Steps required to upgrade to java 1.6.0_27.

Can anyone please tell me or help me to as what are the steps required to upgrade to java 1.6.0_27 ??
EBS R12.0.3

Hi
Helios
You need windows one, please see upper metalink note which is mention by Hussein Sawwan already
Step 1.2. Download the JRE Plug-in
Step 2. Rename the JRE Plug-in and Place it on Web Application Tier So the files mentioned in the link [http://www.oracle.com/technetwork/java/javase/downloads/jre-6u27-download-440425.html]
Linux x86 - RPM Installer     20.10 MB      jre-6u27-linux-i586-rpm.bin
Linux x86 - Self Extracting Installer     20.63 MB      jre-6u27-linux-i586.bin
Linux x64 - RPM Installer     19.67 MB      jre-6u27-linux-x64-rpm.bin
Linux x64 - Self Extracting Installer     20.25 MB      jre-6u27-linux-x64.bin
Solaris x86 - Self Extracting Binary     20.27 MB      jre-6u27-solaris-i586.sh
Solaris SPARC - Self Extracting Binary     25.10 MB      jre-6u27-solaris-sparc.sh
Solaris SPARC 64-bit - Self Extracting Binary     11.19 MB      jre-6u27-solaris-sparcv9.sh
Solaris x64 - Self Extracting Binary     7.48 MB      jre-6u27-solaris-x64.sh
These are used when I am accessing R12 application from linux/solaris platform... for accessing R12 with new JRE plugin on windows platform i need Windows x86 Offlin -> jre-6u27-windows-i586.exe
Please correct me...all these are new to me, so silly questions pop up

Similar Messages

  • Steps required to upgrade OS from snow leopard to yosemite

    What are the steps required to upgrade from Snow Leopard to Yosemite

    Upgrading to Yosemite
    You can upgrade to Yosemite from Lion or directly from Snow Leopard. Yosemite can be downloaded from the Mac App Store for FREE.
    Upgrading to Yosemite
    To upgrade to Yosemite you must have Snow Leopard 10.6.8 or Lion installed. Download Yosemite from the App Store. Sign in using your Apple ID. Yosemite is free. The file is quite large, over 5 GBs, so allow some time to download. It would be preferable to use Ethernet because it is nearly four times faster than wireless.
        OS X Mavericks/Yosemite - System Requirements
          Macs that can be upgraded to OS X Yosemite
             1. iMac (Mid 2007 or newer) - Model Identifier 7,1 or later
             2. MacBook (Late 2008 Aluminum, or Early 2009 or newer) - Model Identifier 5,1 or later
             3. MacBook Pro (Mid/Late 2007 or newer) - Model Identifier 3,1 or later
             4. MacBook Air (Late 2008 or newer) - Model Identifier 2,1 or later
             5. Mac mini (Early 2009 or newer) - Model Identifier 3,1 or later
             6. Mac Pro (Early 2008 or newer) - Model Identifier 3,1 or later
             7. Xserve (Early 2009) - Model Identifier 3,1 or later
    To find the model identifier open System Profiler in the Utilities folder. It's displayed in the panel on the right.
         Are my applications compatible?
             See App Compatibility Table - RoaringApps.

  • Requirements for upgradation from 4.7 to ECC 6.0

    Hi Guru's,
                      Can anybody explain what are the steps required for upgradation from 4.7 to ECC 6.0, technically and functionally. If any body have documents regarding the same, please share.Full marks will be awarded.thanx in advance....

    Hi
    You have to aware of all related program like BDC's , Screens related errors and all dictionary related problems.
    Some function modules may become obsolete, and some screens will change
    abnd some new fields will be added in the new versions etc.
    Also take care of SPAU and SPDD tcodes.
    You should be able to know about Unicode concept in sap.
    chk this
    http://www.thespot4sap.com/upgrade_guide_v2.pdf#search=%22upGRADE%20STEPS%20-%20SAP%22
    also chk these 2 notes in service.sap.com
    Technical Upgrade is only a version upgrade without any functionality changes.
    The objects that are needed to be upgraded are:
    Includes
    Function Groups / Function Modules
    Programs / Reports
    OSS Notes
    SAP Repository Objects
    SAP Data Dictionary Objects
    Domains, Data Elements
    Tables, Structures and Views
    Module Pools, Sub Routine pools
    BDC Programs
    Print Programs
    SAP Scripts, Screens
    User Exits
    You can refer to the below links for more information on technical upgrade:
    https://www.sdn.sap.com/irj/sdn/wiki?path=/display/profile/2007/05/07/upgradeFROMR3TOmySAPERP-PARTII&
    https://wiki.sdn.sap.com/wiki/display/profile/UPGRADEFROMR3TOmySAPERP-PARTIII
    http://help.sap.com/saphelp_nw2004s/helpdata/en/60/d6ba7bceda11d1953a0000e82de14a/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/2e/6d66647d9011d396b60000e82de14a/content.htm
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/5ac31178-0701-0010-469a-b4d7fa2721ca
    Reward points if useful
    Regards
    Anji

  • HT1338 I need to upgrade my JAVA software - I'm in a MacBook Leopard 10.5.8?

