Standard network assigning various WBS Elements

Hi,
I am using Standard network and Stand WBS Element for creating actual project.
There are Std WBS Elements, using the same Standard network. As i know, we can assign Std WBS Element in Std network. How can i make it using same std network for various Std wbs element to create actual project as Std network is same for most of the WBS Elements.
I donot want to copy Std network for actual project once we create copying Std Project in CJ20N.
Regards
N.Raju

create more standard wbs - there is no other way

Similar Messages

  • Assignment of networks / activities and WBS elements

    hi experts,
    I have some basic doubts... can any ony clarify these:
    1.can a WBS element be assigned to several Projects.
    2.  can a network be assigned to several WBS elements.
    3. can an activity be assigned to several networks
    4. can an activity element be assigned to several network activities.
    thanking in advance.
    regards,
    priyanka
    Edited by: priyanka on Jun 29, 2008 10:54 PM

    Hi Priyanka,
    Yes, Iam sure that a single network can be assigned to more than 1 WBS at a same time.
    A WBS can be assigned several activities even different networks also if required, but an activity can be assigned to one WBS element only. Once activities are assigned to WBS elements, you can exchange data between activities and networks. For example activities can inherit statuses from the WBS elements they are assigned to. Conversely you can total up project activity dates to WBS elements or can check funds allotted to activities against WBS.
    A single or several networks can be used in the project structure, to map individual aspects of the project such as activities that are linked to each other via relationships. The relationships between two activities define the logical sequence of the activities (predecessor u2013 successor relationship) as well as their time dependencies. Activities of different networks can also be linked to one another. Advantage of network technique is that, system can automatically determine planned dates for each activity and entire network on the basis of duration of individual activities and their chronological sequence.
    Priyanka, I hope this may clear your doubt . .
    reward points required please . . .
    Regards,
    Dhruv Kumar Malhotra

  • How to create and use templete or standard network / activity and wbs

    dear
    i have define the structure for my project which have WBS elements, network and activties. the strucutre is same for all the projects that i define.
    i wanna know whether to use templete or standard wbs network and activities as templete for the project.
    for a network there are almost 150 activties across 10 wbs elements i want this structure as a templete what can i do create it.
    Further, how can i use LSMW to create relationship for ativities?
    regards
    saqib usman

