Status vector & Status overlap field in LDB PCH
hi all,
Any one pls explain structure paramters in the selection screen of logical database PCH.ie fileds like status vector, status overlap, technical depth,recursion check etc
Hi,
These fields are related to the parameter for structure
evalution which is added to the standard selection screen. This enables structure evaluations via evaluation paths.
This LDB is related to Planning and Organization area
better a HR guy can explain indepth about these fields.
related table for these structure is PLOG in Planning and Organization .
See the data in that table and corelate to these fields.
reward if useful
regards,
Anji
Message was edited by:
Anji Reddy Vangala
Similar Messages
-
Material Master - Error M3 826 Maintenance status of field ... to screen
Hi Experts of the Material Master,
I am getting the error M3 826 "Maintenance status of field MARA-BEHVO does not correspond to status of screen K" when all screens are selected in the Create Material Master transaction.
Here is my situation: I have added the fields MARA-BEHVO and MARA-TEMPB both of status L (Storage) to a screen called "Phys. Characteristics", which has status K (Basic data).
This produces the error message above in standard SAP. I didn't want to change the customizing of the screen to allow L, because this screen is also used by other material types.
I had to copy the screen MGD1 2701 (Phys. Characteristics) to my custom program for Material Master screens anyhow, as the number of fields and their descriptions had to be adjusted.
The program was created using the activity "Create Program for User Subscreens" in SPRO.
in the coding of ZMGD1 screen 2701 I have added this code behind the standard module FELDAUSWAHL to manipulate the standard logic that would blend out L fields on a K screen.
LOOP AT SCREEN.
* Material Type
IF mara-mtart = 'ZPNT'.
* Screen-Names of the 3 fields
IF screen-name = 'MARA-TEMPB' OR
screen-name = 'MARA-BEHVO'.
screen-active = 1.
screen-invisible = 0.
screen-output = 1.
* Change or Create transaction
IF sy-tcode = 'JP27' OR sy-tcode = 'JP28'.
screen-input = 1.
screen-required = 1.
ENDIF. "transaction code JP27 or JP28
MODIFY SCREEN.
ENDIF. "screen-name
ENDIF. "Material Type ZPNT
ENDLOOP.
It all works fine when only a number of screens (but including the modified) screens are selected for creation.
But it fails with the message above on the modified screen when all screens are selected.
Any ideas?
Ralffrom the message, it appears that ZZKUNNR is a custom field attached to your MARA table. So, it is your System specific. I don't see ZZKUNNR available in MARA. If you look at the transaction code OMT3B (configuration for material master data screens), you can find K - Basic Data Screen in Maintenance Status field.
You may look in this area to fix your issue. Because yours is a custom field, its tough to analyse further.
Reward points, if it helps!
Regards -
How to check lock status of field in current document?
Hi,
How to check the status of field in current document(master agreement), that is whether its locked or not.
I locked "Publish to Supplier" checkbox after MA is saved first time. Now, I want to check the status whether this field is locked or not in the same document.
IsLockOwner( ) is not returning the correct value. Its not giving the current document field lock status.
Is there any way to get current document field status?
Thanks,
SaloniHi,
If I understand correctly, your requirement is to get the value of this field "Publish to Supplier on". It can be achieved by writing the below:
isVendorVisible = doc.getExtensionField("VENDOR_VISIBLE").get();
Meaning, if the box is checked, it will return a value = true and if not then false.
Hope this helps,
Regards,
Vikram Shukla -
What is the impact of field status in Field Status Group
Hi,
In MIR7, we want to make Cost Center Mandatory. For this we found the option of "Field Status Varient". We are using "Z004" Field status group in G/L account. In this FSG, we want to change the status of field "Cost Center" as mandatory from Optional.
We want to know what will be the impact of this change in any other transaction?
Regards
Vijay ShindHi
-
Status manager field report in pwa 2010
From Ms project or project server I am trying to get a report on status managers on tasks.
is there a way I can get status managers listed on the tasks in a report other than Opening all projects individually?I got a Sample template which looks almost same called Projects and assignments
we can add status manager field there. Below is the query
SELECT MSP_EpmProject_UserView.ProjectUID as [ProjectUID], MSP_EpmProject_UserView.ProjectName as [ProjectName],
MSP_EpmProject_UserView.ProjectAuthorName as [ProjectAuthorName], MSP_EpmProject_UserView.ProjectOwnerResourceUID as [ProjectOwnerResourceUID],
MSP_EpmProject_UserView.ProjectStartDate as [ProjectStartDate], MSP_EpmProject_UserView.ProjectFinishDate as [ProjectFinishDate],
MSP_EpmProject_UserView.ProjectStatusDate as [ProjectStatusDate], MSP_EpmProject_UserView.ProjectManagerName as [ProjectManagerName], MSP_EpmProject_UserView.ProjectType
as [ProjectType], MSP_EpmProject_UserView.ProjectWorkspaceInternalHRef as [ProjectWorkspaceInternalHRef], MSP_EpmProject_UserView.ProjectWbsIsStale
