Steps for completing Asset under Construction

hi,
i have created the AUC  asset class  with line settlement checked.
will somebody be kind enough to show me the futher steps involved in customization along with postings and settlement procedure....
regards
sayeed

Hi,
You can manage the asset under construction in the system in two different ways, depending on the types of functions that you need. The asset under construction can be either a normal asset record, or a master record with line item management. As a result, the transfer from the asset under construction to completed fixed assets can be handled in one of two ways:
·        Summary transfer from a normal asset master record to the receiver assets (transaction type 348/349)
·        Line item settlement of an asset under construction that has line item management
The Investment Management (IM) component is recommended for handling large-scale capital investments. Using the IM component, you can manage a capital investment in parallel: for financial accounting purposes as an asset under construction, and for controlling purposes as an internal order or project. For more information, see the documentation for the Investment Management component.
Assets under Construction Without Line Item Management
The procedure corresponds to the procedure for the transfer between two assets within the same company code (see Posting the Splitting or Moving of an Asset). Before carrying out a full transfer of an asset under construction, you have to reverse any down payments that were posted in the current fiscal year. Down payments are ignored for a partial transfer.
Special transaction types for the transfer of assets under construction allow for transfers to be displayed in the asset history sheet as acquisitions to fixed assets.
Assets under Construction with Line Item Management
In the FI-AA component, you can accumulate costs under purely technical aspects in an asset under construction. You do not need to consider the later creation of fixed assets at this point. During the construction phase, you can accumulate all acquisitions for an investment in a single asset. These acquisitions include
·        External activity (acquisition from vendor)
·        Internal activity (internal order)
·        Stock material (withdrawal from warehouse)
in a single asset. When using this 'collective management' of assets under construction, it is possible to manage the individual acquisitions as open items over the course of several fiscal years. At completion, the line items must be cleared and then distributed to the various receivers. The system activates open item management when an asset under construction is created, if you set the corresponding indicator in the asset class. In addition, you have to assign a settlement profile to the company codes involved, in Customizing for Asset Accounting, in order for the line item settlement to work (see Define Settlement Profile in the Implementation Guide). The main function of the settlement profile is to specify the allowed receivers (such as, assets or cost centers).
Hope this helps you. Let me know if you need any other information.
Rgds
Manish

Similar Messages

  • Steps to create Asset under construction

    Hi All,
      Can any one pls explain me whats diff b/w normal asset class and AUC, and even provide me the steps to create AUC. (what are the GL acc assignments to be done)
    It's urgent. pls help me...
    thanks,
    sravanthi

    Dear sravanthi  
    For Normal Asset, We create an Asset in AS01 and we assign Depreciation area and depreciation is calculated.
    For  Asset under construction, SAP Provides a Seperate Asset class in As01 and no depreciation is calculated on this asset.
    Fixed asset that is in the process of being completed at the time the balance sheet is being produced.
    Assets under construction are shown as a separate balance sheet item for the enterprise. Assets under construction can be managed for bookkeeping purposes in the FI-AA component using asset master records in special asset classes.
    To also benefit from management accounting functions that go beyond the asset accounting level, you can use capital investment measures in the Investment Management (IM) component. Investment measures can be managed in the form of internal orders or projects
    For Steps to create AUC Refer to SAP Best Practices
    http://help.sap.com/bp_bblibrary/500/BBlibrary_start.htm
    Please let me know if you need more information.
    Assign points if useful.
    Regards
    MSReddy

  • Problem of Down Payment for the Asset under Construction

    Hi All:
    My problem is, after do down payment for the AuC, we got an additional amount under the values booked of AuC, double checked the accounting document, found that system generated two items when doing actual settlement with t-code CJ88, for example, when display asset value, system lists the value as follows:
    Net book value: 194,325 (Normally only has this value under the AuC)
    Down payment: 93,950
    I don't know why? And how to balance the asset values? Please give me some hint, thanks in advance.
    Thanks
    Kai
    Edited by: Kai Jiang on Jan 14, 2009 6:52 AM