    I have create std wbs level 1 5 wbs further i create std nwrk and activities and assignMENT are as follows
    h1.*Create std wbs from CJ91 *
    STD DEFINITION IS
    E00-BSS-CO-BTS-0000              STANDARD BTS
    LEVEL 1 WBS ELEMENTS
    E00.BSS.CO.BTS.0000.RFP     RADIO FREQUENCY PLANNING
    E00.BSS.CO.BTS.0000.SA     SITE ACQUISITION
    E00.BSS.CO.BTS.0000.TXN     TRANSMISSION
    E00.BSS.CO.BTS.0000.CW     CIVIL WORKS
    E00.BSS.CO.BTS.0000.PMO     PMO
    RELEASE THE STD PROJECT OPTIONAL BY EDIT > STATUS > RELEASE
    h1.CREATE STD NETWORK FORM "CN01" tcode
    NEWORK HEADER WITH FOLLOWING SETTING
    9000000    STD NETWORK CORPORATE BTS 0001
    Network usage     UNIVERSAL
    Planner group   1      1
    Network status     RELEASE (GENERAL)
    Std.WBS element     E00.BSS.CO.BTS.0000.BSS
    Predefined plnt      CO01
    press activity overview button or (shiFt+F7)
    I ASSIGN ACTIVITY TO STD WBS ELEMENTS
    ACTIVITY    OPR. SHORT DESC  STD WBS ELEMENT
    A01            ZERO VERIFICATION   E00.BSS.CO.BTS.0000.RFP
    A02            DESIGN DOCUMENT   E00.BSS.CO.BTS.0000.RFP
    B01            SITE SURVEY 1          E00.BSS.CO.BTS.0000.SA
    B02            SITE SURVEY 2          E00.BSS.CO.BTS.0000.SA
    C01            CIR Doc Input              E00.BSS.CO.BTS.0000.CW
    C02            CIR CW Input by RM    E00.BSS.CO.BTS.0000.CW
    D01            CIR Doc Input              E00.BSS.CO.BTS.0000.TXN
    D02            CIR TXN Input by RM    E00.BSS.CO.BTS.0000.TXN
    E01            Rollout Month               E00.BSS.CO.BTS.0000.PMO
    E02            ON Air Date                 E00.BSS.CO.BTS.0000.PMO
    h1.PREREQUISITE FOR ASSIGNMENT OF STD NETWORK and WBS are:
    PROCESS TRANSACTION "CJ20N" TO INCLUDE STD NETWORK ALONG WITH ASSIGNED ACTIVITIES AND STD WBS.
    FURTHER, I WANT TO COPY STD NTWORK SEVERAL TIMES with different network number. EACH TIME I COPY STD NWK TO OPERATIVE STRUCTURE THE SYSTEM SHOULD PROMPT NEW NUMBER FOR NETWORK AND ALSO PROMPT TO ENER ASSIGNED STD WBS ELEMENTS WITH REPLACE OPTION for operative WBS NUMBER.
    STANDARD WBS                                               OPERATIVE WBS
    E00.BSS.CO.BTS.0000.RFP     REPLACE BY     E00.BSS.CO.BTS.0003.RFP
    E00.BSS.CO.BTS.0000.SA     REPLACE BY     E00.BSS.CO.BTS.0003.SA
    E00.BSS.CO.BTS.0000.TXN     REPLACE BY     E00.BSS.CO.BTS.0003.TXN
    E00.BSS.CO.BTS.0000.CW     REPLACE BY     E00.BSS.CO.BTS.0003.CW
    E00.BSS.CO.BTS.0000.PMO     REPLACE BY     E00.BSS.CO.BTS.0003.PMO
    IN MY OPERATIVE STRUCTURE
    I HAVE TWO LEVEL FOR WBS I.E.:
    E00.C0.BSS            LEVEL 1
         E00.BSS.CO.BTS.0001    LEVEL 2    ASSIGNED NWK  0001 WITH ACTIVITIES AND WBS
         E00.BSS.CO.BTS.0002    LEVEL 2    ASSIGNED NWK  0001 WITH ACTIVITIES AND WBS
         E00.BSS.CO.BTS.0003    LEVEL 2    WHERE I WANT TO ASSIGN STD NWK AND WBS
                                                                  (I HAVE CREATED EXTERNAL NUMBER FOR NETWORK)
    I GO TO THE TEMPLETE AREA AND CLICK ON STD NETWORK BUTTON AND DRAG STD NETWORK 09000001-1 TO E00.BSS.CO.BTS.0003. ENTER NAME FOR NETWORK "BTS 0003". SYSTEM PROMPT TO ENTER EXTERNAL NETWORK NUMBER I.E.
    Enter network number
    WBS elem:E00.BSS.CO.BTS.0003
    Copy from network:
    E00-BTS-0003
    h1.CLICK CONTINUE BUTTON  NOW REAL PROBLUM COMES A DIALOG BOX APPEARS
    Include standard network
    You want to include a standard network that has assignments to standard WBS elements. However, the selected WBS element does not correspond to the standard WBS element.
                   Copy Assignment                            Ignore Assignment
    In case, if i select button Copy assignment or select Ignore Assignment then:
    New network created E00-BTS-0003 under WBS     E00.BSS.CO.BTS.0003 with all assigned activitites but no WBS elements i.e.
    STANDARD WBS                                               OPERATIVE WBS
    E00.BSS.CO.BTS.0000.RFP     REPLACE BY     E00.BSS.CO.BTS.0003.RFP
    E00.BSS.CO.BTS.0000.SA     REPLACE BY     E00.BSS.CO.BTS.0003.SA
    E00.BSS.CO.BTS.0000.TXN     REPLACE BY     E00.BSS.CO.BTS.0003.TXN
    E00.BSS.CO.BTS.0000.CW     REPLACE BY     E00.BSS.CO.BTS.0003.CW
    E00.BSS.CO.BTS.0000.PMO     REPLACE BY     E00.BSS.CO.BTS.0003.PMO
    After all my finding i am not able to bring activity assigned WBS elements. Kindly help and provide information to resolve the problum.

  • Attach a network to several WBS elements`

    hi to all,
    i would just like to ask if its possible for a standard network to be assigned to several WBS elements? this is because i have a Standard WBS structure with elements having similar activities, i wonder if i could just create a single network then assign them to SEVERAL WBS elements and not just one.

