Standard network not creating project and WBS automatically

Hi,
I have a standard network with a standard WBS assignment at BOTH header and activity levels.
I created a link to a material in CN08 with this standard network.
Assembly processing has been configured.
When creating a sales order, entering the material... the network create screen appears and the system requests a WBS element.
At this point the system should have created the WBS element.
When I insert an existing active WBS element as a test..., the system message indicates that the network is already assigned to a Std WBS element.
Why is the system not using this assignment to create a project and WBS element form the standard structure?
Thanks

Hi,
As a test...
I've removed the linking of the material and standard network in CN08 - and the system now displayed a screen asking for standard network details.
I create the material and standard network link again in CN08 - and I'm back to the original issue of the network create screen appearing, but the WBS field is blank. The system is not generating the WBS.
So - the system is recognizing the link of the material entered in the sales order and the standard network via CN08. But its not using the Standard WBS used in the standard network AND CN08 setup....
Note: The Std WBS has the planning and  billing indicator ticked.
Once again, when creating the sales order, I get the network create screen asking for a WBS element. If I insert an existing WBS element I get the message below. The issue is - I know the standard WBS assignment exists, why isn't the system generating a new operative WBS at this point?
An assignment to a standard WBS element already exists
Message no. CN044
Diagnosis
You have created a network by copying from a standard network. The standard network is assigned to a standard WBS.
However, at the same time, you have made your own assignments to WBS elements.
System Response
When you manually make assignments to WBS elements, the system does not necessarily take the asignments in the standard stuctures into account.
Procedure
When you call up the function replace standard WBS or when you save the network you decide whether the manually created WBS assignments or those fronm the standard structures are copied.

Similar Messages

  • Creating projects and wbs elements

    I am running a conversion and for the upload portion I need to create projects and the relevant wbs elements in the system.  I have been looking over the forums etc and have seen many notes regarding BAPI_BUS2001_SET_STATUS, BAPI_PROJECTDEF_CREATE, and BAPI_PROJECT_MAINTAIN.
    My problem is this.
    I need to update the APPR and PREP system statuses of the projects I create and I can find no way to do this with a BAPI.  I also need to update the location of the project (stort) and the only BAPI I can find that will allow me to do this is BAPI_PROJECT_SAVEREPLICA which seems incorrect to use in this manner.
    in short:
    How do I update project system status of PREP and APPR?
    How do I update project location (stort)?
    Having no luck finding solutions so any help is appreciated.

    Hi,
    I've used these BAPIs but not for your fields. But maybe I can help you. There is no field LOCATION in the project definition but there is field LOCATION on WBS level. So have you tried to change this field on all WBS elements for your project?
    Unfortunately your system statuses are not supported by this BAPI. All supported statuses are mentioned in BAPI documentation. There is a FM STATUS_UPDATE_PROJECT which might help you but you need to be careful what you do. There are some additional FM STATUS_* for generic object status modification but again, you have to be sure that you can set up that system status without any additional checks.
    Good luck

  • Locking of  the Project and WBS Elements at a single step.

    Hi Experts,
                    My client requirement is to lock the complete project and wbs elements so as not to allow any further postings to the project, I knew that we can lock the project or WBS individually by setting the lock status, but i want to lock the complete project  at one step, Is there any possible standard setting to sort out my Issue if not give me the solution.
    Thanks & Regards,
    RAM.

    V RAM PRADEEP REDDY wrote:
    it is possible to set a lock for Project Definition & WBS Elements at a single shot or not.
    >
    >
    may be the below explanation will be helpful.
    You can open the project in CJ20N for example and can set the lock for project definition and also you can set the lock for WBS element without saving and exiting from CJ20N, after setting the lock for both project definition and WBS Element you can save and exit.
    It is not possible to select more than one object and set lock with one click.

