SRM Local Contract Dumps when same material exists in multiple backend systems

Hi All,
We have a scenario of two backend systems connected to SRM system.
Materials are created with the same number in both the ECC systems and replicated to SRM system .
Materials are  updated in COMM_PRODUCT in SRM with the respective logical system.
But when we  creating a local contract by adding the same material system is throwing a dump .
system is not able to recognize the logical system for the material and material group linked.
Please let me us know if you have faced any such issue
Thanks
Rajesh

Hi Rahul Nazar,
RFC connections are working fine for both the logical systems.
Please find the dump details below :
Error application is coming up.
20140429
TP418
161636
r3cap
https://r3cap.XXXXXXXXXXXXX.net:8101/sap/bc/webdynpro/sapsrm/wda_l_fpm_oif
GETWA_NOT_ASSIGNED
Field symbol has not yet been assigned.
Function: CONVERSION_EXIT_PRID1_OUTPUT of program SAPLCOM_PR_CONVERSION
Method: ADD_FROM_BLANK_LINES of program /SAPSRM/CL_CH_WD_DOTM_CTR_ITEMCP
Method: PROCESS_BLANK_LINES of program /SAPSRM/CL_CH_WD_DO_MAPPER====CP
Method: PROCESS_BLANK_LINES of program /SAPSRM/CL_CH_WD_MAP_DO_TREE==CP
Method: /SAPSRM/IF_CLL_MAPPER~UPDATE of program /SAPSRM/CL_CH_WD_DOTM_CTR_ITEMCP
Method: FIRE_EVENT_UPDATE of program /SAPSRM/CL_CH_WD_XO_MAPPER====CP
Method: /SAPSRM/IF_CLL_XO_MAPPER~FIRE_EVENT_UPDATE of program /SAPSRM/CL_CH_WD_XO_MAPPER====CP
Method: /SAPSRM/IF_CLL_BO_MAPPER~FIRE_EVENT_REFRESH of program /SAPSRM/CL_CH_WD_BO_MAPPER====CP
Method: ONACTIONON_ENTER of program /1BCWDY/P8BFGBR5XZLSDCQM136Z==CP
Method: IF_WDR_VIEW_DELEGATE~WD_INVOKE_EVENT_HANDLER of program /1BCWDY/P8BFGBR5XZLSDCQM136Z==CP
Thanks
Rajesh Kalva

Similar Messages

  • SRM Local Contracts - Price Conditions

    Hi,
    We are trying to extract the price conditions from the SRM Local Contract line items, with the Condition Type, Valid From, Valid To, Amount, Price Unit, Unit.  This is to allow us to track the changes in contract prices.
    If you have any experience of this, or know which SRM tables we need to be extracting from it would be greatly appreciated!  We already have the Contract Header and Line information from CRMD_ORDERADM_H, CRMD_ORDERADM_I, BBP_PDHGP and BBP_PDIGP.  Where are the conditions stored?  And are there any extractors planned for this in the future?  It would be very useful standard content.
    Thanks.

    Hi
    Few BADIs to refer using SE18 Transaction (Please read standard documentation provided by SAP on them )
    BBP_IMS_CONTACT                Changes the Contract for the E-Mail
    BBP_CTR_INIT_UP                Contracts and GOAs to SRM
    BBP_CHANGE_SF_CTR    Change Smart Form for Contract Output              
    BBP_CND_UI_CTRL      BBP Conditions: UI Control                         
    BBP_CTR_BE_CREATE    Exit when Creating a Contract in the Backend System
    BBP_CTR_INIT_UP      BAdI to upload Contracts and GOAs to SRM           
    BBP_CTR_MAIL_BADI    BAdI for Changes Regarding Sending Mails           
    BBP_CTR_MASS_BADI    Implementation of Mass Change Parameters           
    BBP_CTR_STAT         BAdI to enable changes in the contract status      
    BBP_PROCESS_CTR      Process Smart Form with Changed Interface          
    BBP_QA_REDETERM_CTR  Redefine the Contract to be Used (Quota Arrangement)
    <b>Please go through these links -></b>
    http://help.sap.com/saphelp_srm50/helpdata/en/58/2a8442a07b0e53e10000000a155106/content.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/6d/1e8442a07b0e53e10000000a155106/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/fd/dc804258544b76e10000000a155106/frameset.htm
    Regards
    - Atul

