Standard Work Order without requirements

Hello
How or what do I need to do in order to generate a Standard Work Order for an item and NOT have or allow Oracle to automatically create material requirements?
Thank you in advance for your time.
Bob

The three possibilities
If you never want to use the bill of material for this part number then just create the jobs and the system will allow you to do so (even though you don't have a BOM defined).
You can use an alternate as suggested above.
If you want the BOM to be present for the item and don't want any material requirements then you have to manually delete the requirements for this job using Job/Schedule details>Material requirements.

Similar Messages

  • Actual costs posted to work order without maintaining costing variant

    hi,
    i havent maintained costing variant for work order(maintenance order) type i used to create the work order. so when i posted goods issue, how does the actual costs get posted with out maintaining the costing variant for work order type. what is the role of costing variant configuration in work order type settings.
    thanks,
    monica

    Hi monica,
    Costing variant forms the link between the application and Customizing, since all cost estimates are carried out and saved with reference to a costing variant. The costing variant contains all the control parameters for costing.
    The configuration parameters are maintained for costing type, valuation variants, date control, and quantity structure control.In costing type we specify which field in the material master must the price be updated,
    In valuation variant we specify in what order the system should go about accessing prices for the material master planned price, standard price, moving average price etc. Further which is the price which should be considered for activity price. How the system should select BOM and routing.
    assign points if useful
    Regards
    Genie

  • Can you post GR to Work order without it being released??

    HI, Currently if a work order in PM hasn't been safety checked and released no GR can be applied.  Ihave looked at all our setting and can not find anything that would suggest I can change the settings to allow GR even though teh WO hasn't been released.
    Can you please advise??
    thanks
    helen

    I did understand what you were asking. I was talking about linking the movie to the netstream variable/object. The problem is as you stated at the bottom. The server doesn't like when I use an FLV file. I don't think it particularly cares if I useany other format, but it doesn't like the reference to the flv. It sees both files individually, but when the swf tries to connect to the flv, either through the flvplayback or the netstream, it sees the swf as an MP4 container. Since I can't control the movie without coding the AS3 for the Movie load in the first frame, the swf is trying to load/link to the movie from the start. Do you know anything about how it would work if I changed over to silverlight? I love flash, but if this place doesn't allow the video to work, I need to change to a video format that does work.

  • Complete work orders without complete notifications from Overall Completion

    We have a work order assigned to a notification type and we need to complete the work order from the overall completion transaction  (IW42) without completing the notification when clicking on technical completion button.
    Is it possible?

    You can check with your netweaver team if this could be controlled from user authorizations. Do check if the following Business Transactions are available against the tcode "iw42"
    PMM2     Put notification in process     
    PMM4     Complete notification     
    PMM6     Put notif. in process again     
    I hope this will help.
    Regards

  • Create Process Order without requiring a GR

    HI,
    Does anyone know if it is possible to create an order type for rework purpose that allows us to allocate operations but requires no material goods issue but mainly requires no goods receipt.
    We need the input batch, Hu's, serial numbers to remain the same as the output material has not changed it has just been re-labelled.
    Thanks
    Stuart

    Stuart,
    What is the purpose of the rework order for the business?
    It seems you just want to just book all labor costs for relabelling/rework but not have any input ( Goods issue) or output (GR).
    At one client for a similar requirement to capture inbalances in actual inventory vs system inventory we had 1 open order each month that would have all the unaccounted labor costs booked and GI for excess inventory was done to the order.
    This order was then closed out each month end & costs settled at period end.
    The process was well accepted & worked well for this client of mine.
    Hope this gives you some idea on what you want to do. Else please feel free to ask more questions.
    thanks,
    Ram

  • Standard sales orders reports required

    Hello Experts,
    I want to know the standard reports to view the following:
    Orders entered in system but not processed due to any issue (Report should display quantity and value)
    Orders processed but not yet issued (Report should display quantity and value)
    Orders processed and invoiced raised (Report should display quantity and value)
    I tried using Va05 and va14l but it did not serve the purpose, as quantity and value were not visible, kindly guide me.
    Regards,
    Ali

    Dear .. use Query reports SQVI

  • PR Created with reference to Work Order

    Dear Experts,
    We have Work Order Process where Purchase Requisition for Material & Services are created with reference to Work Order . We have chosen the Option (from release), which means PR is created once the Order is released.
    Our requirement is always from release and when the work order released, system to pick the user details of Work Order Creator (not Work Order Release).
    Hope to get the details on the issue.
    Regards,
    Sahu

