Stock in alternative unit
Hello,
Is there a way in SAP to maintain stock in alternative unit at plant level?
Would appreciate your input.
UV
no.
stockkeeping unit = base unit , and base unit is general level.
it is not possible that one plant uses KG while the other uses LB.
Of course you can have an alternative unit LB for a KG managed material, and the other plant can enter the quantities in the alternative unit in MIGO, and they can display the quantity in alternative unit in MMBE. but at table level the stock in kept in base unit.
Similar Messages
-
Stock in alternative unit of measure
Hi experts,
I have problem regarding tools stock, I want to see stock of such material in alternative unit of measure in transaction MB52. Is there any settings for such option in MB52?
Regards,
Rakeshyou can see the stock in alternative unit in MMBE, for one material only.
SAP cannot expect that all materials listed with Mb52 are having same base unit and same alternative unit, only in this case it would make some sense, for all other cases it would just make trouble. So it is not provided. -
Sales Information System (SIS) Reporting- Alternative Units of Measure
Guys,
Does anyone know how can we view SIS Reports (either using Standard or Flexible Analysis) in Alternative Units of Measure? Currently, all the quantities (example Order Quantity) are displayed in Base Unit of Measure .
Thanks a LotHai john ,
If i copy the mc.1 to make -Z report in this how can i view the stock in alternative units as Kgs..But in master datas we maitained as BUM-Nos . For the same material master we are maitaining in additional datas as 1000 nos =40 kgs, if i take the report system will calculate the current stock with the AUM as kgs .for this pls suggest ie have 1000 nos stock if i choose AUM it should shows as 40 Kgs .How to make program for calculating formulas.PLs reply me asap
Thanks in advance
viswa -
Alternative units of measure in MB52 & MC.1
Hai,
Good Morning.I have an issue while checking the stock by using T-code MB52 or MC.1.Before that in material master they maintained basic unit as NOS but in additional datas also they maintain alternatine unit ie Kgs.Now thy are ordering in Kgs issuing in Nos .At the time of checking stock using MB52 or MC.1 here the system showing the stock in NOS .But they need in Kgs .Pls suggest me what kind of settings &datas to be maintained.
Onemore thing i need to share here they issuing the R/m in Nos .1 Nos =100gm,in this case every time or in next order the weight is varrying .but at the end of the month while taking a report they need exact stock in Kgs for this also pls suggest.
In MMBE is possible to view in different units of measure . By selecting in Extras ---Alternative units.
Thanks inadnance
visuHai john ,
If i copy the mc.1 to make -Z report in this how can i view the stock in alternative units as Kgs..But in master datas we maitained as BUM-Nos . For the same material master we are maitaining in additional datas as 1000 nos =40 kgs, if i take the report system will calculate the current stock with the AUM as kgs .for this pls suggest ie have 1000 nos stock if i choose AUM it should shows as 40 Kgs .How to make program for calculating formulas.PLs reply me asap
Thanks in advance
viswa -
Stock posting of Insp. lot in alternative unit of measure
Dear All,
I have a material whose Base unit of measure is Ton and alternative unit is PCS. There is an insp. lot of 10 Ton. Now i want to do its stock posting in PCS. So how can i do that.SAP Note 605861 - Provision of a BAdI for input help for quantities in UD
refer thread
Posting stock in Alternate Unit of Measurement -
Stock and Values in Alternative Unit of Measure
Dear Experts,
Can anybody suggest me any Standard Report for Stock and Value in Alternative Unit of Measure.
Regards,
vgl
Edited by: vglokam on Aug 16, 2010 8:56 AMHi,
you cannot take stock report with alternate UoM. Alternate UoM is for "ORDERING" purpose only and not for SKU.
Arul -
Creation of Inspection lot in Alternative Unit of measure
Dear Guru,
Our implementation is going on in a Tube manufacturing company where Base Unit is maintain in KG & 100 % visual inspection is taken place & we accept or reject tube on Pieces. So how can we do this in SAP, Because in SAP Inspection Lot is created on Base Unit & UD (Stock Movement) also in base unit, How can we in corporate Alternative Unit of measure.Hi,
1. give unit of conversion in MM basic data (Unit of measurement) say 1 kg = 10 pieces
2. add unit of issue as a Pieces in MM QM view
3. add in inspection paln Unit of measure as Pieces ( if possible )
Now during stock posting post the stock KG and now see in stock MMBE by changing the UOm as a pieces you will get the stock in pieces and you can now issue the material in pieces too.
