Standard cost update for configurable material- CU50

Hi,
I am trying to update standard cost for a configurable material using CU50 with reference to the sales order.
System gives a warning message :- Configuration of raw material still not included in price determination
Message no. CK784
Also the save tab is greyed out.
this is the case with all config material
A solution to this would be highly appreciated.
Thanks

Hi,
   Refer note 362193 and check if that helps.
regards
Waman

Similar Messages

  • Costing Run for Configurable Material

    Hi,
    When I try to run costing run CK40N for KMAT material, I am geting information "No materials selected" for the 'selection' flow-step.
    Below is the Error description.
    No materials selected
    Message no. CK277
    Diagnosis
    Due to the costing variant used, no materials could be selected for the cost estimate.
    System Response
    No materials were selected.
    Procedure
    1. First, check that the materials you want to cost exist.
    2. Then go into Customizing and check the costing variant, the reference variant, and the transfer control. If the plant changes, a suitable transfer strategy must be entered in the transfer control belonging to the reference variant.
    Thanks in Advance,
    Shiva

    hi Shiva,
      It is not possible to do the cost calculation for configurable materials in CK40N or CK11N.
      To do the product costing it is mainly required the BOM and Routing, but in case of configurable materials the BOM and Routing are not fixed(here Super BOM/Super Routing are used with valid object dependencies which may result in "n" number of material variants)
    To do the costing for configurable material you can use t code - CU50 (configuration simulation)
    Here in CU50 you can select the characteristics values which ultimately selects the valid BOM and Routing required for variant production and do the costing and check.
    Please check
    http://help.sap.com/saphelp_erp60_sp/helpdata/EN/7e/cb857b43a311d189ee0000e81ddfac/content.htm
    Pavan
    Edited by: Pavanakumar on Jun 29, 2009 4:34 PM

  • STO for Configurable material

    Dear All,
    We require to configure the STO process for a configurable material, but as per the present system configurable material production in supplying plant triggers by sales order. this resulting in non availability of material to dispatch against the STO purchase order.
    Please help me to resolve this issue.
    your inputs are awaited!!!
    thanks & regards,
    Anup
    Edited by: anupam sharma on Jun 27, 2010 3:59 PM
    Edited by: anupam sharma on Jun 30, 2010 8:49 AM

    Maintain the correct MRP parameter for the material, i.e., special procurement type for stock transfer in MRP2.
    So, you have set this up and it generates the stock transfer requests.
    Note that the STO will have the account assignment for sales order stock.
    Check following links for hints:
    Re: Material xxxxx in plant xxxx is configurable and will not be costed
    CK11N:Costing  done for Configurable material is throwing error
    Hope this can assist you.
    Thanks & Regards
    JP

  • Make to Order for configurable Material  Costing Procedure and Stage Trans.

    Hello, PP Gurus,
    I am doing one MTO for configurable Material.
    For each sales order I am preparing Production order so when the costing should caried out?
    What is the Order settlement & closing procedure? 
    how the cost is tranfered to the Sales orderand cost transfer is possible
    Please inform me Costing procedure in this scenario and transaction.
    Thanks & Regards,
    Bhavik Dangi.

    Hi,
    You can use variant configuration for selling the colored fabric. Use the basic fabric as raw. and maintain variant configuarations to have many variants.
    Please use strategy 25. When you run MRP the planned orders will be generated and will be assigned to the sales orders. You can see it on the account assignment tab.
    In material master pleasse maintain Individual collective requirement indicator to 1-individual in the MRP-4 view.
    Then the stocks will be reserved to the specific sales orders.
    Thanks and regards
    Murugesan

  • Creation of Sale Order for configurable material with availability check.

    Hi,
    We have a scenario in which the material is configurable. The configurable material (X) has few variants (Ex: X1, X2, X3, X4, X5). While booking the sale order, we use the material number (X).
    Further, the material planning is done for the variants X1, X2, X3, X4, X5. The standard variants are planned for production in advance.
    1.     While booking the sale order, we want the availability check of the stock (type matching to happen). What needs to be done in configuration?
    2.     While booking the sale order, there is a possibility that the configuration selected will not match with any of the standard variants due to some additional requirements of the optional features, in such cases how to link the standard variants to the sale order & create requirement for additional requirements.
    Regards,
    Umesh

    Hi Umesh,
               1.Create material master for configurable material and variants in mm01.
               2.Maintain BOM for the configurable material in CS01
               3. Configur the variant configuration steps
                  a. Create charecteristics T.code CT04
                  b. Create values and assign classes
                  c. assign the values to charecteristics
                  d . Maitain dependence  T.code CU01
                  e.create configuration profile t.code CU41
                  f.stimulate the configuration profile.
    4. Do the availability check configuration through this path
    IMG --> Sales and distribution > Basic functions ,> Availabilty check and Transfer of requirements.
    5. Maintain the Availbility check field and MRP views in the material masters other wise you sit with PP people and do that
    I hope it will help you
    Regards,
    Murali.