    Dear Chaitanya,
    When the work Order is released, system creates the Purchase Requisition and in this case PR Creator is the person who has released the Work Order.
    In Work Order log, we know the details  such as, who has created the Work Order and who has released. As SAP standard, Work Order release person is the PR Creator as we have made the setting with From Release.
    Our Requirement is on PR creation, system to take the user details of Work Order Creator. This would help to determine the PR approval process in a better way.
    Regards,
    Sahu

  • Work Order Basic Start Date and Basic Finish Date to be changed

    Hi,
    Currently the business creates work orders without specifying the work resulting which the start and fish dates on work order are same. Also we have automatic scheduling turned off. In spite of this If I am trying to manual modify the basic start and basic finish dates on work order it does not allow me to do so. This issue is seen with work orders which are Released whereas orders with status outstanding have no issues. Could anyone please let me know what could be the reason?
    Thanks,
    Vinay

    Please check whether Scheduling type only capacity requirement is configured.
    If yes, choose this scheduling type in order, you can able to change Basic start date & basic finish date.

  • RRB on a Work order

    Hi,
    I have a client who is using Work Orders to manage their program of works. They are currently manually extracting the cost info, and creating a manual invoice, but would like to do this in the system.
    The question I have is how do they bill via work orders, without having to create service orders. We are still at the requirements/blueprinting stage, so I am not really able to dummy things up, and play around in their system, so I am just looking at  the theory behind it, and making them comfortable that is is able to be done.
    They have a high number of orders, and I can not see it working 1-to-1 sales order to work order.
    So, how is this going to work?
    Plesae let me know..
    Thanks,

    Dear Daniel,
    The Work orders can be captured in SAP as Contracts (Service Contracts) VA41. in this service contracts we can captured all the program of work done by each individual as Service ( Material Ids with Number of hours work done) .and will maintain same in Condition records( VK11) which will reflect price in Service contracts. Once this done we can create DP91 or DP90u2014which will capture the actual hours based on resource utilization.
    This process will have integration with PS (Project system) module .which will create WBS and Assign to Individual works with each WBS.. And also with HCM (Human Capital management) which will captures actual hours work done by each one.
    1) Before going for this we need to Configure u201CDIPu201D Profile which will captured the Cost and actual Hours billed and should assign to respective u201CContract Item Categoryu201D
    2) Contract Profile should de define and Assign to u201CService Contractsu201D
    3) Define Billing Plan type and Assign to respective u201CContract Item Categoryu201D
    Regards,
    Seegal

  • Generating deltas records after a work order status change

    Hi
    We are currently reporting on Work Order status changes in BW. However, the process team has written an ABAP program that allows users to change a Work Order status or an Opeartion status. Any changes using this method do not trigger a delta record to be written to the Outbound Queue MCEX17 and subsequently we do not pick them up in BW without having to to a re-initialise.
    Could anyone tell me how we could trigger a delta to be written to the Outbound Queue in the same manner as the standard Work Order change transaction IW32.
    Cheers, Mark

    Hi
    I m not sure about functionality though but you can create delta by using FM...
    Search SDN and you will get doc for that..
    Regards
    Guarav
    Assign points if it helps

  • HOW TO: EAM - Work Order Page - Change Concurrent Program to run

    Hi,
    my customer is using EAM and in the Work Order Search page the customer can select a work order and press the button "Print Work Orders". The standard work order (BI Publisher report) print is submitted.
    Their request is to submit the Customized version of this concurrent program.
    Can this be done and how can this be done?
    Thanks in advance.
    Regard Roel
    Edited by: user13071061 on 6-okt-2010 6:26

    Hi,
    Can you please check that what is the Template of Standard Work Order Report.
    It comes from the setup for Document Types in Oracle. Most probably the template will be
    XXL-FO. And if yes, then you need to have the customized report also, in XXL-FO Template and then in Document Types just give the name of the customized Template Name (Register the Template and Data Definition in Oracle first). Save it
    and then run the page again to see if now it picks the template of your customized report or not.
    Thanks,
    Gaurav

  • Re:No release of production order without standard cost estimate

    Hello Experts
    I do not want to release any production order without standard cost estimate
    I have come acroos the same problem raised by some other users and can you please suggest how to achieve this?
    Is there any way to achieve this without user exit?
    Thanks and Regards
    Subbu

    Hello Subbu,
    In this case, you need to put the status as "B4" Blocked in costing 1 view of material master, when you create the costing view and change it to "03" status when you released the cost estimate.
    Please note that this field can be overwritten in MRP view also. Hence please get the good control of material master and good coordination with PP team to achive this.
    Please let me know if you require any clarifications.
    Thank you,
    Regards,
    Santosh
    Please reward points if helpful.