  • CJ20N: handle Z table's related to project and wbs element

    Hi there,
    The requirement is to handle Z table for project and wbs element.
    Example:
    ZTAB1 has fields: pspnr | field1 | field2 (for projects)
    ZTAB2 has fields: pspnr | field3 | field4 (for wbs element)
    I found an enhancement that can read z table into internal table, i read it into screen and no problem.
    I use it for wbs element too.
    The problem is when the project has several wbs element's in tree, and the user navigate and change them.
    I can't control the data in internal tables, since the user is swithcing.
    How does the standard sap control the memory from each wbs element and project?
    How can i read and save it separatelly?
    Thanks in advance,
    Edited by: orgasmics on Nov 22, 2010 9:37 PM

    Hi,
    try table <b>jest</b> with key = prps-objnr
    Andreas

  • Extract in a file all deleted PROJECTS and WBS element

    hello everyone,
    i need  to create a file wich contain all projects and wbs element  deleted by the transaction CJ20 , but i dont know how to pick those data once someone is trying to delete.
    please help.
    thank you.

    hello everyone,
    i need  to create a file wich contain all projects and wbs element  deleted by the transaction CJ20 , but i dont know how to pick those data once someone is trying to delete.
    please help.
    thank you.

  • Airport Express can only extend network, not create new one. Why?

    I am sharing a flat with some friends. The shared broadband router is placed in the living room. To strengthen the signal and make it easier for me to manage, I bought an Airport Express, connected it to the shared router with an ethernet cable and set up a wireless network of my own in my room. It was working fine, until recently we renewed our broadband contract. The router had been replaced by a new one (I don't know why) and the network configration had been changed. Since then I was not able to use my own network. In the Airport Utility display, the light of Airport Express is green, but the light of Internet is yellow, and the status is disconnected. I tried to change various other configuration on the Airport Express, and all in vain. Until I switched the network mode from 'Create a new wireless network' to 'Extend a wireless network', the Internet connection was finally back online. But this merely extends the existing network and not what I want. Why this happens? Why my Airport Express can only extend a network, not create one?

    Here is the situation on my Airport Express.
    If I choose to extend the existing wireless network, the Airport Utility shows like this:
    If I set up a wireless network of my own, what I get in the Airport Utility is this:
    See my problems here? The Airport Express does not show anything in amble, but the Internet complains that there is no connection.
    This problem did not occur before the broadband was renewed and the rounter was replaced.

  • Why can´t I create projects and tasks into a External Group?

    Why can´t I create projects and tasks into a External Group?

    At this time, it's not possible to collaborate on a Project with External Contributors or add an Externally-Facing group to a Project. This is functionality that we we hope to add at some point in the future.

  • How to find the Project and wbs Element System Status

    Hi all,
      How to find the Project and wbs Element System Status.
      We can find the system status in the CJ20n transaction but I want the table and field name where it is stored.
    Regards
    Raghavendra

    Hi,
    try table <b>jest</b> with key = prps-objnr
    Andreas

  • FCP X does not recognize projects and events on USB drive after a time machine restore of the MBP macintosh disk

    FCP X does not recognize projects and events on USB drive after a time machine restore of the MBP macintosh disk.
    I upgraded from an i5 to an i7 15" MBP and restored my files using my time machine backup. All seemed to go ok, except I had to use the migration assistant because on the initial boot the MAC didn't recognize the backup database on the USB device. MAybe this is a hint.
    Since when I start FCPX it too cannot finnd the project or event directories.
    Before my upgrade, I had a choice of files either on the Macintosh disk or the 2TB USB disk.
    Now only files on the Macintosh are accessible to FCPX. The USB drive is visible under events and project but it finds no projects or events.
    Please help if you can.
    Thanks
    Barry

    Thanks... alas no one has responded.
    I think I have the structure that you are recommending.
    I have a root level directory (Final Cut Events) with the files in them.
    The puzzling thing is that it used to work before the migration!.
    Anyway I'm going to move the contents to the root and see what happens.
    On a slightly different note...
    I also posted a question about CPU utilization. Can I ask a question or two?
    While rendering a short clip, I noticed burst of disk activity when the render started (likely loading the media files into ram since I have about 4Gigs available, then almost no activity while the render is happening, then more disk activity when its done.
    However the cpu activity is not as high as I would have expected since rendering requires a lot of cpu.
    What is your experience? I know some render is done by the GPU, but in my older i5 the CPU was about 100%, now in my i7 its about 50%.
    Please look at the attached utilization for CPU and disk activity.
    Thanks for any thoughts... Barry

  • I just installed an update on my iPhone and since then the choice to repeat music, or not, has disappeared and it automatically plays songs and albums on a loop. Anyone know how to make it play an album or song just once?

