SRM Contract status problem

HI All,
   I have created a contract in SRM. It was approved and showing the correct status in the SAP back end but in front end status showing as 'awaiting for approval'. Could any one let me know why status showing different and the solution.
Regards,
Shiva

Shiva:
Believe you are talking about GOA.
Check in transaction RZ20 for any error in the process.
Regards
Ravi

Similar Messages

  • SRM Workflow - Contract Status problem

    Hey guys!
    I'm having a problem with the status on the approval of contracts in SRM; even though all the required approvers have checked the contract and approved it, its status still remains at "Waiting for Approval." Would anyone know what might be causing this and how this could be fixed?
    Many thanks!
    Glenn

    Shiva:
    Believe you are talking about GOA.
    Check in transaction RZ20 for any error in the process.
    Regards
    Ravi

  • SRM contract Status change

    Hi ,
    Can any one help me out to change the status of a contract.
    I was contracted a contract  using ppb_pd_ctr_create. I want to change the status of the contract to close or delete.. is there any function module available to do the same?
    Thanks & Regards,
    Magesh basavaraj.

    what is the behaviour of contracts in SRM in general.
    Q1.- I create a GOA document in SRM, it is distribute to backend system (R/3). In this moment, which is the status of GOA in SRM?
    A1 :-RELEASED
    2.- Is necessary to activate workflow process to release GOA automatically and then distribute to backend?
    A2:- Upon business requirement. Yes every business need approval since BUYERS decision are not final
    Q2aWhen the contract is on backend system and I change some parameters in the backend, is there some process to update the status or the parameters in GOA document in SRM? Is there some communication between the systems in this moment?
    A2A :- No . you should not change any value in ME32K . no business allows this. you must speak to basis and pull everyone access to edit Purchasing contract. All edit/ massage / change happen only in GOA . evry changes in GOA versions will be created and distributed to backend sytem every time.
    3.- I want to activate a non standard workflow process in backend system (R/3) for contracts distributed. How can I do that when backend contract is released then GOA contract in SRM change the status?
    you can do mostly busineess needs approval on GOA approval.
    RELEASED -status in SRM for good distributed GOA.

  • SRM contract in awaiting approval state

    Hi Gurus,
    We are facing an issue where srm contract is approved via a n step badi workflow. But even after completion of workflow the document remains in awaiting approval state.
    The step which sets the document status to released status is called in background step in workflow.
    If we examine the workflow logs they indicate the successful execution of this release step without any error.
    However document is not released.
    On further investigation we found that if the business partners who are present in active version and who have got expired at the time of creation of change version causes this to happnen.
    Presently we have a workaround by which we replace the expired business partner with a new business partner in active version and then release the change version.
    However to develop a permanent fix we are not able to replicate this scenario in our system.
    Kindly provide your guidance on this issue.
    Regards,
    Rohit

    Hi Rohit
    you have a root cause of this problem
    On further investigation we found that if the business partners who are present in active version and who have got expired at the time of creation of change version causes this to happnen.
    for testing purpose you can delete this test user or ask basis person to inactivate this user .
    1. create a GOA by test user19 buyer1)
    2. Approve a GOA by test manager1
    3. now delete user1 or inactivate the user1 id BY CHANGING THE VALIDIDTY DATE OF THE USER .
    4. revise the GOA by user2 (buyer2) and approve it . will you recreate the same /
    RELEASED AT TOP BUT CHANGE VERSION AWAITING FOR APPROVAL IN THE APPROVAL PREVIEW.
    if your analysis is true. it is your wonderful investigation.
    Muthu

  • A question about Droid pre-order and contract status

    Hi,
    I preorded the droid from best buy the first day preorders were available. The person who handled my order didn't mention problems with my current contract status. My 2yr contract isn't up till 4/2010, and from reading here, it seems that best buy doesn't do the 1yr early upgrades.
    So when I go down to best buy on friday to attempt to pick up my phone what are gonna be my options?
    $599 retail price, or nothing? And so, will they refund my $50?
    Would they do the 1yr and $369 price, if they consider I put in over one year on my current contract and consider it a $1yr? (I read someone say this would be an option)
    Solved!
    Go to Solution.

