STO Via SD or STO via MM

Hi Gurus,
I need to know the pros & cons of Stock trans. order via SD process & STO via MM.
Client need to know the exact diff & which business process is more advantageous.
Thanks
Jai

1)If you are working with the stock transfer procedure with LE outbound delivery (SD route), this has the advantage that the shipping activities can be processed with the R/3 System (picking, packing, printing the delivery note, and so on).
2)This has advantage of control function since dispatch department can control the material shipping out of the company.
Material should have sales view and this material should be maintained in both the plants
Thus the STO via shipping is studied and documented in very simple language
Difference between STO of MM and SD route is explained and same can be considered while configuring STO for client
Hope this helps
If you need more information pls info. Mail
Amit

Similar Messages

  • Difference B/W creation of  STO via ME21N  and  ME27

    Dear all,
    The requirement is to create a STO via transaction ME21N.
    I am doing so using BDC Recording. But I believe that BDCs can not be used for creation of Application Documnets using Enjoy transactions.
    For the same reason I tried to create the STO via ME27 but there wre certain fields
    which I require to populate are not available in this transaction.
    Can u please let me know what is the difference between the above transactions ?
    Kindly help.

    Hi karthick,
    This 'F' has no meaning like 'N'.
    But i think.. these are stands to denote application area.
    F- for pruchase order
    A- for RFQ
    etc....
    ME91F - Purchase Orders: Urging/Reminders
    ME91A - Urge Submission of Quotations
    ME91 - Purchasing Docs.: Urging/Reminding
    ME91E - Sch. Agmt. Schedules: Urging/Remind.
    See these all are for different purpose.
    Regards
    Sreekanth

  • STO with delivery Via Shipping

    Dear Gurus,
    Kindly let me know the process (Tcodes more than enough) for STO with delivery Via Shipping for excisable material from normal manufacturing plant to Depot plant or Visa versa.
    Regards,
    Prashanth Pai

    Say after u get the order for customer u depot dont have ABCD material
    1 Depot Plant Create sto Me21n for ABCD from mfg plant say 45000012
    2 MFG plant send the material against STO VL10B out bound delivery 500000452
       Do picking and PGI VL02N  for OBD 500000452 and get PGI document number 490000245
    3 MFG plant Creates Excise invoice against this PGI document (490000245)J1IS say EI 000231 date 31/12/09
    4 Depot plant do GR against Sto or OBD MIGO and create entry for RG23D reg wrt Excise invoice recived form MFg plant (enter same excise number(000231 date 31/12/09) that is send by mfg plant in excise invoice number and date)
    at this stage ur RG23D reguster has ABCD against EI 000231
    Create a Saleas order VA01
    Create outbound delivery VL01N
    do Picking VL02N
    Do PGI VL02N
    Create Excise invoice for customer J1IJ against delivery (in this u will have to select the excise invoice (000231)against which u have Purchased the material so that same excise values are forwarded to the cstomer)
    Creat bill VF01
    hope this helps
    and from Depot to mfg
    same process
    only while creating Excise invoice in J1IJ create against material document for PGI
    and recive the materia in mfg plant as normal against STO pr outbound delivery.
    hope this helps

  • Planned order creation via MRP depends, If we change Delivery date in STO

    Hi,
    Planned order  creation via MRP depends, If we change Delivery date in Stock transfer Order.
    I created STO with delivery date as 31.1.2012 and when i checked MD04, i can see Planned order created on 27.2.2012 with the same above STO quantity .
    Now when i changed the delivery date as 30.1.2012 and runned MD03, and then checkd MD04, planned order disappeared.
    Why Planned order got created when STO delivery date was 31.1.2012 and when I changed the delivery date in PO, planned order disappeared.
    MRP profile details :
    Plnd delivery time   1
    GR processing time   1
    Planning time fence  38
    Tot. repl. lead time 38
    Can you please let me know why system is beaving in this manner?
    Regards
    Utsav

    Hi,
    Normally , MRP runs based upon the requirements.If your STO is created for a date , system checks through the availabiloty check wheather there exists any stock for that date to get deliverred in the supply plant .If there exists for that date the stock , planned order will not be created.If no stock available then a planned order will be created in MRP.
    cHECK the availability check parameters assigned to material master in supply plant.
    Regards,

  • How to create sto po via bapi-BAPI_PO_CREATE1

    if create sto po via bapi_po_create1, which fields must be defined? and i want to change sto price.how to define bapi fields? can anyone give me a sample?

