Status of child equipment after delivery

Hi All,
I have finished goods equipment and raw material equipment. I have maintained the structure of the FG equipment.
In repair process, i can get the FG equipment as well as the raw material equipment.
When i deliver the FG, the status of the FG equipment changes to "ECUS" but the ststus of the raw material equipment (i.e. child equipment which is maintained in the structure of the FG equipment) does not change. In repair process, when i need to inbound the equipment w.r.t repair order, the status of the equipment should be "ECUS"
Here how can i change the status of the child equipments which are maintained in the structure.
Regards,

Hi,
How are you maintaing the Raw material equipment? as Subequipment of the FG? or in Equipment BOM?
Also let me know the status of Raw materal Equip.
If it is subequipment, the Equipment status can be changed by Edit>Spl Serial No. FunctionsManual Transaction-->To Customer .. will change the status to ECUS...
Babu
Edited by: BabuCS on Aug 20, 2009 4:27 PM

Similar Messages

  • Sale Order Status Change after delivery of materials from projects

    have ETO sccenario which consists of all modules such as SD,PS.PP etc. Materials will be procured from external vendors & manufactured inhouse through project systems. After delivery of materials from project systems, billing & invoicing will be done at sales level.
    On delivery of materials from projects, sale order status remain open. Request you to look into the matter & suggest about status change of sale order after delivery / billing.
    Regards,
    Ranjan

    Hi,
    In sale order, WBSE is assigned. Delivery of materials are through cns0. then subsequently picking / packing / billing will happen at sales level. Billing is of delivery related. Please suggest to fix the issue.
    Thanks & Regards,
    Biplab Ranjan

  • Material Blocked for delivery after delivery is already created

    Is it true that if a material is placed on block after the delivery has already been created but before the PGI is done, the delivery needs to be manually updated with a block status to prevent picking and PGI? I would expect SAP to determine if a material is blocked and read from txn OVSU and OVLS to determine whether picking and PGI are allowed.
    I know it works fine before the delivery is created but if a material is blocked post delivery creation it seems SAP doesnt recognize the fact that the material is blocked and will still allow it to be delivered unless you manually change each delivery. Is this correct?

    James..my friend...use simple business logic....when are you blocking the delivery...if in case customer credit is due, or that material sale is not allowed to the customer etc etc.....so ideally, that should happen before delivery...now you want the system to act like a human and determine if something goes wrong after delivery and do not allow PGI to happen...SAP standard program is like that my friend..you can not control that...if you want to check that again after delivery...take the help of you abaper for putting up the validation after delivery.
    Reward points if it helps
    Regards,
    N

  • Status is not updated from delivery to sales order item.

    Dear Folks,
    One user created sales order with 10 line items and he created delivery and later he deleted line item 30 in that delivery document and with remaining 9 line item he done the PGI & Billing.Here what is the problem is the deleted line item in sales order status showing as completed and delivered quatity showing as 10.Status is not updated from delivery to sales order item.Please let me know how to resolve this?
    Thanks & Regards,
    murali.

    Dear Murali,
    Please go to VTLA transaction then select your delivery and order types after that go in to the details of the item level settings here you check field called Update document flow under Control data tab.
    I hope it will help you,
    Regards,
    Murali.

  • Installation of machine after delivery & Resite of machine

    Kindly refer the below process u2013
    1. Scenario u2013
    u2022     Customer has one machine installed in one location and he requests to relocate the machine from one location to another 
    It could be from one branch to another branch ( Both branch are in different cities )
    u2022     The relocation of machine can happen within one city (e.g destination location and the current location of machine is in same city and under one branch)
    u2022     Sometimes client charges for its service and sometimes it does not charge ( e.g If relocation to be happen is in same building )  
    2. After delivery of machine to customer premises client sends his service engineer to install the machine and after the successful installation only client raises the bill to customer .
    How could i capture this installation process in SAP
    Kindly provide your inputs
    Regards,

