Sto- delivery log
Hi All,
please throw some light
I created a stock transport order and i am trying to create a delivery(VL10B). stock of the material is available in xxxx location of issuing plant. while trying to create delivery system is displaying log like "qty 0(zero) avalable" and i am unable to create delivery.
when i moved the stock to yyyy location and then tried to create delivery, this time system created delivery.
Here my requirement is, system should create delivery for STO irrespective of the storage location. ie system should create delivery is the material is there in plant and it should not check for perticular storage location.
please let me know if i am missing something and if there are any controls of the same. further, whether there are any controls in availability check etc.
waiting for ur valuable reply
thanks
dear balaji
plz matain the mm confucaration which one is supplying plant and which one is receiving plant
and check the P.O details also
regards
magha
Similar Messages
-
Possiblity of STO delivery in foreground
Hello Friends.
Point 1
I am creating delivery against STO in background after getting the due list from VL10B. Client is insisting not to do the background delivery. They are asking for the same kind of option of creating delivery as against VL10E.
Is it possible to create STO delivery in fore ground. If yes, then please guide me how to do it. If not, can I get any sap note which confirms this thing which I can show to my client.
Point 2
I am determining batch during the delivery creation. During batch splitting system is giving the batch no & corresponding batch qty. while doing the picking I am entering manually the picking quantity against respective batch no & batch qty. From few threads in forum I noticed that this manual entry of pick qty has to be done. But client is insisting to have automatic entry of pick qty against batch qty.
If this manual entry of pick qty is the standard sap practice, can I get any write up or note from SAP which I can show to my client.
Regards
DebeshHi All,
Can you please advice on this issue. is there any SAP note regarding this issue.(I tried but could not find anyone)
Thanks.
S J -
Issue in creating a STO Delivery
Hi
We are trying to create STO delivery for a particular product.
There is enuf stock for the product in the supplying plant, however there is no STO delivery created and control returns back to R/3 with BAPI_APO_ATP_CHECK error.
One peculiar thing abt the product is that the product has a field SATNR( Cross reference plant - which is populated with a configurable product.
The configurable product is maintained in APO.
Can you provide any leads what possibly could be the reason and if anyone has faced this kind of issue.
Thanks
AmrutaHi Amruta,
There could be reasons like mismatches in stock, mismatches in sto between ECC and APO which can leads to non-delivery creation. Also, please check whether the stocks are placed in storage location which will be recognized by APO for delivery creation. The error you have received indicates that either the stock or the sto is not available at ATP during ATP check performed during delivery creation.
Regards
R. Senthil Mareeswaran. -
Not able to do GR for STO delivery with packing.
Hi All,
Hi All,
I am not able to do GR for STO delivery.
I am getting the following error:
Data for creating a delivery is incomplete (Vendor)
Message no. M7279
Business scenario:
STO between two plants of same company code with packing material.
Sales Org(Supp)-4444
Sales Org(Rec)- 3333
Plant(Supp)-2003
Plant(Rec)-2002
ME21N->VL10B->PGI->VF01(Proforma)->MIGO w.r.t outbound delivery(error)
Note: PGI with packing material-separate line item generated for packing material-movement type for main material-641 and for packing material-601)
with regards
Azeez.MohdHi,
When the stock is going to be moved between two plants or two storage locations that are under single company code called as stock transfer order business process. Receiving plant raises the purchase order with supplying plant; supplying plant delivers the goods to the receiving plant by raising sales order.
Config Steps
Create Vendor: Transaction code: XK01
Assign Plant to Vendor
Go to change mode of Vendor [XK02]
Specify Vendor number that we created in the previous step
Define shipping data for plants
Create material by maintaining u201CPurchasingu201D view: Transaction code: MM01
Extend the material from XXXX to YYYY plants
As we are extending material from plant XXXX into YYYY plant, system copies all the data into the new plant.So that we have to change the delivering plant in delivering plant field as YYYY in Sales: Sales organization data 1 view.