    I'm trying to use an on-line program that may require me to upgrade my JAVA software. Any ideas?
    MacBook 4.1 Leopard 10.5.8
    Jim

    Upgrade your OS:
    Upgrading to Snow Leopard, Lion, or Mountain Lion
    You can upgrade to Mountain Lion from Lion or directly from Snow Leopard. Mountain Lion can be downloaded from the Mac App Store for $19.99. To access the App Store you must have Snow Leopard 10.6.6 or later installed.
    Upgrading to Snow Leopard
    You must purchase Snow Leopard through the Apple Store: Mac OS X 10.6 Snow Leopard - Apple Store (U.S.). The price is $19.99 plus tax. You will be sent physical media by mail after placing your order.
    After you install Snow Leopard you will have to download and install the Mac OS X 10.6.8 Update Combo v1.1 to update Snow Leopard to 10.6.8 and give you access to the App Store. Access to the App Store enables you to download Mountain Lion if your computer meets the requirements.
         Snow Leopard General Requirements
           1. Mac computer with an Intel processor
           2. 1GB of memory
           3. 5GB of available disk space
           4. DVD drive for installation
           5. Some features require a compatible Internet service provider;
               fees may apply.
           6. Some features require Apple’s MobileMe service; fees and
               terms apply.
    Upgrading to Lion
    If your computer does not meet the requirements to install Mountain Lion, it may still meet the requirements to install Lion.
    You can purchase Lion by contacting Customer Service: Contacting Apple for support and service - this includes international calling numbers. The cost is $19.99 (as it was before) plus tax.  It's a download. You will get an email containing a redemption code that you then use at the Mac App Store to download Lion. Save a copy of that installer to your Downloads folder because the installer deletes itself at the end of the installation.
         Lion System Requirements
           1. Mac computer with an Intel Core 2 Duo, Core i3, Core i5, Core i7,
               or Xeon processor
           2. 2GB of memory
           3. OS X v10.6.6 or later (v10.6.8 recommended)
           4. 7GB of available space
           5. Some features require an Apple ID; terms apply.
    Upgrading to Mountain Lion
    To upgrade to Mountain Lion you must have Snow Leopard 10.6.8 or Lion installed. Purchase and download Mountain Lion from the App Store. Sign in using your Apple ID. Mountain Lion is $19.99 plus tax. The file is quite large, over 4 GBs, so allow some time to download. It would be preferable to use Ethernet because it is nearly four times faster than wireless.
         OS X Mountain Lion - System Requirements
           Macs that can be upgraded to OS X Mountain Lion
             1. iMac (Mid 2007 or newer)
             2. MacBook (Late 2008 Aluminum, or Early 2009 or newer)
             3. MacBook Pro (Mid/Late 2007 or newer)
             4. MacBook Air (Late 2008 or newer)
             5. Mac mini (Early 2009 or newer)
             6. Mac Pro (Early 2008 or newer)
             7. Xserve (Early 2009)
         Are my applications compatible?
             See App Compatibility Table - RoaringApps.
         Am I eligible for the free upgrade?
             See Apple - Free OS X Mountain Lion upgrade Program.
         For a complete How-To introduction from Apple see Upgrade to OS X Mountain Lion.

  • Step by step procedure for Upgrade to ECC6.0

    Hi,
    I gained a lot from this forum . Can someone please mail me at
    [email protected]
    step by step procedure for upgrade .
    Will award full points for helpful documents..
    With regards,
    Mrinal