    Hi,
    To assign the standard network Activities to multiple standard WBS elements please follow the procedure below:
    1. Go to Tcode :CN02 (If the network is already created with CN01 or else create with Tcode CN01)
    2. Select the Network in question.
    3. hit F5, this will take you to the standard network Header.
    Assign the WBS Element where this network header should be asisgned.
    4. Hit Shift+F1, this will take you to the screen where internal, external activities can be entered. Please select the relevent tab. And enter all the activities.
    5. By default all the activities are assigned to the WBS element mentioned in the Network header, this can  be seen by scrolling little right in the same screen under the column standard WBS Element.
    6. Pick the column Standard WBS element and drop it next to Operation short text.
    7. Now identify the activities to which the different WBS elements need to be assigned. Either select them from the list or you may refer to Tcode. CJ93.
    Hope it is clear now.
    Reward points if found useful.

  • How to find out the amount assigned to WBS element

    Hello Friends,
    Will you please inform how to find out the (amount/value/budget) assigned
    to WBS element
    Which Table it is stored in?
    Thanks in Advance
    Bset Regards
    Diwakar

    Hi Diwakarnd,
    You can use any of the following reports to get the information you require.
    1. <b>S_ALR_87013557</b> - Budget/Actual/Variance
    2. <b>S_ALR_87013558</b> - Budget/Actual/Commitment/Rem Plan/Assigned
    3. <b>S_ALR_87013559</b> - Budget/Distributed/Plan/Distributed
    Some of these reports use a complex selection criteria from various tables which has been grouped together, logically by SAP. The Logical Database table name for PS is <b>PSJ</b>.
    Execute transaction code <b>SE36</b> -> <b>PSJ</b> -> (Subobject : Radio button <b>Structure)</b> -> Click on <b>Display</b>.
    You would see all the underlining tables used.
    I hope the above helps.
    Do not forget to award the points please.
    Regards,
    Jacob

  • Sales order assignment to WBS element

    Can somebody tell me Where a Sales order is assigned to a WBS element?
    I am aware that it is assigned to WBS element Field in Item details>>Account assignment Tab. But in this tab page on Sales Order screen, I am not able to see WBS Element field. I am able to see the WBS element field for FERT items but not for DIEN.
    Can somebody tell me where exactly is this done so that I get the WBS element field populated in SO?
    Rgds

    Hi
    Hope the following will fulfill u r requirement
    1) What is WBS element?
    2) What is the Tcode to get to that screen?
    3) What is the need and pupose of WBS element?
    4) Do we happen to work on Functional module during our implementaion project? 5) In what scenario/situation we will be working on WBS?
    WBS is nothing but Work Breakdown Structure. It is mainly used in Project System (PS) module. Tcode : CJ20N
    For any project defined we must have atleast one WBS. Within this WBS we can have networks. Networks are nothing but the series of activities. Material are used to perform the activities.
    To explain in detail just consider one example:
    Govt of india wants to have Roads to be build through out the india. So Project can be defined in sap as “Connectivity”.
    WBS can be roads within different states like Roads for Gujarat, Karnataka etc.. i.e. WBS Gujarat, WBS Karnataka etc.
    We can define different networks for these WBS like Road Between Ahmedabad to Surat or Between Bangalore to Belgham.
    For this network we can have many activities like Land selection, Land Preparation, Road Building, Final finishing etc etc.
    Hemal’s example was a good example. Project Systems comes into play only when the industry’s business is based on projects like… Construction companies, Engineer to Order scenarios. You may not see anyone using PS module for retail business. As Hemal explained in that example, you have a main project which is broken down into WBS elements. You can use the TC CJ20N to create the project and the WBS elements. Each WBS may have mutiple Networks associated and each Network may have multiple Network Activities as explained in the example by Hemal.
    On the Sales Order, if your client is implementing PS module, you may have to attach the Sales Order to the WBS element it belongs to. WBS element is nothing but a bucket where all the activities belonging to that particular part of the project are captured. In the example, WBS Gujurat will tell you how many Sales Orders were created for the Gujurat sector, howmuch was spent on raw materials, what’s the currect stock ([roject stock) available. How many Production Orders have been confirmed and howmany of them are getting confrmed in the future. How many invoices have been generated or how much revenue has been generated for that particular sector. How many deliveries have been made, what deliverables are still not accomplished.
    So as you can see, PS is the center stage for all the modules that are being implemented like FI/CO, SD, MM, PP in this example. You can have cost centers and work centers defined. You can also have profit centers assigned at the plant level and get reports on varius selection criteria.
    In a complete cycle of PS, like in reality, you initiate a project, you confirm/release the WBS/activities as per requirement, you execute the project and you close it.
    One cannot initiate an activity unless it has been released by the project manager. Everything is accountable here and every dime is counted and at the end you know howmuch did you spend or make on each sector (WBS). Dont get confused with the term sector here… I am using it just for the explaination purposes.
    In one typical example, the company I was working with until not too long ago, had Deliveries from the Project (TC: CNS0). We never used VL01N. We used CNS0 to create a delivery and then used VL02N for confirming the picking quantity for the already created delivery document.
    I hope this should help you at least a bit. I’m not a PS consultant so I may not know a whole lot but trying going to CJ20N and you will see a lot yourself.
    PS concultants are one of the highest paid consultants. Their supply is less and so is the demand. They are expected to understand real world business processes very well and they are generally the center stage of a project.