as [ProjectWbsIsStale], MSP_EpmProject_UserView.ProjectEarnedValueIsStale as [ProjectEarnedValueIsStale], MSP_EpmProject_UserView.ProjectRollupsAreStale
as [ProjectRollupsAreStale], MSP_EpmProject_UserView.ProjectHierarchyNotSynchronized as [ProjectHierarchyNotSynchronized], MSP_EpmProject_UserView.ProjectCalculationsAreStale
as [ProjectCalculationsAreStale], MSP_EpmProject_UserView.ProjectGhostTaskAreStale as [ProjectGhostTaskAreStale], MSP_EpmProject_UserView.ProjectCurrency
as [ProjectCurrency], MSP_EpmProject_UserView.ResourcePlanUtilizationType as [ResourcePlanUtilizationType], MSP_EpmProject_UserView.ResourcePlanUtilizationDate
as [ResourcePlanUtilizationDate], MSP_EpmProject_UserView.ProjectCreatedRevisionCounter as [ProjectCreatedRevisionCounter], MSP_EpmProject_UserView.ProjectModifiedRevisionCounter
as [ProjectModifiedRevisionCounter], MSP_EpmProject_UserView.ProjectCreatedDate as [ProjectCreatedDate], MSP_EpmProject_UserView.ProjectModifiedDate
as [ProjectModifiedDate], MSP_EpmProject_UserView.ProjectCalendarDuration as [ProjectCalendarDuration], MSP_EpmProject_UserView.ParentProjectUID as
[ParentProjectUID], MSP_EpmProject_UserView.ProjectFixedCost as [ProjectFixedCost], MSP_EpmProject_UserView.ProjectCost as [ProjectCost],
MSP_EpmProject_UserView.ProjectOvertimeCost as [ProjectOvertimeCost], MSP_EpmProject_UserView.ProjectActualCost as [ProjectActualCost],
MSP_EpmProject_UserView.ProjectActualOvertimeCost as [ProjectActualOvertimeCost], MSP_EpmProject_UserView.ProjectWork as [ProjectWork],
MSP_EpmProject_UserView.ProjectOvertimeWork as [ProjectOvertimeWork], MSP_EpmProject_UserView.ProjectActualWork as [ProjectActualWork], MSP_EpmProject_UserView.ProjectActualOvertimeWork
as [ProjectActualOvertimeWork], MSP_EpmProject_UserView.ProjectDurationVariance as [ProjectDurationVariance], MSP_EpmProject_UserView.ProjectStartVariance
as [ProjectStartVariance], MSP_EpmProject_UserView.ProjectFinishVariance as [ProjectFinishVariance], MSP_EpmProject_UserView.ProjectDuration as [ProjectDuration],
MSP_EpmProject_UserView.ProjectActualDuration as [ProjectActualDuration], MSP_EpmProject_UserView.ProjectActualStartDate as [ProjectActualStartDate],
MSP_EpmProject_UserView.ProjectActualFinishDate as [ProjectActualFinishDate], MSP_EpmProject_UserView.ProjectPercentCompleted as [ProjectPercentCompleted],
MSP_EpmProject_UserView.ProjectPercentWorkCompleted as [ProjectPercentWorkCompleted], MSP_EpmProject_UserView.ProjectACWP as [ProjectACWP],
MSP_EpmProject_UserView.ProjectBCWP as [ProjectBCWP], MSP_EpmProject_UserView.ProjectBCWS as [ProjectBCWS],
MSP_EpmProject_UserView.ProjectSPI as [ProjectSPI], MSP_EpmProject_UserView.ProjectTCPI as [ProjectTCPI], MSP_EpmProject_UserView.ProjectVAC
as [ProjectVAC], MSP_EpmProject_UserView.ProjectEAC as [ProjectEAC], MSP_EpmProject_UserView.ProjectCostVariance as [ProjectCostVariance],
MSP_EpmProject_UserView.ProjectCV as [ProjectCV], MSP_EpmProject_UserView.ProjectCPI as [ProjectCPI], MSP_EpmProject_UserView.ProjectEarlyFinish
as [ProjectEarlyFinish], MSP_EpmProject_UserView.ProjectEarlyStart as [ProjectEarlyStart], MSP_EpmProject_UserView.ProjectLateFinish as [ProjectLateFinish],
MSP_EpmProject_UserView.ProjectLateStart as [ProjectLateStart], MSP_EpmProject_UserView.ProjectSV as [ProjectSV],
MSP_EpmProject_UserView.ProjectWorkVariance as [ProjectWorkVariance], MSP_EpmProject_UserView.ProjectBudgetCost as [ProjectBudgetCost],
MSP_EpmProject_UserView.ProjectBudgetWork as [ProjectBudgetWork], MSP_EpmProject_UserView.ProjectResourcePlanWork as [ProjectResourcePlanWork], MSP_EpmProject_UserView.ProjectRegularCost
as [ProjectRegularCost], MSP_EpmProject_UserView.ProjectRemainingCost as [ProjectRemainingCost], MSP_EpmProject_UserView.ProjectRemainingOvertimeCost
as [ProjectRemainingOvertimeCost], MSP_EpmProject_UserView.ProjectActualRegularCost as [ProjectActualRegularCost], MSP_EpmProject_UserView.ProjectRemainingRegularCost
as [ProjectRemainingRegularCost], MSP_EpmProject_UserView.ProjectRegularWork as [ProjectRegularWork], MSP_EpmProject_UserView.ProjectRemainingWork
as [ProjectRemainingWork], MSP_EpmProject_UserView.ProjectRemainingOvertimeWork as [ProjectRemainingOvertimeWork], MSP_EpmProject_UserView.ProjectActualRegularWork
as [ProjectActualRegularWork], MSP_EpmProject_UserView.ProjectRemainingRegularWork as [ProjectRemainingRegularWork], MSP_EpmProject_UserView.ProjectRemainingDuration
as [ProjectRemainingDuration], MSP_EpmProject_UserView.ProjectCVP as [ProjectCVP], MSP_EpmProject_UserView.ProjectSVP as [ProjectSVP],
MSP_EpmProject_UserView.ProjectOwnerName as [ProjectOwnerName], MSP_EpmProject_UserView.ProjectCount as [ProjectCount],
MSP_EpmProject_UserView.ProjectBaseline0Cost as [ProjectBaseline0Cost], MSP_EpmProject_UserView.ProjectBaseline0FixedCost as [ProjectBaseline0FixedCost],
MSP_EpmProject_UserView.ProjectBaseline0Work as [ProjectBaseline0Work], MSP_EpmProject_UserView.ProjectBaseline0BudgetCost as [ProjectBaseline0BudgetCost],
MSP_EpmProject_UserView.ProjectBaseline0BudgetWork as [ProjectBaseline0BudgetWork], MSP_EpmProject_UserView.ProjectBaseline0StartDate as [ProjectBaseline0StartDate],
MSP_EpmProject_UserView.ProjectBaseline0FinishDate as [ProjectBaseline0FinishDate], MSP_EpmProject_UserView.ProjectBaseline0Duration as [ProjectBaseline0Duration],