    Hi Ravi,
    This Scenario is related to Customer Services module in SAP, Please fallow these steps.
    1, you need to maintain all SD relevant data along with Customer master data and material master (Create also a service material for billing on installation) for the machine as well.
    2, Under Plant maintenance & Customer Services Menu in SAP configure the following:
         a), Define the Functional locations of the customer where you have to install the machine.
         b), Define machine or Equipment as per your requirement. Also work centre if required.
         c), for service processing (External) configure the service order types I.e. u201CSM02u201D.
    Also ref. the link: http://help.sap.com/saphelp_46c/helpdata/en/e6/4a903f9e0311d189b70000e829fbbd/frameset.htm
    3, for Billing please ref. Resource related billing, here you need to maintain a DIP Profile using u201CODP1u201D and check the consistency with u201CODP2Au2019.
    Also maintain copy controls for order type (DR) to billing type.
         Maintain Cost elements for the service material in the DIP profile in material determination view.
    Further you follow the Service processing through service order creation till billing (Broadly) :
    Service notification (IW51) -> Service order creation- > Entry of equipment, SP, components-etc>,service order confirmation (IW41) - >, Debit memo request - > Billing
    Once you create service order only you can send the service technician to the customer site, and do resource related billing. Any doubts please get back.
    Please try all the best.
    Regards
    DSR

  • SAPINST terminated with error "Exit status of child: 3"

    The SAPINST terminated after run with the error message as
    below:
    SAPinst is getting started.
    Please be patient ...
    starting gui server process:
    sapinstport: 21200
    guiport : 21212
    guistart : true
    command : "C:\Program Files\Java\j2re1.4.2_09/bin\javaw.exe" -
    cp "C:/DOCUME1/ADMINI1.LAE/LOCALS~1/Temp/sapinst_exe.3256.1197655087
    \jar\instgui.jar;C:/DOCUME1/ADMINI1.LAE/LOCALS~1/Temp/sapinst_exe.3256.1197655087\jar\inqmyxml.jar" -Xmx256M -Dsun.java2d.noddraw=true
    SDTServer config=jar:sdtserver.xml guiport=21212 sapinsthost=localhost
    sapinstport=21200 guistart=true
    load resource pool E:\SAPCD\Master\IM_WINDOWS_I386\resourcepool.xml
    guiengine: no GUI connected; waiting for a connection on host sapprd2,
    port 21200 to continue with the installation
    guiengine: login in process.
    This application has requested the Runtime to terminate it in an
    unusual way.
    Please contact the application's support team for more information.
    Exit status of child: 3
    First time I use JAVA SDK version 1.4.2_12 after that I try version
    1.4.2_9 and 1.4.2_15 but all of them got the same error.
    So please kindly help for this. We have planed to upload data to the
    PRD System on next week.
    Many thanks,
    Amnat O.

    The problem still occur with the error message as below:
    SAPinst is getting started.
    Please be patient ...
    starting gui server process:
      sapinstport: 21200
      guiport    : 21212
      guistart   : true
      command    : "C:\Program Files\Java\j2re1.4.2_15/bin\javaw.exe" -cp "C:/Temp/sapinst_exe.3536.1198011240\jar\instgui.jar;C:/Temp/sapinst_exe.3536.1198011240\jar\inqmyxml.jar" -Xmx256M -Dsun.java2d.noddraw=true SDTServer config=jar:sdtserver.xml guiport=21212 sapinsthost=localhost sapinstport=21200 guistart=true
    load resource pool E:\SAPCD\Master\IM_WINDOWS_I386\resourcepool.xml
    guiengine: no GUI connected; waiting for a connection on host sapprd2, port 21200 to continue with the installation
    guiengine: login in process.
    This application has requested the Runtime to terminate it in an unusual way.
    Please contact the application's support team for more information.
    Exit status of child: 3

  • Payment review after using "Pay after Delivery"???