  • Getting dump when you hire an emp in Development system

    Hi,
    We are getting an ABAP dump when we hires an emp in development system where as the dump is not coming in Quality system. Kindly suggest any config settings need to changed.
    Please find the dump below for reference:
                                                                                    Error analysis                                                                               
    An exception occurred that is explained in detail below.                                
         The exception, which is assigned to class 'CX_HRPA_INVALID_PARAMETER', was not          
          caught in                                                                               
    procedure "RESOLVE_EXCEPTION" "(FORM)", nor was it propagated by a RAISING              
          clause.                                                                               
    Since the caller of the procedure could not have anticipated that the                   
         exception would occur, the current program is terminated.                               
         The reason for the exception is:                                                        
         Invalid parameter EXCEPTION, value                                                                               
    The occurrence of the exception is closely related to the occurrence of                 
         a previous exception "CX_HRPA_INVALID_INFOTYPE", which was raised in the                
          program "CL_HRPA_INFOTYPE_FACTORY======CP",                                            
         specifically in line 18 of the (include) program                                        
          "CL_HRPA_INFOTYPE_FACTORY======CM004".                                                 
         The cause of the exception was:                                                                               
    Infotype 0529 not permitted                                                                               
    Rgds
    Kumar

    Hi,
    Maybe specific to your master data maintainance, as it is working inQS1.
    Regards
    Team Member.

  • WD Exception when pointing ESS Travel & Expense to multiple backend systems

    Hi All,
    I have a query regarding ESS Travel Management pointing to multiple backend systems.
    ESS MSS is installed on a single portal(Portal1).
    ESS MSS is currently pointing to Backend System1. The requirement is that ESS Travel from Portal1 should point to various multiple Backend Systems therefore making ESS Travel region-specific.
    Is this possible? and if so what are the pros and cons?
    This is what I have attempted:
    1. Followed the documentation from "Multiple Back End Support for the Adaptive RFC Model" [http://help.sap.com/saphelp_nw70/helpdata/en/af/84a34098022a54e10000000a1550b0/frameset.htm]
    Therefore, I created 2 JCOs namely: SAP_R3_Travel_R1 and SAP_R3_Travel_MetaData_R1 pointing to Backend Sytem 2. SSO and JCO tests successfully.
    2. On the iview properties for ESS Travel & Expenses, I added the following to the Application Parameters: sap-wd-arfc-useSys=SAP_R3_Travel:_R1&sap-wd-arfc-useSys=SAP_R3_Travel_MetaData:_R1
    3. I additionally created a system in the Portal under  System Configuration pointing to Backend System2 and adding the SAP_R3_Travel_R1 as the default System Alias. Do I need to add SAP_ITS_XSS and SAP_WebDynpro_XSS system alias, if so how since it is seeing as redundant because it is added in the system I created for Backend System1.
    4. I then tested one of the ESS Travel & Expenses iviews. I have the following error:
    Accessing System XYZ is not possible because RFC Metadata was retrieved using System ABC. Please assure you have configured the RFC Connections properly. A Server restart may be necessary!
    Your help is appreciated.
    Thanks.
    RD

    Hi,
    Can you please share the solution you got for this problem as we are also facing the same kind of problem.
    thanks
    Gaurav

  • SUS - Multiple backend systems (MM & SRM)

    Hi
    I am implementing a SUS client linked to both SRM (seperate client) and MM.
    SAP refer to this as the 1:n scenario http://help.sap.com/saphelp_srm50/helpdata/en/cd/0e343e47fd6b2ee10000000a114084/frameset.htm
    All interfaces are working correctly except for SUS PO confirmation --> Backend.
    For MM-SUS the PO confirmation message route is:
    SUS to PI - PurchaseOrderConfirmation_Out
    PI to ERP - ORDRSP.ORDERS02 idoc
    For SRM-SUS the PO confirmation message route is:
    SUS to PI - PurchaseOrderConfirmation_Out
    PI to SRM - PurchaseOrderConfirmation_In
    The problem we have is getting PI to send the appropriate message back to the appropriate backend system.
    Has anyone implemented this scenario?
    If so can you explain how PI deals with this?
    Do we need 2 interfaces in place?
    Thanks
    James
    Edited by: J-Wilson on Jan 19, 2012 1:25 PM

    thats something to do with PI.
    they get source XML from SUS. and in PI after deciding target system they have to decide the target. I dont have that much knowledge on PI but i know that they have a place in the integration builder to pass the condition for a field from XML. according to that they need to decide the target interface..
    i think SAP must have provided guidelines for PI to configure for SUS.

