Start date in the past

In the process orders scheduling parameters there is a field called allow start in past when backward scheduled. Under what scenario would one allow an order to start in the past ?

In SAP "allow start in past when backward scheduled" comes when it is backward sheduled. Now you have two options.
1) If order is already physically processed you can allow it so that this order will not consume capacity in future which is not required.
2) if order is not physically processed you can change it to forward scheduling.
If the end user is doing all the transaction On-line this kind of problem will not generate.
Regards
AM

Similar Messages

  • Problem-planned order start date in the past

    I use PP-PI - After MRP run, planned order was created and has exception message "06-start date in the past" its make me wonder because before this problem occur we already tested many time and never found this message(06). then i check in OPPR- field "start in past" is blank, OPPQ- field "Start in past" are not check, OPUZ-Scheduling Type is backwards and field "Start in the Past" is blank, OPU5-Scheduling Type is backwards and field "Start in the Past" is blank.
    do any guru know why system not use forward scheduling when found that start date in the past? or have any config of other module which may lead to this issue?
    thank in advance.

    In OPU5,
    Check the setting for correct MRP group which is assigned in  material master or in the SPRO node
    Production >Material Requirements Planning>MRP Groups-->Define MRP Group for Each Material Type.
    check and come back

  • Start with dates from the past in the planning book

    I want to maintain some figures from the last 14 days in the past.
    And I want the planning book to show these 14 days, when I open the planning book.
    (I do not want to scroll back).
    In my Data view i have to define a Time Bucket profile for the future. (system demand)
    This profile I has defined with one day.
    The Time Bucket profile for the past are 21 days.
    When I start the planning book with the view, I see only one column with todays date.
    I want to see the past 14 days, and therefore I have to scroll back.
    Is it possible to start with the last 14 days?
    - By setting the Period information in the Data view tab?
    - By other settings?
    - By macro?

    Hi Per,
    You need to go for a developing an ABAP report. The development calls for updating the planning start date in the data view design mode.
    You can use function modules /SAPAPO/MSDP_PB_READ_DVIEW and /SAPAPO/MSDP_PB_SAVE_DVIEW_TAB.
    So the logic could be as follows:
    1. First develop a FM which will determine the planning start date as per your requirements. This has to be with respect to the system date. So this Function module should in effect subtract 14 days from system date and store in a date field.
    2. Using the FM  /SAPAPO/MSDP_PB_READ_DVIEW, this date can be updated in the data view / PLanning start date field.
    3. Using FM /SAPAPO/MSDP_PB_SAVE_DVIEW_TAB, you can save and generate the data view.
    After developing the program you need to schedule this in background so that the planning start date is calculated and stored automatically.
    You need to take care of one thing though. In case there are any macros developed in the data view/macro book, the start dates for macro execution will be changed as well. You need to tweak those as per your requirements.
    Hope this helps.
    Regards,
    Ashutosh

  • Call object was called with start date in the previous month

    We have a single cycle maintenance plan for 30 days.
    Shift Factor Late Compl.   : 100%
    Tolerance                    :  10%
    Shift Factor Early Compl. :  100%
    Tolerance                    :    10%
    Cycle modification factor:    1
    Factory calendar            :  NIL
    Call horizon                    : 100%
    Scheduling period          :  90 DAY
    Scheduling indicator       : Time
    Call no . 11 was a plan date of 14.08.2009 has completion date 14.08.2009. Schedule type/status has "scheduled complete".
    Call no. 12 was called on 13.09.2009 which is in the past.
    Can someone explain why the system called the order with a starting date in the previuos month , that is , 13.09.2009.
    And how to rectify it to make it current date for the next call object?
    Thanks,
    Manohar

    I checked the algorithm for call no. 12
    Start of Cycle                07.08.2008
    Last planned date         14.08.2009
    Compl.Predecess           14.08.2009        Absolute shift                +   0 Da
    Planned cycle/offset      +    30 Da          Relative shift            0 % =   0 Da
    Shift                                 +     0 Da           erance value           0 % =   0 Da
    Planned Dates Due   13.09.2009    Completed on
    Last call on              15.10.2009    Called by               IP1020091015
    Workorder generated has start date 13.09.2009.
    Should we restart this plan , as the start dates in call object are at least 1 month old ?
    Thanks,
    Manohar

  • Enrollment of Benefits for a dependent and for date in the past

    Hello Experts-
    Can anyone let me know? What kind of changes need to be done on backend and portal for enrollment iview to enable a date in past for enrolling a dependent to the benefits..
    Thanks,
    Raj.
    Edited by: raj1234 on Feb 25, 2011 9:16 PM

