Start up date and valid from date in equipment

Hi,
If we put start up date before valid from date in the equipment master record,will there be any significance?

Hi,
Start up Date => Date from which the Equipment is used for operation or in any activities. This will be used for MTTR / MTBR analysis, as Thyagarajan told.
Valid from date => Date from which that equipment is valid for the existing structure. In case, if Superior FL / Equipment has been changed for the equipment, valid from date will get changed according to that.
Regards,
Maheswaran.

Similar Messages

  • Handling Valid To and Valid From Dates in Infocube

    Hi Gurus,
    I am designing a transaction data InfoCube for Human Resources. The date from and Date to are seem in PSA.
    But they are not display in InfoCube .
    Can anyone share thoughts on how to handle this situation?
    Thanks in advance.
    Sincerely,
    Minaxi

    You look for the infoobjects in the cube level and also in the update rules , but it may be also another reason , just check if this is the one,
    if you include a keyfigure of type Date with Data type DATS, then it will not be available in the planning level. To include a Date keyfigure in the planning level you need to define it as DEC.

  • Planned order creation with PDS valid on only order start date and not finish date

    Hi All,
    We have requirement to allow creation of planned order manually if production version is valid on order start date and not finish date.  This is because lead time of order is longer. I refered OSS notes 385602. I could find out solution for this is implementation of OSS note 694140 to change validity mode at activity level to consider start date of first produce activity  in validity interval. Problem is even If I create order in APO by implementiong this note planned order is not transfered to ECC and it gets stuck with error production version not valid.
    Is there any way in ECC to control this? Any config or customization?
    Regards,
    Santosh

    Nilesh,
    I think there is a simple procedural skip happening in your business process. You are right when a planned order is created after MRP it would default assign it to the first available production version. 2options available for us,
    1. First use transaction MF50 and do the line loading and assign the quantites to the production versions/Production lines, so that the actual capacity planning is getting completed. This way you can have planned orders with both the production versions and matching to your actual line capacity.
    2. Use Quota arrangement concept, to automatically split the Planned orders during MRP for a percentage based on individual production versions.
    Now when backflush is performed S225 table is updated and Planned order qty also gets reduced.
    Hope this helps....
    Regards,
    Prasobh

  • I have a password problem. After importing data and settings from one MacBook Pro to a new one, I have to put my iCloud password in when re-starting, but the password from the old computer in when waking the computer from sleep.

    I have a password problem. After importing data and settings from one MacBook Pro to a new one, I have to put my iCloud password in when re-starting the new computer, but the password from the old computer in when waking the computer from sleep. I want to use my iCloud password on both computers consistently. How can I fix this?

