Standard procedure of component Rejection in production Order

Dear All,
I want to know what is the exactly standard procedure for posting rejection of component in production order?
Some points to be noted !
1).Rejection quantity is not constant. For example, material A can be rejected with 5 EA quantity or 20 EA quantity. so not a static quantity in BOM should be referred.
2) For example, If m going to post rejection of semi finish material abc which exist in finished material BOM. Semi finish material abc contains another semi finish material in its bom. Then how rejection process should be catered in this scenario.
Waiting for your kind responce
Regards
Ahmed

Hi,
You can reject/scrap the semi finish material while it's operational confirmation e.g. by CO11N.
You can put the rejected quantity in scrap or if require to rework then put it into Rework field. See the fields in below screen snap of CO11N,
If your semi finish BOM include another semi finish then at any operational confirmation if is consumed then cost of it considered and ultimately the same is also rejected.
Regards,
Narresh

Similar Messages

  • Standard Report for missing parts at production order operation level?

    Hi PP Gurus,
                We have standard report for missing parts at production orders level.
    For our client, they need a report for missing parts analysis at production order operation level. Do we have any such standard report in the SAP?
    Please help.
    Thanks,
    Reddy.

    Hi Arvind,
          Thanks for for your response.
    1. List: Components,  Layout: Standard layout          set the Missing part
           It shows the component requirement/withdrawn  quantity for each operation of production order. It is not showing the commit quantity.
    2. List: Components,  Layout: Pick list          set the Missing part
           It shows the component requirement/withdrawn  quantity for each production order.
    3. List: Components,  Layout: Missing Parts List-Material View          set the Missing part
           It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
    4. List: Components,  Layout: Missing Parts List-Order View          set the Missing part
           It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
          We are unable to get the solution from all these 1 to 4 reports from COOIS.
    Do we have any option to change the existing layout (ex: 3 ) to get the commit quantity for operation with missing parts indicator?
    If avilable, what is the procedure to be followed?
    Thanks,
    Reddy.

  • To issue the component to the Production Order

    Hello All,
    I have assigned the component to the Operation of Production Order from Different plant(say 1100) of Same company code(1000).
    I want to issue that material from that plant to this plant (say 1000) of Production Order.
      So my question is the correct method of directly issuing the component to this Production Order of different plant.
    Shailendra

    Hi  HAdkar
    The correct procedure is .
    You have to assign special procurement key 80 in material master for which you want to procure from plant 1100. The material master of procuring material should exist for the plant 1100. While running MPR the procurement proposal will be automatically created in the 1100 plant. From 1100 plant you do stock transfer to your storage location. Then finally do GI for the header prod order in you plant.
    This is the procure in SAP. Eventhough both the plants exist in the same compound.
    Regards
    J . Saravan

  • How to create a manufactured component in a production order network

    Hi,
    I've been facing problems to create a subnetwork in a production order. I want to add a manufactured component at a production order network.
    Does anyone know any BAPI or FM to solve this problem?
    Thks,

    I tried to use the below FM sequence, but I just create no-manufactured compenents. However this tried was failed too, becaus a couple of fields was missing when I go to CO02 transaction.
    CO_XT_COMPONENT_ADD
    CO_XT_ORDER_PREPARE_COMMIT

  • Determine a component in the production order

    Hi,
    To determine if a component in the production order is relevant for the paint dispatch list:
    For a Production Order, after retrieving all the components (children) of the header material utilize function module CLSE_SELECT_AUSP.  Pass the following information under the import parameters:
    Function Group: CLSE
    Function Module: CLSE_SELECT_AUSP
    Import Parameters:
    KLART   = 001   (Hard-coded) (ZERO, ZERO, ONE)
         OBJEK  =    (Component number from production order Item) – RESB-MATNR
    MAFID = O  (Hard-coded) (The letter O)
              KEY_DATE  =  (BOM Explosion Date) – CAUFV AFKO-AUFLD
    Returns:
              Table = T_AUSP
              Field  = ATWRT  
              T_AUSP-ATWRT
    Then the following logic should apply:
         IF T_AUSP-ATWRT = OPTPNTD THEN this component (RESB-MATNR) is relevant for the dispatch list.
    can any body explain the meaning of this
    all replies will be rewarded

    Hi,
    i got the solution i came to know the meaning of it
    thanks

  • Scrap Quantity component  in the production order

    Dear gurus,
    in the material master of a component i insert the scrap % ( view mrp4) = 10 %.
    The field is read by planning Mrp and explosion of bom , but when i inseert this component in the production order manually the system don't read this % and the field "scrap quantity in the component detail of the production order is blank.
    Are there a setting for uograde this field ( in the production order ) when i insert MANUALLY the component in the production order?
    Example:
    1) material master of the component  > scrap % (view MRP4 ) = 10 %
    2) production order created
    3) insert this component quantity 100 pc and the system after read the material master  insert 110 pc , and upgrade the field automatically 10 % (as material master)?
    Thansk a lot
    Daniele Pistilli
    PP TEAM

