St.cost estimate in order

hi sir,
please tell my problem,
i have estimated the material cost and released, closed the production order also.
now i want cost estimate for same product with the same raw material no change in MOB,no change in price also. i want to make repeated cost estimate with slight difference in costing sheet or overhead rate or activity price.
please tell how to make repeated cost estimate for production order.
while doing so like i got error '' product cost estmate  is released ''
i have taken new costing variant,but same costing type and valuation variant have been taken and i have tried also using transfer variant (pc01,pc01) with no transfer and with transfer also but i didn't get , same error showing
1.i have taken cost type"01-st.prod.order plan( standard cost, legal view)
2.006 valuation variant plan( plan price,moving price, st.price).
TO UNDER STAND EASILY I HAVE GIVEN THIS LEANTHY,
please tell me how to cost estimate repeated same product afer mark and release the variant.
thank you
sekhar

Dear ,
I think "CKR1 Reorganize of Cost estimate" will be useful for for you.
Enter
Comapny code
Plant
Material Number
choose radio button :
Current Std. cost estimate.
GOPAN

Similar Messages

  • Cost estimate missing for a material in sales order

    Hi All
    Users have opened sales orders with materials which does not have a  valid costestimates. These missing cost estimate sales orders did not flow to COPA. Is there any report,  I can run to view all those sales orders which did not flow to COPA?.
    Q2. Now after creating a cost estimate for the materails , how can I transfer those sales orders to copa??
    Thanks in advance for looking into this

    ke2d and ke2c and ke2b are the tcodes

  • Producrt Cost by Sales Order with Valuated Stock

    Hi Gurus,
    My client is having  Producrt Cost by Sales Order with Valuated Sales Order Stock. Can anybody reply me for my following issues.
    1. while calculating Sales order cost estimate thru VA02 , the same Cost estimate is appearing against with EK02 condition type in Sales order Condotions. what is the use of Sales order Cost estimate? is there any impact on production?
    2. What is Difference between Sales Order Cost Estimate and Order BOM Cost estimate?
    3.when can we calculate Sales Order Cost estimate ? whether before Production or before billing ? can anybody tell me please..
    4.while settling the production order also system picking the cost in VPRS not in EK02, i am not sure about this step.can any body correct if i am wrong
    5.I know we can caluculate WIP in Sales order also. when can we calculate ? before settling the Production order or after production ?
    thanks
    Prasad

    Hi,
    there are 3 types of scenarios in MTO.
    In Two scenarios Sale Order would be cost object - (Non-Valuated Sale orders stock and Valuated Sale Order stock with Sale order being Cost Object)
    In third scenario (Valuated Sale Order Stock without Sale Order controlling), Only Production Order is the Cost Object.
    In all the cases wherever the Sale Order is the cost object, Sale Order is the final Receiver.  Only the difference is that in valuated sale order stock, stock entries would be passed to FI and in non-valuated sale order, no goods movement for FG will be there.
    Please let me know if you need further details in this regard
    Surya

  • User Exit or BADI on saving of Sales order cost estimate (CK51N)

    Hi,
    Can any one share with me what are the User Exit or BADI that gets triggered on saving of Sales order cost estimate (CK51N).
    Regards,
    Bijay

    Hi
    Check the link
    Need Enhancement Spot or BADI for transaction ck51n
    Regards
    Sanil

  • Sales Order Cost Estimates -- Versions?

    In our MTS plant we are creating cost estimates each month with different version numbers so they can easily be compared to review cost changes.
    This concept in our MTO plant is (of course) a problem.
    We would like to create a dummy sales order and on each line list a KMAT and build an "average" configuration.  We use variant config, so the sales order bom is built automatically.  It also costs automatically.  We would like to save this cost estimate and compare it with a cost estimate of the same configuration next month.   I do not have an option for version CK51n, nor do I see a Costing Date in KEKO table.  Either of these items for MTS would create a second cost estimat and allow comparison.
    Is there a way to compare Sale Order Cost Estimates across periods?
    Any other suggestions as to how to obtain the required data??
    Thank you for all suggestions!!

    Any one think of a solution?
    thanks

  • Sales Order cost estimate with variant config

    Hi
    I'm hoping for some advice on costing on a variant material.
    I have created a sales order for a variant material and ran a cost estimate to get costs for the sales order.  Should this populate a cost condition within the sales order pricing?  How can the margin be seen in the sales order?
    Thanks for your help.
    Ashley Shannon

    Hello Ashley
    Yes, if you have done your settings correctly, especially Requirements class set up  (see the documentation link),  then the cost estimate will flow to a condition type in Pricing, usually EK01/EK02 conditions. These conditions are used to calculate sales prices (PR00) in cost-plus (mark-up) scenarios.
    Link: http://help.sap.com/erp2005_ehp_04/helpdata/EN/90/ba6da4446711d189420000e829fbbd/frameset.htm
    However Profit margin  as calculated in a sales order comes from VPRS condition  (which is based in Material Master) and is the difference of net value and VPRS condition value in normal circumstance.
    Hope other more knowledgeable experts will weigh in.