    hi
    check following
    BAPI_PO_CREATE1
    http://abap.wikiprog.com/wiki/BAPI_PO_CREATE1
    hope it helps
    regards
    kunal
    award if helpful

  • Inbound delivery creation in STO via EDI/Idoc

    Hello experts,
    My requirement is like this:-
    Stock transfer order is created for supplying plant 2000 & receiving plant 2010.
    When the supplying plant 2000 posts an outbound delivery & PGI, at same time an Inbound delivery should be created in receiving plant 2010.
    I know theoretically that this is achieved by making confirmation settings & output types. But don't know exactly how to configure it.
    Can you please mention the process?
    I have referred the scn threads:
    Outbound Delivery to Inbound delivery by using IDOC
    how to configure the message control for DESADV
    SAP note 111903
    Receiving Vendor Confirmations via EDI - Purchasing (MM-PUR) - SAP Library
    But there is lack of clarity from my side.

    You do not need to use EDI messages to get an inbound delivery created when a PGI is done on the outbound delivery.
    Search for the config on the SPED output type. This SPED output message can be triggered during the PGI which results in the creation of an inbound delivery in the receiving plant.
    The receiving plant will have to maintain the confirmation control key 0004 at item level in the purchasing document.
    Link to SAP help Automatic Creation of Inbound Delivery - Transfer and Inventory Management - SAP Library
    Refer SAP note 1119073 point 3 and note 965176
    Regards,

  • TLB STO's created in ECC via cif are being created with Intercompany Markup

    STO's created using TLB in APO when cif'd over to ECC6 get created with an Intercompany Markup.  When created manually in ECC6 using ME21N the markup is not part of the pricing and is correct.  Has anyone had this same situation?

    Abhishek,
    ECC Route is is part of ECC Transportation and Delivery scheduling,
    ( http://help.sap.com/erp2005_ehp_02/helpdata/EN/dd/5607e7545a11d1a7020000e829fd11/frameset.htm )
    and is not directly linked to SCM means of transport in standard SCM.  The analogue to Route in SCM is found in shipment scheduling in SCM.  If you wish to link route to alternative Means of Transport, you will need to use an enhancement.
    If you elect to use the more standard 'shipment scheduling' functionality to schedule your STOs instead of an enhancement, you do not need to implement the entire TLB or TPVS, you can pretty much implement just the shipment scheduling functionality.
    http://help.sap.com/saphelp_scm700_ehp02/helpdata/EN/05/f8923945b12c4de10000000a114084/frameset.htm
    Best Regards,
    DB49

  • STO of Sales order stock via delivery

    Hi,
    We have plants in many locations. We create sales order (TAB) in plant A sloc 0001 with individual purchase order . Supplier delivers the goods to the distribution centre (a different plant plant B or same plant A diff storage location Sloc 0002 ). Now the distribution centre (plant B) wants ship these materials along with other regular shipments to the Plant A. I created an STO, but when create the delivery using VL10B, I get an error message that the Material is not in PLant A Sloc 0002.
    Do I have to do any other configuration?
    Thanks
    Ravi

    Hi Raja,
    Thanks for your detailed response. Here is answers to your question.
    Why do you do that?Why not in plant A sloc 0001
    OK if for any administrative reasons you receive the stocks in different plant B or same plant A
    diff storage location Sloc 0002
    As explained initially, plant A and Plant B (or PLant A sloc 0001) are geographically apart. Plant B is the distribution centre. So it was agreed with vendor that he can ship all materials to distribution centre.
    Hope i have clearly understood your process
    Yes. Spot on.
    In MMBE it should show as sales order stocks in the sales order no you have created first in
    same plant A diff storage location Sloc 0002 or different plant plant B
    Yes it is showing in PLant B Sloc 0002 as sales order stock.
    If you are getting the shipping tab in the STO then it means the config from SD side is correct
    Yes I checked the STO. Shipping tab and details look ok. I missed it in my earlier post. When I create the STO I get the availability check message that says that "of the material only 0.0 EA is available on desired date" which means that it does not recognise the
    Sales Order stock. I create the STO woth account assignment "M". I hope that is correct.
    TAB is with special stock indicator E rom SD side in VOV7 so along with movement types in
    MB1B use special stock indicator E also With MB1B things should workout for you
    You have given me a clue here. I think I need to configure a new item category for the sloc to sloc  delivery in vov7 to activate the sales order stock.
    I will come back to you after testin this one,
    Thanks a lot
    Ravi