  • Standard Cost Estimate for Subcontracting

    Dear Sir / Madam,
    We are in the process of migrating from our normal R/3 operations for Production Planning to Execution inclusive of Costing of materials by using iPPE functionality for repetitive scenario. We have our BOMs for painted body currently in R/3. The painted body falls under subcontracting scenario.
    In this scenario the body in white produced from our bodyshop is sent out to the subcontractor along with certain paint items and is received as painted body and consumption of the body in white and the paint items sent needs to be shown during the goods receipt of painted body.
    For this we have maintained the BOM for the painted body in iPPE. Also in the costing variant "ZD01" in order to arrive at Standard cost (CK11N) for the painted body we have maintained the following settings for Valuation variant for subcontracting :
    Priority     Strategy Sequence     
    1          Net Quotation Price
    2          Effective Price from Purchase Order
    While running CK11N for the material (painted body) we are receiving the following message
    Message no. 28501 : Error in dependency processing: condition 0000062388 is empty
    We wanted to verify whether the message raised is normal or would it have any adverse impact.
    Your assistance would be highly appreciated.
    Regards,
    Bhavika
    Edited by: Bhavika Goyal on Feb 7, 2009 12:20 PM

    Dear All,
    Control Key is important for inhouse producrtion and Sub Contract.  Check it once and when ever u have given the Product (semi fisished) to Sub Contractor, along with Paint. 
    Here one thing is important what is your process? how much portionis involced in Sub contracting.  why because
    Paint issue to the sub con is captured by the way for migo or miro
    Payment to sub contract is capture all the cost of the Sub Con., then is there any cost is missed for this process.  Let me know the remain things?
    thanqu
    raj

  • Make to Order for Configurable Material & Error in Confirmation

    Hello, PP Gurus,
                       I am doing one MTO for Fabric business but during the confirmation I am getting error that
    SALES order Stock does not Exist as well Please inform me Costing procedure in this scenario.
    *is it necessary to run MRP in this scenario?*
    Please see the all Details of Business so that U can give answer properly.
    One is raw fabric (Raw material) which has to passed different process to convert Colored fabric as my Finish product as well I can sale Raw fabric also.
    is it possible to maintain raw fabric and Colored fabric with same mat.code?
    I have configured the material as well all pricing BOM, Recipe its working properly.
    How can I assign the material to Operation? I am getting GRAY field in New Assignment in change recipe mode ..
    Is it possible to use Material type other than KMAT? I want to use Finish material type. If yes How?
    Right now I can create Process order from the Sales order but I am facing error in confirmation that Sales Order stock does not exist than I have to transfered stock to Sales order and error get solved temporarily but  I want to avoid this manual transaction to remove this error. Any configuration is required please inform.
    My configuration is given below.
    MRP Type : PD
    BOM item Category:  L Stock Item.
    In dependency & Profile I have set radio Button as Single level Bom explosion.
    Order Bom selection in profile.
    Strategy : 25 make to order for configure material.
    How can I do ? please suggest any changes
    I have only 9 months of SAP experience within short time I have gain lot knowledge from this site and other reading material as well my learning Learning thirst.
    thanks to all SAP gurus..
    THANKS IN ADVANCE .... Definitely I will reward points even if my some questions get solved...
    Regards,
    Bhavik dangi.

    Hi,
    You can use variant configuration for selling the colored fabric. Use the basic fabric as raw. and maintain variant configuarations to have many variants.
    Please use strategy 25. When you run MRP the planned orders will be generated and will be assigned to the sales orders. You can see it on the account assignment tab.
    In material master pleasse maintain Individual collective requirement indicator to 1-individual in the MRP-4 view.
    Then the stocks will be reserved to the specific sales orders.
    Thanks and regards
    Murugesan

  • Routing for configurable material

    Hello PP gurs,
    I want to create Routing for Configurable Material in SAP PP-PI or PP industries. How the object dependency is defined applied ?
    This requirement is for Make TO Order scenario for Configurable Material.
    At present I am working with resources only.
      I want to create in such away So that while creating Production order  system should ask select BOM & routing.
    How can I define the Super BOM & Super Routing in Order?
    Is it possible to calculate cost for this kind of requirement?
    Please Give your Contribution from Whatever  the Questions above....
    Thanks & Regards,
    Bhavik Dangi.

