Stock Of component scrap

Hi all,
I want the scrap stock of the component. After the confirmation of first operiation some components get scraped so i want to create stock of the scrped components
how can i do this in SAP
thanks
ramakant

Hi Ranakant,
Create a seperate storage location for the scrap materials and when you do the scrap confirmation from MB1A with movement type 551 then maintain this storage location in "to storage location filed".
Now you can check the stock in this storage location from MMBE transaction after scrap posting.
Any questions please inform.
Regards
TAJUDDIN

Similar Messages

  • Component scrap queries

    Hi all,
    We have maintained component scrap of 10% in the material master.
    So if we create 100 PCS of header production order, component qty is 110. 10 pcs of scrap generated is sold outside.
    There is a scrap material maintained in system. We want 10 pcs of that scrap generated should be in stock.
    How can we get the stock of component scrap when we run the production order cycle.
    Please reply.
    Ragards,
    S Sudhir.

    Dear
    To address this business process you need to maintain the Scrap in BOM with -ve quantity then that scraped we can move to scrap storage location with movement type 551.So that you will be able to sell this scrap seprately.
    Once you have entered scrap in CO11N material movements are automatically posted in the system. By confirming scrap you are only reducing the balance confirmable qty in the order.
    You can post component scrap as byproduct using 531 movement type if u want ot reuse the scrap. Further action is you have confirmed the scrap quantity now you need to post in some storage location either to order or to the GL account of the material. Both are possible from MB1C. Maintain some storage location and post the scrap.
    By doing scrap in CO11N, material qty will consume from stock but scrap material you can not see in any where.
    Normally in production no one can do scrap.
    And also in every company they want to calculate monthly scarp qty.
    To achieve the above doing component scrap it will not use.
    Follow this method to get rid of your problem.
    1. Confirm all the qty as yield qty in CO11N or CO15. ( ok + scrap)
    2.Create one separate str location for rejection.
    3.Physically you know the how much rejected qty. Move that qty from accepted str location to rejection str location by using MB1B 311 mvt.
    4. Now yield qty will reduce.
    5. Check in MB51 with mvt type 311 with corresponding period, you came to know how much quantities are rejected.
    6.By 551 mvt materials people scrap that rejected qty.
    7. In this no need to create any extra material for scrap.
    8. No need to change in BOM assigning negative qty.
    9.No need to create Byproduct.
    If you want separated cost of scrap then you need to define it is as co-product then it possible with joint production costing. Co Product, In turn you need to setup the percentage, of cost sharing.
    In case of Co-product costs are settled with a apportionment structure. In case of By-product the price of this by-product is credited to the order or the material stock account of the lead material being manufactured. Co-Product are defined as BOM Components/Items with negative quantities.When BOM is created for FERT , you can see one indicator in COMPONENT DETAILS screen for co-product. You need to define the co-products with this special indicator .
    Stock transfer from storage location to storage location (in the plant) is also possible.
    Hope this will be useful
    Regards
    JH

  • Automatic PR for non-stock BOM component for Subcontract PO

    Dear Guru,
    Can you any master please advice me on below question?
    We have a subcontract PO with the BOM component of non-stock, can i know if there is possible for those non-stock BOM component to generate a Purchase Requisition automatically, any existing configuration that we can do?
    Thank you very much,
    Regards
    Chee Wee

    Hi,
    You can use Material Type "NLAG" for Non-stock materials.
    Non stock materials cannot be stored, right, hence the name non-stock.
    Non-stock material includes materials that are not managed on an inventory basis (for example, small parts such as nails) though physically in stock.
    You can create a BOM which contains an NLAG item or directly use in Production order also.
    item Category "N" So system will create the purchase requisition when there is requirement.
    We receive the non stock material using movement type 101. upon receiving the material will be consumed.
    Please refer link below for better understanding.
    BOM explosion in MRP for non-stock material
    What  is use of  Item Category N(non-stock item) in BOM creation
    Believe this could help your queries. TQ
    rgds,
    nanthakumar

