SRM PO Changes Error Status - Error in Process (SRM 4.0 and ECC 5.0)

Hi All,
I created PO in SRM from Sourcing (Shopping Cart) and it is replicated to Back End (ECC 5.0). But I did not post GR or Invoice Verication with reference to PO.
When I am trying to change PO in SRM (SRM Webbrowser - Processing PO) like Quantity, I am receiving the PO status as Error in Process.
Please let me know do I need to configure anything for this issue or need to implement OSS Note/BADI.
Thanks a lot in advance for helping me.
Best Regards,
Sudarsan

got solution

Similar Messages

  • How to change the status of a process chain

    Hi,
    I went through Siegfried's blog and knew how to restart a process chain at a failed step which doesn't have "Repeat" option.
    But is there any other function module through which we can change the "Actual State" of the process chain, in siggi's method we can change only the "i_state" of a particular process but not the "Actual State"(refer to RSPCPROCESSLOG table) of the process chain.
    Please do give your suggestions if there is any way to change the "Actual State" of a process chain.
    Regards

    hey Vamshi,
    We can directly change the status of the process chain.
    there is a specific way to do it, you can go in se38 and change the status from one to another ...go to se38 .... type....rspcprocessmonitor*.........presss f4...
    you will get a standard program ..
    now go to this program ...and give the set of inputs .... like PID and all from RSPCPROCESSLOG table ..
    and in the state give the state you want and press f8.
    this should work.
    Assign points if it answers your queries.
    Thanks,
    Dennis

  • PO Output is possible for SRM PO's in status Error in Process

    Hello All ,
    We have a requirement, where system should not process the PO output when the PO is in u201Cerror in transfer status u201C .
    While creating the PO -> If the SRM PO is in Error in Process status, output will be processed and its sent to vendor also.
    Since Error in Process status in business point of view consider as error free PO but fails to transfer the PO to back-end due to some technical or customization.
    While changing the PO -> if the SRM PO is in Error in Process, We can stop the process the output with the help of OSS Note 1324180 which has been already implemented.
    Can anybody tell me how can we achieve this . Any pointers. We have also tried with condition based output workflow start conditions also .but it couldnu2019t work .
    Thank you
    Bharathi

    Dear Expert,
    Please check in RZ20 what specific error is being shown and accordingly either error message can be changed to warning message or customization should be done so as to replicate the PO into backend.
    Thanks and Regards,
    Sathya Kumar.

  • Error "Status change from READY to COMMITTED is not allowed"

    Dear experts,
    once again SAPs workflow environment drives me crazy with mysterious error messages.
    Some time ago I posted a question here concerning the problem that I cannot put back a workitem by using function module SAP_WAPI_PUT_BACK_WORKITEM due to a lock on this workitem which has been set right after it has been double clicked in the business workplace workflow inbox:
    [How can I put back a workitem before I'm back in the business workplace?;
    Since I do not want to dequeue the lock for the workitem in my application (where the user finds the appropriate detail information along with the function buttons for approval, rejection and F3/BACK) I tried it with calling a POPUP_TO_CONFIRM ("Do you want to put back the workitem?") directly from within the BO-method, right after returning from the FM that called my application. From here (the popup then shows in front of the business workplace instead of the application) the locking doesn't seem to be a problem any more! But whatever I do after the users decision to put the WI back - calling the FM SAP_WAPI_PUT_BACK_WORKITEM or trying to leave the method with macro EXIT_CANCELLED - leads to the error message "Status change from READY to COMMITTED is not allowed" and the workitem changes to status ERROR, too. This message seems to be bull***t, since the status of the item is supposed to go back to READY.
    Does anybody have experience to help me on that ?
    Thanks in advance
    regards
    Andreas

