Standard Values in confirmation

How to flow standard values maintained in routing into confirmation. This values are coming in production order but not coming in confirmation.

Dear Mayuresh,
In OPK4 for ur order type and plant in operation individual entry using initial screen tab tick all check boxes except finaly confirmed and confirmable operations.
test and come back
sree

Similar Messages

  • Standard Value doesn't carried to Process Order Confirmation

    Dear Experts,
    I was trying to run Process Order Confirmation via COR6N but I found out that the Activities shown are NOT consistent with the Activities set in Master Recipe.  The following are the figures shown in master recipe, process order and order confirmation.
    Master Recipe (via C202)
    Base Qty =1
    Operation/phase = 0020
    1st Standard Value (activity 3 setup) = 1Hr
    2nd Standard Value (acitivity 1 machine) = 2Hr
    3rd Standard Value (activity 11 labour) = 3Hr
    Process Order (via COR2)
    Order Qty = 1,000
    Operation/phase = 0020
    Setup (to be confirmed) = 1Hr
    Machine (to be confirmed) = 2,000Hr
    Labour (to be confirmed) = 3,000Hr
    Order Confirmation
    Operation/phase = 0020
    Machine time (to be confirmed) = 1Hr
    Labour time (to be confirmed) = 2,000Hr
    My question are as follows :-
    1) Why the Machine time NOT same as in Process Order
    2) Why Setup time NOT shown in Order Confirmation
    Does anyone have any idea?
    regards,
    Abraham

    Hi,
    all the master recipe, process order and order confirmation, including the material master are maintained by myself alone.
    Is it due to some parameters are not defined properly such as in the formula key?
    The formula key are defined as below.
    Formula key defined in OP21
    Setup  = SAP005 = SAP_01 x SAP_11
    Machine = SAP006 = SAP_02 x SAP_09 / SAP_08
    Labour = SAP007 = SAP_03 x SAP_09 / SAP_08
    Paramater defined in OP17
    SAP_01 = Setup
    SAP_02 = Machine
    SAP_03 = Labour
    SAP_08 = Base Quantity
    SAP_09 = Operation Quantity
    SAP_11 = Operation Splits
    I'm a bit confused with these formula keys.  Could you explain to me how they work?
    regards,
    Abraham

  • How to determine the value of a Standard Value in a routing operation

    Dear Experts,
    Kindly guide me on how to detemine the value of my Standard Value in the  operation of my routing, or in the phase of my Master Recipe.
    I mean what determines the value that I enter for the Standard Values: Machine  and Labor in the phase of my Master Recipe?

    Hi,
    In the Routing / Master Recipe, the standard values are based on the lot size.
    For Example, if you have the lot of 100 KG, then in recipe the machine time will be 2 hr and labor time will be 2 hours, it means to make 100 KG we require 2 hrs of machine and 2 hrs of labor.
    Normaaly all production manager / supervisor will have the date for the hours. The system will calculate will respect to batch / lot size.
    If you have order for 1000 KG, then the system will assign 20 hrs for Machine and 20 hrs for labor.
    This will be used for Capacity planning and Costing.
    Capacity plan here your requirement is 20 hrs for machine and labor. If you have a reacto which wil run for 24 hrs a day, then the order will be completed in a day.
    Costing is concerned, all std. valur key will be assigned with an activity type in work center / Resources and the prices for activity type / cost center will be maintained in KP26.
    Based on the cost and hours, the system will allocate cost for the order (it will be planned cost). When you are confirming the order you will enter the actual time for the operation, then that will be your actual cost.
    Pl do a sample test scenario in your sand box, and surely you will understand more.
    The data for Routing / Recipe will be provided by the production manager of the plant and activity price will be provided by the finance team.
    Thanks,
    JK

  • Goods receipt at standard value also if there isn't record in Qbew..