    Hi,
    I think the system behavior is right ! When posting the final invoice and clearing the down payment the additional items (Down payment: 93,950) were cleared. Go ahead!
    Good luck
    Tao

  • AUC- Asset Under Construction - Gap Analysis

    Hi Guru's,
    I have a requirement to know the Gap Analysis on Asset Under Construction. 
    We are under Analysis Phase where i have to find out the Gaps related to business.
    I received a Reporting FD and asked to find out the data source.
    Please provide the Gap Analysis steps to over come on this specific requirement.  
    Based on my analysis i found multiple tables to derive the AUC - Asset Under Construction solution.
    Tables that involved to get the Asset Under Construction:ANLA, ANLZ, PRPS, ANEP, BPDY, T093B
    My Questions:
    Is there any SAP Standard Data Source for AUC- Asset Under Construction.
    Now in my high level requirement we are pulling the information from multiple tables.
    Please provide me suggestions how can i go ahead with the above requirement.
    Regards,
    Ganni

    Depends on how the FICO guys have configured AuC
    If they have chosen a separate asset class for this (as what tends to happen) - then the std asset data model will cater for this
    Just run the std content reports or build your own for the asset class of AuC

  • Migrating Assets Under Construction?

    Hi all,
    A customer has many fixed assets that are currently under construction during a Go Live implementation.  I realize ByD uses projects as a bit of a work around for handling assets under construction in the system, but what is the best way to handle the data-migration of these assets under construction in ByD?  (along with the expenses/etc associated with these assets under construction)?
    thanks a lot,
    -Ben

    Hi Gopal,
    My understanding is that project balances cannot be migrated in ByD. We have been advised to manually key in all existing projects with budgets, sales orders etc. We are not sure what to do with existing project costs and invoices as historical data cannot be migrated either.
    Since you suggested migrating the 'Assets under construction' as projects, I wonder if that is a special category? I was planning on using 'Direct Cost Project' process variant as suggested in the ByD help centre for 'Assets Under Construction'
    Any further information is appreciated. Thanks

  • Asset under Construction - Is it possible to calculate depreciation?

    Hello Expecrts,
    I have a question and in need to get aswers for that- is it possible to calculated depreciation for AuC. And in case of Down payment too.
    Please let me know- 1. General senario
    2. Diffierent possibilities on depreciation calculation.
    Thank you to check the new thread.
    Cordially,
    partha
    [email protected]

    Hi Partha Saradhi...
    Ordinary depreciation is not allowed for assets under construction in most countries. You reflect this limitation by choosing a depreciation key that does not allow ordinary depreciation in the book depreciation area. To ensure that this depreciation key is protected during master data maintenance, select the asset class as the maintenance level for the book depreciation area.For certain assets under construction, special tax depreciation is allowed. In this case you also enter corresponding keys in the asset class, to be used as mandatory default values.
    reward points if u so fit
    Dasharathi

  • Asset Under Construction Issue

    Hi,
    I am facing problems while settling of Auc.
    I created one asset with asset class of AuC. In Auc master i have given the Capex order type's internal order. After i posted few entries for Order. while entering of fi entries to order i didn't selected any asset number just i posted the fi entries with 40 and 50 posting key.
    After i settled the order in KO88. It was settled.
    After i run AIBU t code then system is saying no line items existed for order.
    Without line items how can i settle the order.
    Please explain me from start to end of Auc Settlement Process and Converting to asset of Auc. It is very very very urgent for me.
    Sateesh

    Hi
    This works like this:
    First we create Asset class for asset under construction with investment measure.
    Assign GL accounts to that asset class
    Create one asset master under that asset class
    create secondary cost element with catagory external settlement.
    create internal order type and select settlement with assets are optional.
    create internal order
    post entries to internal order
    that particular internao order will capture the total cost for particual asset under construction.
    once you finished that construction you will settle to one asset or multiple assets using external secondary cost element in assessment cycle.

  • New Depreciation Area in Asset Master Data, for assets under construction.

