Statistical Key - Unit of Measure Percentage

Hi SAP Expert,
In our setup we are uploading plan values in controlling.
After uploading we run plan assessment cycles. In assessment cycle setup we are using statistical key for allocation percentages.
The issue which we facing is that the allocation percentages has decimal values also like e.g. 8.98%, 8.09% .... Total 100%
When user is posting allocation percentage in stat key we are getting value 9%, 8%..... due to that by product we are getting differences in SAP plan values.
I checked below settings in STAT KEY Master and UOM master data which is as below:
T-Code: KK01
Stat Key: YKAEA1
Controlling Area: 1000
Name:Cost Allocations %
UOM: % Percentage
Category: Fixed Values
T-Code: CUNI
Unit of Measure: Proportion
Int. Measure Unit: %
Display
-Commercial: %
-Technical: %
-Decimal Place: 2
-Float point exp: BLANK
Conversion
-Numerator: 1
-Denominator: 100
-Exponent: BLANK
-Decimal pl. rounding: BLANK
ALE/EDI
-ISO Code: P1
any suggestion or idea?
Thanks in Advance,
Prashant Rane

Hi
Instead of uploading 8.98 and 8.09 - Upload 898 and 809
i.e. Upload the values per 10000 instead of per 100
br, Ajay M

Similar Messages

  • Material Master MATMAS IDOC and base unit of measurement

    Hi
    We are using SAP standard material master IDOC type MATMAS05 to trigger IDOC. Our material master is having base unit of measure as "G". We are not using ISO unit of measurement. But Material master IDOC, segment E1MARM is populating base unit of meaurement (MEINS) as "GRM".
    Any idea why IDOC is picking ISO unit of measurement instead of material master base unit of measurement.
    Any idea how to send base unit of measurememt as "G" instead of "GRM" in DOC segment.
    Thanks
    Nilesh

    There are ISO codes for country keys, currency keys, units of measure and shipping instructions. According to SAP design guidelines, you should use ISO codes for an IDoc if they are available. When you set up the IDoc, the SAP codes have to be replaced by ISO codes.
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCMIDALEPRO/BCMIDALEPRO.pdf

  • Unit of measure with language Key

    Hello Guruz,
    WHile creationd of purchase order, there is a check kept which compares the vendor communication language which gets updated in the Po header - Communucation tab with Db table T006A which holds the Unit of measurements with Language Key and pops up an error message.
    It cheks the order unit in the PO, and the T006A whether the unit is maintained in the Language key as in the PO header - Communiction tab.
    But while creating a unit of measurement in CUNI, we dont have the option to maintain the language key for the UOM.
    In CUNI, it defaults the language key as EN in table T006A.
    I need a prompt support from you guys on this issue. Please suggest how to go about with this?
    Best Regards
    Greg.

    Hello,
    When i am trying to go for the language key in CUNI, it says that the said language is 'not available in server'. I guess it is checking whether the language patch is updated in the server.
    But it doesn't sound logical to maintain all the unit of measurements in all the vendor languages. Suppose if we are having vendors with 75 communication languages and we are having 50 units os measurements, so does that mean that we have to maintain units of measurements 75 X 50  times ?
    Kindly provide your inputs on the issue. We are facing lots of issues with this control kept in PO header checking for the T006A with the vendor communication language.
    Regards
    Greg

  • APO key figures - units of measure

    I am using APO V5.1.
    Via RSA1 I have created a key figure of data type Quantity and unit = 0UNIT.
    I have assigned this key figure to my planning area and planning book.
    The planning area has unit of measure = CAS, and this is the unit of measure shown for my new key figure in interactive planning.
    How can I change the unit of measure for my new key figure to D(ays)?
    Thanks for any advice...

    Datta,
    Thanks for this reply.
    I have followed your advice...
    I have a key figure with data type 'Number'.
    In interactive planning, this key figure is appearing with a blank uom.
    In the planning book design, on the 'key figure attributes' tab, I cannot however make any changes to the key figure attributes including uom, as they are greyed out.
    Any ideas on this?
    Thanks...

  • Report on material code, description and all unit of measure conversions

    report on  material code, description and all unit of measure conversions ?
    any ideas?