    Hi i have this question:
    i have PP order to deliver. Material to deliver is Make to Order in particular for WbE, price control S.
    It's the first time a deliver it in the sistem, so Qbew is clean.
    I have calculate the standard cost for the material only with ck11n so at divisional level so only Mbew as the standard value that is 100.
    My planned cost for the PP order are 110.
    What i want to realize is to have a good receipt (MB31) at Mto stock evaluated at standard price 100 and not with planned value 110!!!
    The process run as i want if the sistem has already a record in Qbew, but not when is clean!
    Thanks.
    Paolo

    hi, try to be clear.
    I have MTO business scenario, but  i don't calculate standard cost with CKW1 but only with ck11n,a nd i released with ck24.
    So,for istance, i have an article with:
    control price S and  standard price released 100,and procurament type E, dependent requirement indicator= 1.
    so i create an PP order to produce this article linked to a WbE, so i have an MTO order. After saving this ord and realising it, planned cost are valuated and for example are 110.
    Then i confirm all activities... labor... picking... external... Mh etc...my total actual cost are 120.
    Now i want to deliver this article to valuated stock, it's MTO so in my case i have the production order that is assigned to the account of the project.
    So when i deliver it movement 101 Q , the stock of the WbE linked to PP order should increase of a standard value so i suppose 100, but this doesn't happend the stock increase of 110, the planned value. Infact after this in Qbew i have 1 quantity and 110 value stock!
    How could i have an increase of standard price 100 of my stock instead of planned cost 110? so the next PP orders makes consumption at standard? 
    is it more clear now? i hope.
    What i should do? Because in the case of cost planned is equal to cost standard released i have the luck and moviment to stock is done at hte right value but it's luck.
    Thanks!

  • Standard Value and Activity at maintenance order

    Dear All
    I have created a standard value and attached a parameter of unit meter cube with the work center, however when i create maintenance order of same work center (by using IW31) system is not showing standard value parameter i attached on work center. It only shows activity type to select and operation duration in HRs.
    Kindly respond on you earliest.
    Thanks
    Regards
    Navaid

    Dear Narasimhan
    In this process operation we are consuming natural gas that i want to take as an input that how much gas has been consumed during maintenance. I have created a standard value key and then attached that with workcenter. now i want to take that gas consumption value during confirmation.
    Regards
    Navaid

  • Functional module for production order operation standard values

    Hi,
    Is there any functional module/BAPI available where I can get the 'Standard Valuse' (Setup/Machine/Labor) from production order operations directly?
    Regards,

    Hi Caetano,
    Thank you for your reply.
    I checked suggested BAPI BAPI_PRODORD_GET_DETAIL, it gives me the operation details like control key, Activity name (like KMCH, KMOD) but not its standard values (values for: Setup/Machine/Labor).
    Could you please check and confirm?
    The FM: PM_ORDER_DATA_READ gives me all details but as name start with PM, I am not sure if its only related to 'Plant maintenance' orders and if its ok to use this FM for PP production orders.
    Please suggest.
    Regards,

  • Unit of measure for Standard Value.

    Hi Gurus
    I have maintained Standard value LABOR in workcenter and maintain deafault value for unit of measure in workcenter Default tab .
    But that unit of measure is not defaulted in routing when i put some value.

    Hi Mayuresh,
    When you insert a work center in the routing, the defaults specified in the Default Values tab gets copied into the operation. The Standard Value Units get copied to the Standard Value fields (1 to 6) i.e. eg: In work center you have specified the Standard Value key as SAP1 which has the fileds - SETUP, MACHINE & LABOR, then in the operations if you scroll, you will find 3 columns named as SETUP, MACHINE & LABOR with the Standard Value Unit which you have maintained in the Work Center - Default Value tab. You can edit these UoM in the routing though.
    The same holds good when you assign the work center directly in a production order, you can edit the values in the StandadVals tab of the Operation.
    Hope the above answers your query.
    Regards,
    Vivek

  • CAPP - standard value calculation origin 9 function module CE22.

    Dear,
    I've a project where i need to calculate standard value time based on multiple and various criteria. (standard price of a all components assigned to one operation)
    I've seen that it should be possible to calculate a characterisitic value based on a function module in a method. (characterisitic value origin 9 - function module).
    When i try to use the method with a function module I get a dump. ( CALL_FUNCTION_PARM_MISSING).
    I don't find any documentation on the usage of a function module. as origin for CAPP.
    Could you please help me ?
    Br,
    Daniel.