    I paid for an item I got from eBay using "Pay after Delivery" as I've done many times in the past.  This time however I see it's been put into a Payment review which I understand comes up for suspicious transactions.  First it seems bizarre since PP pays the buyer directly then in 14 days after I've received the item and had a chance to make sure it's all good PP takes the $$$ from my bank account.  So is PP reviewing themselves since they are the ones making the payment initially???  Craziest thing I've heard of plus it is embarassing to me since notice is sent to the seller as if I've done something that made them suspicious!!!  My standing with both PP and eBay are perfect and only thing I've done different is sell a few camera equipment which I can't access for whatever time they hold my money.  As much as I was really liking using PP these types of issues really make me question my judgement;-/It was also stated in the review notice that should my payment be denied I should just redo the transaction?  That really sounds nuts since theyre the ones reviewing it, right??? 

    PayPal (PP) might have its source of funds overseas. If this is the case then the iTS will not allow you to purchase as the requirements for a USiTS account is that you have a valid credit card from the USA and a USA address.
    As PP is not a credit card hence they are not required to follow credit card rules or other US banking rules.
    PP in the past has frozen my PP account and withheld my money - hundreds of dollars - for 6 months - they finally released the money even thought I had not violated any of the PP rules. PP are judge, jury and executioner.
    MJ

  • How to change the status profile of equipment?

    Hi Experts,
    Is it possible to change the user status profile for already created equipment? I tried to change the assignment of status profile to equipment category and found it works only for new equipments. It is not applicable to already created equipments. The status of the status profile is already used in equipments.
    Please suggest and do the neeful.
    Thanks and best regards,
    Praveen.

    No you can not change status profile assigned with already created equipment.
    Eg. You assigned status profile 00000003 to equipment category M of equipment. so whnever any new equipment created will get status profile 00000003 only.
    For your case, dont make any change status profile no .00000003--> make whatever changes you have to made about status naming,sequence keeping same status profile.
    After that goto equipment change master edit>change category>selet same category for assignment. so equipment will get same status profile with status changed.
    Hope this will help you.

  • After delivery what postings will be happen and PGI also?

    Hi All
    after delivery what postings will be happen and PGI also?
    thanking you
    Sarvesh

    Hi,
    When you create the delivery, the open order quantity is reduced and the status of line item gets updated as either partial, complete. The document flow is updated with corresponding delivery.
    When you post goods issue for an outbound delivery, the following functions are carried out on the basis of the goods issue document:
    Warehouse stock of the material is reduced by the delivery quantity
    Value changes are posted to the balance sheet account in inventory accounting
    Requirements are reduced by the delivery quantity
    The serial number status is updated
    Goods issue posting is automatically recorded in the document flow
    Stock determination is executed for the vendor's consignment stock
    A worklist for the proof of delivery is generated
    After goods issue is posted for an outbound delivery, the scope for changing the delivery document becomes very limited. This prevents there being any discrepancies between the goods issue document and the outbound delivery.
    Hope it helps. Please reward if useful.
    Thanks & Regards
    Sadhu Kishore

  • AP801 admin status is disable automatically after router reload

    We've got cisco 887VGW with wireless AP801GN and registering to the controller 7510, 
    ap801 admin status is disable automatically after router reload.
    Is there any opportunity to fix it?
    AIR-CT7510-K9 os version: 7.6.100