Experts pl guide if i am wrong anywhere -
Alternative unit of measure in Product View
I'd like to know the mechanism of how to convert the qunatity between base unit and alternative unit in Product View.
Example:
[Assumption]
Material: MAT001, Base Unit=KG, Alternative Unit=PC(1PC = 10KG)
Planned OrderA: MAT001, Quantity=108(KG)
[Process]
1. Open the product view and check the quantity. Quantity of planned orderA is 108KG.
2. Change the unit from base unit(KG) to alternative unit(PC).
3. Check the quantity. Quantity is 11(PC)
On the other hand...
4. Open the Stock/Requirement list(MD04) in ECC and check the quantity. Quantity of planed orderA is 108KG.
5. Change the unit from base unit(KG) to alternative unit(PC).
6. Check the quantity. Quantity is 10.8(PC)
Why quantity of Product View is automatically round up?Hello Michel,
Thank you for the answer.
Could you let me know more detail about how to check the settings that you mentioned?
Which field of product master should I check?
I checked Units of Measure tab but I couldn't find the rounding-related field...
I also checked conversion setting of /CUNI transaction but settings of both ERP and APO were entirely same.
Do you have any other ideas?
Shohei -
Alternative Unit of Measure in QM
Hi
We have have a product that is managed in a base Unit of Measure (Kg) and also in an alternative UOM (Dozen), say 1Kg = 1Dozen. Please note 1 Dozen = 12 EA, so posting in possible as 5 EA / 6 EA as well
I have following requirements:
1) to post inspection stock in alternative UoM as well as sometimes in base UoM
2) to calculate sample size on the basis of Alternate UoM
Please tell me settings will be required to achieve the above requirements?Dear Chris,
Following are my views on issues you raised:
1) Posting inspection stock in alternate UOM, not phisible as you are only alowed to post the stock in which inspection lot is generated. Even inspection lot will be created based on base unit of masurement.
2) To calculate sample size on the basis of Alternate UoM : This is possible, while making quality plan (QP01) while defining the characteristics there is option of mentioning sample unit of measurement for each characteristics. Lot can be generated in KG's but you can do sampling in nos, its possible.
pl. revert.
Best Regards,
Shekhar -
Requirement in alternative unit of measure
Hi,
A material is maintained with EA as Base unit of measure and alternative unit of measure is maintained as 100m=1 EA. when MRP is run, the requirement appears in EA and not meteres. The issuing UOM is maintained as M in plant/storage view. Is there a way to have the uom for the requirement in the reservation to be in Meteres.
thanksDear
Please check in BOM, routing according to the same UOM.
And in Stock reqyuirement list MDO4 click on the Settings there u ll find the general settings under that tab u find the UOM
basuunit of measure and alternate unit of measre in that u ll find the list
With regards
Pushpalas -
GR IN ALTERNATIVE UNIT OF MEASURE
Dear Friends,
I want to know report for GR of production order in alternative unit of measure for a specific day.
Plz help me
Thanks
KKHi,
There is ni standard report in SAP for this.
As for the GR, this cannot be changed, you can disply stock in L or EA in many reports and transactions (MMBE and the physical inventory transactions can all be in either UOM for instance) but the main UOM for stock is the UOM defined on the issuing UOM on the plant / storage view of the material master. Or use MB51with movement type.
Or try report 'SAPMUNIT' from SE38
Regards,
R.Brahmankar -
RWBE and changing Alternative Units of Measure
Hi
I'm trying to use RWBE to view the stock holding of multiple materials. I want to change the base unit from Ea's to TON's for all the materials in the list however it seems that I can only do this one at a time for each material in the list. If I change the list display to the "Tree Structure" I get an ABAP dump when attempting to convert all the items at the same time.
Can this be done using RWBE or is there an alternative report which can be used.
Thanks in advance
FYI- MMBE is not an option since I need to view materials u201Cen massu201DHi,
To Check the available unit of measures or to create below gfiven the Path
SPRO->General Settings->Check Uuits of Measurements
Please check whether Alternative Unit of measure is maintaind.
