Status for loading end date when GR

Hi! We are using shipment for imports. I have set the indicator 'Cumulate 'finish loading' status from inbound deliv. sts 'gds rcpt completed' for the shipment type. But on receipting the inbound delivery, the status is still not set in the shipment created (loading end date field).
Does anyone know what else need to be done for the date to be populated?
Regards
SF

No answer

Similar Messages

  • DTP error: Lock NOT set for: Loading master data attributes

    Hi,
    I have a custom datasource from ECC which loads into 0CUST_SALES.  I'm using DTP & transformation which has worked for loading data in the past for this infoobject.  The infopackage loads with a green status but when i try to load data, the DTP fails with an error message at "Updating attributes for InfoObject 0CUST_SALES Processing Terminated" & the job log says: "Lock NOT set for: Loading master data attributes".  I've tried reactivating everything but it didn't help. Does anyone know what this error means? We're on SP7.   Thanks in advance!

    Hello Catherine
    I have had this problem in the past (3.0B) --> the reason is that our system was too slow and could not crunch the data fast enough, therefore packets where loacking each other.
    The fix: load the data into the PSA only, and then send it in background from the PSA to the info object. By doing this, only a background process will run, therefore locks cannot happen.
    Fix#2: by a faster server (by faster, I mean more CPU power)
    Now, maybe you have another issue with NW2004s, this was only my 2 cents quick thought
    Good luck!
    Ioan

  • Need more Info about "Load transactional data when master data not loaded"

    Hi,
    Can you please explain me this option in the infopackage " Load transactional data when master data is not loaded"....
    Say i load a transactional data record which has a material no. AAAXX.
    In the fact table, the material no. is replaced with the corresp. DIM ID.
    Now, assume that there is no entry for this Material no.
    AAAXX in the master data table...so no DIM ID for it..
    How is it then stored in the fact table ?
    Hope i have managed to explain the scenario..
    Thanks in advance,
    Punkuj

    Hello Punkuj K,
    How r u ?
    No, if the entry for that Material Number "AAAXX" is not there in the Master Data then it will create a SIDs & DIMs ID for that & Transaction Data will be loaded.
    Use
    Choose this indicator if you want to always update the data, even if no master data for the navigation attributes of the loaded records exists. The master data is generated from the loaded transaction data. The system draws SIDs. You can subsequently load the master data.
    Dependencies
    The texts, attributes, and hierarchies are not recognized by the system. Load the texts / attributes / hierarchies for the corresponding InfoObjects separately.
    This function corresponds to the update. Possible errors when reading the master data into the update rules are not associated with this indicator.
    Recommendation
    We recommended loading the master data into the productive systems in advance. Select this indicator especially in test systems.
    Best Regards....
    Sankar Kumar
    +91 98403 47141

  • FM to get start and end date when given month

    Hi all,
       can anybody help me if there a FM to get start and end date when given month like 01 for jan.
    Thanks in advance
    Sahitya

    Hi,
    Check this Function Module
    HR_JP_MONTH_BEGIN_END_DATE
    here if you r giving the month u wil get the start date and the end date.
    Hope this helps you.
    Thanks & regards,
    Y.R.Prem Kumar

  • What are the steps for loading master data

    Hello
    what are the steps for loading master data? i want to learn about loading all master data and the steps to choose the best way to load the data.
    if anyone has documents please send me the documents i will be really greatful
    [email protected] thanks everyone
    Evion

    Hi Heng,
    Download the data into a CSV file.
    Write a program using GUI_UPLOAD to upload the CSV file and insert records.Chk the below link for example
    http://www.sap-img.com/abap/vendor-master-upload-program.htm
    Reward Points for the useful solutions.
    Regards,
    Harini.S

  • ASCP Test for Load Legacy Data

    Through to the legacy Web Adi ASCP Data in the Test of the load.
    Plan to check more than one, but the result is not correct  that there is  cause msc_operation_components not exists.
    Questions 1: msc_operation_components Table also through the Upload Web Adi BOM_Component and Routing_operation Data should be used or whether the Pre-Process Monitor Program or other Concurrent Program please tell us what is produced?
    Questions 2: If you create a Data Collect flat file data self service if you need through the OA Template Upload for msc_operation_components Dat there is no there, what should I do??