    Who does best buy sell phones to if they don't offer upgrades? Just new customers and people with expired accounts?
    Can someone explain this post to me? http://www.howardforums.com/showpost.php?p=13177342&postcount=32
    According to the guy that posted that, he was orginally denied, like has been said here. but then the looked it up and told him they'd honor the 1yr early upgrade.
    To me, it just doesn't make much sense to not honor what verizon does.. cause you'd be losing lots of business. Anyone who is up for NE2, and denied honoring it by BB will just go to the verizon store, or order it online via verizons website. Anyone 1 year into their 2 year contract who is denied the 1yr early upgrade that verizon offers, and who doesn't care much about waiting for their $100-$50 NE2 discount will again be forced to buy elsewhere cause BB turns them away.
    I'm not trying to make threats that BB needs to change. Just trying to draw attention to something that makes no sense to lots of customers. And would like someone to actually look into this again, since it seems to vary from store to store, clerk to clerk.

  • SRM Contract Catalog - Creation

    Hi,
    I am working with a customer on SRM 5.5 /CCM 2.0.
    We need to have product and contract catalogs in our system.
    1) Do we necessarily need to have <b>CCM on another client</b>?
    2) We have initialized CCM with the /ccm/ccm_initialize report. After we run the BBP_CCM_TRANSFER_CATALOG report SRM Product Catalog gets created. <b>How does the SRM Contract catalog get created</b>? Is there a separate report for that?
    4) <b>Do we necessarily need XI</b> for my scenario?
    Any helpful answers would be greatly appreciated.  [and rewarded, ofcourse :-)]
    Thanks and Regards,
    Waheed

    Hi Chris,
    Thanks a lot for the reply.
    Couple of associated queries.
    <i>1) XI configured and the business scenario MasterDataInclusion set up.</i>
    Yes, it is set up for us.
    <i>2)A logical system entry for CCM defined as a backend system with type Cataloge.</i>
    We have CCM on the same client as the SRM EBP. So, we have already defined this client logical system as <b>Local B2B</b>. I cannot define the same logical system again as type CATALOG. So, should I create a dummy entry for this CCM backend system.. without any client assignment that is?
    3)We dont have a supplier catalogue scenario. Only Product & Contract Catalogues.
    When I executed the BBP_CCM_TRANSFER_CATALOG first time a SRM Product Catalog got created. Is the contract catalogue expected to be created then itslef?
    Because, after we release our contracts there is no contract creation/updation happening in the CCM. Is the contract catalogue expectd to be created the first time we release any catalogue with the tick on?
    Everytime we release a conract an error log is being generated for a user WF-BATCH with message
    "Recepient not found.
    The error ocurred by processing event RELEASED_NEWLY with GUID 70D3DB446F7CEC36E10000000A0000E8 and object_id= 5000000213" [5000000213 is our contract number"
    Is this relevant to my problem? What is the issue here?
    Thanks a lot again for your patience.
    Regards,
    Waheed

  • Mapping SRM Contract fields

    Hi experts,
    image the folowing situation:
    You have to replicate a contract from SRM to backends passing through XI.
    Can you please provide me a list of standard fields contained  in SRM contract replicable to SAP backends without too many mapping problems?
    Thank you very much!

    these links ll help u
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/33/5d1d9b1d7a11d2a59a0000e839c3d0/frameset.htm

  • 'Add Approver' is inactive for SRM contracts

    Dear colleagues,
    We have deal with SRM 5.5. The point is that the button 'Add Approver' is inactive for  'Approval Preview'.
    This issue regarding SRM contracts. Does anybody know how to activate usage of "add approver"  during approvement  of a contract.
    Many thanks in advance for your help.
    Kind regards,
    Grygoriy
    P/S
    I've had a look at  notice 'ADD Approver/Reviewer buttons are disabled'  by  N M Poojari ( ADD Approver/Reviewer buttons are disabled), unfortunately, author didn't point to solution of his problem. So, I'll appreciate more detailed  plan of actions.