    The only other place to change a password for the computer login is in Users & Groups preferences. But I don't really know enough here to fix your problem. You can try fixing the keychain:
    iCloud- Frequently asked questions about iCloud Keychain
    Tutorial: Resolving Keychain Issues
    If you can't access your keychain, or forget your password If you can't get into your keychain file because you've forgotten your password or the keychain file appears to be corrupt, there are a couple of options.
    First, if you've forgotten your password, you can use the "Keychain First Aid" utility to make the keychain password the same as the login password. This can be accomplished via the following process:
      1. Open Keychain Access (located in Applications/Utilities)
      2. Go to the "Keychain Access" menu and select "Preferences"
      3. Click the "First Aid" tab
      4. Make sure the "Synchronize login keychain password" box is checked
      5. Close the Preferences window
      6. Go to the "Keychain Access" menu and select "Keychain First Aid"
      7. Enter your username and password
      8. Click the "Repair" button
    The second option is to completely delete your keychain then recreate it. This routine is useful if your keychain appears to be corrupt or otherwise inaccessible. This can be accomplished as follows:
      1. Launch Keychain Access (located in Applications/Utilities)
      2. Click "Show Keychains" in the lower-left corner of the window.
      3. Select the problematic keychain from the left-hand pane.
      4. Navigate to the "File" menu and select "Delete Keychain '(name of keychain)'"
      5. Check all options for deletion and press "OK"
      6. Create a new keychain by going to the "File" menu, then "New" and selecting
          "New Keychain"
      7. You can now make this keychain your default if you desire by selecting it, then
          going to the "File" menu and selecting "Make '(name of keychain)' Default"
    Login as root and perform repair In some cases, problems with keychains can only be resolved when logged in as the root user.
    First, you want to enable the root user:
      1. OS X Mountain Lion: Enable and disable the root user
      2. OS X Lion: Enable and disable the root user
      3. Mac OS X 10.6: Enabling the root user
      4. Enabling and using the "root" user in Mac OS X
    After enabling the root user, and logging in under this account, again open Keychain Access. First attempt repairs using Keychain First Aid, and failing that, delete then recreate the keychain as described above while logged in as root.
    Persistently asked for stored passwords If you are persistently asked for passwords in various applications that you have specified should be remembered in a keychain, your "login" keychain may not be active for one reason or another.
    Navigate to ~/Library/Keychains/ (this is the Library folder inside your user's home folder). Find the file named "login.keychain" and double-click it.
    Failing that, select the "login" keychain within the Keychain Access application and make sure it is the default keychain by going to the "File" menu and selecting "Make 'Login' Default"
    Turn off Keychain synchronization in applications having problems If specific applications are experiencing issues when accessing password-protected material, the Keychain may be to blame.
    The above comes from an article published on MacFixit.com.

  • How are valid-from and valid-to dates set in TRPROD table in APO during CIF

    First question:
    How are the valid-from and valid-to dates set in the APO TRPROD table?
    For example, if I activate a transportaion lane model on March 1, 2008, will the valid-from and valid-to in TRPROD be 20080301 and 99991231?
    Or are these dates defined in the model itself? Or in APO config somewhere?
    Next question:
    Suppose I rerun the model on May 1 2008 to add some records that didn't get added in the March 1 run.  But suppose I want to back-date the valid-from of these records to March 1, rather than use May 1 as the valid-from.
    Can this be done?
    Or is the valid-from always the date of the CIF that creates the TRPROD records?
    Please advise. 
    Thanks

    Hi Srinivas -
    Thanks very much for replying so quickly, but your response didn't answer the questions.
    Let me try again.
    1)
    If I run a CIF on March 1 2008 based on a model that will generate APO TLane data, will the TRPROD valid-from and valid-to get automatically set to 20080301 and 99991231?
    2) 
    If the answer to this question is yes, then is it also true that if I run a new set of records in on May 1, 2008 (no duplications with the original set), then the valid-from and valid-to dates will be 20080501 and 99991231.
    3)
    But if (1) and (2) are both true (if you answer them both "yes", then suppose I want the May 1 record set to have valid-from dates of March 1 (for example, if the May 1 record set includes records that didn't get included in the March 1 set due to an error in selection criteria).  How do I get the valid-from to be March 1 when I run the CIF on May 1?
    On the other hand, if (1) and (2) are NOT true, then how DO the two dates get set during a CIF ????
    Thanks
    djh

  • How to pass Valid from and Valid to Dates in CS_BOM_EXPLOSION

    Hii Experts,
    My requirement is to explode BOM using CMC LDB and generating files for all the remaining months by varying Valid from and Valid to dates. For this I am using CS_BOM_EXPLOSION but it has provision for a single date field.
    Can you please guide me how to pass both Valid from and Valid to dates in CS_BOM_EXPLOSION ? And if you can suggest any other alternative, its most welcome...
    Regards,
    Vikas

    Hi Vikas,
    There is a tables parameter STBP which is of type CSXGEN.
    This structure CSXGEN contains two fields valid from date(DATUV) and valid to date(DATUB).
    Is this what something you are looking for?
    Regards,
    Swarna Munukoti

  • ARQ: Are "Valid From" and "Valid To" dates are considered for risk analysis???