    Hello Andreas,
    Ah, sorry, there was so much talk about user decisions that I assumed you were using a standard decision task.
    Still, I would be extra careful of changing the way workflow usually works because you have an unknown target audience that are based on the standard.
    The standard SAP philosophy is quite simple: cancel/F3 or do nothing and it stays reserved. If you do not want it reserved, you need to perform an action. This is based on a majority of processes: in most cases when you execute a work item you will also be the one who is going to completed it. Replacing it is the lesser used of the two alternatives, therefore it is the only one that requires an action on the part of the user.
    Again, this is intended as constructive input. Strange quirks and unusual behaviour tend to add a black mark to software if they do not make things easier to use. In many environments users are not even aware of the reserve/replace business, so there you would be adding an additional layer of complexity.
    Personally I would find an exit popup annoying as a regular workflow user - regular decisions can be approved with one click, or I can back out with a single click if I need to make a phone call or look up some info before approving - but with this new-fangled thing I've got an extra button to click and an extra thing to think about. This is especially the case in a payment approval scenario where you may have users in some departments who may approve hundreds of payments each week.
    My suggestion would be to leave it like that. By all means put an option into the user decision to put it back or to 'un-reserve' it (and loop round if the user chooses it). That way you are adding value and not clicks.
    Cheers,
    Mike

  • Error message without error status matching

    Hi Gurus,
             I have a error message from process chain as follows:
    Failure Group EREC01 Special FULL - Job 1                                                                                Process Group EREC01 Special FULL - Job 1 Of Type Local Process Chain Has Status Ended with errors (Process Chain Encapsulate EREC01 GRP)                                                                                It is now 21:19:54 on 05/05/2010 (time zone PST)                                                                                Current Process Chain Run: D80JW1WN91Q0OEZ3K0ZGF3MS5 in System BIP (Host biprd03)                                                                               
    but when I get into rspc to check the status for this running, it shows green for status in the log view. why does this error message come up without any error status matching?
    Many thanks

    Hi,
    Please check if your are looking the correct process chain and in correct transaction. you may look at the logs of this process chain in RSPCM and not in RSPC.
    If you can not find this error status message in RSPCM, them check SM37 and SM12 by providing the proper timeinterval for the message you got.
    Regards,
    Pratap Sone

  • Process chain / DM error in 'Modify dynamically' process

    Hello experts,
    I try to run the following how to : "move date between applications using Data Manager ..."
    Yon can find the pdf here : http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/b0480970-894f-2d10-f9a5-d4b1160be203
    I'm looking after someone who used it successfully, on my side after implementing all steps and running the package I get the message "IMMEDIATE RUN: Request to run the package on the server was successful The package is now running"
    When I look the log for the process chain, overall status of the process chain is yellow, and steps "modify dynamically" and "clear BPC Tables" are in error.
    I can't get any usefull error messages.
    Thx....D

    Hi Deepak,
    We are experiencing a similar issue while trying to Light optimize one Application.  The step "Clear BPC Tables" stays in red status, in addition to "Plan mode on" process.  The Application Set has three applications, but this issue only happens regarding one of them.
    Have you found a solution from SAP to this problem or any workaround?
    Regards,
    Maximiliano

  • Error in PAYE Incoming Process (E-filing GB)

    Hello Everyone,
    I was wondering if some one could help me in identifying the PAYE: Incoming process ( E-filling for Gerat Britain) error. We have configured both outgoing and incoming process in efiling using Business connector 4.7.
    When user was trying to run program RPUEFI_START_POLL from SE38 for retrieving P6, P9, P6B,SL1 and SL2 forms online we stuck up with error " The process has stopped with error status:Error in communication" also we found detail log in PB2A transaction saying that
    PAYE:  Incoming forms  HELPDESK
    Polling from Government Gateway
        System failure [B2BSERV.0026.9201] Unknown service: GBOUTCOM
        ING:HR_GB_EF_BC_DPS_REQUEST_TOKEN 1
        Polling is over.
    I have verified all RFC connection settings in BC aswell as in R/3. Every thing looks fine.Also please note that outgoing process was running successful only we had problem with incoming process.
    Please share your ideas if some has ever experienced this issue before.
    Thanks & Reagrds,
    Vinod