Regards
Reward Points if useful -
Alternative units of measure are inconsistent; correct the values in SMW01
Hi,
when material replication process is happening we came across an error in SMW01.It shows
Alternative units of measure are inconsistent; correct the values
Message no. COM_PRODUCT_UNIT014
Consider the below example
we have maintained a material from KG to MM which is not a standard SAP conversion but client requires this conversion as
Tubes (Steel) are mainly ordered in M (Meters) but invoiced by the supplier in KG. Then used in production in KG again. In that case we need a conversion M <-> KG.
This is very common practice even in indirect material (e.g. Oil, you order barrels, tu vendor invoices KG and you handle Liters in your stock
can anyone guide me if there is any BADI or SAP note available for this error.
regards
subbuHi,
I have gone through that note it says that the corrections has to be done at BBPCRM component level but i have gone through the system component version i did not find CRM
so how can we apply the note?
regards
subbu -
PM - Working with Materials that have defined Alternative Unit of measure
Hello !!!
I have the following case:
the material XXXX000011 the base UOM is PCE (piece), and was defined as alternative UOM the MM (milimeters).
Now the user creates a PM order and set as component that material as Stock Item, the unit used was MM, he reqquested
100 MM.
Now here comes the issue, the reservation was created for 1 PCE... not for the 100 MM that is in the PM Order.
Why do this happened?
I hope the system will create a reservation by 100 MM not for 1 PCE.
Could any help me on this issue , question!! ??
Thanks in advance!!Hi,
It appears to be expected behaviour, the base unit will be used on the reservation.
You could possibly use exit COZF0002 to get different behaviour. You would have to change the quantity and unit back to the alternative UOM.
This exit only allows change of fields in structure EBAN_ORD_CUST. The relevant fields are not there but could be appended.
-Paul
Please use [Enterprise Asset Management (EAM)|Enterprise Asset Management (SAP EAM); forum for PM/CS specific topics -
No alternative unit of measure specified, during creation of sales order
Dear Experts,
when user is creating sales order, User is getting the error message no. MM108 "No alternative unit of measure specified" for particular material.
we have checked the alternative unit of measure it is already maintiained in the material master.
we have checked the OSS note : 117611 - Error message MM108 during goods receipt for order, but we couldn't get exact results for our issue.
can you provide the exact reason and solution to over come this please .
Thanks in advance.
Regards,
Suresh VeerepalliDear Experts,
The Base Unit of Measure (L) and Sales unit (PCE) ,The alternative unit of measure is maintianed in the material master as shown below.
X AUn Measuremt unit text Y BUn Measuremt unit text
1 L l <=> 1 L l
1.121 KG kg <=> 1.000 L l
1 PCE Piece <=> 1 L l
1 BDL Bundle <=> 12 L l
1 PAL Pallet <=> 720 L l
Error is gettting when creation of Sales Order ,Order is standard order.
When we double click on error message the following details are shown.
1.No alternative unit of measure specified
message no:MM108
2.Diagnosis:
This alternative unit of measure is missing.
3.System response :
The system cannot carry out conversion
4.Prodedure:
This is due to Program error that should not occur.
Please provide the exact solution on this issuse.
Thanks
Maybe you are looking for
-
Report:Setting the line-count in the output automatically
i want to set the line-count in the report automatically irrespective of screen resolution.could you please explain.
-
Hi all, Could any one suggest me how to apply changes on FAX coversheet through SAP SCRIPT? I need to change the existing Coverpage address to Japanese text. Please suggest some solution. Useful answers would be rewarded. Regards, Kalpana.
-
Hello! Is there any way to hook to Interactive Reports to: 1) do select of an option item in a widget filter (table header) from JavaScript and submit the report request (usefull when comming to an IR page from another page and want to "pre-filter").
-
Camera RAW Support 2.3 is available in Software Updates
It has been mentioned, but not in a separate post. It adds support for the: Nikon D90 Canon 50D Sony A900 Nikon CoolPix P6000 Message was edited by: Steven Hale
-
Advice needed about lens correction plugin's for Aperture 2.1
Please can I have some advice about lens correction plugin's for Aperture 2.1? I see that the Apple Aperture Downloads site promotes two: 1)LensFix 4.3 An external editor. The Aperture Downloads site calls it Lens Fix 4.3 but when you go the develope