    (Cisco Controller) >show sysinfo
    Manufacturer's Name.............................. Cisco Systems Inc.
    Product Name..................................... Cisco Controller
    Product Version.................................. 7.6.100.0
    RTOS Version..................................... 7.6.100.0
    Bootloader Version............................... 7.3.101.0
    Emergency Image Version.......................... 7.3.101.0
    Build Type....................................... DATA + WPS
    System Name...................................... CNDGIDCWLC01
    System Location..................................
    System Contact...................................
    System ObjectID.................................. 1.3.6.1.4.1.9.1.1295
    Redundancy Mode.................................. SSO (Both AP and Client SSO)
    IP Address....................................... 10.15.131.46
    System Up Time................................... 3 days 3 hrs 40 mins 22 secs
    System Timezone Location......................... (GMT +8:00) HongKong, Bejing, Chongquing
    System Stats Realtime Interval................... 5
    System Stats Normal Interval..................... 180
    Configured Country............................... Multiple Countries:CN,HK,TH,US
    --More-- or (q)uit
    Operating Environment............................ Commercial (10 to 35 C)
    Internal Temp Alarm Limits....................... 10 to 38 C
    Internal Temperature............................. +22 C
    Fan Status....................................... OK
    RAID Volume Status............................... OK
    State of 802.11b Network......................... Enabled
    State of 802.11a Network......................... Enabled
    Number of WLANs.................................. 2
    Number of Active Clients......................... 6
    Burned-in MAC Address............................ 64:9E:F3:65:2A:80
    Power Supply 1................................... Present, OK
    Power Supply 2................................... Present, OK
    Maximum number of APs supported.................. 300
    (Cisco Controller) >
    Cisco IOS Software, AP801 Software (AP801-K9W8-M), Version 15.2(4)JB3, RELEASE SOFTWARE (fc1)
    Technical Support: http://www.cisco.com/techsupport
    Copyright (c) 1986-2013 by Cisco Systems, Inc.
    Compiled Wed 18-Dec-13 21:56 by prod_rel_team
    ROM: Bootstrap program is AP801 boot loader
    BOOTLDR: AP801 Boot Loader (AP801-BOOT-M) Version 12.4(23c)JX, RELEASE SOFTWARE (fc1)
    NST6839 uptime is 4 hours, 32 minutes
    System returned to ROM by power-on
    System image file is "flash:/ap801-k9w8-mx.152-4.JB3/ap801-k9w8-mx.152-4.JB3"
    Last reload reason:
    This product contains cryptographic features and is subject to United
    States and local country laws governing import, export, transfer and
    use. Delivery of Cisco cryptographic products does not imply
    third-party authority to import, export, distribute or use encryption.
    Importers, exporters, distributors and users are responsible for
    compliance with U.S. and local country laws. By using this product you
    agree to comply with applicable laws and regulations. If you are unable
    to comply with U.S. and local laws, return this product immediately.
    A summary of U.S. laws governing Cisco cryptographic products may be found at:
    http://www.cisco.com/wwl/export/crypto/tool/stqrg.html
    If you require further assistance please contact us by sending email to
    [email protected].
    cisco AP801GN-A-K9 (PowerPC 8343) processor (revision B0) with 49142K/16384K bytes of memory.
    Processor board ID FGL164624AL
    PowerPC 8343 CPU at 400Mhz, revision number 0x0031
    Last reset from power-on
    LWAPP image version 7.6.100.0
    1 Gigabit Ethernet interface
    1 802.11 Radio
    32K bytes of flash-simulated non-volatile configuration memory.
    Base ethernet MAC Address: 70:CA:9B:2F:49:30
    Part Number                          : 73-11027-11
    PCA Assembly Number                  : 800-28807-11
    PCA Revision Number                  : B0
    PCB Serial Number                    : FOC1634C1G6
    Top Assembly Part Number             : 800-33059-04
    Top Assembly Serial Number           : FGL164624AL
    Top Revision Number                  : B0
    Product/Model Number                 : AP801GN-A-K9       
    Configuration register is 0xF

  • After delivery aslo PIR are not reduced

    Hi
    I am using strategy 10.normally in 10 strategy PIRS will be reduced after Delivery.
    after delivry also the PIRS are not reduced but  the stock is reduced.
    why it is happenning.
    plz give me the solution immediately.
    Regards
    Srinivas