MSP_EpmProject_UserView.ProjectBaseline1Cost as [ProjectBaseline1Cost], MSP_EpmProject_UserView.ProjectBaseline1FixedCost as [ProjectBaseline1FixedCost],
MSP_EpmProject_UserView.ProjectBaseline1Work as [ProjectBaseline1Work], MSP_EpmProject_UserView.ProjectBaseline1BudgetCost as [ProjectBaseline1BudgetCost],
MSP_EpmProject_UserView.ProjectBaseline1BudgetWork as [ProjectBaseline1BudgetWork], MSP_EpmProject_UserView.ProjectBaseline1StartDate as [ProjectBaseline1StartDate],
MSP_EpmProject_UserView.ProjectBaseline1FinishDate as [ProjectBaseline1FinishDate], MSP_EpmProject_UserView.ProjectBaseline1Duration as [ProjectBaseline1Duration],
MSP_EpmProject_UserView.ProjectBaseline2Cost as [ProjectBaseline2Cost], MSP_EpmProject_UserView.ProjectBaseline2FixedCost as [ProjectBaseline2FixedCost],
MSP_EpmProject_UserView.ProjectBaseline2Work as [ProjectBaseline2Work], MSP_EpmProject_UserView.ProjectBaseline2BudgetCost as [ProjectBaseline2BudgetCost],
MSP_EpmProject_UserView.ProjectBaseline2BudgetWork as [ProjectBaseline2BudgetWork], MSP_EpmProject_UserView.ProjectBaseline2StartDate as [ProjectBaseline2StartDate],
MSP_EpmProject_UserView.ProjectBaseline2FinishDate as [ProjectBaseline2FinishDate], MSP_EpmProject_UserView.ProjectBaseline2Duration as [ProjectBaseline2Duration],
MSP_EpmProject_UserView.ProjectBaseline3Cost as [ProjectBaseline3Cost], MSP_EpmProject_UserView.ProjectBaseline3FixedCost as [ProjectBaseline3FixedCost],
MSP_EpmProject_UserView.ProjectBaseline3Work as [ProjectBaseline3Work], MSP_EpmProject_UserView.ProjectBaseline3BudgetCost as [ProjectBaseline3BudgetCost],
MSP_EpmProject_UserView.ProjectBaseline3BudgetWork as [ProjectBaseline3BudgetWork], MSP_EpmProject_UserView.ProjectBaseline3StartDate as [ProjectBaseline3StartDate],
MSP_EpmProject_UserView.ProjectBaseline3FinishDate as [ProjectBaseline3FinishDate], MSP_EpmProject_UserView.ProjectBaseline3Duration as [ProjectBaseline3Duration],
MSP_EpmProject_UserView.ProjectBaseline4Cost as [ProjectBaseline4Cost], MSP_EpmProject_UserView.ProjectBaseline4FixedCost as [ProjectBaseline4FixedCost],
MSP_EpmProject_UserView.ProjectBaseline4Work as [ProjectBaseline4Work], MSP_EpmProject_UserView.ProjectBaseline4BudgetCost as [ProjectBaseline4BudgetCost],
MSP_EpmProject_UserView.ProjectBaseline4BudgetWork as [ProjectBaseline4BudgetWork], MSP_EpmProject_UserView.ProjectBaseline4StartDate as [ProjectBaseline4StartDate],
MSP_EpmProject_UserView.ProjectBaseline4FinishDate as [ProjectBaseline4FinishDate], MSP_EpmProject_UserView.ProjectBaseline4Duration as [ProjectBaseline4Duration],
MSP_EpmProject_UserView.ProjectBaseline5Cost as [ProjectBaseline5Cost], MSP_EpmProject_UserView.ProjectBaseline5FixedCost as [ProjectBaseline5FixedCost],
MSP_EpmProject_UserView.ProjectBaseline5Work as [ProjectBaseline5Work], MSP_EpmProject_UserView.ProjectBaseline5BudgetCost as [ProjectBaseline5BudgetCost],
MSP_EpmProject_UserView.ProjectBaseline5BudgetWork as [ProjectBaseline5BudgetWork], MSP_EpmProject_UserView.ProjectBaseline5StartDate as [ProjectBaseline5StartDate],
MSP_EpmProject_UserView.ProjectBaseline5FinishDate as [ProjectBaseline5FinishDate], MSP_EpmProject_UserView.ProjectBaseline5Duration as [ProjectBaseline5Duration],
MSP_EpmProject_UserView.ProjectBaseline6Cost as [ProjectBaseline6Cost], MSP_EpmProject_UserView.ProjectBaseline6FixedCost as [ProjectBaseline6FixedCost],
MSP_EpmProject_UserView.ProjectBaseline6Work as [ProjectBaseline6Work], MSP_EpmProject_UserView.ProjectBaseline6BudgetCost as [ProjectBaseline6BudgetCost],
MSP_EpmProject_UserView.ProjectBaseline6BudgetWork as [ProjectBaseline6BudgetWork], MSP_EpmProject_UserView.ProjectBaseline6StartDate as [ProjectBaseline6StartDate],
MSP_EpmProject_UserView.ProjectBaseline6FinishDate as [ProjectBaseline6FinishDate], MSP_EpmProject_UserView.ProjectBaseline6Duration as [ProjectBaseline6Duration],
MSP_EpmProject_UserView.ProjectBaseline7Cost as [ProjectBaseline7Cost], MSP_EpmProject_UserView.ProjectBaseline7FixedCost as [ProjectBaseline7FixedCost],
MSP_EpmProject_UserView.ProjectBaseline7Work as [ProjectBaseline7Work], MSP_EpmProject_UserView.ProjectBaseline7BudgetCost as [ProjectBaseline7BudgetCost],
MSP_EpmProject_UserView.ProjectBaseline7BudgetWork as [ProjectBaseline7BudgetWork], MSP_EpmProject_UserView.ProjectBaseline7StartDate as [ProjectBaseline7StartDate],
MSP_EpmProject_UserView.ProjectBaseline7FinishDate as [ProjectBaseline7FinishDate], MSP_EpmProject_UserView.ProjectBaseline7Duration as [ProjectBaseline7Duration],
MSP_EpmProject_UserView.ProjectBaseline8Cost as [ProjectBaseline8Cost], MSP_EpmProject_UserView.ProjectBaseline8FixedCost as [ProjectBaseline8FixedCost],
MSP_EpmProject_UserView.ProjectBaseline8Work as [ProjectBaseline8Work], MSP_EpmProject_UserView.ProjectBaseline8BudgetCost as [ProjectBaseline8BudgetCost],
MSP_EpmProject_UserView.ProjectBaseline8BudgetWork as [ProjectBaseline8BudgetWork], MSP_EpmProject_UserView.ProjectBaseline8StartDate as [ProjectBaseline8StartDate],
MSP_EpmProject_UserView.ProjectBaseline8FinishDate as [ProjectBaseline8FinishDate], MSP_EpmProject_UserView.ProjectBaseline8Duration as [ProjectBaseline8Duration],
MSP_EpmProject_UserView.ProjectBaseline9Cost as [ProjectBaseline9Cost], MSP_EpmProject_UserView.ProjectBaseline9FixedCost as [ProjectBaseline9FixedCost],
MSP_EpmProject_UserView.ProjectBaseline9Work as [ProjectBaseline9Work], MSP_EpmProject_UserView.ProjectBaseline9BudgetCost as [ProjectBaseline9BudgetCost],