    I think you'll find the white paper published on metalink, our main avenue for publishing documentation and providing support information to customers.
    <BLOCKQUOTE><font size="1" face="Verdana, Arial">quote:</font><HR>Originally posted by JohnWorthington:
    Hello,
    The 11.0.2 implementation doc mentions a technical "White Paper about the Data Pump" for loading legacy data into HRMS.
    I cannot find this White Paper anywhere.
    Does it exist?
    What is the easiest way to load our legacy data into 11.0.3 HRMS??
    Thanks,
    John Worthington
    [email protected]<HR></BLOCKQUOTE>
    null

  • Change infotypes end date when delete leaving action for employee

    Hello,
    I created new infotype and when employee leaves its end date is changed for leaving date.
    When leaving action is deleted ther is some least of infotypes that user can sign so the end date of selected infotypes will be changed to 31.12.9999. How can i add my infotipe to this list?
    Thank you,
    Paulina

    Hi,
    Maintain IT 0041 where in that table maintain employee start date of hiring and leaving date of employee bze in IT 0000 the dates will change as per action lets say if employee hire that date will be in IT 0000 action and if employee gets promotion date or leaving date that will store in IT 0000 by delimiting other actions
    So maintain IT 0041 where you can pull dates from there if you maintain
    End date will always be 31.12.9999 so check action start date you will get in sequence
    Thanks
    Edited by: Vibinsap on Mar 9, 2012 7:12 AM

  • What is the use of specifying an "End Date" when certifying conditionally?

    Hi,
    When certifying conditionally, it is possible to specify an "End Date".
    * What does OIM do with this End Date?
    * What happens on specified date?
    * Will the entitlement be automatically removed at that date?
    Note : Screen view for help.
    The steps are:
    1. Start any certification
    2. Log in as the certifier
    3. Open the certification task
    4. Now you can certify any item "conditionally" and enter an end date (see screenshots 1, 2 and 3).
    http://docs.oracle.com/cd/E40329_01/admin.1112/e27149/managecert.htm#OMADM5063
    http://docs.oracle.com/cd/E40329_01/user.1112/e27151/usingcert.htm#OMUSG3891

    I had the same thought
    wilnesse dericer

  • OIM 11g Modify User Profile for Updating End Date

    Hi Gurus!
    We have an OIM implementation where users may request the creation of other users by means of a Create User request template. In this template we set the End Date to be 3 months after the request date.
    In order for the requester to extend the period of a user's OIM user account (along with its provisioned resources) we customized a Modify User Profile by displaying the End Date field and automatically populate it again to 3 months after the request date. Also we developed a custom event handler to enable the user when it is disabled and the End Date is updated to a future date.
    This Modify User Profile is working great when the user is still enabled (the End Date is still in the future), however, when the End Date has passed (and the user is Disabled) the requester is not able to see the user when selecting the Modify User Profile request template.
    Is there a way to allow requesters to also see disabled users in the Modify User Profile request template?
    Thank you in advance.
    Regards,

    Hi Kevin,
    thanks for your reply!
    But, in this case, when the user is already disabled due to his End Date, how can a requester, through the Self Service TAB, enable it?
    The Enable User request template does not work since when trying to enable the user, OIM sees the End Date is already passed and the DataSet validation throws an exception.
    The only way I saw was providing a Modify User Profile Request template to change the End Date and developing a custom event handler to enable the user upon the extension of the End Date...
    How can, in this situation, a requester enable the user and extend its End Date?
    Thank you!
    Regards,

  • CIF of SA is not consistent for Validity End Date

    Hello gurus,
    Our company is quite new in using SNC, and we bumped into this problem (see description below), and hopefully this forum can help us.
    <Description>:
    When the Scheduling Agreement is CIFed from R/3 (ECC) to SNC, the Validity End Date does not get updated each time.
    It gets updated sometimes, but not always. It is inconsistent behaviour.
    <Example>:
    Scheduling Agreement A
    Validity End Date: 31.12.2012 Changed to 30.11.2012 in R/3.
    Performed CIF using Transaction Codes CFM1 and CFM2.
    Correctly updated the Validity End Date in SNC.
    For the same Scheduling Agreement A updated Validity End Date to 31.01.2013 in R/3.
    Performed CIF using Transaction Codes CFM1 and CFM2.
    The Validity End Date was not updated in SNC & remained as 30.11.2012.
    For the same Scheduling Agreement A updated Validity End Date to 15.10.2012 in R/3.
    Performed CIF using Transaction Codes CFM1 and CFM2.
    The Validity End Date was not updated in SNC & remained as 30.11.2012.
    Thanks guys
    Tuffy