  • SRM Local Contract Mass update

    Hello,
    We are in SRM 4.0 and working on local SRM Contract.
    Now we want to update the validity in these contract, but as there is no way to perform mass change to these contract.
    Is there any way we can update the contract validity period at the header level and also at the Item Condition level.
    Thanks & Regards,
    Hitendra

    Hi
    It is not advisable to update contract validity period as per the standard process.
    BBP_PD_CTR_UPDATE - You try this FM to update contract but i am afraid since you are trying to update the validity period.
    Use of expired contracts
    Validity period extension
    reagrds
    Muthu

  • ABAP Dump when executing tcode CATS_APPR_LITE for multiple selection.

    Dear Members,
    Issue:
    When executing tcode CATS_APPR_LITE for Time Approval from the remote R/3 by selecting multiple selections and click on Approve, if you get a dump saying CALL_FUNCTION_REMOTE_ERROR
    Analysis:
    If there is an SAP Note applied in 1368487 and at CALL FUNCTION CATS_CHECK _PTEXDIR FM getting the dump because in source system for this function module Remote Enabled Module option is not checked.
    To resolve this correction note 1430042 has to be applied.
    Regards
    Durga

    Dear Members,
    Issue:
    When executing tcode CATS_APPR_LITE for Time Approval from the remote R/3 by selecting multiple selections and click on Approve, if you get a dump saying CALL_FUNCTION_REMOTE_ERROR
    Analysis:
    If there is an SAP Note applied in 1368487 and at CALL FUNCTION CATS_CHECK _PTEXDIR FM getting the dump because in source system for this function module Remote Enabled Module option is not checked.
    To resolve this correction note 1430042 has to be applied.
    Regards
    Durga

  • Error when opening an existing report from BW system

    Hi All,
    I have Crystal Reports 2008.
    Service Pack 2.
    Fix Pack 2.2 (I also tried with fix pack 2.7)
    When I try to open a crystal report from a bw system it gives me error message : " An error occured while updating the report's parameter pick list.  " ..
    Do you have any idea how can I fix this ?
    Regards
    Ozan

    Post your question BEX and B1 and classic SAP data source issues to the Integration Kit forum

  • Using same Wildcard certificate on multiple SAP systems with same domain name.

    Hello All,
    Need urgent help.
    I have a WILDCARD SSL certificate in pfx format. I also have individual root certificate , primary certificate in text form.
    The certificate mentioned above is already active in one of our portal.
    We want the same certificate on ECC Production.
    What are the steps to import this certificate in STRUST?
    I believe no certificate response needs to be imported.
    I have a certificate response provided by Verisign. But STRUST says- cannot import certificate response'
    Please help.

    Hi,
    This is what i did for installing wildcard certificates:
    On the OS of the sap server, log in with the sapadm account.
    Open a command prompt:
    make a backup of your sec directory in drive:\usr\sap\<SID>DVEBMGS00\  (just to be sure)
    cd to drive:\usr\sap\<SID>DVEBMGS00\exe
    >sapgenpse.exe import_p12 =p SAPSSLS.PSE location\to\the\certfile.pfx
    It will ask you for the pin, and to overwrite the file, answer yes.
    Now copy the new SAPSSLS.PSE to a desktop that has sapgui
    Login with the sapgui and run transaction strust
    Select import from the PSE menu and open the SAPSSLS.PSE
    Then again goto PSE menu  and select Save As
    I saved it twice, once in System PSE  and then again in SSL Server
    For me SSL is now working without problems on a couple of servers.
    -small update-
    You can check internal servers using the certificate utility from digicert https://www.digicert.com/util/
    It has the option to specify port numbers, usefull for internal web services.
    Regards,
    Rolf

  • Security  issue when mi server interacts with multiple backend.

    hii all,
    i wanted to know that if suppose mi server is interacting with multiple backend then how to maintain application access
    security for differnt back end and how & where to customize or configure it.
    thanks in advance.