    Thanks, Siobhan, for your reply.
    However, the problem was caused by my attempt to  to do the following steps with a wrong WF (instead standart workflow for contracts (WS14000148) we use Z-flow) :
    PFTC -> Select workflow template ->  workflow you are using -> Display -> Additional data ->
    Agent Assignment -> Maintain -> Attributes -> Select radio button
    'General Task'. -> The problem is solved
    Yours faithfully,
    Grygoriy Gavrylyuk

  • Benefits SRM contracts compared to MM contracts

    Hello,
    As I'm pretty new in the SAP world (just passed my EBP 5.0 certifcation), I hope someone can help me with the following:
    What are the benefits and differences of SRM contract management compared to contract management in MM?
    Many thanks!
    Jennifer

    Hi Jennifer,
    EBP contracts are used extensively in the sourcing application. When price determination comes into picture, these are selected first. This can also be used during requesting temp labor. All the MM function are available, release orders can be created. Release doc is saved. One imp thing is, you have a chance to work with version controls that can also be linked to workflow and can also be compared at any time to find the status.
    Alert events can be triggered from BW via workflow..
    Also you have a chance to work with GOA.
    Any many more...
    Let me know if you need more info..
    BTW MM sourcing is very limited. Very difficult to trace the overrun.

  • SRM Contracts

    Is there any table(s) from which I can download the contracts?
    I use the Download Contract button to download to Excel but the Unit of Measurement (field between Product Type and Price in Item Data) is missing during downloads using the single contract download or bulk download. I checkup the notes but none of them pertain to this problem.
    Is there any workaround to accomplish this hence the question about can I directly access and table and download.
    We are on SRM 5.0.
    Thanks

    Hi
    <b>Please go through these pointers and links as well.</b>
    <u>Refer to Function module - BBP_PD_CTR_CREATE / BBP_PD_CTR_CHANGE
    Tcode BBP_PD is a wealth of knowledge. you need to select proper object type from the drop down and enter the relevant Object number and execute.On the next screen in the details double click on each separate node and it will take you to table and display the records, There are vaiorus object type like Shopping cart, PO Contract, Bid etc</u>.
    <b>Other related links -></b>
    <u>Re: SRM and MDM for material master in SRM contracts for multiple R/3
    Re: Purchase Contract creation in SRM
    Re: Upload Contracts
    What is the name of BAPI or Function module to change and cacel the SRM PO
    Initial Uploald of Contracts from ECC to SRM 5
    Uploading contracts into SRM from flat file...
    Re: SRM Contract Download - Multiple contracts in one shot
    Updating SRM contracts from backend R/3 to SRM.</u>
    Hope this will help.
    Regards
    - Atul

  • Two load errors for a standard SRM Contract ODS

    We've just installed standard business content for SRM Contract ODS.  The standard InfoSource we installed is 0BBP_TD_CONTR_1.   Two loading errors occur:
    1st error:
    No return value <> 0 allowed in update routines in transfer mode     
    Diagnosis
    The return code was set to <> 0 in routine 'r0063_0SR_TARGVDC ', but the corresponding data field is updated with MOVE. You therefore can not prevent the update of a single data field for certain key values.
    System Response
    The load process is terminated.
    Procedure
    When you update with MOVE, you do not have to update all the data records. In this case you should use a start routine in the update rules in which you delete the data records that you do not want to update from    table DATA_PACKAGE. Set the return code for all routines affecting a data field that is updated with MOVE to 0 (also the corresponding key field routines).
    Procedure for System Administration
    2nd error:
    Error converting currency to standard currency (see long text!)     RSBCTBBP     
    Diagnosis
    Record number 1 : Error during currency conversion to standard currency.
    The currency JPY of field 0OUTAGTARGT could not be determined.
    Procedure
        Possible causes are listed below:
        - Could not find currency tables RSCURTRT or TCURR
        - Could not determine conversion date
        - Could not find an exchange rate for currency JPY in table TCURR
        Check the erroneous data record, currency unit, and date.If all data is
        available, check whether the standard currency was created correctly.
    You can change it in transaction <rscur> by changing the settings for InfoObject 0SR_DEFCUR.
    Furthermore, the global settings must be transferred from the source system in order to get the currency keys of the currencies (maintained for currency JPY in table TCURR). Use transaction <rsa1> to transfer the global settings. Select 'Source Systems' and choose the entry 'Transfer Global Settings' for the respective source system.
    Note: we've transfer the global settings at currency from our SRM source system already, but we still get the same error msgs.
    Any idea/solution?
    Thanks