    Material Number MATNR
    with this key and SPRAS (the desired Language key)
    from MAKT you can get the descriptions..
    and with MATNR from MARM you can get alternative UOM and the conversion rates.
    If you need help on MARM how to get the conversions please notify.
    Hope it helped
    Please reward if found useful
    Best Regards

  • Unit of Measurement in Material Master

    Hello Experts...
    I have an intresting issue on Unit of Measurement. I would like to maintain alternative unit of measurement as per below..
    1 EA = 1 EA
    1 ROLL = 5000 EA
    1 CT = 150,000 EA
    However the field UMREZ length in the material master allows me to enter upto 5 digits...and also it is not possible to enter decimal digits here.
    Have any one of you faced this kind of issue, if any one faced what would be the solution for this...?
    Look forward to hearing from you..
    Cheers
    Umakanth..

    Hi Umakanth,
    For increasing the numerator for conversion of base unit of measure, UMREZ  would be  appending the structure SMEINH by requesting Access Key from SAP.
    Even though its not a suggestible decision to append standard SAP structure , if the requirement demands we may need to do that.
    Cheers!
    Sudhakar Reddy

  • Unit of measure for Standard Value.

    Hi Gurus
    I have maintained Standard value LABOR in workcenter and maintain deafault value for unit of measure in workcenter Default tab .
    But that unit of measure is not defaulted in routing when i put some value.

    Hi Mayuresh,
    When you insert a work center in the routing, the defaults specified in the Default Values tab gets copied into the operation. The Standard Value Units get copied to the Standard Value fields (1 to 6) i.e. eg: In work center you have specified the Standard Value key as SAP1 which has the fileds - SETUP, MACHINE & LABOR, then in the operations if you scroll, you will find 3 columns named as SETUP, MACHINE & LABOR with the Standard Value Unit which you have maintained in the Work Center - Default Value tab. You can edit these UoM in the routing though.
    The same holds good when you assign the work center directly in a production order, you can edit the values in the StandadVals tab of the Operation.
    Hope the above answers your query.
    Regards,
    Vivek

  • " Unit of measure ****** is not defined; check your entry in table T006

    I´m Trying to create a material from MDM to SAP and I´m monitoring the IDOC in  WE05 and i get the next message:
    " Unit of measure ****** is not defined; check your entry
    Message no. M3490
    Diagnosis
    The key for the unit of measure you entered is not defined in table T006.
    Procedure
    Define the unit of measure through Customizing (Materials Management). "
    In MDM we are sending as remote key the SAP Code and this code exists in the table T006, but in the information of failed IDOC say:
    " Messages have been issued: number 0000000000184470
    Message no. MK101
    Diagnosis
    During inbound processing for the IDoc, messages have arisen while checking material data. "
    If someone has information about it ,pls I´ll appreciate your answer.
    Regards Itzell T.

    I´m Trying to create a material from MDM to SAP and I´m monitoring the IDOC in WE05 and i get the next message:
    " Unit of measure ****** is not defined; check your entry
    Message no. M3490
    Diagnosis
    The key for the unit of measure you entered is not defined in table T006.
    Procedure
    Define the unit of measure through Customizing (Materials Management). "
    In MDM we are sending as remote key the SAP Code and this code exists in the table T006, but in the information of failed IDOC say:
    " Messages have been issued: number 0000000000184470
    Message no. MK101
    Diagnosis
    During inbound processing for the IDoc, messages have arisen while checking material data. "
    If someone has information about it ,pls I´ll appreciate your answer.
    Regards Itzell T.
      Hi Itzell T,
          While creating the material the unit of measurement which is entered is not existing in the SAP System. The unit of measurement entered during creation of material is cross checked from enteries of check table T006.
          So, functional consultant should take care of this issue just let him know the message.
       He know what problem actually is and fix the problem as Ankur had said.