    Hi Tuffy,
    1 - I am just wondering if after the Delete the existing External Procurement Relationship in SNC, and CFM1 and CFM2 the SA (i.e. changed my validity end date value) to the SNC, will the problem of the SNC side not able receive the changed SA??
    When there is a change in the SA, integration model would create the same in SNC if it does not exist. But the transfer from ERP does not happen just like that. First, make sure that the message type (CIFSRC) has been checked in BD50 and then schedule a job to periodically transfer the SAs.
    2 - What does the tcode the person in the SNC side have to double check to ensure the SA is transmitted there??
    The t-code is /SAPAPO/MTI2 - External Procurement Relationship.
    3 - Someone in our company advise BASIS team to check the transactions BD50 and BD52. What exactly does it mean and does it help?
    This is correct. I mean guys who are responsible for Integration model need to set-up BD50, BD52 so that changes to SAs are transferred periodically.
    Regards,
    Sandeep

  • Javascript for calculating End Date

    I have two date fields "Start_Date" and "End_Date". User selects the start date. Then the form takes that date and adds 365 days. puts the result in the "End_Date" field. I have attempted a couple of scripts and none have worked. So I attempted to first just get the selected date in the "Start_Date" field to show in the "End_Date" field. When I select a date like, "May 28,2008" the output reads "Object44194500". Using the following script in the "Start_date" field
    ----- form1.Order_Page.Product_Table.Row4.Subscription_Start::change: - (JavaScript, client) -------
    xfa.resolveNode("form1.Order_Page.Product_Table.Row5.Subscription_End").rawValue = this;
    What am I doing wrong. How do it get it show currently while at the same time adding 365 days. So if the user select May 28, 2008 the output in the "End_Date" field is May 27, 2009??? Thanks
    - a frustrated new developer of LiveCycle Designer 8.0...

    I was able to find an answer on the LiveCycle Google Group. Here is what I was given. (for some reason I only got the FormCalc version to work).
    -----------Begin Code--------------
    if(EndDate.rawValue != null && StartDate.rawValue != null)
    if(EndDate.rawValue < StartDate.rawValue)
    xfa.host.messageBox("Please check your End date. It cannot be before
    the Start date!", "Date Checker", 3);
    this.rawValue = null;
    // to set focus to the End Date field so that the user can type his
    new value..
    xfa.host.setFocus(this.somExpression);
    Alternatively.. this must work if it is formcalc...
    if(EndDate.rawValue <>null and StartDate.rawValue <> null)then
    if(EndDate.rawValue < StartDate.rawValue) then
    xfa.host.messageBox("Please check your End date. It cannot be before
    the Start date!", "Date Checker", 3)
    $.rawValue = ""
    // to set focus to the End Date field so that the user can type his
    new value..
    xfa.host.setFocus(this.somExpression)
    endif
    endif
    -------------End Code ----------------

  • Lock NOT set for: Loading master data attributes error

    Hi experts,
    We were encountering this error before when trying to load master data.  When we checked the system we could not find any locks at the time, and activation or kicking off the attribute change run failed again.  We finally solved the problem running FM RSDDS_AGGR_MOD_CLOSE which sets the close flag to 'X' in table RSDDAGGRMODSTATE.  I have read that it is possible this lock error happens when two change runs happen at the same time.
    My question are:
    1. is it possible to find out what process exactly "caused" the lock? the table RSDDAGGRMODSTATE does not have a reference to any object or job. I am curious as we are trying to find ways to avoid this in the future...
    2. in our case, when we could not find any locks, is running this fm the only work around? is this a best practice?
    mark
    Message was edited by:
            Mark Siongco
    Message was edited by:
            Mark Siongco