MSP_EpmProject_UserView.ProjectBaseline9BudgetWork as [ProjectBaseline9BudgetWork], MSP_EpmProject_UserView.ProjectBaseline9StartDate as [ProjectBaseline9StartDate],
MSP_EpmProject_UserView.ProjectBaseline9FinishDate as [ProjectBaseline9FinishDate], MSP_EpmProject_UserView.ProjectBaseline9Duration as [ProjectBaseline9Duration],
MSP_EpmProject_UserView.ProjectBaseline10Cost as [ProjectBaseline10Cost], MSP_EpmProject_UserView.ProjectBaseline10FixedCost as [ProjectBaseline10FixedCost],
MSP_EpmProject_UserView.ProjectBaseline10Work as [ProjectBaseline10Work], MSP_EpmProject_UserView.ProjectBaseline10BudgetCost as [ProjectBaseline10BudgetCost],
MSP_EpmProject_UserView.ProjectBaseline10BudgetWork as [ProjectBaseline10BudgetWork], MSP_EpmProject_UserView.ProjectBaseline10StartDate as [ProjectBaseline10StartDate],
MSP_EpmProject_UserView.ProjectBaseline10FinishDate as [ProjectBaseline10FinishDate], MSP_EpmProject_UserView.ProjectBaseline10Duration as [ProjectBaseline10Duration],
MSP_EpmTask_UserView.TaskUID as [TaskUID], MSP_EpmTask_UserView.TaskParentUID as [TaskParentUID],
MSP_EpmTask_UserView.FixedCostAssignmentUID as [FixedCostAssignmentUID], MSP_EpmTask_UserView.TaskName as [TaskName], MSP_EpmTask_UserView.TaskIndex
as [TaskIndex], MSP_EpmTask_UserView.TaskIsOverallocated as [TaskIsOverallocated], MSP_EpmTask_UserView.TaskIsProjectSummary as [TaskIsProjectSummary],
MSP_EpmTask_UserView.TaskOutlineLevel as [TaskOutlineLevel], MSP_EpmTask_UserView.TaskOutlineNumber as [TaskOutlineNumber],
MSP_EpmTask_UserView.TaskIsMilestone as [TaskIsMilestone], MSP_EpmTask_UserView.TaskIsCritical as [TaskIsCritical], MSP_EpmTask_UserView.TaskIsSummary
as [TaskIsSummary], MSP_EpmTask_UserView.TaskFixedCost as [TaskFixedCost], MSP_EpmTask_UserView.TaskActualFixedCost as [TaskActualFixedCost],
MSP_EpmTask_UserView.TaskCost as [TaskCost], MSP_EpmTask_UserView.TaskOvertimeCost as [TaskOvertimeCost],
MSP_EpmTask_UserView.TaskActualCost as [TaskActualCost], MSP_EpmTask_UserView.TaskActualOvertimeCost as [TaskActualOvertimeCost], MSP_EpmTask_UserView.TaskWork
as [TaskWork], MSP_EpmTask_UserView.TaskOvertimeWork as [TaskOvertimeWork], MSP_EpmTask_UserView.TaskActualWork as [TaskActualWork],
MSP_EpmTask_UserView.TaskActualOvertimeWork as [TaskActualOvertimeWork], MSP_EpmTask_UserView.TaskDurationVariance as [TaskDurationVariance],
MSP_EpmTask_UserView.TaskStartVariance as [TaskStartVariance], MSP_EpmTask_UserView.TaskFinishVariance as [TaskFinishVariance],
MSP_EpmTask_UserView.TaskTotalSlack as [TaskTotalSlack], MSP_EpmTask_UserView.TaskFreeSlack as [TaskFreeSlack], MSP_EpmTask_UserView.TaskDuration
as [TaskDuration], MSP_EpmTask_UserView.TaskDurationString as [TaskDurationString], MSP_EpmTask_UserView.TaskActualDuration as [TaskActualDuration],
MSP_EpmTask_UserView.TaskStartDate as [TaskStartDate], MSP_EpmTask_UserView.TaskStartDateString as [TaskStartDateString],
MSP_EpmTask_UserView.TaskFinishDate as [TaskFinishDate], MSP_EpmTask_UserView.TaskFinishDateString as [TaskFinishDateString],
MSP_EpmTask_UserView.TaskDeliverableStartDate as [TaskDeliverableStartDate], MSP_EpmTask_UserView.TaskDeliverableFinishDate as [TaskDeliverableFinishDate],
MSP_EpmTask_UserView.TaskActualStartDate as [TaskActualStartDate], MSP_EpmTask_UserView.TaskActualFinishDate as [TaskActualFinishDate], MSP_EpmTask_UserView.TaskPercentCompleted
as [TaskPercentCompleted], MSP_EpmTask_UserView.TaskPercentWorkCompleted as [TaskPercentWorkCompleted], MSP_EpmTask_UserView.TaskPhysicalPercentCompleted
as [TaskPhysicalPercentCompleted], MSP_EpmTask_UserView.TaskACWP as [TaskACWP], MSP_EpmTask_UserView.TaskBCWP as [TaskBCWP],
MSP_EpmTask_UserView.TaskBCWS as [TaskBCWS], MSP_EpmTask_UserView.TaskLevelingDelay as [TaskLevelingDelay], MSP_EpmTask_UserView.TaskPriority
as [TaskPriority], MSP_EpmTask_UserView.TaskSPI as [TaskSPI], MSP_EpmTask_UserView.TaskTCPI as [TaskTCPI],
MSP_EpmTask_UserView.TaskVAC as [TaskVAC], MSP_EpmTask_UserView.TaskDeadline as [TaskDeadline], MSP_EpmTask_UserView.TaskDurationIsEstimated
as [TaskDurationIsEstimated], MSP_EpmTask_UserView.TaskEAC as [TaskEAC], MSP_EpmTask_UserView.TaskIsEffortDriven as [TaskIsEffortDriven],
MSP_EpmTask_UserView.TaskIsExternal as [TaskIsExternal], MSP_EpmTask_UserView.TaskIsRecurring as [TaskIsRecurring],
MSP_EpmTask_UserView.TaskCostVariance as [TaskCostVariance], MSP_EpmTask_UserView.TaskCV as [TaskCV], MSP_EpmTask_UserView.TaskCPI as [TaskCPI],
MSP_EpmTask_UserView.TaskEarlyFinish as [TaskEarlyFinish], MSP_EpmTask_UserView.TaskEarlyStart as [TaskEarlyStart],
MSP_EpmTask_UserView.TaskLateFinish as [TaskLateFinish], MSP_EpmTask_UserView.TaskLateStart as [TaskLateStart], MSP_EpmTask_UserView.TaskSV
as [TaskSV], MSP_EpmTask_UserView.TaskWorkVariance as [TaskWorkVariance], MSP_EpmTask_UserView.TaskIgnoresResourceCalendar as [TaskIgnoresResourceCalendar],
MSP_EpmTask_UserView.TaskClientUniqueId as [TaskClientUniqueId], MSP_EpmTask_UserView.TaskIsMarked as [TaskIsMarked],
MSP_EpmTask_UserView.TaskIsActive as [TaskIsActive], MSP_EpmTask_UserView.TaskIsManuallyScheduled as [TaskIsManuallyScheduled],
MSP_EpmTask_UserView.TaskWBS as [TaskWBS], MSP_EpmTask_UserView.TaskCreatedRevisionCounter as [TaskCreatedRevisionCounter], MSP_EpmTask_UserView.TaskModifiedRevisionCounter