Create Purchase order: Transaction code: ME21N
Activities due for Shipping (Purchase order fast display): Transaction code: VL10B
Display stock in transit: Transaction code: MB5T
Goods receipt: Transaction code: MIGO
Stock movement types: INTRAand INTER
INTRA
Stand order type (Document type) = UB
Delivery type = NL
Determination of document type:
Supplying plant + Receiving plant = UB
Supplying plant + UB = NL
Movement types:
Issuing plant Receiving plant
Single step 647 101
Two step 641 101
INTER
Standard order type (Document type) = NB
Delivery type = NLCC
Determination of document type:
Supplying plant + Receiving plant = NB
Supplying plant + NB = NLCC
Movement types:
Issuing plant Receiving plant
Single step 645 101
Two step 643 101
PBXX is the Gross price condition type for Stock Transfer Order
Vendor = Supplying plant
Customer = Receiving plant
NOTE: In single step method updations takes place in both plats simultaneously.
In two-step method updations should takes place manually. -
STO delivery date should not be in weekend.
Hi expert,
i just want to make sure the STO delivery date should skip weekend or give a warning message in case it is calcuated based on planned delivery time to be the weekend. Now I know that the calendar in receiving plant configuration can reach this request. but what i concern is, if i change this config, the impact is too big. Does any one have better idea?
also, it looks like that the calendar in unloading point in ship-to master data doesn't work for this.
Thanks!Dear Srinivas,
Change the check as follows from
Check: BKPF-BUDAT>SYST-DATUM
to
BKPF-BUDAT <= BKPF-CPUDT
add BSEG-KOART = 'K' in prerequisite
Regards,
NCC Talluri -
Error in Batch determination in STO delivery
Hello Gurus,
When i m doing batch determination in STO delivery, system is throwing error "Batch determination is not possible because there is no search procedure."
I think search procedure is assigned to sales doc types. Please correct me if i m wrong. This is working fine in case of normal sales cycle(Order-delivery-Billing). As the scenario is STO, the delivery is made against PO so this should not be reason for this error.
Also i have maintained Auto batch deter. at delivery item category level, but still getting the same error.
Please advice.
Thanks in advance,
Kind regardsAll,
I have the same issue with my stock replenishment deliveries. One question I have is what module should the configuration be for Auto Batch Determination on deliveries from STPO's, is it SD or MM? The reason I ask is because I have the SD side working just fine for example if I enter a customer order for this material and issue a delivery against it I get a batch automatically assigned according to your search/sort criteria. I know with a Stock Transport you have different item categories etc. and I have flagged them as relevant for ABD. I have been racking my brain regarding this and I have went through the configuration for both Inventory Management and Sales and Distribution. I have went through the steps several times. I am not seeing what I am missing any help in this arena would be helpful I am getting the following error message when I go to the batch tab on the replenishment delivery "Batch determination is not possible because there is no search procedure". I am at a loss to what configuration is needed. I keep going through the steps and I am not finding whats missing. Any help in this area would be most grateful.
Thanks,
Jeremy -
PGI reversal issue for STO Delivery
Friends,
While I am trying to reverse the PGI using VL09 for a STO delivery, I get an error " E M7 022: PU withdrawn quantity exceeded by xx Ton : Material, plant and storage location".
Looked at the OSS notes but could not arrive at the correct one.
Please help as this is an urgent issue.
Thanks and Regards,
Ram
Edited by: Ram Murthy on Apr 25, 2008 2:13 AMIf you are shipping from, for example, plant 100 to plant 200 then when you PGI in100 the inventory is immediately placed into plant 200 inventory in special stock "in transit". If the two plants are in different company codes then it is placed into "In transit CC".
Please check in transit stock is sufficient to be reduced by the cancellation of the PGI.
Regards,
Brian -
Zero quantity should not be allowed for STO delivery
Hi,
zero quantity should not be allowed for STO delivery.
when i create a delivery for a STO it should not allow zero quantity
can someone throw some light.