  • STO (via EDI) extend delivery

    Dear, colleagues
    Our customer has requested to setup Intercompany Stock transfer Orders to supply sales stores form DC. Business scenario is:
    - Store creates PO for goods
    - DC creates Delivery documents based on PO (vl10b)
    - Goods are delivered on Pallets, each store takes care about them. There are no PAL in PO doc, DC add then only in at the moment of delivering (in delivery doc).
    - Goods issue/ receipt
    - Intercompany billing
    - Invoice verification
    The problem I faced is what to do with PAL in IV? In fact, I have to process them as normal goods. It seems to IV has to be created on Goods receipt base, unfortunately SAP threats PAL as extra costs, not as goods
    Does anybody has faced with such scenario?
    Many thanks
    Valters
    To make live interesting, ICB stuff should be done via EDI

    You do not need to use EDI messages to get an inbound delivery created when a PGI is done on the outbound delivery.
    Search for the config on the SPED output type. This SPED output message can be triggered during the PGI which results in the creation of an inbound delivery in the receiving plant.
    The receiving plant will have to maintain the confirmation control key 0004 at item level in the purchasing document.
    Link to SAP help Automatic Creation of Inbound Delivery - Transfer and Inventory Management - SAP Library
    Refer SAP note 1119073 point 3 and note 965176
    Regards,

  • Intra company STO via delivery

    Hi,
    can someone pls explain when should one go for STO with delivery in case of Intra company stock transfers. pls explain the real practical situation when I shuould go thru the Delivery route instead of NO delivery.
    Thanks in advance.....

    Hi,
    Check out the link :
    http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b90dc43ad11d189410000e829fbbd/content.htm
    http://www.sap-img.com/sap-sd/configure-intercompany-stock-transport-order.htm
    Regards
    Anand

  • Delivery completed indicator for STO cannot be set!

    Dear colleagues,
    There are number of STO’s those goods issue quantity > quantity of goods received. Because of this delivery completed indicator cannot be set due to message “06 848 - Delivery completed indicator cannot be set for item XXXXX”.
    There is an OSS note (167795) that allows to set delivery completed indicator for such purchase orders. Even though our SAP release is 6.04, report RM06EV70 does not exist (yet BADI ME_ARCHIVE_ACTIVE is active) in the system and OSS note cannot be implemented.
    Any help would be appreciated.
    Regards,
    Melih
    PS. Please do not provide answers like “the goods receipt must be first posted via the entire goods issue quantity; then you can post a scrapping via the shortfall quantity” since there are backdated STO’s.

    Hi,
    Find STO created for which plant in t.code:ME23N and check MRP parameter maintained for that plant in t.code:OPPQ( also check entry of that plant in t.code: OMCD).
    Also cross check which Field Selection Key assigned to your STO PO document type and check “Delivery completed" indicator” available as Optional entry in GR/IR control segment in your Field Selection Key.
    SPRO - > MM - > Purchasing -> Define Screen Layout at Document Level
    Regards,
    Biju K

  • Default Values for Creation of STO's.

    Hello Experts:
    When I create STO's, I don't see any source of default values, like Delivery Tolerance, Confirmation control key, etc, that for a PO usually come from the Vendor or The Info Record.
    We have managed to add these values via BADI, but for STo's created from APO via Transportation load Builder, this Badi is no taking effect. (The Badi I used is and works fine when doing it online, in ME21N or via a BAPI.
    Do you have any experience on where (user exit, etc) to add logic for putting these default values in the STO's created by TLB.
    Thanks in advance

    Sorry the BADI used is ME_PROCESS_PO_CUST

  • Freight in STO

    Dear Experts
    Non valuated material is transferred to another plant via stock transfer order. We have used FRB1 condition in STO with FRE and FR1 keys.
    In this transaction we want to post freight cost to one of our expense account (GR/IR freight vend account) at the time of Goods issue. How to customized this assignment.
    Please guide.
    Thanx in advance
    Kailash

    Hi Kailash,
    Since material is non Valuated it is not required to mainatin the fright on PO itself.
    The batter would be to use SD-Transpotation (shipment costing) customization and accure the fright as per your requirement.
    you may check the below mentioned link, for any challange do write.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/d5/2285347860ea35e10000009b38f83b/frameset.htm
    Regards
    Sanjay