as [TaskModifiedRevisionCounter], MSP_EpmTask_UserView.TaskCreatedDate as [TaskCreatedDate], MSP_EpmTask_UserView.TaskModifiedDate as [TaskModifiedDate],
MSP_EpmTask_UserView.TaskBudgetCost as [TaskBudgetCost], MSP_EpmTask_UserView.TaskBudgetWork as [TaskBudgetWork],
MSP_EpmTask_UserView.TaskResourcePlanWork as [TaskResourcePlanWork], MSP_EpmTask_UserView.TaskHyperLinkFriendlyName as [TaskHyperLinkFriendlyName],
MSP_EpmTask_UserView.TaskHyperLinkAddress as [TaskHyperLinkAddress], MSP_EpmTask_UserView.TaskHyperLinkSubAddress as [TaskHyperLinkSubAddress],
MSP_EpmTask_UserView.TaskRegularCost as [TaskRegularCost], MSP_EpmTask_UserView.TaskRemainingCost as [TaskRemainingCost], MSP_EpmTask_UserView.TaskRemainingOvertimeCost
as [TaskRemainingOvertimeCost], MSP_EpmTask_UserView.TaskActualRegularCost as [TaskActualRegularCost], MSP_EpmTask_UserView.TaskRemainingRegularCost
as [TaskRemainingRegularCost], MSP_EpmTask_UserView.TaskRegularWork as [TaskRegularWork], MSP_EpmTask_UserView.TaskRemainingWork as [TaskRemainingWork],
MSP_EpmTask_UserView.TaskRemainingOvertimeWork as [TaskRemainingOvertimeWork], MSP_EpmTask_UserView.TaskActualRegularWork as [TaskActualRegularWork],
MSP_EpmTask_UserView.TaskRemainingRegularWork as [TaskRemainingRegularWork], MSP_EpmTask_UserView.TaskRemainingDuration as [TaskRemainingDuration],
MSP_EpmTask_UserView.TaskCVP as [TaskCVP], MSP_EpmTask_UserView.TaskSVP as [TaskSVP], MSP_EpmTask_UserView.TaskCount
as [TaskCount], MSP_EpmTask_UserView.TaskBaseline0Cost as [TaskBaseline0Cost], MSP_EpmTask_UserView.TaskBaseline0FixedCost as [TaskBaseline0FixedCost],
MSP_EpmTask_UserView.TaskBaseline0Work as [TaskBaseline0Work], MSP_EpmTask_UserView.TaskBaseline0BudgetCost as [TaskBaseline0BudgetCost],
MSP_EpmTask_UserView.TaskBaseline0BudgetWork as [TaskBaseline0BudgetWork], MSP_EpmTask_UserView.TaskBaseline0StartDate as [TaskBaseline0StartDate],
MSP_EpmTask_UserView.TaskBaseline0StartDateString as [TaskBaseline0StartDateString], MSP_EpmTask_UserView.TaskBaseline0FinishDate as [TaskBaseline0FinishDate],
MSP_EpmTask_UserView.TaskBaseline0FinishDateString as [TaskBaseline0FinishDateString], MSP_EpmTask_UserView.TaskBaseline0DeliverableStartDate as [TaskBaseline0DeliverableStartDate],
MSP_EpmTask_UserView.TaskBaseline0DeliverableFinishDate as [TaskBaseline0DeliverableFinishDate], MSP_EpmTask_UserView.TaskBaseline0Duration as [TaskBaseline0Duration],
MSP_EpmTask_UserView.TaskBaseline0DurationString as [TaskBaseline0DurationString], MSP_EpmTask_UserView.TaskBaseline1Cost as [TaskBaseline1Cost],
MSP_EpmTask_UserView.TaskBaseline1FixedCost as [TaskBaseline1FixedCost], MSP_EpmTask_UserView.TaskBaseline1Work as [TaskBaseline1Work],
MSP_EpmTask_UserView.TaskBaseline1BudgetCost as [TaskBaseline1BudgetCost], MSP_EpmTask_UserView.TaskBaseline1BudgetWork as [TaskBaseline1BudgetWork],
MSP_EpmTask_UserView.TaskBaseline1StartDate as [TaskBaseline1StartDate], MSP_EpmTask_UserView.TaskBaseline1StartDateString as [TaskBaseline1StartDateString],
MSP_EpmTask_UserView.TaskBaseline1FinishDate as [TaskBaseline1FinishDate], MSP_EpmTask_UserView.TaskBaseline1FinishDateString as [TaskBaseline1FinishDateString],
MSP_EpmTask_UserView.TaskBaseline1DeliverableStartDate as [TaskBaseline1DeliverableStartDate], MSP_EpmTask_UserView.TaskBaseline1DeliverableFinishDate
as [TaskBaseline1DeliverableFinishDate], MSP_EpmTask_UserView.TaskBaseline1Duration as [TaskBaseline1Duration], MSP_EpmTask_UserView.TaskBaseline1DurationString
as [TaskBaseline1DurationString], MSP_EpmTask_UserView.TaskBaseline2Cost as [TaskBaseline2Cost], MSP_EpmTask_UserView.TaskBaseline2FixedCost as [TaskBaseline2FixedCost],
MSP_EpmTask_UserView.TaskBaseline2Work as [TaskBaseline2Work], MSP_EpmTask_UserView.TaskBaseline2BudgetCost as [TaskBaseline2BudgetCost],
MSP_EpmTask_UserView.TaskBaseline2BudgetWork as [TaskBaseline2BudgetWork], MSP_EpmTask_UserView.TaskBaseline2StartDate as [TaskBaseline2StartDate],
MSP_EpmTask_UserView.TaskBaseline2StartDateString as [TaskBaseline2StartDateString], MSP_EpmTask_UserView.TaskBaseline2FinishDate as [TaskBaseline2FinishDate],
MSP_EpmTask_UserView.TaskBaseline2FinishDateString as [TaskBaseline2FinishDateString], MSP_EpmTask_UserView.TaskBaseline2DeliverableStartDate as [TaskBaseline2DeliverableStartDate],
MSP_EpmTask_UserView.TaskBaseline2DeliverableFinishDate as [TaskBaseline2DeliverableFinishDate], MSP_EpmTask_UserView.TaskBaseline2Duration as [TaskBaseline2Duration],
MSP_EpmTask_UserView.TaskBaseline2DurationString as [TaskBaseline2DurationString], MSP_EpmTask_UserView.TaskBaseline3Cost as [TaskBaseline3Cost],
MSP_EpmTask_UserView.TaskBaseline3FixedCost as [TaskBaseline3FixedCost], MSP_EpmTask_UserView.TaskBaseline3Work as [TaskBaseline3Work],
MSP_EpmTask_UserView.TaskBaseline3BudgetCost as [TaskBaseline3BudgetCost], MSP_EpmTask_UserView.TaskBaseline3BudgetWork as [TaskBaseline3BudgetWork],
MSP_EpmTask_UserView.TaskBaseline3StartDate as [TaskBaseline3StartDate], MSP_EpmTask_UserView.TaskBaseline3StartDateString as [TaskBaseline3StartDateString],
MSP_EpmTask_UserView.TaskBaseline3FinishDate as [TaskBaseline3FinishDate], MSP_EpmTask_UserView.TaskBaseline3FinishDateString as [TaskBaseline3FinishDateString],
MSP_EpmTask_UserView.TaskBaseline3DeliverableStartDate as [TaskBaseline3DeliverableStartDate], MSP_EpmTask_UserView.TaskBaseline3DeliverableFinishDate