    Hi,
      The issue is relating to New Depreciation area. We have created new Depreciation area as 80=IFRS.  We had followed three steps
    1. Create Depreciation area via OADB.
    2. Activate Depreciation area via OAYZ.
    3. Automatic opening of new depreciation are via AFBN and program RAFABNEW :-
    3.1 u2013 Indicator: Leave values initial = ticked.  Set this indicator if you want to open the newly created depreciation area without any values i.e. blank.
    In this we have find that the old assets value has been copied. But when we are doing internal order settlement through KO88 i.e. from pre-cap to AUC we are not finding new Depreciation area 80=IFRS in AUC. We had checked in AW01N.
    Letu2019s assume that creating a new deprecation area is normally not required since these assets are not depreciated. But During the final settlement, the new depreciation area should also automatically supplied with values from the reference depreciation area from the AUC(assets under construction) in the completed assets. But we doesnu2019t find any values of in Dep Key = 80 IFRS for final assets.
    In Assets Class of AUC we had used  Investmnet Measure as Status of AUC.  
    Kindly provide solution for the same.
    Nikhil

    Check Transfer Variant 5 (under Transactions->Intercompany Asset Transfers->Automatic Intercompany Asset Transfers->Define Transfer Variants):
    5     Investment measure settlement
    Your Transfer Method is most likely 1 now (without transfer to dependant areas), change it to:
    4     Gross method with transfer of values to dependent areas
    This should help.

  • Asset under Construction for Investment Measures

    Hi all
    This is my client requirement
    how to do asset under Construction for Investment Measures
    configration
    pls send configration

    Hi
    These are the steps to be followed:
    1. Create a asset class for CWIP (Auc) - OAOA: In this select Investment Measure under Status of AuC.
    2. Define Investment Profile (OITA) - Give AuC Asset class as invest measure asset class.
    3. Create Internal Order Type for Investments: Normally standard 0650 order type will take care of the requirement.  We need not to create anything.
    4. Create Asset (AS01) under normal asset class i.e., buildings or vehicles etc... (You cannot create under AuC Asset Class)
    5. Create Internal Order (KO01): Give Object class as investment and under Investments tab give investment profile created in step 2.
       Go to settlement profile tab and give category as FXA and settlement receiver the asset no. and give 100%.
    6. Change asset master to incorporate the internal order number under Origin Tab.  Give no. in Investment order field.
    7. Release the Internal Order (KO02)
    8. Post the transactions through different T.Codes by referring Internal Order as account assignment.
    9. Go to Internal Order through KO02 and complete TECO under control data.
    10. Go to T.Code KO88 (internal order settlement) and settle the order.
    Hope this will help you.

  • Down payments for Asset Under Construction

    Hi Experts,
    Urgent!
    My client paying advances to vendors, thru TC-F-48.
    Previously there is no PO requirement ,now asper client requirement I put  PO fild as requirement in posting key 29.
    1)There is no problem for payment to vendors -for Raw materials.
    2)while paying advance to vendors - for Asset Under Construction, system showing error.
    *Error is:
    Contact your system administrator (table error)
    Message no. AA866
    Diagnosis
    No account has been entered for posting down payments in area 01 under the account assignment key 4800 (chart of accounts FTL).
    Procedure
    Enter the account using the Customizing menu.
    Pls Reply frinds.
    Regards
    vinod

    Hi Vinod,
    I hope that you are following Valuated goods receipt concept.
    Valuated goods receipt: Asset will be debited at the time of goods receipt
    Non valuated good receipt: Asset will be debited at the time of invoice receipt
    If you follow valuated goods receipt concept, then at the time of making down payment, AUC should not be debited (whatever the value date/ capitalization date be). Please refer SAP note number 310368 (valuated goods receipt paragraph) for reference. In that they have clearly mentioned the steps to make down payment against asset under construction Purchase Order without debiting to AUC and without any error message. You have to make F5 378 message number from error message to warning message and in posting key 29 and 39, you have to supress the asset related fields. If you have done the above settings, then system will not show any error message to update G/L account in AO90 transaction code for the Acquisition: down payments and Down payment clearing - 2nd and 4th field or for AUC related fields.
    Hope this helps. Assign points if useful.
    Regards
    Dwarak.