AlecHi,
Please maintain the "B - Create Delivery with qty greater than Zero" in Part.dlv./item in shipping tab page of the customer of site.
more briefly: in WB02 --> click on the customer of the site --> Shipping Tab page --> Maintain B (Create Delivery with qty greater than Zero)
Regards,
Srini -
STO Delivery Date is not copy from Allocation Table Site Date
Hi,
I have a problem when Stock Transfer Order created based on the Allocation Table, the delivery date is not copy from Allocation Table. E.g. In Allocation Table delivery date is 26.09.2009, but in STO delivery date is 06.11.2009.
Check the configuration and also check the stock, there is stock available to be delivered on 26.09.2009.
Can someone please give me a hint to find out what is missing or wrong, and how to fixed this?
Greatly appreciate for your suggestion and sharing.
Kind Regards,
2teaI found the problem finally.
-
Intercompany STO Delivery Creation
Hi Experts
Scenario: Intercompany STO Delivery creation.
When delivery creation though Tcode - VL10B, in the shipping side if no enough stock, is it possible stop creating delivery orders and to throw error.
I dont want to use the P.O side ATP check settings, as P.O raising shouldn't be stopped.
Appreciated your help.
Regards
GJHi
OVLP - Avilablity Check Indicator is Set Blank already.
However, currently even if no stock also still the delivery order able to be created by VL10B. Just only can't do PGI.
Requirement is First place the delivery creation in VL10B itself to stopped by showing error as deficit of stock for the material.
All the settings in Purchasing --> Purchase Order --> Setup stock transport order seems it relevant to the Purchase Order not to control the delivery creation.
Appreciated further advise.
Regards
RG -
STO Delivery (NL) Automatic Pickup Billing Type in VF01
Dear friend,
I have created PO for STO and delivery (Delivery Type NL) through billing VF01, working fine. But when I create the Billing VF01, billing type (JEX) is not coming automatically. I am selecting manually the billing type.
I have already maintained the copy control (T-code - VTFL) against Delivery document to billing document. I canu2019t create the sale order type.
Is there any configuration or option to automatic pick up of billing type STO delivery(NL).
Useful answers duly rewarded
DevendraDevendra,
We have achieved teh same using USer Exit in Delivery (MV50AFZ1)
Form : FORM USEREXIT_MOVE_FIELD_TO_LIPS
Created one Z Table - ZBLTYP
with fields: Delivery type, WERKS, Prposed Billing Type
Codes for picking up as below:
SELECT SINGLE * FROM zbltyp
WHERE werks = lips-werks
AND lfart = likp-lfart
IF sy-subrc EQ 0.
likp-fkarv = zbltyp-fkarv.
ENDIF.
We have achieved automation based on Plant. If you do not need Plant as criteria then u can drop the logic accordingly.
Your techical person will help you in the same.
Sandeep -
Unexpected issue of error message at time of STO Delivery
Hi,
I am trying to create STO Delivery by transaction by VL10B by I am getting error 'Unexpected issue of error message (Output VL 447).
Please help in order to solve issue.
LaitHi,
We have reuired changes in Note but problem was wrong Partner determonation procedure assigned in delivery type. -
STO Delivery problem with VL10B.
Dear All,
As my client required the cross-company STO. We have configured all the setting as required. But now after creating PO. While creating the Delivery with VL10B system gives below mentioned error.
Diagnosis
When the system checked whether saving delivery was
permitted, it determined that the requirements stored in
Define Incompletion Procedures for this document do not
allow this subsequent function.
System response
The system does not permit this subsequent function.
Procedure
o If this message appears during online processing, you
can edit the document by choosing Edit -> Log of
incomplete items.
o If the message appeared during background processing,
you can analyze the problem by regenerating the
delivery.
Furhter, client is not getting any error for inter company STO.It's most required,Plz give the answer.....
Thanks.
SPTDear STP,
What is the error?