    Hi Vinod
    The above error potentially relates to E-FILING Package being applied incorrectly.
    Check it was installed as follows
    Check you have the latest package                                                                       
    Check the directory where  "SAP_Efiling_46C_and_above.zip" needs to Copied      
    ,,->\sapbc47\Server\replicate\inbound (BC Server Directory on the Hard
    Disk )                                                                               
    Then in the Business Connector                                                                               
    1. Goto : Packages > Management > Install Inbound Releases            
    And select SAP_Efiling_46C_and_above.zip and install                                                                               
    2. Then in Package List you should see  the Package : SAPGBEfiling ( If
    not kindly Logout and Login)                                                                               
    3. Goto : Packages > Management > SAPGBEfiling > Services and you should
    be able to see the following services ,                                                                               
    GBINCOMING:HR_GB_EF_BC_DELETEMESSAGE                       
       GBINCOMING:HR_GB_EF_BC_GETMESSAGEBOX                       
       GBINCOMING:HR_GB_EF_BC_GETMESSAGEDETAIL                    
       GBINCOMING:HR_GB_EF_BC_LOGOFF                              
       GBINCOMING:HR_GB_EF_BC_LOGON                               
       GBOUTGOING:HR_GB_EF_GZIP                                   
       GBOUTGOING:HR_GB_EF_SUBMIT                                 
       Incoming.SecureMailAPISoapPort:DeleteMessage               
       Incoming.SecureMailAPISoapPort:GetMessageBox               
       Incoming.SecureMailAPISoapPort:GetMessageDetail            
       Incoming.SecureMailAPISoapPort:Logoff                      
       Incoming.SecureMailAPISoapPort:Logon                       
       Outgoing:gzipGBEfiling                                     
       Outgoing:submitR3xml                                       
       sap.util.hashtable:get                                     
       sap.util.hashtable:put                                     
       sap.util.hashtable:remove                                                                               
    This means the Package has been correctly installed.          
    Alternatively check the user credentials are correct and defined in V_T5GCREDTIALS
    or indeed try the latest BC core fix available
    Please also check you have defined the correct URLS
    Test URL                                                              
      https://www.tpvs.hmrc.gov.uk/dpsauthentication/dpsauthentication.jws
      https://www.tpvs.hmrc.gov.uk/dps/dps.jws                                                                               
    Live URL                                                              
    https://ws.hmrc.gov.uk/dps/service                                   
    https://ws.hmrc.gov.uk/dpsauthentication/service                    
    Best wishes
    Stuart

  • Change in status network For superseded and obsolete Status

    Hi All
    Users are incorrectly changing the status of Controlled Documents from Superseded (SU) and Obsolete (OB)…….. to Cancelled (CA).
    SAP DMS Process should not allow Controlled Documents that are status Superseded (SU) or Obsolete (OB) to be changed to status Cancelled (CA).
    According to me Cancelled status can be attend at any stage. there is no Configuration like excluding Cancelled status from any 1 of the status.
    kindly suggest on this Issue as how we can Approach on this
    Thanks in advance

    Hi Shankar,
    I guess you can do this from SPRO.
    project systems>>Structures>>Operative Structures>>Work breakdown Structures
    Check if you can do this in WBS User status and Create project profile.
    Regards,
    Gautham Paspala

  • Just down loaded 10.8.5 and now secret files won't allow me to change document status

    Just down loaded 10.8.5 and now secret files won't allow me to change document status.

    Just down loaded 10.8.5 and now secret files won't allow me to change document status.

  • FM to change the status od DSO Request

    Hi All,
    I need a Function Module (FM)  to change the status of the request in the DSO and subsequently able to delete that request.
    As I am unable to delete a request manully form the manage tab.
    Regards,
    Mayank

    Hi Dennis,
    Thanks your your reply.
    I tried giving the IP technical name and the requets ID. Nothing is happening.
    It remains in the same state. Any other pointers.

  • SRM PO Status "Error in Process"

    Hi,
    SRM 3.0 Extended classic scenario
    EBP Purchase order goes in to Status "Error in process" after making some ammendments.
    Getting following error
    1) EEP\Business to Business Procurement(100)\...\Purchase Order\Backend application errors
    2)Business to Business Procurement(100) Purchase Order Backend application errors ACTIVE PurchOrder xxxxxxxxxx: Please specify a valid account assignment
    3) Business to Business Procurement(100) Purchase Order Backend application errors ACTIVE Purchase order xxxxxxxxx: Instance xxxxxxxxx of object type PurchaseOrder c ould not be changed
    Can you please suggest what are the setting i need to check, actuallly the changes is not reflecting in to backend.
    Thanks,
    Jairaj