    Hi Danielepistilli,
    Well there is a lot of difference is there: see you are creating production order for header material which is FG. If you maintained component scrap in material level it will be dependent on BOM quantity which you maintained for the header material.
    For example say component x quantity is 50 in BOM. How it will calculate when you run the MRP.
    component scrap % is 5% then:
                                     ===>            (5/100) * 50 + 50
    Formula is: Percentage of scrap quantity x original quantity + original quantity
      So                           ===>           52.5 quantity should be come for component
    So, the order quantity for the header material will not take this quantity or scrap but if you see individually in MD04 screen for X material you can find this quantity ok.
    I hope it clears your doubt and helps you any queries please revert me back.
    Regards,
    Madhu.G

  • Component quantity in production order

    Hi,
    For my finished product component quantity in BOM is 1.386 for the base quantity 100.When am creating the production order for 100 in my component overview of  production order screen it is showing component quanitity as 2 instead of 1.386.
    Since am not using any rounding value,rounding profile and scrap nad upto 3 decimals allowed in CUNI for particular UOM.
    Thanks
    P.Srinivasan
    Edited by: srinivasan ponnurangam on Dec 23, 2011 12:33 AM
    Edited by: srinivasan ponnurangam on Dec 23, 2011 12:35 AM

    As I understand even if production order screen it is showing component quanitity as 2 instead of 1.386 ,Internally it is stored as 1.386 only.
    So as per knowledge it should not affect anything.
    Refer Note 931971 - Decimal places in stocks and stock postings
    Also refer
    Problem with item/component quantity in BOM

  • Fixed component of the production order

    Dear Gurus,
    i need of fixed reservation of the batch at the production order.
    I can fixed the component only in the production ordere ( CO02- batch Assignment ) or are there other transaction , where for production order i can fixed the batch of the component?
    Thanks a lot
    Daniele Pistilli
    PP TEAM

    Dear gurs
    excuse me for the explication ,  i have for a component two bacth :
    111
    222
    and i need of fixed in the production order the batch for example the bacth 222 .
    Now i run the transaction CO02 and in the view of the component select the single component and whit the buttom batch assignment reserve the quantity.
    The system setting the status F in the stock /requirement list.
    I would want to know if there are other methods in order to reserve the batch component in the production order , other transaction .
    Thanks a lot
    Daniele Pistilli

  • Component addition in Production order.

    Iam doing Sales order Mrp. After that planned order is converted into production order.
    Bom components appear in pegged requirements.
    In production order change mode I delete some components and refresh MD04. Components disappear from pegged requirement. It is ok
    Now In production order change mode I add some components and refresh MD04. Components does not appear in pegged requirement.
    I do MRP again but Components does not appear in pegged requirement.
    How to get components in Pegged requirement list??

    Hi,
    Why requirement for new component does not get added when MD50 is carriied out??
    While running MRP using T-code MD50, The system will explode BOM and it will do the net reqmt calculations. Since the newly added component is not part of the BOM, that is the reason it is not considered.
    After doing Plant level MRP requirement for that component gets generated but it does not appear in pegged requirement of header material??
    When you add the component in the production order, it will create the reservation. In the next MRP run only this reservation will be considered and it will plan.
    Regards,
    V. Suresh

  • Batch Determination for a component of a Production Order

    Hello All,
    I need to determine the batch for a given component of a Production Order in my report.
    Like in tcode CO02 we provide the production order and select the component from the list and do the Batch Determination , i need the same functionality in my report.
    Currently i am fetching all the components of a PO entered by user on the selection screen of my report. Know the user selects the component and press on Batch determine button to fetch the batch value.
    Can anyone please let me know if there is any FM or class or BAPI for the same .
    I tried using FM VB_BATCH_DETERMINATION but the passing of parameters is not correct...  still working on it.
    Thanks & Regards,
    Ravi Aswani

    Hi,
    Will you share steps you have completed so far for doing for Batch Determination?
    It will help us to find the missing part..
    - Check all the Batch Characteristic values are maintain in the Batches.If values are missing then also Determination will not take place.
    - Check whether you have maintain Sort rule to Batch Determination strategy or not
    Regards,
    Dhaval

  • Fetching open component qty against production order

    Hi
    The requirement is to fetch component 'open quantity' for a production order. [ Open quantity = requirement - withdrawn qty of the component ]
    Can we get it through /SAPAPO/OM_ORDER_GET_DATA ? I could see the requirement quantity but not the quantity required.
    Thanks in advance...
    Yogesh

    Hi PP_HKV,
    I did as you told me  about use MB1A/261 against production order and you rigth, This not up date any quantity in production order for component only I can see this movoment in option   GOTO --> Documented goods movements, but not in component overview in field Qty withdrawn, It is the same case when I use MB1A/262 transation allow me to do the movment but the quantity in production order for component is not up date only it is show in GOTO --> Documented goods movements
    I see in standard process it is not work as I expect. Is there some way for to do that any bapi o customization?
    Thanks in advance,
    Julio Werekeitzen