    SAP defined a roadmap for upgrade.
    1) Project Preparation
    Analyze the actual situation
    Define the objectives
    Create the project plan
    Carry out organizational preparation for example identify the project team
    2)Upgrade Blueprint
    The system and components affected
    The mapped business processes
    The requirements regarding business data
    3)Upgrade Realization -- In this phase the solution described in the design phase is implemented in a test environment. This creates a pilot system landscape, in which the processes and all their interfaces can be mapped individually and tested on the functional basis.
    4)Final Preparation for Cutover -- Testing, Training, Minimizing upgrade risks, Detailed upgrade planning
    5)Production Cutover and Support
    The production solution upgrade
    Startup of the solutions in the new release
    Post processing activities
    Solving typical problems during the initial operation phase.
    SAP expects at least 2 to 3 months for Upgrade and that again depends on project scope and complexity and various other factors.
    STEPS IN TECHNICAL UPGRADE
    •     Basis Team will do the prepare activities. (UNIX, BASIS, DBA).
    •     Developer need to run the Transaction SPDD which provides the details of SAP Standard Dictionary objects that have been modified by the client. Users need to take a decision to keep the changes or revert back to the SAP Standard Structure. More often decision is to keep the change. This is mandatory activity in upgrade and avoids data loses in new system.
    •     After completing SPDD transaction, we need to run SPAU Transaction to get the list of Standard SAP programs that have been modified.  This activity can be done in phases even after the upgrade. Generally this will be done in same go so that your testing results are consistent and have more confident in upgrade.
    •     Run SPUMG Transaction for Unicode Conversion in non-Unicode system. SPUM4 in 4.6c.
    •     Then we need to move Z/Y Objects.  Need to do Extended programming check, SQL trace, Unit testing, Integration testing, Final testing, Regression Testing, Acceptance Testing etc.,
    The main Category of Objects that needs to be Upgraded is –
    •     Includes
    •     Function Groups / Function Modules
    •     Programs / Reports
    •     OSS Notes
    •     SAP Repository Objects
    •     SAP Data Dictionary Objects
    •     Domains, Data Elements
    •     Tables, Structures and Views
    •     Module Pools, Sub Routine pools
    •     BDC Programs
    •     Print Programs
    •     SAP Scripts, Screens
    •     User Exits
    Also refer to the links -
    http://service.sap.com
    http://solutionbrowser.erp.sap.fmpmedia.com/
    http://help.sap.com/saphelp_nw2004s/helpdata/en/60/d6ba7bceda11d1953a0000e82de14a/content.htm
    http://www.id.unizh.ch/dl/sw/sap/upgrade/Master_Guide_Enh_Package_2005_1.pdf
    Hope this helps you.

  • Upgrading to Java 1.4.1 on OS X

    On http://www.apple.com/java/ they state:
    The Java 1.4.1 Update 1, now available from software update, improves stability, memory usage, and correctness. Requires
    Mac OS X v10.2.6 or later.
    Following the link one is directed to:
    http://www.apple.com/macosx/upgrade/softwareupdates.html
    Apparently one should be able to upgrade the Java version by doing a standard Mac 'Software Updates'. I have installed the Mac "compilation" upgrade (100Mb) but Java didn't follow that. After a restart and running the tool again, I still do not see Java in the list of available updates (and there are no 'compilation packs' where Java might be).
    Anyone know how to upgrade the Java version on a Mac? I can't believe how difficult this turned out to be.

    Here is a helpful link for more info...
    http://developer.apple.com/java/faq/#gen_1
    -- Begin Copy
    Q: What version of Java is included on Mac OS X?
    A: Mac OS X v10.3, "Panther", is now shipping with an updated Java 1.4.1. A Java 1.4.1 Update 1 for Mac OS X v10.2.6 ("Jaguar") is currently being updated for compatibility with other software updates, and will be made available again shortly. Both releases are based on the J2SE 1.4.1_01 JDK with the HotSpot Client VM, and contain a number of bug fixes and performance enhancements since the initial Java 1.4.1 release.
    Q: Does Mac OS X support multiple J2SE versions on a single OS installation?
    A: The Panther and Jaguar releases of Mac OS X include both 1.3.1 and 1.4.1 J2SE implementations. Earlier releases of Jaguar did not ship with Java 1.4.1, but can obtain 1.4.1 through Software Update. With 1.4.1 installed, the standard command-line commands such as java and javac use 1.4.1. Apple developer tools such as Jar Bundler and Xcode both allow you to specify a Java version for double-clickable apps to use. Please see the Java 1.4.1 Info.plist Dictionary Keys documentation for details on how this is done.
    -- End Copy
    I was able to download the update via Software Updates. But the response "currently being updated" means that it may have been pulled off the update list temporarily.
    On the other hand, if it does not appear in the list of available updates when you run Software Update, you may already have it.
    Launch a terminal and enter "java -version". What is the output?