    Hi,
    Thanks for reply,
    It is a service purchase order and changes made to them is delete and undelete  the service line items not updating in to back end,
    below is details fo error log.
    1) javascript:displayTools('bbpadm_poappli/!?PARAM1=CE5C79FAF918944F9F4F968D8CF25D9E&PARAM2=6500010389&PARAM3=Pleasespecifyavalidaccount+assignment&PARAM4=BBP_PD_PO_TRANSFER_EXEC&alert_ALSYSID=EEP&alert_MSEGNAME=SAP_CCMS_esccebp_EEP_00&alert_ALUNIQNUM=0002283846&alert_ALINDEX=0000001660&alert_ALERTDATE=20090206&alert_ALERTTIME=092614&alert_DUMMYALIGN=&alert_MESSAGE=PurchOrder 6500010389: Please specify a valid account assignment&CTR_URL=test1', 'tools')
    2.     javascript:displayTools('bbpadm_poappli/!?PARAM1=CE5C79FAF918944F9F4F968D8CF25D9E&PARAM2=6500010389&PARAM3=Instance6500010389ofobjecttypePurchaseOrderc&PARAM4=ouldnotbe+changed&alert_ALSYSID=EEP&alert_MSEGNAME=SAP_CCMS_esccebp_EEP_00&alert_ALUNIQNUM=0002283847&alert_ALINDEX=0000001659&alert_ALERTDATE=20090206&alert_ALERTTIME=092614&alert_DUMMYALIGN=&alert_MESSAGE=Purchase order 6500010389: Instance 6500010389 of object type PurchaseOrder c ould not be changed&CTR_URL=test1', 'tools')
    Please advice.
    Regards,
    jairaj

  • Process chain failed with Error-Status Change of Process ABAP ZL321NIMIMUUT

    Hi,
    process chain got failed with Error --**Status Change of Process ABAP ZL321NIMIMUUT
                                                                   Save Status and Trigger Events if Appropriate**

    Hi Neha,
    When we do the repeat after right click then we are getting this messege"--**Status Change of Process ABAP ZL321NIMIMUUT
    Save Status and Trigger Events if Appropriate**"
    I have come to know that there is one ABAP programe when we go to manage varient.
    ABAP Programme"ZBWR_ZMYYNNINOH_CSV_CHANGE"

  • Service entry sheet reversal document (Status: Error in process) List repor

    Hi,
    I have a requirement, to have or develop report which gives service entry sheet reversal documents (Status: Error in process),
    while investigation i found below options (not exactly meeting my requirement)
    1) Display and Process Confirmations Centrally >Document Category>reverse documents
    which giving all reversed document list (need only error list) and it is giving only my puchasign group list (need all purchasing group list)
    2) I can execute PPB_PD with BUS2203>status>I1019
    is there any way/possible option that i can execute a report of reversal service entry sheets which ststus :error in process"
    Thanks,
    Jai

    Hi Christian,
    Thanks for your reply.
    But this is what has happened. No the SES was not deleted in ECC before the confirmation was deleted in SRM. Our users don't have access to ECC T-codes.
    Also I have checked the time at which the cancellation was created and everything is in sync.
    How can i change the status of SES from 'Error in process' to 'posted in backend'?
    Please advise
    Thanks

  • How to clear status "Error in process"?

    Hi All,
    I need help to clear the status of my invoice in SRM. The invoice status is "error in process". We checked in backend and reprocessed the IDOC through WE19 instead of BD87 and the invoices are posted now in backend. But the status of the invoices still shows "error in process" in SRM. I do understand that we should not use WE19 and should have processed it through BD87.
    I checked in SRM and the enteries exists in BBP_DOCUMENT_TAB table for these invoices, just tried to run CLEAN_REQREQ_UP and BBP_GET_STATUS_2 but no help.
    Please help
    Thanks, Sachin