    If I am right, you have done a PGI and still able to see the sale order/purchase order alive in MD04.
    If this is your problem area,
    Use SDRQCR21
    <b><u>Instructions for Using SDRQCR21</u></b>
    •<u>Material and Plant</u>
    If you enter selection criteria for "Material" or "Plant," the report processes the requirements according to this selection only. If you do not enter a selection criterion, the report processes all sales and delivery requirements.
    By severely restricting the selection criterion "Material," you may be able to reduce the runtime of the report. In general, selecting the "Plant" criterion only does not shorten the runtime period. For more information, see the section entitled "Performance of SDRQCR21".
    •<u>Data transfer</u>
    Select the "Data transfer" parameter so that the report updates the requirements on the database.
    If you execute the report without selecting the data transfer parameter, the report simulates the update only (that is, it checks the requirements and issues a log, but it does not make any changes). In this way you can also use SDRQCR21 as a pure check report for sales and delivery requirements.
    •<u>Compare</u>
    Always select the "Compare" parameter to improve the performance (runtime) and to restrict the scope of the log.
    The report then corrects, deletes and creates only the requirements affected by the correction. If you do not select the parameter, the report completely reconstructs the database (for the materials/plants selected).
    •<u>Planning entry</u>
    If you select the "Planning entry" parameter, the report creates planning file entries (entries for the planning run) for the materials/plants affected (and relevant according to the MRP type).
    •<u>Processing for material</u>
    If you select the "Processing for material" parameter, the report saves the requirements (database commit) one after the other for each material/plant, instead of saving all the requirements in one step. Correspondingly, the log issued by the report is also sorted according to material and plant.
    •<u>No parallel processing with a data transfer!</u>
    Only execute the SDRQCR21 report with a data transfer once you have made sure that no-one will process sales documents or deliveries (for the materials/plants according to the selection) whilst the report is running, either in the foreground (dialog) or in the background (rescheduling, collective run for creating deliveries, EDI-IDoc and so on)!
    Reason: The report does not read or set blocks. It therefore produces correct results only if no other program updates sales or delivery requirements, or checks availability while the report is running. If you execute the report with a data transfer during production operation, the system may even generate new requirement errors!
    Additional Information: If you run the SDRQCR21 report twice at the same time, enter the relevant selection criteria Material/Plant for the same reason, so that they do not overlap during simultaneous processing.
    •<u>     Recommendation</u>
    To execute the SDRQCR21 correction report easily, securely and completely, do not enter any selection criteria for "Material" or "Plant," select all four checkboxes and make sure that the report is not running during production operation. If runtime problems or other problems occur, see the following explanations in the sections entitled "Performance of SDRQCR21" and "Solving SDRQCR21 Problems."
    •     <u>Comments</u>
    o     Even if you execute the report without a data transfer, you should still select the "Compare" parameter.
    However, it is irrelevant whether you select the "Planning entry" parameter in this case, since the report without a data transfer does not create any planning file entries.
    o     The "Compare," "Planning entry" and "Processing for material" parameters are available as of R/3 Release 3.1I only.
    <u>Performance of SDRQCR21</u>
    The report may require a long runtime. Since you can only execute it at specific times (you cannot use parallel processing, that is, you cannot execute the report with a data transfer during normal production operation), bottlenecks may occur.
    In this case, attempt the following solutions:
    •     Execute the report with a data transfer only for materials with requirement errors. To do this, proceed as follows:
    o     <u><b>Step 1</b></u>: Execute the report without a data transfer and without the selection criteria 'Material/Plant', but with 'Compare' and with 'Processing for material'. You can also do this during production operation.
    o     <u><b>Step 2</b></u>: Outside production operation , execute the report with a data transfer only for those materials (or material/plant combinations) for which step 1 logged requirement errors.
    o     <u><b>Step 3</b></u>, only if you use total requirements (Table VBBS, daily/weekly requirement) and not individual requirements (Table VBBE):
    Outside of production operation , repeat step 1 without 'Processing for material' for test purposes. The report should no longer log any errors.
    o     <b><u>Comment 1</u></b>: If step 1 logged several materials with requirement errors, repeat it (several times if necessary) with selection(s) according to these materials. By repeating the step in this way, the system may log fewer materials with requirement errors. (During production operation, the report usually logs more requirement errors than actually exist. If data was transferred, the report would then create new errors.) Carry out step 2 only for those materials for which the report has logged permanent requirement errors.
    o     <u><b>Comment 2</b></u>: If the time outside production operation is insufficient for step 2, divide the step into several substeps. That is, divide the material list determined in step 1 into sections that do not overlap and execute the report for each corresponding subsection. You can execute these substeps in succession, if necessary over several days, or partially at the same time depending on your system capabilities.
    o     <b><u>Comment 3</u></b>: If, contrary to expectations, step 3 logs materials with requirement errors, (repeatedly) treat this step as step 1 of a new correction process. Outside production operation, reduce the list of materials with requirement errors as described in comment 1, and so on.
    •     Do not select the 'Planning entry' parameter.
    The report then does not create any new planning file entries (see above). However, you must be aware of the risks involved in doing this!
    •     Archive sales documents and deliveries.
    We recommend that you archive sales documents and deliveries. Document archiving reduces the database for the SDRQCR21 report and for other programs, and therefore significantly improves performance.
    •     Optimize database performance.
    The tables that the report uses to approximately preselect the relevant document items are the most important:
    o     VBUK and VBUP (without a selection according to Material/Plant)
    o     VAPMA, VLPMA and VBUP (with a selection according to Material/Plant)
               The report still reads entries from tables VBAK, VBAP, VBEP, LIKP, LIPS, as well as VBPA, VBUP and VBFA (if necessary).
    Finally, it reads and updates tables VBBE (requirement individual records) or VBBS (totals records for each day/week).
    Solving SDRQCR21 Problems
    •     Document status
    The report returns correct results only if the statuses of the documents affected are correct (with regard to reference, delivery, goods movement, reason for rejection). This prerequisite is usually met. Only if you have good reason to suspect that the statuses are inconsistent or that the report has returned incorrect results because of inconsistencies, see Note 207875 and/or 506510, to check and, if necessary, correct the statuses of sales documents and/or deliveries.
    •     Item Material Index
    If you enter the 'Material' or 'Plant' selection criteria, the report returns correct results only if the document items affected are contained correctly in the relevant material index (VAPMA, VLPMA). This prerequisite is usually met. Only if you have good reason to suspect that the index is inconsistent, that the report has returned incorrect results because of inconsistencies, or that the report terminated with SAPSQL_ARRAY_INSERT_DUPREC because of inconsistencies, check the TVIND Customizing table and see Note 128947 and/or 33267 for information about correctly reconstructing the material index.
    •     ATP server: After the run of SDRQCR21 (if you use the ATP server), you must load the requirements for the combinations from material and plant for which SDRQCR21 was started to the ATP server.