    Hello Catherine
    I have had this problem in the past (3.0B) --> the reason is that our system was too slow and could not crunch the data fast enough, therefore packets where loacking each other.
    The fix: load the data into the PSA only, and then send it in background from the PSA to the info object. By doing this, only a background process will run, therefore locks cannot happen.
    Fix#2: by a faster server (by faster, I mean more CPU power)
    Now, maybe you have another issue with NW2004s, this was only my 2 cents quick thought
    Good luck!
    Ioan

  • Code for capture digital data when change of state

    Dear Sir,
    I had written a program to capture the digital data when it change of state.
    It work well when I check the check box "Lock file for faster access".
    But error occur when it unchecked.
    Because I need to open the tdm file at the vi running, thus I need to uncheck it.
    Please kindly to advise any solution for it.
    The program is attached.
    Thank You.
    Attachments:
    datalogcos.vi ‏53 KB

    Hi Jayme,
    Sorry for late reply.
    The screen capture of error message is attached.
    Thanks for your helping.
    Poly-Alex
    Attachments:
    error.jpg ‏24 KB

  • Tables for Basic end date and work center for operation

    Hi!
    I need table name to fetch the basic end date of a maintenance order and maintenance work centers with respect to each operation in maintenance order.
    Regards,
    VM
    Edited by: V M on Jul 20, 2010 7:22 AM
    Edited by: V M on Jul 20, 2010 7:35 AM

    Hi VM,
    Input is Order Number (AUFNR).
    You can find the Basic End date of Order in Table AFKO, filed is GLTRP.
    For work center in Operations, you can use the Table AUFPL from AFKO.
    Pass this AUFPL in AFVC and get the ARBID.
    Then pass this ARBID to CRHD Table as OBJID, and get the work Center (ARBPL)
    Regards,
    MLN Prasad

  • Best Practices for Loading Master Data via a Process Chain

    Currently, we load attributes, text, and hierarchies before loading the transactional data.  We have one meta chain.  To load the master data it is taking more than 2 hours.  Most of the master data is full loads.  We've noticed that a lot of the master data, especially text, has not changed or changed very little since we implemented 18 months ago.  Is there a precedence or best practice to follow such as do we remove these processes from the chain?  If so, how often should it be run?  We would really like to reduce the amount of the master data loading time.  Is there any documentation that I can refer to?  What are other organizations doing to reduce the amount of time to load master data?
    Thanks!
    Debby

    Hi Debby,
    I assume you're loading Master Data from a BI system? The forum here are related to SAP NetWeaver MDM, so maybe you should ask this question in a BI forum?
    Nevertheless, if your data isn't changed this much, maybe you could use a delta mechanism for extraction? This would send only the changed records and not all the unchanged all the time. But this depends on your master data and of course on your extractors.
    Cheers
    Michael

Maybe you are looking for

  • Safari 6.0.5 Crashes When I Load Facebook

    Starting today, Safari 6.0.5 crashes when I open Facebook. It seems to have something to do with Javascript. Here is the report I get when it crashes: Process:         WebProcess [12031] Path:            /System/Library/StagedFrameworks/Safari/WebKit

  • Problem installing flash eff2

    i cant install flash eff2 ,i ve flash cs3 ,extinsion manager cs5.5 and i get the error message the extinsion cant be installed you need flash version 9 or greater what is the problem ??

  • MacBook to VGA

    I have an orginal Black MacBook 2 Ghz duo and I want to connect it to a VGA projector. I thought a cable came with the MacBook but I can't seem to find it. Does anyone know if a connector came with the MacBook and if not which cable I should get? Tha

  • Invalid number error , number column as last field in my csv

    LOAD DATA INFILE 'test.csv' "str '#'" APPEND INTO TABLE esgapp.c_test FIELDS TERMINATED BY "," Optionally enclosed by '"' TRAILING NULLCOLS rstring, rtext char(12000) ENCLOSED BY '<start>' and '<end>', ruser, rid SEQUENCE(MAX,1) This control file is

  • AR02-Asset Historysheetreport -001 Ordinary depreciation positive in are 01

    In AR02 -Asset History sheet report,we are getting the below error displayed for few specific assets  .The asset values  are displayed in correcltly till October and however in December 2009. it shws correct values. The message displayed :     001 Er