  • PM Order Operations Default Unit of Measurement

    Halo Experts,
    We have a problem in UOM for PM/CS order operations. We have defined HR as default value of UOM for operations in IMG.
    Business wants to change at the order level to H as UOM and it is manually keyed in and saved. But when we check with the F4 option for Unit of Measure " H" doesnt appear where as HR appears.
    Any restrictions in displaying all the unit of measures. Can anybody clarify why "H" is not appearing on F4 option in the work order operation line items.
    Regards,
    Selva

    Hi Rajesh,
    We are getting the default unit in operation tab and all the config of default values is available but when we execute the F4 option the unit "H" is not appearing where as if we change from HR which is a default unit to H it is getting saved at the operation Tab.
    Hope it is clear now.
    Regards,
    Selva

  • Creation of New Base Unit of Measure

    Hi Forum, does anyone have any detail on how to go about creating new units of measure and what to look out for?  Any documentation would be appreciated.
    I know the Tcode (CUNI) and to copy certain existing BuM's but was wondering about the ISO and whether i actually need to apply for this as we wont be using EDI with our Vendors.  Any best practice or guidance to be aware of would be highly appreciated.
    Thanks
    Dan

    Generally, if you are creating new Uom same as like exisitng one and you are not using the EDI than you are file with ISO code but if you are planning to use EDI than you can search for ISO code on Google. If the Uom is standard other wise you have to use the exisitng which can match some percentage to your Uom

  • Decimal places in unit of measure in Sales order

    Hi,
    In the Sales Order application in PCUI, when I create a create an order for customer XYZ, and add product ABC for qty 1 which uses unit of measure PC, the qty is displayed with 3 decimals as 1,000 whereas if I use the unit of measure EA the quantity is displayed without the 3 decimals as 1. I need the unit of measure PC to not have the decimal places like in SAPGUI.
    Could anyone help me understand how this can be achieved?
    Thank you for help in advance.
    Regards,
    Priya

    To elaborate better.
    Again, use Tcode CUNI - Unit of measurement : Initial Screen.
    At initial screen, choose TIME from the list (where by default AAAADL- no dimensions is there).
    And click on UNIT OF MEASUREMENT button.
    In that you will find MON - Month.
    There go for details by selecting MON or select MON and press F5 from Key board.
    For MON unit maintain following parameter as per your requirement:
    -Number of decimal places for number display
    Use - This parameter determines the number of decimal places with which this measurement unit is displayed.
    -Base ten exponent for floating-point display
    Use - This exponent determines how the values for this measurement unit are formatted as floating point numbers.
    Examples - If the exponent is 3, the floating point numbers have the format xxx.xxxxE3.
    And deselect commercial meas. unit in application parameters section.
    I would suggest instead of changing standard settings of MON, you create ZMON in TIME dimension.
    Thanks & Regards
    JP

  • Unit of Measure Calculation in Query

    Hi,
    I have a few calculated keyfigures in my query for example:
    whats happening:
    KEY 1= Standard Price * Qty A = Output in (LBS) Qty unit of measure
    What I want is:
    KEY 1= Standard Price * Qty A = Output in $
    How can i fix that on the query level so that my output is in $
    Thanks
    Edited by: DANIEL GREEN on Jun 12, 2008 2:33 AM

    Hi
    change the target currency and conversion type.
    --- Pravin

  • Retractor for Statistical Key Figures Not Sending Values

    I have configured the standard retractor for primary costs and stat key figures based on all the documentation.  Primary costs retract perfectly.  Stat Key Figures do not send over the values.
    I have configured UPBR_RETRACT with UPB_RET_STKEYFIG.  In the update rules the only thing I have changed is assigned ZRATENU to 0BPS_PRICE and 0QUANTITY to 0BPS_QUANTITY.  I copied the delivered planning level 4EXP0004 to a Z level assigned to my custom cube.  In UPBR_STRUCT I assigned to the correct structures /1SEM/_YS_CHAS_210ZEXP0004 and /1SEM/_YS_KYFS_210ZEXP0004.
    From BPS, when I run the retractor I get the message that "Retraction: Update completed without errors. Number of records:   56".  All of this tells me things are running fine.  My parameter group is setup as follows:
    Retr. R/3 Comp.          6
    Retractor Control          3
    Delta Update          0
    Destination          DE1CLNT209
    Test mode Is Active          0
    I go over to ECC and look at KP46.  The stat key figures by cost center have been transferred but the planned values all show 0.  When I go to table COSR, I see 0 in the planned fields. 
    Has anyone had this issue and do they know how to solve it?
    Thanks,
    Cherie