as [TaskBaseline3DeliverableFinishDate], MSP_EpmTask_UserView.TaskBaseline3Duration as [TaskBaseline3Duration], MSP_EpmTask_UserView.TaskBaseline3DurationString
as [TaskBaseline3DurationString], MSP_EpmTask_UserView.TaskBaseline4Cost as [TaskBaseline4Cost], MSP_EpmTask_UserView.TaskBaseline4FixedCost as [TaskBaseline4FixedCost],
MSP_EpmTask_UserView.TaskBaseline4Work as [TaskBaseline4Work], MSP_EpmTask_UserView.TaskBaseline4BudgetCost as [TaskBaseline4BudgetCost],
MSP_EpmTask_UserView.TaskBaseline4BudgetWork as [TaskBaseline4BudgetWork], MSP_EpmTask_UserView.TaskBaseline4StartDate as [TaskBaseline4StartDate],
MSP_EpmTask_UserView.TaskBaseline4StartDateString as [TaskBaseline4StartDateString], MSP_EpmTask_UserView.TaskBaseline4FinishDate as [TaskBaseline4FinishDate],
MSP_EpmTask_UserView.TaskBaseline4FinishDateString as [TaskBaseline4FinishDateString], MSP_EpmTask_UserView.TaskBaseline4DeliverableStartDate as [TaskBaseline4DeliverableStartDate],
MSP_EpmTask_UserView.TaskBaseline4DeliverableFinishDate as [TaskBaseline4DeliverableFinishDate], MSP_EpmTask_UserView.TaskBaseline4Duration as [TaskBaseline4Duration],
MSP_EpmTask_UserView.TaskBaseline4DurationString as [TaskBaseline4DurationString], MSP_EpmTask_UserView.TaskBaseline5Cost as [TaskBaseline5Cost],
MSP_EpmTask_UserView.TaskBaseline5FixedCost as [TaskBaseline5FixedCost], MSP_EpmTask_UserView.TaskBaseline5Work as [TaskBaseline5Work],
MSP_EpmTask_UserView.TaskBaseline5BudgetCost as [TaskBaseline5BudgetCost], MSP_EpmTask_UserView.TaskBaseline5BudgetWork as [TaskBaseline5BudgetWork],
MSP_EpmTask_UserView.TaskBaseline5StartDate as [TaskBaseline5StartDate], MSP_EpmTask_UserView.TaskBaseline5StartDateString as [TaskBaseline5StartDateString],
MSP_EpmTask_UserView.TaskBaseline5FinishDate as [TaskBaseline5FinishDate], MSP_EpmTask_UserView.TaskBaseline5FinishDateString as [TaskBaseline5FinishDateString],
MSP_EpmTask_UserView.TaskBaseline5DeliverableStartDate as [TaskBaseline5DeliverableStartDate], MSP_EpmTask_UserView.TaskBaseline5DeliverableFinishDate
as [TaskBaseline5DeliverableFinishDate], MSP_EpmTask_UserView.TaskBaseline5Duration as [TaskBaseline5Duration], MSP_EpmTask_UserView.TaskBaseline5DurationString
as [TaskBaseline5DurationString], MSP_EpmTask_UserView.TaskBaseline6Cost as [TaskBaseline6Cost], MSP_EpmTask_UserView.TaskBaseline6FixedCost as [TaskBaseline6FixedCost],
MSP_EpmTask_UserView.TaskBaseline6Work as [TaskBaseline6Work], MSP_EpmTask_UserView.TaskBaseline6BudgetCost as [TaskBaseline6BudgetCost],
MSP_EpmTask_UserView.TaskBaseline6BudgetWork as [TaskBaseline6BudgetWork], MSP_EpmTask_UserView.TaskBaseline6StartDate as [TaskBaseline6StartDate],
MSP_EpmTask_UserView.TaskBaseline6StartDateString as [TaskBaseline6StartDateString], MSP_EpmTask_UserView.TaskBaseline6FinishDate as [TaskBaseline6FinishDate],
MSP_EpmTask_UserView.TaskBaseline6FinishDateString as [TaskBaseline6FinishDateString], MSP_EpmTask_UserView.TaskBaseline6DeliverableStartDate as [TaskBaseline6DeliverableStartDate],
MSP_EpmTask_UserView.TaskBaseline6DeliverableFinishDate as [TaskBaseline6DeliverableFinishDate], MSP_EpmTask_UserView.TaskBaseline6Duration as [TaskBaseline6Duration],
MSP_EpmTask_UserView.TaskBaseline6DurationString as [TaskBaseline6DurationString], MSP_EpmTask_UserView.TaskBaseline7Cost as [TaskBaseline7Cost],
MSP_EpmTask_UserView.TaskBaseline7FixedCost as [TaskBaseline7FixedCost], MSP_EpmTask_UserView.TaskBaseline7Work as [TaskBaseline7Work],
MSP_EpmTask_UserView.TaskBaseline7BudgetCost as [TaskBaseline7BudgetCost], MSP_EpmTask_UserView.TaskBaseline7BudgetWork as [TaskBaseline7BudgetWork],
MSP_EpmTask_UserView.TaskBaseline7StartDate as [TaskBaseline7StartDate], MSP_EpmTask_UserView.TaskBaseline7StartDateString as [TaskBaseline7StartDateString],
MSP_EpmTask_UserView.TaskBaseline7FinishDate as [TaskBaseline7FinishDate], MSP_EpmTask_UserView.TaskBaseline7FinishDateString as [TaskBaseline7FinishDateString],
MSP_EpmTask_UserView.TaskBaseline7DeliverableStartDate as [TaskBaseline7DeliverableStartDate], MSP_EpmTask_UserView.TaskBaseline7DeliverableFinishDate
as [TaskBaseline7DeliverableFinishDate], MSP_EpmTask_UserView.TaskBaseline7Duration as [TaskBaseline7Duration], MSP_EpmTask_UserView.TaskBaseline7DurationString
as [TaskBaseline7DurationString], MSP_EpmTask_UserView.TaskBaseline8Cost as [TaskBaseline8Cost], MSP_EpmTask_UserView.TaskBaseline8FixedCost as [TaskBaseline8FixedCost],
MSP_EpmTask_UserView.TaskBaseline8Work as [TaskBaseline8Work], MSP_EpmTask_UserView.TaskBaseline8BudgetCost as [TaskBaseline8BudgetCost],
MSP_EpmTask_UserView.TaskBaseline8BudgetWork as [TaskBaseline8BudgetWork], MSP_EpmTask_UserView.TaskBaseline8StartDate as [TaskBaseline8StartDate],
MSP_EpmTask_UserView.TaskBaseline8StartDateString as [TaskBaseline8StartDateString], MSP_EpmTask_UserView.TaskBaseline8FinishDate as [TaskBaseline8FinishDate],
MSP_EpmTask_UserView.TaskBaseline8FinishDateString as [TaskBaseline8FinishDateString], MSP_EpmTask_UserView.TaskBaseline8DeliverableStartDate as [TaskBaseline8DeliverableStartDate],
MSP_EpmTask_UserView.TaskBaseline8DeliverableFinishDate as [TaskBaseline8DeliverableFinishDate], MSP_EpmTask_UserView.TaskBaseline8Duration as [TaskBaseline8Duration],
MSP_EpmTask_UserView.TaskBaseline8DurationString as [TaskBaseline8DurationString], MSP_EpmTask_UserView.TaskBaseline9Cost as [TaskBaseline9Cost],
