Status of material sent to sub-contractor

Hi, Is there any way to get the report of status of materials supplied to sub-contractor using movement type 541 and 311. we need to know the status of both the materials that were sent through movent type 541 and 341. points will be surely rewarded. thanks in advance.

Dear,
Check with MB51 with movement type  541 and 311
Use TCode ME2L - PO documents per vendor
So the user enters the vendor name and all the items he has supplied ....a status comes.
ME80FN.
Regards,
R.Brahmankar

Similar Messages

  • Material issue to sub-contractor

    Sub-contractor needs 2 qty of X raw material to manufacture our finish product. instead of 2 qty sub-contractor needs 4 raw materials. how to handle the extra  qty for sub-contracting?

    Hi,
    First please search on SAP online help and on MM forum in connecton with subcontracting, there's huge amount of threads...
    My suggestio:
    1. You can modify the PO item's component list from 2 pcs to 4 pcs (ME22N > "Material" tab of subcon PO item > "Components" icon) nad after that you can do the GR.
    2. Subsequent adjustment - here first you post GR by consuming 2 pcs and after that you
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/4d/2b908943ad11d189410000e829fbbd/frameset.htm
    You can use both MIGO and MB04 for this purpose.
    Please also read the pdf attachment of OSS note 205454 that has many useful information on subcontracting.
    Regards,
    Csaba

  • Incoming material from Sub-contractor to Quality Stock

    Hi ,
    We have a scenario where we get material back from sub-contractor and is posted to quality stock . When I am doing MMBE then I am not able to see this stock in quality stock .
    Regards
    Nandini

    Hi All ,
    Thank you so much for the effort put in to solve my problem.
    Merwyn and Vikas...my problem was solved by maintaining the inspection type.
    Regards
    Nandini

  • Block a material with Sub-Contractor

    Hey All,
    I am just wondering, I have  a business requirement to block a material that is with the sub-contractor as it is with the sub-contractor for rework.
    I have tried to do a 541 Transfer posting and setting the stock as blocked stock but it shows up as unrestricted in MMBE.
    Is there a process that would suit my requirement?

    Hi,
    Check the configuration setting for the 541 movement type once.
    Configure the movement type -stock if necessary.
    Thanks
    Asini

  • Sub contractor using his own material

    Dear Experts ,
    I wanted to map a scenario in which I send the material to sub contractor , in which apart from processing the sub contractor uses his own material which is modvatable .
    And also in service po , when I send the machine for servicing, the service provider also uses his own material which again is cenvatable .
    In both the scenarios how do we map it SAP .
    Thanks

    Hi,
    Both the issues you have posted are different.
    So, please close this thread and open two different threads, for each problem.
    Regards,

  • Movement of material from Unrestricted to Quality at sub contractor

    Hi Expert,
    I am looking for a way to move stock from Unrestricted to Quality for stock that is stored at a vendor (sub contractor)?
    Have you got any advice?

    Hi Anders,
    Is your wish to move your goods from unrestricted special stock at SC vendor to QI special stock at SC vendor?
    In this case you may have solution, please check transaction MB1B + relevant movement type (sorrowfully I cannot check 'cause I have no access to SAP now). Please take care of choosing proper movement type with special stock category 'O'.
    http://help.sap.com/saphelp_46c/helpdata/en/4d/2b909643ad11d189410000e829fbbd/frameset.htm
    BR
    Csaba

  • Sub Contractor Ledger

    Dear MM Experts,
    I urgently need Sub Contractor Material Ledger (LIKE MB5B Report). It should show Opening & closing balances of material vendor wise.
    Is there is any standard report is SAP. We are using ECC 5.0. If not if anybody having developed report then please send code.
    Thanks in advance
    Ashwani K Mathur

    Hi Ashwani,
    You can goto T-CODE : MB5B in intial screen under stock type select SPECIAL STOCK & under database selection for special stock indicator select "o" & execute you will get with opening stock & closing stock.
    Regards
    Rang
    Message was edited by:
            Ranganath Mysore
    Message was edited by:
            Ranganath Mysore
    Message was edited by:
            Ranganath Mysore

  • Excess material remain with sub contracting vendor

    HI expert
    I have made subcontracting po for which migo, miro had done, we had made manual BOM in the po, usually my BOM ratio 1:1, But now end user had done mistake, by taking 1:3 ratio, tht mean for 100 he taken  300. My 200 stock I lying with sub contractor, I want to take it back that 200.
    I donu2019t want to reverse any thing from the system, is there any solution for the above except reverse
    how should i go about
    Regard
    Nabil

    Use 542 mvt type and provide vendor in MB1B transaction to get material back to your plant.