  • Requirement Assignment Tab on Work Order

    Hi Gurus,
    I am working on capacity planning.I am creating an order & putting some requirement let say 2HR. with the help of capacity levelling in CM25, I am dispatching the manpower against that req, which is getting updated in PM order on requirement assignment tab.After conpletion of job I am  doing techo. Now my qyery is :
    1. During teco, requirement assignment tab is not there in order.
    2. If I am cancelling that Teco of order, manpower which is udpated thorugh CM25 in order, is getting clear.
    Is this the standard system behaviour, if yes, please guide me what is the reason. In case of no, how to solve this.
    Thanx in advance

    Hi,
    As mentioned, it is expected that requirement assignment data is deleted at time of technical completion. Documented in KBA/Note [1634839|https://bosap-support.wdf.sap.corp/sap/support/notes/1634839].
    -Paul

  • Standard to item caregory B or Frame work order

    Hello All
    What are the impacts are there when i change the standard PO to item category B or frame work order.
    Assume that one of the external system creates a PO in ECC system and i am trying to change the item category B or frame work order of the docuement type?
    what impacts in the system?
    one benifit, i need not do good receipt or any other benifts/ impacts?
    any help  is appreciated.
    Muthu

    Hi,
    Whether you trying to create the PO with Item Cat B you will need to worry about the consumption as with Cat. B you need to mention the Account assignment cat. whether its K or U or M any thing but your material will go in consumption directly for that specified account and not to the accounts you maintained for that material.
    this will impact you on your monthly report's or the Yearly reports as if you have changed  tha account for consumption.
    as well if you have consumed that material you need to put the Material Valuation as Moving only as the price of all the PO will be differed and the material in PO will need to monitor for MAP change by M1EP TCode.
    see if you want to consume all the materials for specified accounts other than what you maintaining now, is very much helpful for you but not to maintain your Price. as well if you gonna sale that material how you going to rectify the price is a big problem so there will be a difference in Profit analysis also.
    Try do Confirmatory test in DEV(i think you have done that) still i suggest not to go for B other than Standard one.
    Regards,
    Ninad Kshirsagar

  • Generating the RM requirement based on the work order?

    Does Oracle Disceret MFG has the provision of generating the RM requirement based on the work order?

    Hi,
    If you mean RM requisition as Material indent from Stores , then Yes, Component Pick Slip is the form
    Regards
    S

Maybe you are looking for

  • AS3 pass variables-values from loaded external swf to parent swf

    Hi, I am working on an eLearning project that uses a main SWF (SWF1) and a second SWF (SWF2) with 2 quizzes in it. Published to AIR for Desktop and Android, SWF1 and SWF2 are packaged together in the AIR desktop or AIR APK exports. I can use a loader

  • Play video (http) works, stream video (rtmp) does not; edge server not starting

    However, I think the problem is the edge server not starting. I looked in the logs directory and found the core log, the master log. I also found /var/log/messages. Shouldn't there be an edge log? I did this from the readme: sudo ./fmsmgr server fms

  • Adding field to mb52 by copying it to a zprogram.

    HI Guru's, I am using the t code MB52 to display warehouse stocks of a material. This overview is needed to find out what the specific stock per storage bin is. For that we need to copy the standard program from MB52 to  a zprogram and add MARD - LGP

  • A Way to Tell if a New Doc is Created from an INX?

    Dear all, Is there a way to tell if the newly document created has just been recreated from an INX? I was guessing that IDocument::IsConverted would provide some kind of a clue, but apparently no. Thanks!

  • Choppy scrolling in Firefox/Facebook

    I beta tested Yosemite. That being said, when I was still running Mavericks, I had this awful problem in Firefox (especially on Facebook) where scrolling down got horribly choppy, and the rainbow spinny pinwheel would come up constantly. After instal