Post the complete System Error Log, alon with Message No.
in Your post, except Error Description, every thing is provided.
Diagnosis
When the system checked whether saving delivery was
permitted, it determined that the requirements stored in
Define Incompletion Procedures for this document do not
allow this subsequent function.
System response
The system does not permit this subsequent function.
Procedure
o If this message appears during online processing, you
can edit the document by choosing Edit -> Log of
incomplete items.
o If the message appeared during background processing,
you can analyze the problem by regenerating the
delivery.
Before Diagnosis, Error-Description along with Message No. must be there.
Best Regards,
Amit -
STO- delivery document not commiting materials from storage location.
While creating an STO PO and delivery to move a material from a storage location in Plant 0003 (plant 0003 consists of 30 storage locations and 3 Shipping Points (1 for each of the Depots)), we are facing 0 stock issue.
We can change the Shipping Point in the STO PO to the Depot the material is coming from but no place to identify the Storage Location from which we are pulling.
The STO PO commits the material and provides a commit date.
We are using VL10B to create the Delivery > the Delivery fails and the log says "440000 0010 Only 0 EA of material 772-8760-876 available". There is material in 3 different Storage Locations in that Plant.
Does a delivery document consider shipping point only and not the storage location (sloc) inventory?
Do we need sloc-shipping point tie-up one to one?
We have inventory in both Storage Locations for MRP and for NO MRP.
Any advice, not sure if we are missing anything in config!
Thnx!
Points will be rewarded.Check the following in OPJJ
The checking rule(for delivery it is B in std SAP) and avaiability check(from material master) combination
in the storage loc check sub screen
NO storage loc inspection check box is activated or not?
If it is not activated then system will check as per storage loc specified in delicvery, if activated, then system will check and give commitent at plant level
One more check is
In table TVKOL, is the storage loc is determined through shipping point/plant/stog condition combination?
IS so this storage loc is taken for checking -
MRP for STO Delivery Date Issue
Dear Gurus,
We are using MRP to generate STO purchase requisition for a specific material.
We have entered planned delivery time in the receiving plant. The supplying plant is 1000 and receiving plant is 2000.
We have entered planned delivery time in plant 2000 for 10 days . MRP is run at mid night. System is generating PR . But the delivery date is same as current date.
E.G: Material A planned delivery time 10 days in plant 2000
Planning date is 20/07/2014
in PR : Delivery date is 29/7/2014
and PR release date is 19/7/2014.
The release date is appearing in the past. Kindly help me to resolve this issue.
Thanks in Advance.
SreedharHi Dev,
When i create STO PR manually all the dates are appearing as per standard calculation considering the planned delivery cost.
The issue is in MRP run.
Thanks & Regards,
Sreedhar
Maybe you are looking for
-
How To get the number of request's for a single Composite Application
Hi can any body tell how to get the number requst's for a single composite application. Thanks Mani
-
P6 R8.1.0 Web Access not loading EPS
Hi, This is really weird situation. It started out of nowhere without any specific change to the app or the DB (SQL Server 2008 R2). Whenever i try to load the EPS (clicking on the tan Project) the Java bar for loading data shows starts and stays the
-
How do you specify interface_name in INTERFACES section of ubbconfig
Some of the query services take very long time to complete, depending on the query requested by the user. We want the server to timeout after 15 seconds, if the query is not completed. Tried to use SVCTIMEOUT for the corba service, which is specified
-
Hallo Forum, habe ein akutes Problem dahin gehend, dass mein W530 gar nicht mehr startet. Fingerabdrucksensor blinkt, zieh ich den Finger drüber blinkt die Powertaste kurz und manchmal das Festplattensymbol, ansonsten tut sich nichts. Beim Druck auf
-
Hi, I am using a X-Y graph in labview to see a plot of voltage vs. current. How do I set up a cursor table so that I can see the values of x(voltage) and y(current) whenever I move the cursor on the graph. Any kind of help is appreciated! Thanks, Mah