    please read all below
    An IDoc BBPIV is sent if an invoice is released in the BBP system.In the invoice the statuses I1022 "Release granted" and I1017 "In transfer" are set.In addition, for the background job (see below) an entry is written to table BBP_DOCUMENT_TAB.
    Unless I1017 is not set again to inactive, all previous operations are not allowed (in particular all changes to the invoice), that is, they are stopped by the program. The sending of the IDOC is checked by the background job CLEAN_REQREQ_UP. The report reads the BBP_DOCUMENT_TAB and makes a RFC (remote function call) per META_GOODSMVT_UPDATECHECK to check the posting of inbound IDocs.If the IDoc is posted successfully (status 53), the BBP invoice receives status I1018 "Transferred to backend".In addition, the entry is deleted in BBP_DOCUMENT_TAB.
    If the IDoc is posted incorrectly (status 51, no follow-on document), the status of the invoice is set to I1019 "Transfer failed".The entry in BBP_DOCUMENT_TAB remains as is, that is, the status of the IDOCs in the backend system is still checked by the background job.The sending of the IDOC is checked by the background job CLEAN_REQREQ_UP.If the IDoc has not (yet) arrived in the backend system, the entry also remains as is.
    Status I1018 allows to reverse the invoice in the future. In case of status I1019, a deletion is (again) possible.
    The following must be considered when processing an incorrect IDoc in the backend system:
    a) Further process the same IDoc (BD87), instead of copying and correct the IDoc with Transaction WE19 since in the latter case, the background job cannot find the (copied) IDoc and the invoice posted from that. In this case the BBP invoice would remain endlessly in status "incorrect", the entry in BBP_DOCUMENT_TAB would never be deleted and the background job would always make the RFC at every run.In addition the BBP invoice would never receive the status "paid" (see below).
    b) If the IDoc cannot be corrected or the error in the backend system cannot be solved, the IDoc remains in status "incorrect".In this case the BBP invoice should be deleted and the entry in BBP_DOCUMENT_TAB should be deleted manually or with a self-written report.
    Additional information: As of EBP Release 4.0 or after the implementation of Note 601470 or the import of the relevant Support Package, the entry in BBP_DOCUMENT_TAB is deleted by the program (during the deletion of the invoice). Then the manual deletion is no longer required.
    The following section does not correspondingly apply to the confirmation, but only applies to the invoice.
    Status I1020 "paid" is set in the invoice by using the second background job BBP_IV_UPDATE_PAYMENT_STATUS to check the payment status of the follow-on invoice in the FI backend system for all invoices from the selection area.This only occurs for BBP invoices with status I1018 "Transfer to backend". To read the FI documents, META_FI_DOCUMENT_READ_40B is used.

  • While Changing the status system gives error

    Dear Experts,
    In Solution Manger,  While changing the status from Tcode SE38 with Program CRM_SOCM_SERVICE_REPORT system gives error.
    Document 8000002519 refused for technical reasons: ERROR_FREE
    Message no. SOCM_ACTION_LOG203
    Diagnosis
    The status value cannot be changed.
    The document may no longer be modifiable as a result of its status, or it may be being edited by another user.
    System Response
    This change transaction is skipped during report processing.
    Procedure
    Analyze the corresponding document during transaction processing and perform the status change manually if necessary.
    Also if i select the status as in process, then it executes sucessfully.  Please help me in this.
    Ramesh Jaiswal
    9867936636

    Hi Ramesh,
    Pls check your SP level because till SP17 this (CRM_SERV_REPORT) Tcode is not present
    I just checked.
    So it seems this is availabe only after SP18.... we can use the above report.
    Kindly confirm once you solve your problem.
    Dirk
    Can you please tell us a document which wil tel us what technical things have been changed in this new SP18.for e.g the source for this information.
    Regards
    Prakhar

Maybe you are looking for

  • Can iTunes utilize more than one external hard drive at once?

    A couple of years ago we had the bright idea to get a mac mini with an external hard drive and load it up with movies and such, so when we wanted to watch a tv show or movie, we could just scroll through the titles and pick without having to deal wit

  • Where do I get MPN for iLife that came with my computer?

    I purchased a MacBook about a year ago. I just now have occasion to use iPhoto. I'd like to register it in case there are updates. When I attempt to do so I am asked for the "market product number" [MPN]. The methods explained for locating the MPN on

  • JSP can't find class file

    I created a package for my JSP and import it to be used in a JSP. It works great a couple of times, but for some reason, it displays an error message saying it can't find the class in import. Can anyone explain that? Thanks. null

  • Nav Block Filter Affected but not in Expand/Collapse

    Hi, Does anybody know if is possible to setup a Nav.Block to affect two queries (Dataproviders) only with FILTER option. This mean: When we choose expand/collapse, affect only one of these Dataproviders. We have two Nav.Block and Two Tables. When we

  • UTL_FILE: Reading and Writing client-side Files

    Hi All, Please tell me how to read & write UTL_FILE at client-side Regards