    Dear,
    In can explain youn w/ example
    Let us say you have to manufactur CAR's(matyerial no in SAP is CAR). The coonfiguration options are - Paint, and tyre
    Create a char inn CT04 as piant and tyre with value as below(data type = char)
    Paint - white, red, blue and black
    Tyre - Redial, Normal
    Create materials like White-paint,  Red-paint,  Blue-paint,  black-paint, Tyre-redial, tyre-Normal, Engine
    Create a class in CL01 called CAR-CLASS , clas type 300 and assign the above Char to this class
    Assign this class to Material CAR.
    Create BOm with following items
    Engine
    White-paint
    RED paint
    Blue-paint, 
    black-paint,
    Tyre-redial,
    tyre-Normal,
    Create a object dependency in CU40 type - selcetion condition to selcet red-paint material when in Sales order select paint red. and like this all others.
    Selection condition for red paint is as below
    Paint = 'red'
    Like this for all others
    Paint = 'white'
    Paint = 'black'
    Paint = 'blue'
    Tyre = 'Normal'
    Tyre = 'Redial'
    Assign this object dependency to BOm items
    Engine
    White-paint -
    >Paint = 'white'
    RED paint -
    >Paint = 'red'
    Blue-paint,  -
    >Paint = 'blue'
    black-paint, -
    >Paint = 'black'
    Tyre-redial, -
    >Tyre = 'Redial'
    tyre-Normal---->Tyre = 'Normal'
    Now create a configuration profile
    When you create a Sales order, system will pronmpt to enter the vlaues for piant and tyre
    if you have selceted piant as red and tyre as normal, then the BOm will look like as below
    Engine
    RED paint
    tyre-Normal
    This is the configured BOM...what you have cretaed is supre BOM.
    It is available in PP
    For nmore information see blow
    http://help.sap.com/saphelp_47x200/helpdata/en/92/58d455417011d189ec0000e81ddfac/frameset.htm

  • GATP allocation check for configurable material with characteristic

    Hi APO Gurus,
    We are using configurable products and wanted to go for GATP  allocation check based on Characteristics.
    The scenario is goiven below,
    All our products are configurable materials. At the entry of sales order , the characteristic values are updated and then the sales order is checked for GATP.
    When the order come to APO-GATP for allocation check , here I want to check the allocation for configurable material.
    But the allocation quantities are given for a combination of Configurable material and its characteristics.
    How can we map such scenario?
    Do I  to create the CVC at family level that is configurable material level ?
    How the characteristic values are considered in allocation.
    Waiting for your reply.
    regards,
    Ravi

    answered.

  • Standard cost update errored

    Good Day All,
    Happy new year. The Standard cost update process errored out for specific individual parts with the following being the only error message in the log file:
    No Errorw CSTPSISC.INS_STD_COST (70): ORA-00001: unique constraint (INV.MTL_CST_ACTUAL_COST_DETAILS_U1) violated
    CMLCCU-0999 : Cleaning up
    The only thing I can find anywhere is in the CST MGMT users guide indicating uncosted transactions as the culprit. We have no uncosted or unprocessed transactions. I'm not sure what possible unique constraint on NV.MTL_CST_ACTUAL_COST_DETAILS_U1 is being violated and the error message obviously shows nothing. If anyone has any help I'd appreciate it.
    Regards,
    Tim

    Hi,
       Refer note 362193 and check if that helps.
    regards
    Waman

  • How to do the Partial delivery for configurable material ?