    Hi Dev,
    Every syncBo has a RFC destination which represent the target system (backend) on which the bapi wrappers for that particular syncBo resides. This RFC destination  is configured in the transaction SM59, which provides you with various secuirty configurations.
    For more info consult your basis consultant in this regards.
    Regards,
    Rahul
    If this helps, do not forget my points

  • SRM Upload contracts

    Hi,
    System details :
    ECS
    SRM 5.0
    ECC 6.0
    Please help me in finding out, How to upload Contracts (SRM) Locally...
    Do we need to write a Zprogram or is there a way to upload the contracts locally using any Function modules ?
    If so please provide me the code as well as the structure of the internal table..
    Points will be rewarded ...
    Regards

    Hi
    <b>Try using Function Modules -  B46B_CTR_CREATE for creation of contract.
    One helpful Note on contract.</b>
    <u>Note 646903 Global Ouline Agreement:Tips and tricks
    See note 734060, which provides you Excel macros to view the downloaded document.</u>
    <b>Sample useful code and links -></b>
    <u>Re: Upload new Contracts in SRM4.0</u>
    Re: Contract Upload to New System
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/CABFAISMM/CABFAISMM.pdf
    <u>Report - BBP_CONTRACT_INITIAL_UPLOAD
    You can use this report to upload the contracts and scheduling agreements from an ERP system to an SRM system. A contract or a scheduling agreement from the SAP backend system is uploaded to the SRM system as a contract or a global outline agreement (GOA), based on the transaction type customized in the SRM or SAP backend systems.
    If you want to upload R/3 contracts to SRM you can run the below mentioned report using SA38 and can upload the contracts in SRM.</u>
    <b>BBP_CONTRACT_INITIAL_UPLOAD</b>
    However any changes made in the contracts in R/3 after the upload will not get updated in SRM.
    Refer to this link for details.
    http://help.sap.com/saphelp_srm50/helpdata/en/6d/1e8442a07b0e53e10000000a155106/frameset.htm
    <b>Other SRM useful function modules for contract upload -></b>
    BBP_PD_CTR_CREATE
    BBP_PD_CTR_SAVE
    BBP_PD_CTR_CREATE
    Upload Contracts
    Re: Upload COntracts
    Do let me know.
    Regards
    - Atul

  • File.exists() returns false even when the file exists

    hi,
    the exists() function of java.io.File function returns false even when the file exists on the file system. why is this? i checked the path of the file which gives me the correct path, but exists returns false. can anyone help?

    post some of the code you�re using - then maybe I can help you out
    //Anders

  • One SRM integrated with multiple Backends

    Hi All
    Can One SRM be integrated with multiple Backends?
    If so any insights, documentation, pros-cons that can you all can share?
    Does the version of SRM or ECC matter?
    SRM version will be 7.0 and ECC 6 EP3.
    Thanks,
    Gamad

    Hi Gamad,
    multiple backend systems for one SRM is normal and works fine.
    You just need to connect the systems, replicate the materials/vendors you would like to use and maintain the SRM customizing:
    1) Add the further backend system(s):
    -> Supplier Relationship Management -> SRM Server -> Technical Basic Settings -> Define Backend Systems
    2) Define the scenario/follow-on document creation for the product categories
    -> Supplier Relationship Management -> SRM Server -> Technical Basic Settings  -> Define Backend System for Product Category
    3) Define the scenario/follow-on document creation for the product categories
    -> Supplier Relationship Management -> SRM Server -> Cross-Application Basic Settings -> Define Objects in Backend System (Purch. Reqs, Reservations, Purch. Orders)
    Regards,
    Peter

  • I'm try to buy a movie from iTunes with my I pad 3 and it tells me there is not enough local storage and when I go to my local storage there is a lot on free storage I also restarted my ipad but still the same prob what do I do?

    I'm try to buy a movie from iTunes with my I pad 3 and it tells me there is not enough local storage and when I go to my local storage there is a lot on free storage I also restarted my ipad but still the same prob what do I do?

    5GB is typically not enough space to download a movie.  Often, movies take from 3 - 5 GB to begin with.  The only option you have is to delete more things from your iPad.  You can remove unused Apps, pictures, music, text message (messages with pictures can take up a lot of space), email messages, books, magazines etc.

  • TS1363 My iPod Nano 7th Generation couldn't be detected by iTunes when I plugged in. I tried resolving the issue by uninstalling the iTunes and then install it back again but yet still the same problem exist. Can you please help me to solve this issue?

    My iPod Nano 7th Generation couldn't be detected by iTunes when I plugged in. I tried resolving the issue by uninstalling the iTunes and then install it back again but yet still the same problem exist. Can you please help me to solve this issue? I have already updated to the latest version of iTunes on my Windows 8 and I cannot synchronize my iPod for the time being. Please do help me to solve this problem. Thank You.

    uninstall all iTunes,5 programes,this worked for me after reinstall them

Maybe you are looking for