  • Profit Center Problem in case of PGI after delivery

    Hello All,
    The problem is related to Stock Transfer Order (STO) between two plants which is as follows -
    When a PO is raised for Material 1 the Profit Center is maintained in the material master in the Supplying Plant A but not maintained in the material master for Material 1 in the Recipient Plant B.After Delivery & PGI when posting is checked it is observed that In case of Supplying Plant A inventory a/c is getting credited reflecting the assigned profit center while in case of Recipient Plant B inventory a/c  is getting debited but the profit center field remained blank.Is there any configuration possible to check/restrict the PGI posting when the profit center is not getting reflected in the recipient Plant without making the profit center field as 'mandatory' in the General Plant & Storage Data of the Material Master??
    Please suggest at the earliest.
    Thanks & Regards
    Priyanka Mitra

    Hello Sangram,
    thank you for your fast reply.
    It is not about the amounts. They are correct.
    I got confused regarding the change of the profit center numbers on the level of the GR/IR.
    KR
    Thomas

  • Cannot set status of Urgent Change after manual transport

    Hi all,
    We are usng CHARM in Solution Manager 7.1 for import to the SAP ECC (EHP6) systems.
    I cannot set the status of the Urgent Change document (ZMHF) to status "To be Tested" after the transports were manually released and manually imported to the ECC QA system.
    When I use action "Pass Urgent Change to Test", the system stopped with error "Not all task are yet released" and will not change the status .
    Based, on the Task List log, the system started the release process although no transports were released.
    Is there any way that I can update the status of the Urgent Change document to "To be Tested"?
    I tried program CRM_SOCM_SERVICE_REPORT but still did not change the status.
    Any suggestion?
    Thanks,
    Tess