MSP_EpmTask_UserView.TaskBaseline9FixedCost as [TaskBaseline9FixedCost], MSP_EpmTask_UserView.TaskBaseline9Work as [TaskBaseline9Work],
MSP_EpmTask_UserView.TaskBaseline9BudgetCost as [TaskBaseline9BudgetCost], MSP_EpmTask_UserView.TaskBaseline9BudgetWork as [TaskBaseline9BudgetWork],
MSP_EpmTask_UserView.TaskBaseline9StartDate as [TaskBaseline9StartDate], MSP_EpmTask_UserView.TaskBaseline9StartDateString as [TaskBaseline9StartDateString],
MSP_EpmTask_UserView.TaskBaseline9FinishDate as [TaskBaseline9FinishDate], MSP_EpmTask_UserView.TaskBaseline9FinishDateString as [TaskBaseline9FinishDateString],
MSP_EpmTask_UserView.TaskBaseline9DeliverableStartDate as [TaskBaseline9DeliverableStartDate], MSP_EpmTask_UserView.TaskBaseline9DeliverableFinishDate
as [TaskBaseline9DeliverableFinishDate], MSP_EpmTask_UserView.TaskBaseline9Duration as [TaskBaseline9Duration], MSP_EpmTask_UserView.TaskBaseline9DurationString
as [TaskBaseline9DurationString], MSP_EpmTask_UserView.TaskBaseline10Cost as [TaskBaseline10Cost], MSP_EpmTask_UserView.TaskBaseline10FixedCost as
[TaskBaseline10FixedCost], MSP_EpmTask_UserView.TaskBaseline10Work as [TaskBaseline10Work], MSP_EpmTask_UserView.TaskBaseline10BudgetCost as [TaskBaseline10BudgetCost],
MSP_EpmTask_UserView.TaskBaseline10BudgetWork as [TaskBaseline10BudgetWork], MSP_EpmTask_UserView.TaskBaseline10StartDate as [TaskBaseline10StartDate],
MSP_EpmTask_UserView.TaskBaseline10StartDateString as [TaskBaseline10StartDateString], MSP_EpmTask_UserView.TaskBaseline10FinishDate as [TaskBaseline10FinishDate],
MSP_EpmTask_UserView.TaskBaseline10FinishDateString as [TaskBaseline10FinishDateString], MSP_EpmTask_UserView.TaskBaseline10DeliverableStartDate as
[TaskBaseline10DeliverableStartDate], MSP_EpmTask_UserView.TaskBaseline10DeliverableFinishDate as [TaskBaseline10DeliverableFinishDate], MSP_EpmTask_UserView.TaskBaseline10Duration
as [TaskBaseline10Duration], MSP_EpmTask_UserView.TaskBaseline10DurationString as [TaskBaseline10DurationString], MSP_EpmTask_UserView.[Health] as
[Health], MSP_EpmResource_UserView.ResourceName as [ResourceName], MSP_EpmResource_UserView.ResourceType as [ResourceType],
MSP_EpmResource_UserView.ResourceIsTeam as [ResourceIsTeam], MSP_EpmResource_UserView.[Resource Departments] as [Resource Departments],
MSP_EpmResource_UserView.[RBS] as [RBS], MSP_EpmResource_UserView.ResourceCostCenter as [ResourceCostCenter], MSP_EpmAssignment_UserView.AssignmentCost
as [AssignmentCost], MSP_EpmAssignment_UserView.AssignmentWork as [AssignmentWork], MSP_EpmAssignment_UserView.AssignmentActualWork as [AssignmentActualWork],
MSP_EpmAssignment_UserView.AssignmentPercentWorkCompleted as [AssignmentPercentWorkCompleted], MSP_EpmAssignment_UserView.AssignmentStartDate as [AssignmentStartDate],
MSP_EpmAssignment_UserView.AssignmentFinishDate as [AssignmentFinishDate], MSP_EpmAssignment_UserView.AssignmentActualStartDate as [AssignmentActualStartDate],
MSP_EpmAssignment_UserView.AssignmentActualFinishDate as [AssignmentActualFinishDate], MSP_EpmAssignment_UserView.AssignmentType as [AssignmentType],
MSP_EpmAssignment_UserView.AssignmentResourceType as [AssignmentResourceType], MSP_EpmAssignment_UserView.AssignmentIsOverallocated as [AssignmentIsOverallocated],
MSP_EpmAssignment_UserView.AssignmentModifiedDate as [AssignmentModifiedDate], MSP_EpmAssignment_UserView.AssignmentResourcePlanWork as [AssignmentResourcePlanWork],
MSP_EpmAssignment_UserView.AssignmentRemainingCost as [AssignmentRemainingCost], MSP_EpmAssignment_UserView.AssignmentRemainingWork as [AssignmentRemainingWork]
FROM dbo.MSP_EpmProject_UserView INNER JOIN dbo.MSP_EpmTask_UserView ON
MSP_EpmProject_UserView.ProjectUID = MSP_EpmTask_UserView.ProjectUID LEFT OUTER JOIN dbo.MSP_EpmAssignment_UserView ON
MSP_EpmTask_UserView.TaskUID = MSP_EpmAssignment_UserView.TaskUID AND MSP_EpmTask_UserView.ProjectUID = MSP_EpmAssignment_UserView.ProjectUID
LEFT OUTER JOIN dbo.MSP_EpmResource_UserView ON MSP_EpmAssignment_UserView.ResourceUID = MSP_EpmResource_UserView.ResourceUID
ORDER BY MSP_EpmProject_UserView.ProjectName, MSP_EpmTask_UserView.TaskIndex,
MSP_EpmTask_UserView.TaskName -
URGENT : how to pass status & reason field in BAPI_LEAD_CREATEMULTI module
HI,
<b>CAN ANYONE TELL ME how to pass status & reason field in BAPI_LEAD_CREATEMULTI module.IT'S VERY URGENT,</b>
SO PLEASE SEND ME YOUR REPLY AS EARLY AS POSSIBLE,
TAHNKS IN ADVANCEDHi ,
your config is missing , what is ur TD object ?
you can cross check in SE75-->Under MARA
regards
Prabhu -
Regarding ldb pch (include DBPCHSEL for selection screen)
hi experts,
i am developing report for training and event mgmt details for this i m using ldb pch and include DBPCHSEL for standard selection screen what i want that in this include extra parameters & select-options/selection fields for input are already declared but i dnt want all of these plz help me how to remove extra selection fields which i dnt want on my customized report i want only one to two selection fields.
plz help me how to remove these extra fieldsdear amit,
ven ever u use ldb "pch" it is not asking for report category means it wnt allow u create a report category.then plz gve another solutions. -
Renaming the Selection Text of LDB PCH
Hi -
Can anyone suggest a way to Rename the Standard Selection Screen Variable Name ( Selection Text in a Standard Selection Screen ) of a LDB ( PCH )to a custom one ?