    Hi All,
    I am creating a sales order  for a configurable material and is trying to do the partial delivery for the same. But, after the outbound delivery the status of the sales order is shown as completed although I have done the partial delivery.
    Here are the steps I followed.
    1. material I used here is a configurable material.
        Main settings.
      a. In Basic Data tab, marked as configurable
      b. Procurement type='E' in MRP 2 tab
      c. Strategy group as 82 in MRP 3 view.
    2. I created a sales order for quantity 10
    3. Created a production order followed by goods Movement thereby increasing the stock.
    4. Did the outbound delivery for  quantity 5.
    Now if I checked for the status of the sales order using VA02, the status for the line item as well as for the sales order was "Completed" although I had done partial delivery.
    I have checked for setting in Customer master record, item category in VOV7. Everything seems to be fine.
    I checked for all the information in the FORUM without any help.
    Can you please help me?
    Kind Regards,
    Anupama

    Hi,
    For Info, I am creating a sales order for Item category TAC.
    1. In my case, after completing the partial delivery, in the document flow for Order, the status is shown as completed.
    2. In status overview for this item, delivery status indicator is set as  'Fully delivered'.
    I did check in the customer master record and the field
    Partial delivery per item  is set to Blank(  Partial delivery allowed)                
    3. I did run the report RIBELF20  and I am getting this error for all the sales order I created for partial delivery for configurable material.
    For Normal item, the status is showing properly.
    Is there any other settings I have to check?
    I needed this to be working. Please help

  • Cost object for raw material consumption posting

    the raw material cosumption posting is done in the background when the goods issue is done. so where do we assign cost object for the primary cost element of raw material consumption account. since we create primary cost element for raw material consumption account, it will expect us to give cost object, so where we assign cost object for the raw material consumption cost element

    hi
    since the raw material cost is relevent for cost accounting u need to maintain primary cost elment accounts.When ever u confirm goods, the rm issue will take place automatically and will be debited to either product cost collector or production order. so u need not to assign any cost object for these consumption accounts why bcoz issues will take palce aganist a production order or product cost collector which is a cost object .
    regards
    siva

  • Cost variance for the material master

    Hi all,
    This is very urgent requirement.
    How to maintain cost variance for the material master?
    I will assign the points
    venu

    Hi,
    Material Variance key will be assigned in Material master Costing data tab
    Best Regards
    Ashish Jain
    Message was edited by:
            Ashish Bohara

  • What are the possible cost objects for raw material consumption postings

    what are the possible cost objects for raw material consumption postings. i want to know whether it can be work order(maintenance order).

    For example, you are confirming a process order and issuing raw materials to the process order, the system in the background creates the consumption posting and will by default use the process order as a cost object.
    Similarly, when you are issuing materials to a work order, you will use MB1A and with movement type 261 and the system prompts you to enter the order number.  If you are using movement type 201, then the system prompts you to enter the cost center and so on.
    Thanks,
    Madhav Nanduri

  • Lock characteristic value for configurable material in Sales Order

    Is there a setting in SAP which can prevent user changing characteristic value for configurable material in Sales Order after production order created for this Sales Order? Currently, it can only works when first delivery create for this Sales Order.
    Thanks a lot.

    Hi,,
    in the characteristic goto additional data tab,
    you have a field called not ready for input.
    you select this when the value in this characteristic come by calculation based on the previous selection.
    that field will be greyed out.
    OR
    u can even select the no display check box,
    by selecting this u cant see the characteristic in the list,, it will give u a popup before leaving the screen.
    for this the char has to be a required field.
    OR
    if any of this is not working then may be u can try out with authorization management.
    thanks

Maybe you are looking for

  • How can i open a new Port on Firewall service (1200)

    Hello, i need to open a port 1200 for one Application on my macmini server 10.6.. I have try to ad port to a Service and i did it, but is seams like the port dont exist. With Networkutility i make a port scan, but i don´t became succsses massage. Wha

  • Simple transformation with reference to ddic structures

    Hi, experts, we decide to use xml as the format when exchanging massive data with other applications. and we want to use simple transformation because according to the document it's more fast. actually our file structure is determined by certain ddic

  • Payment Method Mandatory

    How shall I make "Payment Method" field mandatory in FB60/FV60? Kindly advice.

  • Acrobat reader X unable to display flash content (swf) why?

    Basically we have a OBIEE dashboard page which has some flash content and we also have the ability to download/ export this swf file into PDF when i try to export it and save it  to my local machin the pdf file opens but it just shows an empty page w

  • UWL Configuration SAXException ItemTypeCriteria

    Hello, i have my uwl-configuration file changed with sample from SAP (TS74507936, object FORMABSENC). I can't upload the new configuration. I have a Error "org.xml.sax.SAXException: Parsing near (CustomAttributes), and (ItemTypeCriteria) present at w