  • MB1B - Bulk material issue for sub-con PO

    Hi All,
    For a subcon PO, the user has by mistake done a transfer of a bulk material using MB1B. The vendor has used this material as well. Now when i receive the material from the vendor, this bulk material is not consumed by this PO with a 543 mvt, which is normal.
    But the issue is, this item is now shown as lying with sub-contractor, & there is no way i can post a 543. I can post a 542 & reverse the issue, but then how do i treat this stock?
    Hope my question is clear, await inputs.
    Regards,
    Vivek

    Hi Vivek,
    Thanks for your explanation.
    Still I have doubts. Are you speaking of bulk material in terms of BOM?
    I haven't got experience with them BUT SAP help definetly says that bulk material is not 'withdrawn specially for the order' and 'a bulk material item is only for information'.
    http://help.sap.com/saphelp_46c/helpdata/en/b1/c043f4439a11d189410000e829fbbd/frameset.htm
    Considering this, we cannot expect consumption by mvt 543 of bulk material when GR against subcon-PO takes place.
    It's only my opinion so please think about this yourself as well.
    BR
    Csaba
    Re: Items with Bulk Indiactor in subcontracted assembly.
    http://www.sapfans.com/forums/viewtopic.php?f=9&t=289342&p=869693&hilit=bulkmaterialconsumption#p869693
    http://www.sapfans.com/forums/viewtopic.php?f=6&t=310542&p=938766&hilit=bulk+material#p938766

  • Period Status in material ledger

    Dear Gurus,
    I am confused by period status in material ledger.  Now, when displaying material price analysis with CKM3, period status is quantities and values entered. However, I checked MB51 and invoice. There is no material posting in the period. Even for some new material without any postings, the status is quantities and values entered as well. I wonder how the system sets the status. Could you please give a hint on it?
    Thank and Regards,
    Rebe Z.

    Hi Rebe,
    To see the transactions and documents for ML category in t-code CKM3 report  i.e., Beginning Inventory--> choose "Expand sub tree" and choose the corresponding line. I guess these , period status quantities and values entered entries are  for New period opening. Whenever  the New period is opened, for New materials also, Material Ledger document will be created and updated in Material Price analysis report. The Material ledger records the following categories of data and the system generates ML documents automatically :
    01.     Beginning Inventory
    02.     Price change
    03.     Receipts
    04.     Other receipts/consumption
    05.     Cumulative inventory
    06.     Consumption
    Also whenever Price determination for Material Master is changed from 02 to 03 or vice-versa, ML documents will be generated automatically and updates in Material Price Analysis report-t-code-CKM3.
    Regards
    appalas
    Regards
    appalas

  • Sub Contractor challan Reconcillation after subsequent adjustment

    Dear Friends,
    I am sending 1 kg of material to receive back 1kg of material the sub contractor uses .90 kg to make 1 kg of the reqd material. So I do subsequent adjustment after MIGO for under consumption of  0.10kg
    Now after doing subsequent adjustment, while  doing  reconciliation in J1ifq should  I change the assigned qty to 0.90 kg ( as there was under consumption of 0.1kg ), I tried changing the assigned qty to 0.900  but its showing me the message u201Cmaterial xxx is not fully assigned, short by 0.10 kg& itu2019s not letting me reconcile.
    Kindly suggest the correct procedure for reconcillation & sub con challan completion after subsequent adjustment.
    Thanks