  • Goods Receipt w.r.t Outbound Delivery with HU-STO

    Hi All,
    We are doing STO Process with Handling Unit.
    When doing GR w.r.t outbound delivery, we select Via.Hand.Units and execute then we enter into it and select the HU and click and copy.Then item OK and Save.
    Upto here its fine.
    When i save the GR,it is giving the Inbound Delivery no. I want to know how this inbound delivery is generating in background when i save the GR.
    Kindly help me.
    With Regards
    Azeez.Mohd

    Hi Attila,
    Appreciate yor reply.
    The problem is that for one of my client it is generating the inbound delivery when we do GR w.r.t outbound delivery via HU.
    But when iam trying do the same scenario for other client it is not generating.
    I have maintained same config w.r.t that client even though i am unable to get the inbound delivery for GR w.r.t outbound delivery via HU.
    What might be the problem? where i need to check?
    Kindly help me.
    with regards
    Azeez.Mohd

  • STO from unrestricted to E stock from TAB item in Sales Order?

    Hi all,
    We have the situation where we are shipping stock intra-company via the STO Process. The requirements are being driven of a TAB item on the Sales Order, and the purchase req is being generated automatically, and being converted to STO > Delivery > Shipped then received at requesting plant.
    If we leave the Dependent Requirements Indicator on MRP4 in Material Master to blank the stock is shipped from the shipping plant as Sales Order stock and received into the requesting plant as Sales Order stock. If we change the Dependent Requirements Indicator on MRP4 in material Master to '2' then it trys to ship the stock as unrestricted, and the theory is that is should be received as Sales Order stock.
    Shipping as Unrestricted and receiving as Sales Order stock is exactly the scenario we are trying to achieve. 
    We initially ran into an issue with error message M7146. OSS Note 305582 describes this situation, and says we need to change the consumption posting on Account Assignment Catgegory M to be 'E - Accounting via Sales Order'.
    So we changed this, and now when we try and create the Sales Order we get an error message kd051 Maintain a Settlement Profile. We are told by our Finance people that we cannot use the Sales Order as a cost collector as it impacts the PA reporting, so I am wondering if anyone has any suggestions as to how we can resolve this issue.
    Many Thanks.

    Dear all,
    can u update me with the depot to depot process   ( like  there some  20 qty in 1300 depot   i wanted to transfer the  20 qty to 1200 depot)
    what is the process should be followed   
    i am still  not getting the right way  
    please guide me    my process i am following is  :
    supplying plant
    Create a STO PO from receiving plant  T-code ME21n
    Create delivery with ref to STO PO   T-code VL10b
    Post goods issue     T-code VL02n
    Create Depot Excise invoice with  Reference to delivery document T-code J1IJ
    Create pro-forma invoice   T-code VF01
    Receving plant
    Goods receipt   (With out excise capture selection)  T-code MIGO
    Capture excise invoice at depot  (Enter challan qty and Excise baseAmount)  T-code J1IG
    Please guide me on this as it is critical

Maybe you are looking for

  • EA4500 Windows 7 cannot index files so files not seen by Windows Media Player

    I have setup a disk on the USB port of the EA4500 and have 4 folders.  One being music.  I want to access this folder via my Wireless laptop with Windows Media Player but I only get a handful of the 3000+ songs on the disk.  A hard wired PC can acces

  • Problems skipping on dvd player

    Hello, I made a movie with imovie &  burned 30+ dvds for clients and tested just the first few min of each, figuring they would be good to go. Turns out they ALL skip in the same spots 16+ min into the movie. Arggg! Why is this doing this and how can

  • Gapless playback information...? waht?

    Okay. Every single time I open iTunes, I get thing thing at the top saying that iTunes is "Determining Gapless Playback Information" for 4 songs that are not in my library. I know this for certain. How on Earth to do I stop this. It is quite annoying

  • Groups on CSS11150 causes routing to break

    I have a CSS setup using 4 interfaces. Interface E1 is connected to our public firewall. This is where the VIP's are for inbound load balancing. E2 is a Vlan with some FTP servers. E5 is a Vlan with some Web servers. E3 is connected to another firewa

  • PrinterSetupEx dialog in CRXI R2

    I recently moved a VB6 project from Crystal Reports 9 to 11.5. In version 9, the dialog presented by PrinterSetupEx allowed the user to select a printer and its paper size, source and orientation (and as the user changed printers, the valid paper siz