    Hello All,
    As I have already mentioned the condition types in SRM are identically matched to ERP condition type hence the data is flowing correctly and even the idoc has the z-condition type Z123.The IDOC in backend ERP has status 53.
    On trial and error method we did unchecked the manual indicator check in the pricing schema for the relevant condition type and because of that now the Z-condiiton type can be seen in the backend ERP contract.
    If the indicator was checked, this means that this condition can be maintained only manually (directly in the transaction
    ME32K in ECC) and nothing can be transfer from other source.
    Note: If the same condition type is being used in more than one pricing procedure then ensure that the check bok is unchecked for agianst the relevant condition type.
    Thanks,
    Yatin

  • Download of SRM Contracts in Excel - Unit of Measurement Missing

    We are using SRM 5.0 in Extended classic mode.
    I downloaded the SRM contracts in Excel. One field that is missing is the Unit of Measurement at the Item Level (On the Basic Data Tab). Anybody having any clue how this can be taken care of ?
    I tried both individual download and bulk download.

    Hi
    <b>Please go through following SAP OSS Notes which will help  -></b>
    <u>Note 859049 SRM 5.0: Restrictions for uploading and downloading
    Note 673479 - Excel download: Quantities not displayed correctly
    Note 790860 - Frequently asked questions for Excel upload and download
    Note 734946 - SRM: Restrictions for upload and download
    Note 812884 How to change the fields used for Excel Up- and Download
    Note 673479 Excel download: Quantities not displayed correctly
    922328 Upload: Product category change is not checked
    921258 Upload: Old name displayed after changes to the partner ID
    921302 The scales of cond is not arranged in proper order in excel
    876176 Mass upload: Terms of payment not accepted
    813114 Missing parameter in BAdI BBP_PD_DOWNLOAD methods
    810646 Excel upload & download: Incorrect partner type in download
    809437 Problems uploading and downloading documents
    741837 SRM Upload & download: Conversion of amount fields
    734946 SRM: Restrictions for upload and download
    Note 653283 Contract: Excel sheet does not open in separate window
    Note 641621 Language of the product description in contract items</u>
    Regards
    - Atul

  • New buttons on SRM contract screen? (+)

    Hello,
    I'm asked to add specific button into the SRM contract screen (BBP_CTR_MAIN transaction). I've been trying to use BBP_CUF_BADI, but achieved none - my customer screen is not displayed at all. However it is called - I've checked it using the debugger. What am I doing wrong?
    Thanks in advance.

    Hi Cyrill,
    Please go through the following lnks,
    Add a new button to BID Invitaion
    Add customer button to check status screen
    Hope it helps.
    Thanks,
    Pradeep

  • Updating SRM contracts from R/3 to SRM....

    Hi all,
    I am working in SRM, my requirement is to update the SRM contracts from R/3 to SRM and if any changes happen in R/3 contracts (previously updated contracts to SRM) then it should replicate those changes in SRM contracts also.
    I found the program BBP_CONTRACT_INITIAL_UPLOAD (This program can be used to upload contracts from ERP to SRM. A separate contract in SRM would be created for each successfully transferred ERP contract.)
    My question is, so if any changes happen in R/3 contracts it should update SRM contracts also.
    Please let me know the solution how to solve this?
    Highly appreciated any kind of help..
    Thanks
    Rajesh.