    Hello,
    Please check the process supported by SAP for                   
    subcontracting with and without duty payment in the following link:                                                                               
    http://help.sap.com/saphelp_erp60/helpdata/en/09/ebf138cdd78a4be10000000     
    a114084/frameset.htm                                                                               
    It is quite helpful for challan reconciliation issues.                                                                               
    Keep in mid that for challan subcontrating you should perform the            
    following steps:                                                                               
    1) Create Sub contracting PO                                                 
    2) Create MB1B ( 541 mov)                                                    
    3) Create Challan from J1IF01 with reference to material document            
    4) Create GR using MIGO sub cont PO. ( faced error )                                                                               
    Please be ensure that the following note is already applied in your          
    system:                                                                      
    1423896 - The subcontracting challan validation - MIGO                       
    Please chek if you have set the movement types     
    541 and 541 O as relevant for creation of challan. Also, you ha       
    ve to set the number of line items in a challan to be only 1 in the customi       
    sing node 'subcontracting attributes'.                                         
    So the system will create 1 challan per line of the transfer posting           
    document as it finds both 541 and 541 O movements.                                                                               
    If you do not want the system to create challan for 541 as is normal           
    then remove the movement type 541 from movement type group 0001. Also          
    remove 101 from movement type group 0002.    
    I hope it helps you.
    Regards,
    Fábio Almeida                                 
    Mm Consultant

  • Sub contractor stock  consideration

    Dear SAP Friends,
    While taking MRP run,the requirement were generated without considering the stock at Sub-contractor.
    As we send the same material for machining operation at 2-3 sub contracors.
    We take MRP run through the MD01(as scope of planning setting are here)
    All 3 plants were take under the planning scope( X ).
    No MRP area defined separetly.
    Make to stock scenario here.
    What customisation setting we will required to consider the subjected  matter.
    Please guide,& reply soon.
    Regards,
    Chandra.

    Hi,
    You can have a separate dummy plant as subcontractor where the stocks will be stored ( that will be as Subcontractor stock).
    U can include that plant in ur MRP RUN.
    Regards,
    Prakash

  • Status 51 material document data and po data do not match(vendor)

    i am using we19 to try an inbound idoc mbgmcr(receipt for po)
    i put in gm_code 01
    movement indicator B(goods receipt for po)
    vendor 3815
    PO 4500015241
    PO Order Item 00030
    Movement type 101
    qty in unit of entry  1
    iso code unit of measurement pc
    on the po screen i see the po item and qty to be delivered is 75
    when i run the inbound idoc i get
    status 51 material document data and po data do not match(vendor) but as i say on the po inquiry screen i see the po vendor item with 75 to be delivered
    what am i missing????????????????

    thank you
    i put in the leading zeros and got rid of that problem
    now i am getting status 51
    posting only possible in 2004/07 and 2004/06
    but in the posting date i use 07/02/2004  i have tried several dates in the period but get the same error
    any ideas?
    thanks you

  • Bypass D-Chain specific status of material master

    Hi,
    Is there a way ( Copy Routine/ user exit)  to bypass D-Chain specific status of material master which prevents creation of Delivery doc w.r.t a PO in STO scenario?
    I dont want change the config setting for status to allow delivery creation.
    Thanks in Advance
    Subhankar

    Hi Kapil,
    Threre are some material for which D-Chain status ( MVKE-VMSTA) in the materila master are set in such a way so that deliveries can not be created. We need to bypass this restriction for couple of delivery types. One of them is the delivery type used for intracompany STO.
    I am looking for some way out like user exit so that I dont need to change existing config change for those statuses.
    Regards,
    Subhankar

  • Reg: reading  the status of material in terms of legal control in GTS

    Hi All,
    I have a requirement like i need to capture the data from GTS for the status of material in terms of legal control(/SAPSLL/LGREG) as well as Legal Control: License Header(/SAPSLL/LCLIC) as a RFC call from R/3 To GTS module.
    Can any one come across such sort of requirement?
    Kindly provide is there is any RFC enabled funcion module is enable to meet the above requirement.
    Appreciate your answers.
    Cheers,
    Joe

    The data has to be retrieved based on the combination of billing docuemtns material and item number from R/3 through a RFC call to GTS.
    Tnx,
    Joe

Maybe you are looking for