    Hi All,
    I have one question w.r.t. risk analysis of user while raising a request in ARQ.
    I have noticed that, when a user is assigned 2 conflicting roles in a request (with "Valid From" and "Valid To" fields being the same), ARQ shows risk violations properly.
    This is quite logical, because user is assigned conflicting roles within the same dates.
    In another scenario, if a user is assigned 2 conflicting roles in a request (with "Valid From" and "Valid To" fields being different)
    Example:
    Time Administration : Valid From=15.06.2014 and Valid To= 31.12.2014
    Payroll Administrator: Valid From=20.06.2014 and Valid To= 31.12.2014
    ARA still shows as violations (in ARQ)! Though the "Valid From" dates are different.
    Logically, user is not assigned these roles at the same time to cause a risk violations. However, system is showing violations.
    May I know if validity dates are considered while performing risk analysis in ARQ? If no, then what could be the justification?
    Please advise.
    Regards,
    Faisal

    Rafal,
    Thanks for your reply.
    Does it mean that all future dates will be considered while analysis?
    OR
    Does ARA consider these dates?
    Regards,
    Faisal

  • Validity start and Validity End date in PO

    HI  gurus
       can you plz tell me how to activate  validity start and Validity End date in PO
    Neha

    Hi,
    It is applicable for PO done for Frame work oder with Doc type - FO(Frame work order)as its an agreement of supply of stock only between specified period.For this kind of Doc type system makes it mandatory to enter the valisity start and end date.
    Thanks

  • Table containing 'Valid From' and 'Valid To' dates --  tcode SU01

    Hi All,
    I want to know the Table containing 'Valid From' and 'Valid To' dates -- In tcode SU01 ---Tab Logon Data there are 'Valid From' and 'Valid To' dates. I want to know the table(s) where this info is stored.
    thanks
    Naved

    Looks like you have two userids. Login to SDN using your userid that created the post and assign the points. If you don't see the radio button then change your original post to a question.
    Message was edited by: Prakash  Singh

  • Valid from date in ECM and BOM.

    Hi All,
    I create a Change master with release key and assign a material as an object whose BOM will be changed. I save the Change number.
    I go to change BOM main screen of the same material and enter the change number created, by default the valid from date comes as todays date. But when i hit enter to go inside the change BOM screen then the date dissapears from the field and i get an error as "please enter valid from date" even if the date of ECN is valid and that of BOM is also valid.
    Can somebody help in this?
    Thanks
    Shailesh.

    Shailesh,
    While creating the BOM have you used the change number ...? if yes then display that change number and check wheather do you have any alternative date mention in it.
    check validity date of change number as well as BOM validity.
    another reason can be you need to apply SAP note 1278790.
    https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=0001231930
    check it out and revert back for further discussion.
    Hope it helps you.
    Regards
    Ritesh

  • How to get valid from date in KONH Table

    Hi ,
          I am sending COND_A idoc for MRP. Now when I create a record using VK11,the valid from date is fine.
    But while changing the same using VK12 changed date does not reflect in KONH Table (when the new valid from date is greater the the previous one) .I understand the SAP Logic behind this from previous threads .
    But my issue is this :
    Suppose I have a Material X created with Valid from = 10.01.2011 & valid to = 31.12.9999
    Now I change this Valid from = 28.01.2011 & valid to = 31.01.2011.
    Now how can I send the data for 28.01.2011 in my I-doc , as KONH still has 10.01.2011 as valid from date.

    even if you send the data for 28.01.2011, it should pick up the condition record because the start date for condition record is in past? why do you think it is a problem? now if your concern is that if your input date is 27.01.2011 and it should not pick this condition (that is a different matter altogether)...