Eg. There is a need to change the Object ID ( PCHOBJID - Selection Text ) to " Org. Unit " .
Thanks,
MullaiHi,
You can do that, suppress that field whatever you are getting from the standard LDB and define a selection field in your custom program witht he same name and use your own selection text and check,
This should work for you.
Thanks,
Mahesh. -
Hi,
i need to hide all the defualt select options for LDB PCH and add the custom select potions.
how to hide the default select options completely.
Thanks in advance.Hi Ajay,
Go To Reports Attribute -
> You will see field Selection screen --- enter screen no 901 ..as empty selection screen.
~Bhawanidutt -
I need create a selection-screen belong to the LDB PCH, On the selection-screen there are two blocks: Objects and Reporting period. I need a third block named Event selection, so how is the structure for get this?
My statement is
TABLES: objec .
I appreciated much yours suggestion.
Regards.Hi Ajay,
Go To Reports Attribute -
> You will see field Selection screen --- enter screen no 901 ..as empty selection screen.
~Bhawanidutt -
Changes in Standard RHBUCH00_LSO with LDB PCH
Hi All,
Greetings!!
I have to make changes in RHBUCH00_LSO which uses LDB PCH . The changes are to display Applicanr also with Participant also . The Standard report at selection screen take only one object type (P Participant ) or (AP Applicnat) .
As it uses LDB making changes in it is difficult .
I am trying yo use FM LDB_PROCESS to call again LDB for AP .
Please throw some light on the use of FM LDB_PROCESS or is some other alternative is available .
Thank YouHi rhaul,
1. I don't we can directly do as per ur requirement.
2. Bcos No-Intervals cannot be modified using Loop at screen.
3. Another option is to copy the standard Ldb and use it.
regards,
amit m. -
Invoice List Cancellation Status table field
Hi,
I need to know, which table field is updated when we cancel an invoice List using VF26. If there is cancellation once the VBRK-SFAKN is updated with the cancelled Invoice List Number. But in case there are multiple cancellations, the SFAKN field still contains the first cancelled Invoice list #. There is no status field in VBRL to indicate whether the status of the invoice list is cancelled or active.
How to trace whether the subsequent invoice lists are cancelled or not?
Thanks,
AmitAmit,
I don't find any field being updated on the original Invoice list while u are cancelling it.
So unfortunately you can't find from its VBRK entries that it was cancelled.
This is my understanding.... Let me know if you discover any thing new.
Coming to how we live up with it......
Before sending the invoice list to the customers we will check whether any entry exist in VBRK table with the same number in SFAKN(Cancelled billing doc #).. So if any entry exist in VBRK, that means this document was cancelled, so ignore it from the send list.
Let me know if you would like to know anymore details....
Thanks,
Aj. -
Equipment status table field...
Hi,
Does anyone know in which table is stored the equipment status field (Display lines for system status ITOBATTR-STTXT ). The field that tells you if the equipment is installed or available or flagged for deletion..
I will really appreciate any comments.. thanks in advance.
JVHi
http://www.sapfans.com/forums/viewtopic.php?t=199800&highlight=equipment+staus
Goto EQUI Get the value from OBJNR based on EQUNR
Now goto Jest table ,use OBJNR and you get many status.
Either you can use JEST Table or FM STATUS_READ
You can see all system status in Transaction BS23
or
Please check these tables.
TJ02
TJ02T
TJ30
TJ30T
JEST
<b>Reward ff usefull</b> -
Field status varient & field status group
Dear Sap Gurus,
Someone can clarify the following words please.I will be grateful for help.Thank you.
1.Field status varient
2.Field status group
3.Field status
Sincerely,
priya desaiHi Priya,
Field Status:
Field status controls which fields are required for document entry.like fields are optional,required or supress.
Field status group
Determines the screen layout for document entry.
Fields can have the following statuses:
Optional entry - you can enter data in the field
Mandatory entry - you must enter data in the field
Suppressed - the field does not appear on the screen
Use
Enter the field status group in the master record of a G/L account. When you enter a document, the definitions stored for the group are effective.
Dependencies
The field status when you create a document also depends on the posting key.
The field status groups available are those grouped together in a field status variant and assigned to your company code.
Field Status Variants
In this activity you can define and edit field status variants and groups. You group several field status groups together in one field status variant. You assign the field status variants to a company code in the activity Assign Company Code to Field Status Variants. This allows you to work with the same field status groups in any number of company codes.
You can also define and process field status groups. You must define a field status group in the company code-specific area of each G/L account. The field status group determines which fields are ready for input, which are required entry fields, and which are hidden during document entry. Bear in mind that additional account assignments (i.e. cost centers or orders) are only possible if data can be entered in the corresponding fields.
Thanks,
Rau -
'Status profile' field in VOV8
Hi All
In VOV8 there is a control field " Status Profile".
What's the use of this field.
thanks & regards
jyotiDear jyoti
Check these links
[Status Profile|Status profile]
[Status Profile |http://help.sap.com/saphelp_47x200/helpdata/en/d8/7323024b7511d1894b0000e8323c4f/frameset.htm]
[Creating a User Status Profile |http://help.sap.com/saphelp_47x200/helpdata/en/0e/830b378a50fc5be10000009b38f839/frameset.htm]
thanks
G. Lakshmipathi
Maybe you are looking for
-
With Yosemite's updates, Reminders doesn't wrap unfinished tasks to the next day. Previously, if I didn't check off a task on one day, it wrapped to the next day. Now, they just stay on the original day, causing me to not see that I haven't finished
-
Hi All, I have added an additional field in IT0109 through PM01. But the field is not displaying in PA30, while using infotype 0016.I have created an entry in table T582C for mp001600 and zp010900. Please let me know what could be the problem. Thanks
-
N8-00/anna update/belle refresh/it got slower plea...
nokia
-
The screen doesn't always respond
The touchscreen on my iPad doesn't always respond, anyone help?
-
How to get rid of those Marvell raid drivers
By accident I installed the whole bunch of the dvd msi tools and also the Marvell raid drivers (Winky ?). Motherboard Z68A-GD65 B3. I don't use them, but even after uninstalling and cleaning the registry. I see this in the boot and it is back in the