    I just installed an update on my iPhone and since then the choice to repeat music, or not, has disappeared and it automatically plays songs and albums on a loop. Anyone know how to make it play an album or song just once?

    Basics from the manual are restrt, reset, restore.
    Have you tried each of these?

  • We are creating a photo book and on the cover in the lower right hand corner there is part of the title. We did not create it and cannot find how to delete it. Any ideas.

    We are creating a photo book and on the cover in the lower right hand corner there is part of the title. The cover title is centred below the cover picture. We did not create it and cannot find how to delete it.  Any ideas?

    Preview according to this article and see what it does. http://support.apple.com/kb/PH2486
    The printed book will match the preview
    LN

  • BAPI's for creating of Project and WBS elements in SAP system.

    Hi Guys,
                 I was able to use a Wrapper FM for creating the
    We have a FM which combines 5 different BAPIs
    FM/Wrapper: "Z_LEED_PROJ_WBSELEMT_CREATE"
    1)      BAPI_PS_INITIALIZATION
    2)      BAPI_BUS2001_CREATE
    3)      BAPI_BUS2054_CREATE_MULTI
    4)      BAPI_PS_PRECOMMIT
    5)      BAPI_TRANSACTION_COMMIT
    Requirement: To automate the process of creation of Project and WBSE(Tasks) and create an entries in the PS tables based on the user inputs from the user interface in Visual Composer.
    Basically user should be able to create the Projects and WBSE.
    Issue: We were able to create the Project with the FM (BAPI_BUS2001_CREATE) but having the issue with the creation of WBSE(Tasks), the user will be entering the inputs for Project Definition, Project Profile and WBSE which are to be created in the UI.
    The problem is we are not able to create the WBS elements using  BAPI     BAPI_BUS2054_CREATE_MULTI .i will send u the code below .Can anybody correct
       CLEAR it_return.
      CALL FUNCTION 'BAPI_BUS2054_CREATE_MULTI'
        EXPORTING
          I_PROJECT_DEFINITION = i_project_definition-project_definition
        TABLES
          IT_WBS_ELEMENT = it_wbs_element
          ET_RETURN = it_return.
      APPEND LINES OF it_return[] TO et_return[].
    Thanks,
    Gopi.

    Hi Ramiro,
                   This is the entire FM code which is below.
    ""Local Interface:
    *"  IMPORTING
    *"     VALUE(I_PROJECT_DEFINITION) LIKE  BAPI_BUS2001_NEW STRUCTURE
    *"        BAPI_BUS2001_NEW
    *"  TABLES
    *"      IT_WBS_ELEMENT STRUCTURE  BAPI_BUS2054_NEW
    *"      ET_RETURN STRUCTURE  BAPIRET2 OPTIONAL
    *"      EXTENSIONIN STRUCTURE  BAPIPAREX OPTIONAL
    *"      EXTENSIONOUT STRUCTURE  BAPIPAREX OPTIONAL
      DATA: it_return LIKE STANDARD TABLE OF BAPIRET2 WITH HEADER LINE,
            v_error TYPE boolean VALUE IS INITIAL.
      CLEAR: et_return, it_return.
      CALL FUNCTION 'BAPI_PS_INITIALIZATION'.
    Do checks for creating project definition
      CALL FUNCTION 'BAPI_BUS2001_CREATE'
        EXPORTING
          I_PROJECT_DEFINITION = i_project_definition
        TABLES
          ET_RETURN = it_return.
      APPEND LINES OF it_return[] TO et_return[].
      LOOP AT it_return.
        IF it_return-type CA 'EAX'.
          CALL FUNCTION 'BAPI_TRANSACTION_ROLLBACK'.
          v_error = 'X'.
          EXIT.
        ENDIF.
      ENDLOOP.
      IF v_error = 'X'.
        EXIT.
      ENDIF.
    Do checks for creating WBS elements
      CLEAR it_return.
      CALL FUNCTION 'BAPI_BUS2054_CREATE_MULTI'
        EXPORTING
          I_PROJECT_DEFINITION = i_project_definition-project_definition
        TABLES
          IT_WBS_ELEMENT = it_wbs_element
          ET_RETURN = it_return.
       APPEND LINES OF it_return[] TO et_return[].
      LOOP AT it_return.
        IF it_return-type CA 'EAX'.
          CALL FUNCTION 'BAPI_TRANSACTION_ROLLBACK'.
          v_error = 'X'.
          EXIT.
        ENDIF.
      ENDLOOP.
      IF v_error = 'X'.
        EXIT.
      ENDIF.
      CALL FUNCTION 'BAPI_PS_PRECOMMIT'
        TABLES
          ET_RETURN = it_return.
       APPEND LINES OF it_return[] TO et_return[].
      LOOP AT it_return.
        IF it_return-type CA 'EAX'.
          CALL FUNCTION 'BAPI_TRANSACTION_ROLLBACK'.
          v_error = 'X'.
          EXIT.
        ENDIF.
      ENDLOOP.
      IF v_error = 'X'.
        EXIT.
      ENDIF.
      CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
        EXPORTING
          WAIT = 'X'.
    ENDFUNCTION.
      can u please look at the code and let me know the changes?
    Thanks,
    Gopi.