  • Reason ofr rejecting the production order

    Dear Consultants,
    When i am trying to release the production order the same is getting rejected. The following message i am getting.
    "Release rejected (check log)
    Message no. C2039".
    When i check the log i found following two error messages.
    1) Order type 8686 plant 8686: No checking rule maintained for operation
    Message no. CO288
    Diagnosis
    To carry out a material availability check, the system needs a check rule.  No check rule has been maintained for order type 8686 and plant 8686 for this business transaction (for ex. "order creation" or "order release").
    Procedure
    Maintain the checking group for the corresponding plant, order type and key (business transaction).
    Key 1: control for automatic checking on
    order creation or manual checking for orders that have not been released.
    Key 2: control for automatic check on order release or manual check for
    partially released or released orders.
    2) Release of order not possible
    Message no. CO118
    Diagnosis
    The order could not be released.
    Please provide a solution to me. I need to release the production order.
    Thanks in advance.
    Anand.
    Procedure
    Check the entries in the release log.

    Well, i m not a PP consultant but i guess thismessage ( CO288) is due to incorrect customizing.
    Please check the data in OPJK for this ordertype/plant combination and enter a corect strategy
    I guess anyway you should address this question to a logistic forum, this is for CO /FI/EC and
    your issue ios clearly PP (so. logistic)
    br, Guido

  • Rejected Qty Production Order

    Suppose I have got a production order for 100 Nou2019s. I have maintained the rejection percentage as 2%. I have maintained 4 operations 10, 20, 30 and 40. While running MRP, planned order generated for 102 Nou2019s. After that I have released the production order. Now during confirmation of operation 10, 4 Nou2019s have rejected. So in this case, what will happen? Whether again new planned order will generate? If yes, then for what Qty (2 or 4)? Please explain in detail?

    Hi ,
    Rejection  % u  defined that is planned rejection( as per ur past exp.). and rejection happen during operation is unplanned .
    It will not create any planned order.

  • Query to show component cost of production order

    Need help writing a query to show the component cost of a production order, using moving average valuation method.
    I understand the table oinm has all history for an item and its calculated price.
    would like to query a production order to show the cost of components at the time of receipt of that production order.
    ideas?

    I have created this query that will work:
    SELECT t0.docdate,t0.appobjtype as [Prod/Comp],t0.itemcode,t0.dscription,t0.outqty,t0.calcprice,(t0.outqty*t0.calcprice) as [Trans Value],t0.warehouse,t0.appobjabs as [Production Order] FROM OINM T0  WHERE t0.transtype='59' and T0.[AppObjAbs] =[%0] order by t0.transnum
    The prompt is where you enter the production order document number.  It will show the calculated cost of components at the time of receipt.
    Thanks for the guidance.
    Rich

  • Production Order - Modify field Material Provision Indicator for component in the production order

    Good afternoon,
    I have a component in the bill of material, that has the option Material Provision Indicator activated.
    When i create the production order, the component automaticaly is activated with the  Material Provision Indicator option.
    However, in the production order, this field isn't possible to modify, because is closed.
    Anybody knows way the modify this field? Configure to open?
    Thanks.
    Kind Regards,
    António Pinho

    Hello Amar,
    I am also getting the same error while Releasing Production Order and Costing (CO11N). This error is related to EHP7 in our case.
    Please try one of the following solution and see whether the error is gone or not.
    1. Implement the SAP Note 1317551 - Error AD_SUBCON 141 / 143 / 144 (T417)
    OR
    2. Complete the customizing of Material Provision Indicator (T Code OICO) as per the attachment.
    Regards,
    Prashant Karanjgaonkar

Maybe you are looking for

  • Error in BSP of LSOCP300 Business Package

    Hi community, I've deployed a business package LSOCP300 in my J2EE 6.40. I've activated a BSP service in Backend system (ECC 5.0) with BP LSOFE300 (Sap E-Learning Solution). On testing the BSP service,I've a "Raise Exceptions" on link "Training Activ

  • How to handle errors in a file at sender side?

    Hi I have done a file to proxy scenario. I know how to handle errors on proxy. But on sender side when picking the file if one the record have worng fomat its throwing mapping error and its not processing any record.. I wanted to process the records

  • Can't run Adobe Bridge

    Hello folks. I've never run Bridge before, was never interested, but a lot of people seem to like it and it came with GoLiveCS2 so I decided to give it a try. It seemed to come up okay, then I immediately got this window. I have Illustrator, GoLiveCS

  • Trying to Rebuild and my scores keep tanking!

    Hi, I've been working on my credit for a little over a year.  Here's what I have: BankOpenedLimitStatusBalanceHigh Credit CommentsBofA2/13$500current$175$531AllPIF each moCapitalOne3/14$8001x30 10/14$46$439AllSm balance each moDiscover (AU only)3/87$

  • No Adobe flash player for Motorola Milestone ( 2.1 update 1 [Eclair]) Middle east (Lebanon) ?????

    ??????????/