    There are so many threads and documentation available on the same..Please search the same.
    Moreover if you share the error then it would be easy to know the exact problem
    Regards,
    AL

  • How to batch change the standard value of routing

    Dear all,
             I meet a problem, and need you help.
            As you know, we can use T-code "CS20"  to batch change a component's quantity in different Bom by a factor.
           for example:  Component a in Fert. A,  quantity change from 6g x 0.9 = 5.4g
                               Component a in Fert. B,  quantity change from 8g x 0.9 = 7.2g
           now, my question is how to Batch change the standard value in routing. (select by work center)  CA85N can select the value, but seems can not batch change by a factor,
           thanks in advance

    It is not a big task for u prasobh...Just play in CEWB for 5-10 mins you will understand everything....
    If you face any issue let me know..
    For ur information I am also an IBM employee...
    Gobi

  • How to make the current values in the frontpanel as standard values (in an exe-file)?

    There are some posts to this topic, but I couldn't find a satisfying solution to this.
    Simply example for what I am looking for a solution: The fronpanel includes one numeric input element. I start the VI, change the value of the numeric input element to an other value and than stop the VI. The next time I start the VI I want the numeric element to have the value that it had when the VI was stoped. Preferably, I want the value of the numeric element be setted up as "standard-value"  when I push a button (see the example attached).
    Thanks.
    Solved!
    Go to Solution.
    Attachments:
    Frontpanel_SaveAsStandard.vi ‏8 KB

    I put together a very basic example, which should give you the idea. Find it attached (this subVI only works with doubles).
    Of course the toolkits which Sam_Sharp mentioned are much more "pro" solutions with much more options...
    Regards!
    Attachments:
    emulate_exe_mainVI.vi ‏16 KB
    config_subVI.vi ‏22 KB

  • How to solve sync problem between Outlook calendar and iPhone when reminder is set to _some_ non-standard values?

    Hi,
    I am having a sync problem between my iPhone/iPad and Outlook calendar events (Outlook 2010).
    Here is the description of the problem:
    1. In Outlook - please create a new event/appointment (e.g. "Test").
    2. Reminder is set by default to 15 minutes. You can change it by using a dropdown menu - please select: "0,5 days".
    3. Click on "0,5 days" and change it manually to "14,5 days".
    4. Click on "Save & Close".
    5. (Do not snooze or dismiss the reminder.)
    6. Sync with your iPhone/iPad.
    7. Open this new event on iPhone/iPad - you can see that alert is set to "15 minutes before" instead to a correct value that was set in Outlook.
    The same problem can be seen if you set the reminder to e.g. "3 weeks" (standard value is "2 weeks").
    However, it is interesting that non-standard values like "1,5 days" (and all other until "13,5 days") are synced without any problem.
    Does anyone have a solution how to solve this problem (different than the trivial solution of not using those strange values)?
    Thanks!

    Thanks to another post (https://discussions.apple.com/message/17501071#17501071) I reset the sync history, here is what to do: 
    Launch iTunes.
    Before you hook up your iPhone to the PC and iTunes do this: Go to iTunes Edit menu > Preferences… > select the iPhone > click the Reset Synch History button > click OK.
    Connect the iPhone to the PC and let iTunes recognize it.
    In the top right corner is the iPhone icon, click on the left side of the iPhone icon > the iPhone menu launches.
    In the menu along the top click on Info > make your selections > click Sync button > it gives you a dialog at the top with the steps it’s going through during the sync.
    In the top left of the iTunes app > click Exit.

  • Bapi to change Standard Values

    Hy,
    can anyone tell me if exists a BAPI to change standard values (times) for production order.
    tks,
    Tiago

    Hello Tiago,
    try with BAPI_PRODORD_CHANGE.
    Best Regards, Dirk

  • Operation Overview-Standard Values Rounding

    In production order operation overview screen, the standard values (setup time & Processing time duration) are rounding up and displaying with one decimal place. Where as in routing the same standard values are displaying with 3 decimal places.
    Is there any config setting (or screen exit) for to display setuptime duration in CO02/CO03 operation overview screen with more than one decimal places?