  • How to load Cj01 create project for WBS level 1,2 and 3

    Dear All
    I want to load the project for WBS element.I had used IDOC project01 for the same but I am getting error as 'SaveReplica'method was not called up via ALE.I am presently trying with LSMW recording for tcode CJ01 in order to populate the
    wbs levels 1 ,2 and 3 since the hierachy is not fixed i:e there is no limit as to how many 2 or 3 wbs levels are there so how shall i proceed with recording.If any body has migrated Projects for WBS elements please do share me.In my recording i am getting error 'Do not enter a level greater than 2'.is it that i have to carry t recording for each level seperately.
                        Tried with Bapi Bapi_project_maintain and all Bapis related to it most of the cases i am getting
    error as to no initialization created though having executed Bapi_Ps_Initialization.
    Regards
    Somnath

    Hi Somnath,
    The BAPI, BAPI_PROJECT_MAINTAIN should work for any levels of requirement..and you dont need to initialize it. First, go through the documentation given in the SE37 transaction code. It will explain all. Just concentrate on the reference number. If you see in the example given there, two wbs elements are being created.
    Then you have to use methods like create,save...unlike other BAPI's.
    Just go through the documentation once.
    Regards,
    Vishwa.

  • Sales order for service should create project and link equipments.

    Hi,
    I'm trying to create a sales order for a service material through VA01. The problem is that this sales order should create a proyect, but at the same time i should be able to associate several equipments to the item position.
    The problem is that if I want to create a project, option " Sched.Line Allowed" should be marked for the item category, But if do it, when i create a sales order, if i want to associate 1 o more equipments to my item position, (Extras-->Technical Objects), i get this message "Serial number profile is missing for material..." instead of the table where i would introduce my equipments.
    Is there any solution to this problem or should i proceed in a different way?
    Thanks in advance.
    Luis.

    Hi Luis,
    We both are working on the same vertical, I am also working now in elevators and escalators.
    We have enabled similar (not same) scenario like this.
    When order is created (sales order) using serial number profile, serial no and equipment number are generated. I think even during service order, this can be enabled. The only thing you have to do is to create a profile and link that to material master. Please explore in SD and MM. This is easy to do. This will create equpment no for every item in the service order.
    We have also enabled the creation of whole project for the order and one WBS element  and network for each of the line items adn this happens automatically.  This is done as explained earlier. Creation of standard project, std WBS, std network adn then linking the material codes to these objects in CN08. To my knowledge, this is the only way.  If there is one standard project, which is linked to all related standard WBS, then during order creation, a WBS element is created after the creation of a standard project. When project is created, service order is linked to the project. So for other items, this project is taken and the WBS and network are created using this project.
    Now your assembly processing, production order, Purchase requisition are taken care of by the usage of components overview for activities in the network and object dependencies. For Production orders, you also have standard BOM, which can be linked to activities in the NW. You can control the materials of the standard BOM using selection condition dependencies. You can also initiate variant configuration in service order to maintain the nature of service and then use dependencies to trigger respective assembling, PR etc.
    If you want to do this for multiple eqpmts, you can also use functional location, which links multiple equipments to one place.
    The only thing you have to do is to configure this and see. Only then you will get ideas.
    Pls let me know if you need more information.