  • Attach Network to a WBS Element

    Hi,
    I have created a network having activity and its milestone using BAPI bapi_network_maintain, and a project and its wbs elements using bapi_project_maintain. Now i've to attach the network to the wbs element using a bapi.How to achieve this??

    I dont know which version you are using. But, it is there since release 4.0A. Go to t.code BAPI > click on Alahabetical tab ? Network > Maintain > INetwork Update.  that is BAPI_NETWORK_UPDATE

  • Standard Price Update fo WBS Element

    Hi SAP Community,
    For a free stock material I can update the standard price by transaction code CK11N and mark/release by CK24;
    For a sales order stock material I can update the standard price by transaction code VA02;
    But how can I update a standard price for a WBS element stock material??
    Thanks & Regards,
    Daniel.

    Hi,
    If your order in Based on the Sales Oder they you can carryout easy cost planning for sales order
    why do u want to standard price to be updated to WBS element
    Need some more clarity on your question
    let me know your process. what is the strategy you are using.
    Regards,
    Raj

  • Assign Project / WBS Element in Notification

    Hi,
    I have one specific requirement from my client that, the Project / WBS element number (created under PS Module) whould be used as reference object in same way as that when Purchase Order & Material document is refered.
    How can I achieve this?
    Regards,
    Prashant

    Hi  Prashant,
    I don't think there is a standard solution for this. You need to develop the solution with the help of Abaper.
    Regards
    Srini

  • How to use BAPI_PROJECT_MAINTAIN to create network activities under WBS elements ?

    Hello ABAPers,
    I have been using BAPI_PROJECT_MAINTAIN to create Project and WBS elements and I have done them without any errors.
    Now I need help on how to create network activities.
    Can anyone share on how to pass data to I_NETWORK table and I_ACTIVITY table and a brief description on what they are ?
    Thanks in advance,
    Kiran

    Hi Kiran,
    Do the following steps
    1.pass the following to i_method_project
    method_project-refnumber = lv_refnum.
    method_project-objecttype = 'NETWORK-ACTIVITY'.
    method_project-method = 'UPDATE'.
    concatenate aufnr(network nr) vornr(activity) into method_project-objectkey.
    2.Into i_activity
    activity-network = aufnr.
    activity-activity = vornr.
    3.i_activity_update
    activity_update-network = 'X'.
    activity_update-activity = 'X'.
    It should work.If not let me know.
    Rgds,
    K.S.

  • Reg. Account assignment or wbs element

    Dear Friends
    I want to create production order without sale order and WBS Elements, using the tcode CO01 i create production order then the sales order or WBS elements need to be entered i.e it is in mandatory field, I want to make it optional. please advice me
    Thanks
    Rajakumar.K

    Dear
    Co01 is a manual creation of production order here u required material production plant and order type
    please check the order type settings OPJH / OPL8
    With Regards
    Pushpalas

  • I need a report of PS Text assigned to Project Definition or WBS Elements.

    Dear Friend's
    I need a report of PS Text assigned to Project Definition or WBS Elements.
    By putting Project Definition or WBS Elements i must get all PS Text & print option is also required.
    How i can do this in PS module.
    Regard's
    Sandeep

    hi pratap,
    on ps texts account, can u pl let me know, how i can restrict using the ps texts assigned to one project, bcos the same ps text can be edited or modified any other user.
    ps texts may be different eg, different excel sheets assigned at wbs elements.
    1. abc project wbs assigned xyz ps text (excel sheet)
    2. zyx project wbs assigned xyz1 ps text (excel sheet)
    the above are used by two different users.
    if abc project user goes thru cj02 for editing the ps text xyz, but at the same time, if this user goes thru pull down list, he can also pick up xyz1 ps text and can do edit/modify. 
    is there any way to restrict thru basis/ps control or authorisations
    my requirement whatever assigned ps text is only has to be changed/modified as & when the user opens project thru cj02
    pl help
    regards
    srihari

  • Delete Partners assigned to the WBS elements using PM_PARTNER_DELETE_PARVW?