  • Sales order cost estimate with GIT account

    Hi,
    Business introduced Goods - in - Transit (Balance sheet account), so PGI will always post to GIT and Invoice it will get reversed.
    For one of the Configuratble material (MTO) scenario we need the Sales order cost estimate to get the Planned cost.
    When i try to execute the sales order cost estimate it says cost element doesnot exist for GIT GL (WHich is right).
    But with maintaining the GIT how to achieve the sales order cost estimate.
    I tried to create CE category 90 for GIT, in Cost estimate am getting error CE 90 not supported for Cost estimate.
    Kindly help this is kind of urgent req for us
    Thanks,
    Sudha

    Hello Ashley
    Yes, if you have done your settings correctly, especially Requirements class set up  (see the documentation link),  then the cost estimate will flow to a condition type in Pricing, usually EK01/EK02 conditions. These conditions are used to calculate sales prices (PR00) in cost-plus (mark-up) scenarios.
    Link: http://help.sap.com/erp2005_ehp_04/helpdata/EN/90/ba6da4446711d189420000e829fbbd/frameset.htm
    However Profit margin  as calculated in a sales order comes from VPRS condition  (which is based in Material Master) and is the difference of net value and VPRS condition value in normal circumstance.
    Hope other more knowledgeable experts will weigh in.

  • Sales order cost estimate

    hi,
    While saving the sales order cost estimate its getting the GL account from GBB-ZG0.
    as we assigned Balance sheet account its asking the cost element.
    can you please explain what is link to get the gl from GBB-ZGO, can we change this to pick from GBB-VBR.
    Thanks,
    Sudha

    Hi,
    Are you are working with unvaluated special stock ?  In this case, the system is looking for a consumption account via the account assignment category. For example if you are using requirement class ZPJ which uses account assignment category Q. In account assignment Q, you entered account modification VBR. Therefore, the system is looking for an account via the keys GBB / VBR.
    regards
    Waman

  • Sales order cost estimate not happening because of GIT B/S account

    Hi,
    Requirement is to have Goods in Transit account in PGI and reverse it in Invoice no issues iwth it.
    For the same sales order user wants to get cost using sales order cost estimate.
    When i run that am getting following error
    Item 00001 : Cost element 14001212 does not exist in CO area 0010 for 10/07/2011
    Message no. KK689
    Even though i maintain the CE for Balance sheet account with Cost element category 90 its not accpeting.
    Can you please help me on how to proceed for sales order cost estimate.
    Thanks,
    sudha

    hi,
    if you give a balance sheet account in obyc , you will not be able to create a cost elementin category 01 , accordignly system will give error in sales order costing , as its not able to get correct cost element in cost planning.
    if your requirement is just to post  cogs to a balance sheet account which is goods in transit and when invoice is done cogs to be posted.
    you should actually use  revenue based RA functionality on sales order instead of assinging a balance sheet account in obyc.
    in this approach;
    - first assign a p/l account in obyc and create cost element in cateogry 01.
    - create revenue based RA and assign RA key in requirement class.
    - in OKG8 for RA category  WIPR and your ra key assign , goods in transit account and give a offsetting account which is not cost element (credit entry in offsetting account nullify debit in account given in OBYC when GIT is posted , when billing is done system will automatically post a oppsite entry in both account).
    -in OKG8 for RA category COSR give the COGS account and a offsetting account without cost element (credit entry in offsetting account nullify debit in account given in OBYC when COGS is posted).
    regards
    rajesh

  • PP - order cost estimate in PP-PS scenario

    Hello dear colleagues!
    Where can I read about the plan and actual estimate material components for pp-order in pp-ps scenario?
    In the settings specified sequence of assessment strategies material component. These strategies are clear to me.
    As far as I know except for these strategies, the system applies more:
    - price from the stock for WBSE;
    - price from cost estimate for WBSE;
    - other strategy.
    From my point of view is correct, but I can not find descriptions and settings that change those strategies.
    Can you help me?
    Thank you for your attention

    Found in the following scenario
    FUNCTIONS "PRICE_STRATEGY_NEW" INCLUDE "LCK36FAZ":
    1. Price from segment of WBS-Stock.
    2. Price from USER-EXIT "EXIT_SAPLCK36_001".
    3. Price from cost estimate for WBS-element.
    4. Price from confirmation.
    5. Plan price from PP-order forr material and same WBS-element.
    I do not quite understand how the strategy 3 and 4.
    Explain, please.