  • Advanced action: jump to next slide if all text entry boxes are filled out. If not, pause project and show error message

    Hi there
    Working with captivate 4 and advanced actions, which is a great new feature, I encounter the following problem:
    I have a sign-in slide, where the user has to insert his name and several other data. For user-friendly handling, I have the text entry boxes appearing one after another, so when the user confirms his entry, the next text entry box appears and has the focus.
    The button for jumping to the next slide works with an advanced action:
    Only if the user has filled out all the text entry boxes, the action "jump to the next slide" is performed.
    If not, an error message is shown.
    It works well so far.
    Now, I want the project to pause there, and not to jump back to the beginning of the slide (as suggested in another Thread in this forum), because then the text entry boxes dissappear again.
    I tried to set the movie control variable rdcmndPause to 1 in order to make the movie pause, but nothing happens.
    I tried it with an external playback control bar and without, it didn't work in either case.
    I found the hint:
    To control the project through the skin file, add the prefix cpSkinLoader_mc to the variables. This might be the solution.(?)
    But how can I change the name of a MovieControl Variable?
    If anyone knows, how this is supposed to work or has another suggestion to solve the problem, please let me now.
    Thanks a lot.
    Petra

    Hi Petra,
    I believe I can help you, but from a completely different angle than anything you've tried yet.  I try to find simple solutions to complex problems.  No advanced actions will be needed, just a little creative timing.  First, I need to be sure I correctly understand what it is you're hoping to accomplish.
    If I understand you correctly, you've got a single welcome slide.  On this slide you've got several TEB's (text entry boxes), set up with variables to make your project more personal or gather some required information.  These TEB's have no right or wrong answers, they simply require an entry: such as an address which begins with a numeric key.  The TEB's are set to appear one after another, as one is completed the next one appears.  Once all have been completed a next button, set to "jump to next slide" takes them  to the next slide and on through your course.  You want the project to pause until the user clicks this button, and only proceed if all TEB's have been entered.  If not, you wish an error message to appear.
    If the above description is correct, I'd do the following:
    Leave your TEB's to show up one at a time as the previous is submitted, as you've described. (each one pauses the slide till info is submitted, then "continues" the slide and the next TEB displays)
    Set each TEB to "display for rest of slide".
    For the next button:  In the properties dialog box, options tab, name the button "Next_button" and uncheck the visibility box.
    Open the properties for the final TEB that students will fill in and set the on success property to "show" then choose the Next_button by clicking the drop down arrow beside the "show" field.  This will hide the Next button until all TEB's have been filled in.
    There is no error message, because there is no possibility of error.  Why tell a student they've messed up, just eliminate that possibility!    All TEB's only display after the previous is entered, and the Next button is hidden until the last TEB is entered.
    I've tested this in a simple 3 slide project and it all worked fine, including some variables.  If you need more detailed info, or would like to see the sample proj. I created let me know.
    Hope this helps.
    randy

Maybe you are looking for

  • Can't see disk content with accounts set-up in Airport Extreme.

    Hello, all. I can't see the contents of a hard disk I have connected to my Airport Extreme and shared using accounts. Accounts have been set-up as Read & Write, and Read only, but finder window is empty. Disk mounts on the desktop but doesn't display

  • SAP Script - How to check a text element is empty in Script.

    Hello Friends,               I like to display a text element when it is not empty, otherwise I like to display some other text. I know how to read text element in Script, but  How to check a text element is empty in Script Thank you for your time. S

  • Facebook Access Problem in Safari and from App

    I cannot access Facebook on my ipad from Safari or the App.  Each time I try I get an error message that the connection has been lost BUT I have no problem accessing the internet from other apps or other websites from Safari so the problem is specifi

  • Prevent Active Directory Parent Domain Admins from accessing Child Domain

    We want to prevent Parent domain administrators (or a similar profile?) from accessing and/or administering child domains. Is this possible, or do parent domain admins have irrevocable administrative access to any child domain? Asked another way, can

  • Is it possible to directly upgrade 15454 M12 TCC2 rel 9.10 to rel 9.221?

    I'm planning to upgrade our client's node an ONS 15454M12 from release 9.10 to release 9.221. Can i directly loadand upgrade it to release 9.221 or do I need to do step upgrade 9.10 to 9.211 then 9.221? Is it service affecting? ...many thanks.... che