    The way we have configured this as follows:
    -  We ask employees to first add all the dependents to the system before beginning their enrollment process.
    - Adjusted the Use cases for the Dependent infotype and subtypes accordingly.
    - Implemented the BADI (with custom logic for DEFAULT_DATE) HRXSS_PER_BEGDA to control the start date of the enrolled dependents.
    - We control the start date of the dependent records created in various ways (birth day of dependent, employee start date, adjustment reasons, ... )
    With this, we are able to provide employees with the ability to add dependents as of a past date and hence enroll dependents in Benefit plans as well.
    - Shanti

  • Maintenance Plan - Avoid maintenance dates in the past

    Hi gurus,
    I have a requirement that I dont know how to solve it.
    I our maintenance plan (Based on days and activity) we need to avoid dates in the past when we start the plan (IP10).
    We've noticed that sometimes in days based plans, after start in IP10, some records for dates in past appears.
    Example:
    If we start a plan in 01.01.2011 and cycle is at 10 days we get this:
    ABNUM    NPLDA
    1-              11.01.2011
    2-              21.01.2011
    3-              31.01.2011
    We dont need records 1 and 2, because it planned date is in past.
    Is there any way to avoid this records in past?? Our ideal behaviour will be as the following, with no past dates.
    ABNUM  NPLDA
    1-             31.01.2011
    Thanks in advance.
    Edited by: Ole ES on Jan 25, 2011 7:32 AM

    Solved using IPRM0004 user-exit.

  • Load a sales order with delivery date in the past

    Hi,
    We want to load in the system a sales order with delivery date in the past, and maintain the schedule delivery date in the past. To do that, in the customizing Sales And Distribution / Basic Functions / Delivery Scheduling and Transportation Scheduling / Define Scheduling By Sales Document Type, I selected the flag Blackwards. But the problem is that the rest of the dates in the scredule line: goods issue date, loading date, material avail.date and transportation Plan Date, are in blank and you cannot enter any data because the system deletes it.
    How can I have these dates informed with dates in the past?
    Thanks in advance,

    You can control this using the "Message Control" in the SAP IMG.
    Supplier Relationship Management>SRM Server>Cross-Application Basic Settings>Message Control>Influence Message Control
    Using this you convert Error to Warning or even swith off this message.
    Please refer this thread for complete steps:
    Re: How to change an error message to a warning message in SRM
    Note: you need to suppress the messages relevant to your case here.
    Regards
    Kathirvel

  • How to print out a date from the past

    I am trying to print out a date from the past but I cant seem to get It,
    Lets use for example Independece Day,
    How would you write the code in order to print out that exact date?

    Look at the
    [url=http://java.sun.com/javase/6/docs/api/index.html?
    java/util/Date.html]Date APIActually the Calendar class would be better to use, since you can set all the different fields from year to second, plus things like day of week, day of month, week of year, etc.
    too slow
    Message was edited by:
    hunter9000

  • How does the GR processing time affect the scheduling of the process order & the latest start date in the operation.

    Hi
    Can anyone explain  how does the GR processing time affect the scheduling of the process order & the latest start date in the operation overview.

    Hi
    GR processing time means number of workdays required after receiving the material in storage.
    Check this link:GR Processing time
    Regards,
    Anupam Sharma

  • How to process data in the past based from data in the present

    hello guys,
    i have a problem in my labview programs. how to process data in the past based from data in the present ?
    i have a formula self-organizing maps
    this formula is looking for D1, D1 is neuron index that will be searched for the smallest value.and the result are D1=2 ,D2=5, D3=17 from calculating with formula  .it means the smallest value is 2, "2" from weight [2 2] in file attached.
    and then it will be in other formula
    it mean [2 2] + 0.5 ( [1 1]-[2 2] ) = [1.5 1.5]
    and the weight will be  [1.5 2 2 ] in matrix
                                              1.5 3 5
    I would appreciate any input/help on solving this
    thanks
    Attachments:
    dika.vi ‏16 KB
    weight.txt ‏1 KB
    data .txt ‏1 KB

    Hi Ronny Hanks,
    Moving your records from internal table into the database table depends upon various scenarios :-
    1. If you use INSERT statement.
    INSERT <database_table> FROM TABLE <internal_table>.
    But in this case, you need to make sure that you don't have any duplicate entries in your internal table that violates data entry into database table, else you will get a dump.
    INSERT <database_table> FROM TABLE <internal_table> ACCEPTING DUPLICATE KEYS.
    In this case, you are forcefully inserting duplicate records into your database table which may lead to data redundancy in your database table.
    2. If you use UPDATE statement.
    UPDATE <database_table> FROM TABLE <internal_table>.
    This will update the existing records in your database table from the internal table.
    3. If you use MODIFY statement.
    MODIFY <database_table> FROM TABLE <internal_table>.
    This statement works both in combination of INSERT & UPDATE statements.
    Existing records (in database table) will be eventually updated/modified and new records (not in database table currently) will be successfully inserted into the database table.
    Hope this solves your problem.
    Thanks & Regards.
    Tarun Gambhir.