    Hi Guys,
                  Can anybody tell me how to delete the partner assigned to WBS elements using PM_PARTNER_DELETE_PARVW.
    Below is the code.but i was NOT able to DELETE the by using the BELOW CODE.
        Is there any other alternative.
       CALL FUNCTION 'PM_PARTNER_DELETE_PARVW'
       EXPORTING
         OBJNR         = 'PR00001103'
         PARNR         = '000050260281'
         PARVW         = 'ZA'
      CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
       EXPORTING
         WAIT          = 'X'
       IMPORTING
         RETURN        = WA_RETURN.
      APPEND WA_RETURN TO ET_RETURN.
    Thanks,
    Gopi.

    Try below code:-
    CALL FUNCTION 'PM_PARTNER_DELETE_PARVW'
    EXPORTING
    OBJNR = 'PR00001103'
    PARVW = 'ZA'.
    Dont pass partner no.
    Enjoy SAP.
    Pankaj Singh

  • Copy partner function from sales order to WBS element

    Hello
    Does someone know if it is possible to copy the partner function and its assignment from the sales order to the WBS element?
    In our project, we create sales order with article having a strategy group (85) view MRP3. Thanks to that a network and a WBS element is created in background based on template. In the template a partner determination procedure is maintained => partner tab in the WBS element is displayed (CJ20N) but the partners maintained in the sales order are not populated.
    Is something missing in the customizing?
    Is it possible to do it in standard?
    Kind regards
    Chris

    Hello Tison.
    I guess you have the Project created with a BAPI in your system in background. As far as I have seen I'd try the following in ABAP to create Partners in the Project Definition: BAPI_BUS2001_PARTNER_CREATE_M or the corresponding method ProjectDefinitionPI.PartnerCreateMultiple. This should happen in background when the Project is created also.
    Best regards.
    Jens Schmid

  • WBS element- Sales Order

    Dear Gurus,
    In WBS element If dont tick on Billig element system will not allow assign this WBS element while creating a Sales Order.
    How it is happening,where can i find out these settings.
    Cheers,
    Sumith

    Hi
    Is it really a standard SAP behaviour which will allows only billing WBS element to be account assigned to a sales order line item? There must be some setting in sales item category or document type or requirement class. Anybody has any idea?
    All of a sudden in my case the sales order document is behaving differently. It is also accepting a non-billing WBS element to be account assigned.
    Some document says that even a non-blling (operative indicator) WBS element can be account assigned. However revenues can flow from sales order only if the WBS element is ticked as billing element.
    In that case, how to set a control in the sales document from not accepting a non-bllling WBS element to be account assigned?
    Regards
    Srikrishna

Maybe you are looking for

  • Open Purchase Order quantity in SC PO

    Hi, Can anybody tell me open purchase order quantity in case of Subcontracting Purchase order. what happen in case of subcontracting po with open quantity of po Thanks and Regards Anil Patil

  • Unable to access UNC path on 2012 R2 file server with ABE enabled

    Brief Description: We have granted access to people via a domain local group on a folder on a file server that is three levels deep from the share, i.e. \\servercluster\share\folder1\folder2\folder3, where folder3 is where the group is granted Read &

  • PAYMENT_METHOD_LOOKUP_CODE on AP open interface import

    Hi all, in the standard concurrent "AP open interface import" when import invoices records, its was created with Payments Method retrive from Suppliers. (this is standard function). But in the scripts (see down) there is a parameter "PAYMENT_METHOD_L

  • Need help with advanced applet

    I need help with designing an applet as follows. Can someone give me a basic layout of code and material so i can fill in the rest or at leats give me some hints so i can get started since i am like no good at applets. Design and implement an applet

  • How to do a select from a table whose name is saved in a field?

    Hello, This is an abap report. I need to do a select from a table whose name is saved in a field of Z* table. Like this.. SELECT * FROM znodos.    SELECT * FROM znodos-tabla.   "znodos-tabla contain the Z* table name        move zodos-tabla-txtmd to.