  • Internal Orders with AUC ( Assets under construction) Config steps

    Dear Experts,
    Can you send me the step by step configuration for Internal order with Asset Under Construction
    Thanks
    Sanjai

    Hi nick,
    you can maintain this in the settlementrule of the internal order, Type ANL
    Best regards
       Horst

  • Asset under construction not completely credited

    Hi,
    We are getting the message "asset under construction not completely credited" when trying to process an actual settlement for an internal order.  We have checked all our settlement rules and read SAP Note 726031 but we are still getting stuck on this error. It may have something to do with a 2c USD balance on the AUC that doesn't want to clear.  The local (AUD) balance is zero. We tried posting a 2c USD transaction to the Order but that didn't work either.
    Thanks
    Bill

    Hello,
    Check the AUC balances  and also check the settlement rule upto which period it is maintained.  If the to period  is ended with value and remove the " To period" and settle the values.
    Thanks
    Lakshmi Narayana

  • Down payments request for Asset Under Construction

    Hello Expert
    while Down Payment request  to vendors - for Asset Under Construction, system showing error.
    Contact your system administrator (table error)
    Message no. AA866
    Diagnosis
    No account has been entered for posting down payments in area 01 under the account assignment key IN95 (chart of accounts YAIN).
    Procedure
    Enter the account using the Customizing menu.
    Pls Reply frinds.
    regards,
    Riten patel

    Dear:
                   First check in OAYB that have AUC class been specified for down payments and then go to transaction AO90 and maintain the GL account for depreciation are 01 under the Balance Sheet account in the field Acquisition: Down Payment. It will resolve your issue.
    Regards

  • Gather all cost for asset under construction

    Hi everybody
    Please tell me the way to gather all cost for asset under construction. You can detail as good as possible.
    Thanks so much
    Ngocpt

    Dear Ngocpt,
    Internal order is functionality from CO. U can use it for the purpose of collating all the cost. U can also do cost planning in internal orders. This helps u to analyse bet planned & actual cost.
    Create IO thru KO01. Once created use it in ur transactions. In your case u can use it in posting any document to AUC.
    Also as I mentioned in my previous post that IO can posted with real values and statis tical values. If you want to post statistical vales only then check the box statis tical order in control data.
    Whenever passing an entry put ur IO number in "order" field.
    Hope this is of use to u.
    Regards,
    Ajay

  • Error when processing asset under construction (AuC) for WBS element message no cj824

    Hi,
    i am getting error message when i change dates in activities.
    Error when processing asset under construction (AuC) for WBS element
    Message no. CJ 824
    i have checked related post but did not find any solution. also check SAP Note but not related to my issue.
    Please guide.
    thanks
    Sunil

    Hi Ken,
    Please check below screens:
    according to this error message AUC has some missing field or some incorrect value. but when i checked via program RAUNVA00 which will display
    Incomplete Assets - Detail List.
    but this program does not return any incompleteness.
    i found many threads and SAP Not but none of is related to my program. this problem comes when i change dates in activity and save the project.
    Please suggest what to do now.
    thanks
    Sunil

Maybe you are looking for

  • Cannot get BI JDBC query to display results..

    My connection to the Oracle DB works fine. The system check in Portal returns OK. The system alias is visible in VC. I can browse tables and views. I can use the BI integration wizard to set up a query, and I am also able to review the output (see th

  • Ordering Additional Copies of a Book

    How can I place orders for additional copies of a photo book already shipped?

  • Reduce number of rings before Voicemail

    I would like to reduce the number of rings before my voicemail comes on on my Blackberry Z10. It is forwarded from my desk phone and that means that customers are waiting an excessive amount of time before my voicemail kicks in on my BB. I called my

  • Implementing drop lists

    Hi I want to implement a list that is made up of information from the database. what i want is that the the list should be collapsible with a + sign to its side and then when the user clciks on it, it expands to display all of the information. can so

  • No blank record in dropdown values

    Hi experts, I have an issue in providing values in dropdown values.  Is it possible to provide dropdown values without any blank record using VRM_SET_VALUES or by assigning a domain values through declaration? Bcoz, when i populate values through VRM