    Saiful,
    Execute T code CUNI.
    Select 'Time' & click on 'Unit of measurement'.
    In the next screen, select the desirder UOM. Click on details.
    Under 'Display' put 3 for 'Decimal places'.
    And under conversion put 6 for 'Decimal places rounding'. Save.
    It will solve your problem.
    Hope this helps you.
    SmanS

  • Standard Values in Production Order for Alternate Work Center

    Hi SAP Expert,
    I would like to find out whether there is possible solution for the requirements as below:
    e.g.
    >>> Routing for Product A only has one Operation 0010.
    >>> 4 Work Centers/Resources (A,B, C, D) can be assigned to run this operation where all these 4 Work centers/resources are having different capacities (Setup, Labour, Machine hour & Electricity are different).
    >>> Out of these 4 work centers, only one work center will be selected (Selection criteria will be based on the capacities & availability).
    >>> In my current setting, only one preferred work center (A) is maintained in the routing for operation 0010.
    Issue:
    >>> If I select the work center B manually in APO during the planned order creation, the Production Order created will be tied to work center B but the standard values captured in the Production Order are still referred to the standard value of A.
    Question:
    1. Is there any way I can maintained in the routing so that it will captured all the different standard values for each work centers?
    2. If the answer is yes for Q1, then can the SAP auto populate the correct standard value into the Production Order according to the work center I selected before the planned order is converted into Production Order?
    Thanks.
    Regards,
    Hooi Chia

    Hi,
    You can use alternative sequence in routing and mainain three different sequence for all 4 workcenter.
    At APO side you can maintain priority for alternative sequence in PPM/PDS.
    Now when you execute the scheduling Heuristic depending on priority and capacity workcenter will be assigned.
    Regards,
    Vishal

  • Error in standard value key

    Hi ,
    I have created one new standard value key  with four parameters,
    In one of the parameters formula was missing,
    i have entered it in Standard value key and trasported to producction and used it in Work Center.
    Now my issue is, due to missing formula the system is showing error in my order creation , it's 100% right and acceptable,
    But , the same error is howing in PS , PM order, where this Standard value is not all used,
    in PS,PM standard value key is SAP0( no standard values), why it is happening as i m not using the new Std value key in PS/PM
    Regards,
    Pavan

    Hi,
    this is an error message,
    In PM/PS order we are using different stndard value key,
    This parameter is not at all used in those Standard keys, i have check every thing, that is what my confusion, Y it is throwing
    error
    Regards
    Pavan

Maybe you are looking for

  • Printing PDF while in Safari

    Recently I had to reinstall Adobe Acrobat Reader to view a PDF in Safari, previously I had no problem with other sites.  The page is displayed normaly, except when I select "print" it's blank on the print page.  I do not like Adobe Reader, it seems t

  • When is Apple going to fix keyboard shortcuts?

    iOS6 has been out for more than a year now.  When is Apple going to get around to fixing the keyboard shortcuts.  They worked perfectly on iOS5 but they only work about 10% of the time with iOS6.  Will this issue be resolved with iOS7?

  • Measure tree

    Hi all, could anyone please explain the functionality of the measure tree in the management cockpit. Are formulas of calculated measures shown there in a graphical way? I have a calculated measure in a query and I integrated this measure into a frame

  • GNOME 3.12 Power and Graphics Issues

    Hello, this is my first post.  Please excuse any stupidity...I didn't mean it.  These issues seem related, so I am going to list them all here.  I have searched extensively for infomation on how to fix these problems over the past few weeks and have

  • IDOC_INPUT_SPE_DELVRY: RMA numbers could not be found

    HI, I am new to IDOC, In WE19, I'm using the function module IDOC_INPUT_SPE_DELVRY(For IBD creation). While executing the function module I am getting the error "Delivery Items with requested RMA numbers could not be found".  In we02, I'm searching t