    Hi Rajesh,
    I think that your scenario is very risky as there is no master system for contract : one time it is srm and after it can be r/3 !
    Besides this comment, you can search the forum and find some threads for contract replication in both ways (but no activated in the same time...)
    Kind regards,
    Yann

  • SRM and MDM for material master in SRM contracts for multiple R/3

    Dear all,
    my question is:
    We are implementing SRM 4.0 in classic scenario with multiple R/3 back-end and we want to set-up Global Outline Agreements in SRM in a multi-backend environment where the Material Master are not harmonized.
    We heard that MDM and COntent Integraton can be a solution.
    Then detailled question is:
    Can we have 2 material numbers (e.g. ABC and XYZ) in 2 different R/3 systems refering the same product.
    Have the mapping done in MDM (Content Integrator?) to a third material number:123
    Replicating the material master 123 to SRM from MDM(?)
    Create global Outline Agreements in SRM for Material Master 123.
    Distribute the GOA as Outline Agreement to R/3 system 1 with the translation to ABC and to R/3 system 2 with the translation XYZ, all of that during the distribution step (or another).
    Have the call-offs quantities correct on 123 in SRM and BW?
    IF yes, how is it working, do you have some documentation discribing the scenario and the config steps to do?
    Thanks in avance

    Hello RD,
    That's a good question.
    You are on the right way. MDM is the tool for you.
    But..
    Content Integrator (CI) was first developped for Shell, to address the need of cross-referencing of material/supplier/category IDs, for:
    - reporting purpose (actual Spend Analysis)
    - mapping purpose (send of XML PO)
    CI was later "fusionned" into the new MDM (1.0) solution.
    So now, you can not order CI without MDM (even if some SRM slides still present CI).
    But mapping API where developped for all inboud/outbound interfaces in SRM, for materials only (good luck for you).
    You will find everywhere this piece of code:
      Call ECI
        CALL FUNCTION 'BBP_PRODUCT_MAP'
          TABLES
            it_input          = lt_mapping_in
            et_output         = lt_mapping_out
          EXCEPTIONS
            logsys_not_found  = 1
            driver_not_found  = 2
            product_not_found = 3
            internal_error    = 4
            OTHERS            = 5.
    So it is ok, you have the mapping call, but I don't know if all the rest of the process was really "finalized" (call of API mapping in CI, via XI). I personnaly never used it, but I assume it should work.
    I my opinion your process is supported by SAP:
    - Extract materials from both R/3 and consolidate them as a single product in MDM.
    - Distribute this product into SRM.
    - Maintain contracts on those products.
    - Distribute them to R/3 (The ECI call is also used during contract distribution).
    - Call offs corrects in SRM and BW
    For MDM documentation, look at netweaver area of service.sap.com.
    For MDM/SRM integration, look at SRM 4.0 spend analysis:
    https://websmp206.sap-ag.de/~sapdownload/011000358700004424262004E/GlobalSpendOverview.ppt
    For SRM contract distribution, call-offs, BW, look at SRM in details in service.sap.com/srm/SRM4.0:
    https://websmp206.sap-ag.de/~sapdownload/011000358700001966382004E/contracten.ppt
    For SRM5.0, see online help on help.sap.com.
    Rgds
    Christophe

Maybe you are looking for

  • ENVY 120 will not copy or scan

    I unpacked my new ENVY 120 yesterday. I can print OK. Although on one occasion, printing 2 pages per sheets in duplex, the second side was unreadable. Tried again and the output was satisfactory. The issue I have is with copy which should be straight

  • Purchase order not appearing as commitment for next fiscal year in KOB2

    Hi Experts Any help on this is highly appreciated.Our Fiscal year 2008 is ending on 27th september and fiscal year 2009 will start on 28th September. We have some purchase orders created with delivery date as 30th september which falls into next fisc

  • IOS 4.3 constantly dropping calls

    I updated to iOS 4.3 about 2 hours ago. Before updating, I had maybe 1 call drop every few weeks. Since updating.. I'm checking my call log to be accurate.. What should have been one 24 minute call was broken up into 16 calls because it kept dropping

  • How to create reports using jDeveloper

    what procedure to follow in order to creating reports drawn from mysql or Oracle 8.5.0 database.

  • Wi-Fi Menu below Airplane Mode Touch is not working

    Hi Every body i am using iPhone 4 and i am having a problem with it's WI-FI when i tries to click on SETTINGS>Wi-Fi it's not entering in wifi menu option or not even touch works on this menu when i tries to touch it sometimes it goes in Airplane mode