  • Error reading material cost estimate for sales order (KE292)

    Dear All,
    I have an issue with billing. we are posting july month transactions, the material cost is maintained through MR21. When releasing billing document for accounting we are getting error message like"Error reading the material cost estimate for sales order "11"
    Message no. KE292
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate item 000010 of sales order 11 by reading the corresponding product cost estimate.
    However, no product cost estimate could be found for this sales order item.
    The system accessed product costing for product AMLFP011011XX00P using costing key YB3 as defined in the
    CO-PA Customizing settings.
    System Response
    The system cannot process the document any further.
    Procedure
    Check your Customizing settings."
    We cross checked with other client as a current date and we ran cost estimate through CK40N with same material. and we posted entries. Here it is working fine. but in above process it is not working. Can you pls guide me where i missed.
    Regards,
    Nagaraju,

    Hi,
    When the Costing Key is assigned to the material types in the COPA customizing, then system expects Cost estimation when billing is released to Accounts.
    If you dont run cost estimation but update the material master through MR21, system will not accept as in the Costing key configuration you must have selected the Current Standard price field for the valuation.
    Hence, try to run cost estimation and then do releasing.
    Thanks & Regards
    Ravi Kumar

  • Blocking creation of production order if standard cost estimate is not done

    Hi PP gurus,
    Can anyone help me in blocking the creation of production order if the standard cost estimate is not done for the particular posting period.

    Hi,
    I do not think there exist a standart check. You can use exit EXIT_SAPLCOZF_003 to block creation of production order by sending error messages based on any condition.
    Regards.

  • How to Copy Cost Estimate from Quotation to Sales Order in MTO Scenario

    Hi,
    We are working on a MTO scenario- Sales order Costing with Valuated Stock.
    And our case we are creating the Cost Estimate at the time of Quotation using PP qty structure. Now we wan to transfer the cost estimate to Sales Order as we don't want to recost the sales order.
    Currenty it's transferring only the EK01 condition as total planned costs in Sales order but we want to see the itemization also.
    Please suggest is there any way to transfer this cost estimate with itemization from Quotation to Sales Order.
    Regards
    venkat

    Hi
    As far as I know the CO esimate does not get copied from Quotation to Sales Order
    You need to recost the SO again.. If your Qty Structure has not changed between Quotation to SO and your valuation variant is also the same - it would give the same result
    br, Ajay M

  • Excluding price of last purchase order from cost estimate

    Good morning,
    we have the issue described below:
    we would like to exclude a price of some purchase orders from valuation in cost estimate in case of valuation is made by price from purchasing info record.
    In this case valuation considers price of last purchase order even if there is a valid agreement used.
    Our customer would like to have valuation with price of purchasing agreement and not price of the standard purchase order closed, but if agreement is older and during creation of standard PO is setted the "InfoUpdate" flag, system updates the inforecord and in CK11N during cost calculation it uses this price for subcontracting.
    We have done some tests...Is there a standard SAP solution to have price of valid purchase agreement?
    Many thanks.
    Giusy Castiglione
    Accenture Outsourcing

    Hi,
    Your requirement seems to be very unique and hence you need to try out through by selecting the valuation through user exit where we can request the system take the po price from purchase agreement instead of purchase orders. This selection deftly resolve this unique requirement instead of searching for a std solution.
    Trust this helps much!
    Regards,!
    Ashok Singh

  • AFS grid value/valuation type not picked in sales order cost estimate

    Hi Experts,
    We have different valuation types in the material master. This is part of the AFS, where each grid value is a valuation type. While making a sales order cost estimate and in one sales order item, we have 3 grid values (valuation types), system is costing only for one grid value and that too for the entire quantity. This way the costing is wrong as different grid values have different BOMs and routings.
    Is there any specific setting to have the grid value to be picked up in the sales order cost estimate? Or am i missing some setting? in general product costing settings or AFS product costing settings?
    Best Regards
    Vimal

    Hi,
    Do you mean "sales order costing", please  if so then please ref. the link:
    http://help.sap.com/saphelp_46c/helpdata/en/90/ba6da4446711d189420000e829fbbd/content.htm
    Regards
    DSR
    Edited by: D.Srinivasa Rao on Nov 25, 2011 8:19 AM

Maybe you are looking for

  • Ipod skips only with songs purchased from ITunes

    My Ipod skips with a handfull of songs that I purchased from ITunes. They play fine on my laptop, but my Ipod wont play the entire song. Some play for 2 minutes others play for 20 seconds. I can't get anywhere with help topics, and I went through the

  • Windows Explorer Properties Dialogue box delay

    Hello from Sydney Australia We have an ageing Windows SBS 2008 server that is our file share. When I right click on a folder to check the properties it can take up to 1-10 minutes to open. Sometimes not at all and I have to reboot the entire server.

  • Error Code 61499 after license update (FPGA)

    Hello, I am a fairly experienced FPGA module user.  I have LabVIEW 2009 installed (9.0.0) including the FPGA module on a 32-bit XP system.  Everything was working fine, and I had one particular FPGA project that had been built and run within the last

  • CS3 Creative suite sluggish

    Hi, I'm on OSX 10.4.11 with 2 GB on my IMac. (2GB is my max capacity). I use CS3 Photoshop and Indesign. Both can be slow. Indesign slower and quirky. This is without other programs running or huge files opened. Do I need more memory? I'm already max

  • "You cannot use the application "Safari" with this version of Mac OS X."

    This little box popped up after I downloaded 10.5.1 update last night. Anyone else? Any ideas? Nothing else changed.