  • Help reqd on Changing the Valid from "date"  for both BOM & Routing

    Hi all...
    Pls advise me how to do the changing of Valid from "date"....
    Is there any process in CC01 or ECM???....
    pls reply me in detail step format (step by step analysis)....
    I wrongly created in CS01 and CA01 as 05.10.2007 as my valid from date instead of 01.10.2007.....
    How to change to my actual one......
    I dont know how to change it exactly.....as im beginner in SAP...pls take this into consideration...and post ur replies imm.
    Pls reply me in detail....will be rewarded at the end while closing this issue.
    thanks & regards
    sankar

    Dear Sankarbabu,
    IF there's no setting for Date Check in OS54 - Engineering Change Management
    Control Data,then you can create a change number with past dates,and also to
    use the same one for changing BOM.
    Tell me one thing you are saying you want to use ECM.Was the earlier one
    created without BOM was created without an ECN?
    See already if you have created your BOM with an ECN,then remove the date
    check setting which I have mentioned in OS54.
    Now goto T code CC02 ,enter the Change number and give the valid from date as
    01.10.2007.
    After that check in CS03 whether this date(01.10.2007)is getting reflected or not.
    I'm sure this will solve your problem.
    Regards
    Mangal

  • Updating Cube in the End Routine based on the incoming Valid From Date

    Hello Experts
    Here is my scenario.
    We are using BW 7.x.  There is DSO and from DSO it goes to the Cube, the promotions information.  These data targets will have Material (Article), Plant (Site), Promotions Number, Valid from and Valid to dates.  The Valid To date will come in as 12/31/9999 all the time.
    If I receive a new record from ECC with same Material, Plat and Promotion combination again, I need to get the Valid From Date from the new record and Update the existing record' Valid To date in DSO/Cube as Valid From of the new record - 1.
    So Valid To date of the existing record = New Record's Valid From date minus - 1.
    I would like to do the update in "End Routine" of the Cube.
    Would you please suggest if this can be done and if so would you please provide the sample code.
    THANK YOU in Advance.
    Nag.

    yes, you can do this...
    just use a RESULT_PACKAGE in end routine.
    and using RESULT_PACKAGE fatch the existing records from DSO and append that into RESULT_PACKAGE after your desired changes,
    just try to create a code using this l;ogic. if you can't then i will provide you a code.
    Regards,
    Ashish

  • BPC 7.5 NW: Import master data and Hierarchy from BI

    There is a HTG about Import master data and Hierarchy from SAP NT BW, the BPC cost center master data's property have corresponding attribute  InfoObject 0COSTCENTER of BW.
    what about for those properties which do not have corresponding attribute in BW? I would asume that START_ROUTINE and END_ROUTINE will do this in BPC side,  can we also do this on BW side instead of BPC side?

    Hi,
    You can check this in start routine which can be called from Transformation file using BADI.
    http://help.sap.com/saphelp_bpc75_nw/helpdata/en/28/b66863b41f47589b9943f80b63def6/content.htm
    Hope this helps...
    regards,
    Raju

  • Dump in user exist CC01 to set default value to valid from date

    Dear friends,
    Task is to set default value to valid from date field in Transaction "CC01".
    In INCLUDE ZXCCAU01 of Function 'EXIT_SAPMC29C_001' in Enhancement 'PCCD0001' I written the code like this
    DATA var LIKE sy-datum.
    var = var + 1.
    which is not related to program by creating project and activated the project.
    When I run cc01 it is giving dump.
    Error is :
    Program "SAPLXCCA" tried to use screen 1000.
    The screen does not exist.
    Can some one guide me What is the problem and How to resolve this.
    If not, Is there any other method this can be done.
    Regards,
    Venkat

    Hi venkat,
    DATA var LIKE sy-datum.
    var = var + 1.
    the code u written i guess not ok.The code used by kishan is correct. i.e
    DATA var LIKE sy-datum.
    sy-datum = sy-datum + 1.
    var =  sy-datum.
    write var.
    use the above code.
    SAPLXCCA is a functionpool not a program.please check the same.
    regards,
    Nagaraj

Maybe you are looking for