    Hi Venu,
    have a look under System Administration - System Configuration -- Knowledge Management -- Configuration --Content Management -- User Interface -- Commands -- UI Command Groups -- StatemanagementGroup.
    See Java class: com.sapportals.wcm.rendering.uicommand.cm.UIStatemanagementGroupCommand. Take the class and decompile this and everything needed around to understand how this class works.
    Then you can choose to extend this CommandGroup to also have a command "Resubmit for Approval" or you can implement your own UI Command only for resubmitting (you will also have to activate your command (group) by settings within the configuration).
    On the other hand, if all this is completely new to you, I'm a bit sceptical if the task isn't a bit too big as a first task on KM implementation topics...?
    Hope it helps
    Detlev

  • How to change the status of an incident, after it is "Confirmed"

    Hi, I'm new to ITSM and the client asking me how he can change the status of an incident, after he change it to "Confirmed".  Is there a way to change the status of an incident after it is set to "Confirmed"?  Or can I change the configuration of the Status field to allow that change?
    Thank you

    hi
    I dont think, you can reopen the confirmed ticket by standard, but please try with the report CRM_SOCM_SERVICE_REPORT.
    if not try with the status profile customization, remove the FINI settings from the confrimed status  also change the highest and low values also accordingly.
    please try.
    Thanks
    Jansi

  • Pay After Delivery disappeared as method of payment with a seller that DOES accept PAD.

    I have been using Pay After Delivery for a few months now, especially on Kidizen (an app for buying used baby and kids clothes). Today, I was shopping and went to check out with PayPal and as usual, it showed PAD as my payment method. Before finishing the transaction though, I needed ot double check my cart so I pressed the back button, verified it was all correct, and then went right back to PayPal. However, this time, Pay After Delivery was not showing as my method of payment. I refreshed the app and re-entered PayPal a hundred times to no avail. I tried other websites that accept PAD and for some reason PAD won't show up as my method of payment on any of them. I even went into my PayPal settings to turn off PAD and turn it back on, but again my efforts were futile. Can someone please tell me what is going on and how to fix it?

    This is EXACTLY what happened to me, but I was using eBay. Ready to check out, changed shipping method, never even left the page...PAD dissapeared. Awful. How are you supposed to find the best deal and manage your purchases and budget when your payment methods are so messed up. It's obviously not about the item or the seller/store because it has dissapeared like this for both of us. Really unhappy.......

Maybe you are looking for

  • Nw-bpm and ccbpm

    hi, can someone explain to me the difference between nw-bpm ("galaxy") and ccbpm (part of nw-pi): -> what is the usage for both? -> how are they related? -> will ccbpm be replaced by nw-bpm some time in the future? -> for new projects, is it still re

  • Release 4.2 - Application Builder - Missing links at bottom of the screen

    Hello In 4.1 (and all releases before) when run an application you could see links at the bottom of the screen for development activities e.g. home, edit page, session, etc In release 4.2 I can no know longer see these links. Is there away to "Switch

  • Problem sending big attachments through mail - E72

    I've tried both profimail & the built-in client but most of the time it gives error like 'connection timeout or 'unable to send'. Is anyone else experiencing this problem ? This happens when the file size is around 2-3 MB.

  • How to add tooltip on dashboard

    Hi all, How can I add tooltip on Dashboard (shown in picture)? I have tried this by adding Comment on dashboard while creating it. But It did not show comment just name of dashboard in tootip. http://img686.imageshack.us/img686/5295/tooltip.png Thank

  • How to install windows on an iMac

    I would like to add windows to my Imac but cannor find any helpful info on the apple site. I would welcome any help as I am new to Apple. I have the new IMac. Thanks Dennis