  • Requirement to upgrade OBIEE 10g on Windows to OBIEE 11g on Linux

    Dear All,
    I have a requirement to upgrade OBIEE 10g from current windows 2003 environment to OBIEE 11g Linux environment.
    I went through forums and many threads on upgrade, everywhere they talk about Upgrade Assistant (UA). And oracle documentation says ,
    +"Do not change from one platform or architecture to a different platform or architecture as part of the upgrade process.+
    +For example, if the existing 10g system is running on a Windows 32-bit platform, do not install Oracle BI 11g on a Linux 64-bit platform and then run the Linux 64-bit Upgrade Assistant to upgrade the existing 10g system."+
    But there would certainly be scenarios with other users the way I have. Then what is the way out to do this upgrade?
    Can anyone give some advice on this. It is little urgent.
    Thanking in advance.
    Regards,
    Deepika.

    Thats are huge change in platform. win32 to linux 64.
    Yet what we upgrade is only
    catalog and rpd.
    this might involve some manual change if UA cannot complete successfully.
    Its better to do a prototype before the actual upgrade as recommended by Oracle. This will show what can the possible issues and road blocks.
    Edited by: user10615659 on May 23, 2013 11:22 AM
    Edited by: user10615659 on May 23, 2013 12:26 PM

  • Steps required to enable webservice calls in SAP ECC 6.0

    Hi Friends,
    I'm working on XI, more on part of webservices and as I dont have a good knowledge on BASIS part, I would like to know the steps required to enable the webservice calls in SAP ECC 6.0.
    Blogs/documents could be helpful.
    Thanks in advance

    duplicate thread
    [Required infrastructure to enable web service calls in SAP ECC 6.0 system;

  • Minimum steps required for Change Management and Incident management

    Hello experts,
    Does anyone have a check list of the absolute minimum steps required for getting Change Management and Incident management functioning in Solution Manager.
    I just need it to function with creating changes and incidents and be able to assign them, change their status and close them.
    The purpose is to get an idea if this is something for us to use. If we then find it useable, then we will go for a full scale implementation using official guides, education etc.
    I just need an absolute minimum guide for demonstrating the functions, and if you guys have any recommendations, things we should pay special attention to or other experiences feel free to tell me.
    Thanks in advance.
    Regards,
    Kenneth

    Hi,
    There are a number of Blogs in the SDN about Charm and ServiceDesk, explaining first steps and more.
    Check these to start:
    http://wiki.sdn.sap.com/wiki/display/SM/ChangeRequestManagement
    The Complete ChaRM Solution
    Change Request Management scenario: Usual questions and known errors
    First steps to work with Change Request Management scenario in SAP Solution Manager 7.0
    Regards,
    Jan

  • Steps required for Sender IDOC adapter PI 7.0

    Hi all,
    My basis guy has installed SAP EHP1 for PI7.0 for handling the idoc packaging(sending idocs in packs)...
    Please can any one let me know the further settings required in PI after it has been installed...
    and even when i open the sender IDOC in comminication channel in ID i am able to see only 3 options
    Transport prtocol, message protocol,Adapter engine...
    But i am not able to see the other fields...
    Can any one help me...
    Thanks and Regards,
    sridhar

    Hi Michael,
    Thanks for your reply..
    I searched for the docs in many ways.. but couldnt find proper information regarding the IDOC packaging with sender IDOC adapter and steps required...
    Could you please let me know  if i can get the book in Singapore since our project, because almost 90% interfaces are related to IDOC...
    And request you if you can share me the steps required in PI to confirgure IDOC packaging for EHP1...
    Regards,
    Sridhar Reddy
    Edited by: sridhar reddy kondam on Jun 15, 2009 4:35 AM

  • BPM steps required.

    BPM steps required...
    Idoc to ,Proxy and JMS(2 receivers,JMS 1 and JMS2) scenario....totally 3 receivers
    JMS 2 has to wait till JMS1 reaches receiver....then JMS2 should reach receiver..
    what are the steps i should  put in BPM.....
    Please remember that there is no need logic for PROXY...no need of waiti time aswell...only JMS2 receivers required....
    can some one tell me step by step, what are the steps required to do so...

    Hi Harsha
    You can correlate JMS messages with or without BPM.
    Use these
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/8060448a-e56e-2910-f588-9af459e7ce21
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b028f6f6-7da5-2a10-19bd-cf322cf5ae7b
    This will help you getting response from JMS1
    Thanks
    Gaurav

  • How to config new plant in SAP MM. Steps required

    how to config new plant in SAP MM. Steps required pls help

    Hi,
    1S pro---enterprise structure-definition -logistic general-define,check ,delete plant
    here click on copy object icon
    then copy your plant from stander plant or existing one
    2and then define storage location if required
    3then assign plant to company code
    4if purchasing organization is there for your plant then assign plant to purchasing organization
    Regards
    kailas

  • Failure when Upgrading from Java 1.2 to Java 1.3

    After upgrading from Java 1.2 to Java 1.3 I get an "Internal Server Error" when trying to run even the simplest jsp.
    Java 1.3 runs successfully in other cases such as compiling and running from the command prompt or from JDeveloper.
    I have the following configuration on my server:
    - Windows 2000
    - Oracle 8.1.7
    - Apache 1.3
    - Tomcat 3.2.3.
    I'm testing the jsp by using a client that has:
    - Windows 2000
    - Internet Explorer
    Any help would be appreciated.

