System Landscape Copy for SAP SRM 4.0 and 5.0
Regards
- Atul
Maybe you are looking for
-
User exit for requested delivery date at SO header
Hi Experts, Trying to find a user exit which can be used to calculate the default requested delivery date in the order header based on the current date and the lead-time in the route. By default, In SO header, requested delivery date is system date.
-
Having an iPad problem I don't see anywhere else. PLEASE HELP!!!
Starting about a week ago when I charge my ipad the screen stays on and flashes a battery icon with the % charged. It charges but VERY slowly because the screen is on all the time. Even if I hit the power button on top it flashes back on in a second
-
Customer adopted parts to be issued in production line
Dear Experts, I need some help for this scenario. Customer will provide a part to assemble in the main production line. Business will have to mainatain that material & issue to production order. How to handle this. Like is there any movement type fro
-
Tab displayed twice in MIGO screen when created by a BADI
Hello all i have created a tab in MIGO transaction using the BADI MB_MIGO_BADI n the method PBO_DETAIL. but the tab is displayed twice . In debugging i saw the badi is being called twice. But i 'm not understanding why the badi is called twice .
-
Installing Oracle APPS - Burning DVDs and installing from then!!!
Hi all, I'm finishing the download of Oracle Application 11i (33GB) and i don't have space enough to create a staging area and install from this area. I want to install from DVDs. How can i do that? What files i burn in each DVD?? What is the order??