  • How do I change the start date for the week from Monday to Sunday on my iPhone 5?

    How do I change the start date for the week on iCal from Monday to Sunday on my iPhone5?

    Yes. On my new iPhone 5 the iCal week begins on a Monday not a Sunday and does not give me the option to edit in settings on the phone

  • Is there a way on CONVERSION to create a sales order with a scheduled ship date in the past?

    Is there a way on CONVERSION to create a sales order with a scheduled ship date in the past?
    Customer wants to maintain the original scheduled ship date on converted ordered, but the scheduled dates is defaulting to sysdate for past due shipments on converted orders.

    Hi Friend,
    As of now there is no functionality to display SSD,RD,PD backdated, max it can be sys date, not lower then that.
    Regards
    Shyam
    Please see following Metalink Note ID for all in One solutions
    Oracle E-Business : All In One Metalink Note ID's
    If you are happy with the Document, please mark as Helpful by doing so this will provide assistance for other people looking for answers to their queries.

  • Only return activities with a date within the past 90 days

    I'm doing an activity report that should only look at activity with a date within the past 90 days. I would like to avoid using a prompt; just to make things easier. Is there a way to do this say via a formual for example? Any thoughts?

    try this record selection formula
    {date field} in Over90Days
    regards,
    Raghavendra.G

  • Delivery Date in the past

    Hi Guys,
    Question:
    I have one item order with a Customer requested date of 6/23/2008 entered against plant 2000.
    quantity 400 units.
    Because we ware moving to a new warehouse we had to create a new sales document against plant 2019 with a creation date of 7/10/2008 but we left the same customer requested date ( in the past )
    stock just became available recentily in october and the material availability date was for October 24th, at plant 2019.
    so the system split the line into 2, line one with a delivery date in the past (6/23/2008) and
    the other with a delivery date in Novemeber.
    Does anyone know why this would happend? the MAD is in octoboer, so why would the system force
    the first line to be delivered on 6/23/2008?
    is the issue caused by creating the new order and leaving the Customer Requested date in the past?
    there were some other items in this Order that did not behave this way.
    any feedback would be appreciated.
    Cheers
    JD Loera

    While entering the sales, if you maintain the customer's requested date as in the past then system would give you a warning message and you can proceed. When you enter the material it would not be possible to deliver the goods as per the customer's requested date and hence system would carry out the forward scheduling and propose the next possible date when the delivery can be made to the customer.  This would ensure you have more than one schedules line for the line item.
    Regards
    Nadarajah Pratheb

  • Inventory status for a date in the PAST with BATCHES with VALUE

    Hi,
    How can I get a status REPORT of all inventory as on a date in the PAST with BATCH numbers and VALUE?
    The following ready reports do not solve my problem:
    1. Inventory Status: This gives CURRENT date inventory QUANTITY only.
    2. Inventory in Warehouse Report: This gives CURRENT date only, no BATCHES.
    3. Inventory Audit Report: Doe not give BATCH numbers and ignores qty without transactions.
    4. Inventory Valuation Report: Meant for "what-if" only.
    5. Inventory Posting List: Does NOT give BATCH numbers
    6. Batch Number Transactions Report: Doe NOT give VALUE.
    I suppose an SQL will be required for this requirement?
    Thanks,
    Ajay Audich

    Hi Rozario,
    Thanks for the pointer. Could you or anyone of the gurus out there have a code for doing this which will achieve this?
    Thanks,
    Ajay
    Edited by: Rui Pereira on Dec 9, 2008 5:08 PM

Maybe you are looking for

  • Disk error - How do I fix this?

    I was running Onyx, and while verifying the HDD, it told me I had an error on the startup disk and needed to run Disk Utility off of the CD to fix it. I ran the utility while in OSX (not the CD) and it says this: Verifying volume "Macintosh HD" Check

  • My yahoo mail works on safari but not firefox

    tonight i still can receive yahoo mail but the top line is gray so i can't send mail, i can't delete mail with the top trash can, i cannot edit or add a new contact. please advise. apple laptop, all up to date

  • Can't print on my F4580 all in one from my MacBook with OSX via usb

    Hi Forum, I have a HP F4580 All-in-one printer/scanner which worked fine on my old laptop with windows vista. The laptop has now died so i thought I'd try Apple. I now need to print some stuff off for work but it doesnt seem to produce anything. It's

  • Win7 and Reader X - default settings for ALL users/profiles

    I have a custom browser/app that opens PDF's within the app which can sometimes cause issues. I found that if I set Reader X to not open in the browser (Edit>Preferences>Internet - uncheck "Display PDF in Browser") that this does resolve most issues.

  • How to bring Job Posting tab page in Requisition Maintenance?

    Hi All, I want to know how to bring the Job Posting tab page in Requisition Maintenance? As SAP help document says, before creating Job Posting you should create the corresponding requisition. I can able to create the requisition as a requisition man