    I get this even with the new 1.4 beta 2 - currently
    reverted back to original

  • Required Post Upgrade Jobs: Missing jobs and failures

    Folks,
    In reviewing "Required Post Upgrade Jobs", I found that "Compile Non-Compiled Flexfields" failed. The job was submitted by APPSMGR and immediately started since the Request Process queues were not initially deactivated as reccomended in doc 399362.1. I'm afraid I don't know the password for APPSMGR. Is there a way for me to restart this job so that any successors release?
    Only a handful of the required jobs show to have been submitted and run. Would required jobs that have not run and do not appear in the queue need to be manually submitted?
    Thanks for any help.

    All of my post upgrade processes completed without error except the flexfield compile of AR_ADJUSTMENTS_ALL_DFV. It will not compile from within the forms either:
    Oracle error 911: ORA-00911: invalid character
    ORA-06512: at "SYSTEM.AD_DDL", line 165
    ORA-06512: at line 1 has been detected in afuddl() [3_xdd].
    do_ddl(APPLSYS, AR, 2, $statement$, AR_ADJUSTMENTS_ALL_DFV): private_do_ddl(APPS, APPLSYS, AR, 2, $statement$, AR_ADJUSTMENTS_ALL_DFV): do_cd_view(1, APPS, 2, AR_ADJUSTMENTS_ALL_DFV, $statement$): : do_apps_ddl(APPS, $statement$): : substr($statement$,1,255)='CREATE OR REPLACE VIEW AR_ADJUSTMENTS_ALL_DFV
    (ROW_ID, "CONTEXT_VALUE", AdjustmentStatus,
    CONCATENATED_SEGMENTS)
    AS SELECT ROWID, ATTRIBUTE_CATEGORY, ATTRIBUTE4,
    ATTRIBUTE4
    FROM AR_ADJUSTMENTS_ALL'
    View Name: AR_ADJUSTMENTS_ALL_DFV
    I am going to apply 5484000 Oracle E-Business Suite 12.0.2 Release Update Pack (RUP2) tonight and see if it makes any difference.

  • Configuration steps required in ID

    Hello Experts,
    I am new in XI/PI. Can anyone explain me the configuration steps required when we have one sender and multiple receiver.
    I have a scenario having file as a sender and JDBC,File and JMS on receiver side.
    If anyone have the screenshot for similer scenario will be more helpful.
    Regards,
    Jay.

    Hi,
      in ID, you will need...
    1) 1 receiver determiantion
    2) 3 interface determination
    3) 3 receiver agreement
    4) 1 sender agreement
    5) 1 sender and 3 receiver channel
    Regds,
    Pinangshuk.

Maybe you are looking for

  • InDesign 5.5 "interruption" every 7 seconds

    This problem started just this week. I'm working on a multi-page document and InDesign appears to "interrupt" every 7 seconds. I see whatever tool I'm using at that second flicker and a brief "beachball" and whatever I'm doing stops for a second, and

  • How to park invoice ( Incoming Idoc )

    Hi, I have a requiremnt where i need to park the incoming idoc(INVOIC01). I am using the standard program "IDOC_INPUT_INVOIC_MRM". I made the copy of this FM into a Z Function Module and using "MRM_CREATE_INVOICE" passing RBSTAT_NEW = 'A' which is fo

  • Reminders is a useless app on iOS 5

    i tried using Apple made Reminders app bundled in iOS5. When i try to add location, it makes me take either the current location or some address(if i stored one such) in the Contacts book. How do i know all the addresses that i will be using in futur

  • Layers problem... I think.

    Hi. I posted yesterday, but I think something happened to their forum website because I don't see my question. I'm a new user of Indesign. I have the CS3 version on WinXP. Yesterday I placed two text boxes and a placer box on a page, then added a gra

  • Restored address book from Time machine no images on contacts

    hello all had an issues with my address book unfortunately i deleted my contacts from adress book fom my macbook and lost al my contacts even from iphone (so propably deleted the icloud contacts) now thank god i found a way to restore them from Tiem