    Dear Chrie,
    Can u explain,  what are the keyfigures that are not getting retracted to R/3?
    If quantities and Unit of measure is not getting retracted, you will have to apply the note 889634. Check once.
    If you are using the function modules UPR_COST_PLAN_INIT and UPR_COST_PLAN_EXECUTE, then make sure that you pass only Object Currency (0AMOCCC) values to it, as it supports only those.
    Regards,
    Srinivas Kamireddy.

  • BEx Query:  Attribute not display Unit of Measure (UOM)

    In a BEx I am trying to create a query that displays attributes to 0EMPLOYEE.  One of the custom attributes is the employee's rate of pay.  We have the hourly rate, nightly rate, etc.  This attribute is a numeric attribute with currency assigned as the Unit of Measure.  I am trying to create a query displaying the pay rates from the attributes of 0EMPLOYEE but remove the unit of measure in the output.  I am aware this can be done on key figures using the NODIM formula.  How can I remove on an attribute?
    Example:  Output is $10.25 UOM.  I want it to display as $10.25.
    Thanks.

    Hi,
    Create a Formula Variable with Replacement Path for this Attribute.
    Use NODIM function for the Formula Variable.
    Let me know if it works according to your requirement.
    Regards,
    Geeta

  • CK11N Unit of Measure MIN & HR not consistenly shows

    We try to run standard cost estimate using CK11N. As a result some activity type "E" has MIN (minutes) as unit of measurement. By right it should show as HR (hours) because this was the unit we have been using since SAP went live. This problem occurs recently after we have done
    patch 22 to 55.
    There was no changes in work center, routing, material master. All remain the same.
    In routing using MIN for setup time, since long time back.
    This problem occured whenever we have setup time between
    1 to 5 minutes. If we put 5 minutes above then it will show
    as HR, which we are expected to.
    For the calculation of cost for activity type there is
    nothing wrong, the formula key and formula inside
    work center was correct.
    So, the question is, is there any setup to tell
    the converstion to display as MIN insteas of HR
    whenever setup time in routing we put
    between certain condition, let say
    1-10 will show as MIN
    10 and above will show as HR.
    There is no error message for this, only display
    a different result.
    Thank You

    Hi Berliner
    Yes, SAP converts the UOM on the lower degrees if the calculated figures are so small the they are going out of calculations. This I have observed many a times.
    Hence according to me costing lot size should be aligned with the routing base quantity or if some Fixed costs are involved in any operation/activity, the costing lot should be optimum to cover the fixed charges else per unit cost will be wrongly inflated.
    Regards
    Rajneesh Saxena

Maybe you are looking for

  • How can we know AR invoice is opended or closed?

    Hi All, I have a invoices(Receivables) data in 11.5.5. Now i would like to migrate open invoice or partially paid invoice to R12. How can we know that invoices(Receivables) is opened or closed. Suggestions will be highly appreciated. Thanks. Edited b

  • HTML output and missing graph

    I am developing a report having a graph in BI Publisher 10.1.3.3.0. When the report o/p is genereated to PDF, the graph is showing up, but the same report doesnt return the chart in HTML output (it shows small icon in the place of graph). I followed

  • SQL*Loader and binary data

    i have a C routine that builds SQL*Loader input files. the input files contain multiple records, with a couple of integer columns and a raw(1400) field. the control file specifies a record separator of '|', which seems weird (having text in the middl

  • Changing persitence FileI/O to DB2e

    Hi, The persistence of my app was development withFile I/O. Now, we want use DB2e. I would like to know, if it's need just do the download of the ADD-ON for DB2e or it's necessary change something in my persistence? We are using Smart Sync. Thanks. M

  • Updating condition records in an outbound delivery

    Hi, I'm trying to update condition records in an outbound delivery but couldn't find any suitable BAPI for the same so I just implemented the BADI 'le_shp_delivery_proc' and called a FM inside the method SAVE_DOCUMENT_PREPARE' which does a call trans