  • Difference between assembly scrap and component scrap

    Dear All,
    What is the use and difference between assembly and component scrap ?
    Regards

    Dear,
    Please go through this page, you will understand clearly
    http://wiki.sdn.sap.com/wiki/display/ERPLO/Scrap+Calculation
    if satisfied, plz close all your other open threads too. Thx

  • Report on component scrap

    Hi,
    Could you please suggest is there any standard SAP report to show component scrap usage or compare the BOM usage with the actual usage on the production orders?
    Thanks & Regards,
    Nataraj

    THis is a reply for the comparison of Bom usage with the actual usage in production order...
    I am understanding ur requirement as you need to see the required qty(BOm qty) vs actual qty( GI qty) in a production order..
    Go to COOIS, select components from the list.. give plant and execute...
    you can add the fields reuired qty..(total)..
    karthick

  • Mass change in component Scrap % in BOM

    Hi Guru,
    Can someone explain me the process of mass change in component scrap % in BOM ? I have to make zero coponent scrap % in BOM for all materials.

    Dear Vikash,
    Check with t-code CEWB
    for this you need to define work area in OP77
    Regards
    Madhu

  • Component scrap at material level

    Hello,
    We have some packing materials for which the component scrap % is always the same, wathever the line or the process. Today this value is maintained in the BOMs, as recommended.
    For theses material, in case of a change of this value, we have to update all the BOMs, more than 350 for instance for the need we have know. As far as we know, there is no standard transaction to update this value in mass (CS20 don't provide this).
    My question is the following: in such cases, wouldn't it make more sense to maintain the component scrap % directly in the MRP4 view of Material MD, and to delete (or replace) the value in the BOMs?
    If yes, then can you ensure that it doesn't affect the costing process, more precisely that the scrap % will always be taken into account by the costing run, even if maintained at material lelvel?
    If not, do you know about a transaction to update the component scrap in the BOMs?
    Thanks a lot for your help!

    Hi JJ,
    Question 1 what is LSMW?
    LSMW(Legacy System Migration Workbench) is the Tcode for uploading/editing master data which are of small size,if huge data then master data are uploaded using BDC
    Question 2
    if there are discrepancy on MRP4 and BOM scrap % system will take the BOM value rather than MRP4?
    Yes system will first search whether any scrap % value is maintained in BOM,if yes it will consider only this else the one maintained in MRP 4 view of the material master-you can check it
    Question 3
    can this plan of mine be precise if we run costing that the scrap % declare in MRP4 material master will be taken into account, even if it is maintained at material master?
    Yes if you delete the value maintained in BOM ,then it will take value from the material master & hopefully it should not cause any problem in cost calculation as it will pick from here(MRP4)
    Revert if you have further query
    Reward points if useful
    Regards,
    SVP

  • The stock of component item cannot be negative

    I'm having this strange problem with a number of work orders.  I issue all of the components.  All of them.  If I bring up the issue window again, it's empty.  I try to release and it gives the above error.  I don't get it, if there wasn't enough stock of component items then why did it let me issue them in the first place?
    Thanks!

    "Inventory or stock is a moving concept."
    Yes, I understand that.  But when I do an "Issue Components", when I hit ok on that screen, from my understanding, the components required to create the item are removed from inventory at that moment.  If I dont' have enough, it tells me and won't let me complete the Issue.  But it did.  So at the moment I issued, all component items were in inventory and were removed.
    Now I go to Report Completion, seconds later and it tells me there's not enough of something in inventory.  How can that be when I just issued ALL of the components?  And if I try to re-issue, there's nothing there to issue.
    So maybe I have the above mis-understood.  I look at the order and there's an item in there, Base Qty is 8, required Qty is 16 (2 items are being constructed) Issued quantity is 0, Available is -636.  How do I re-issue these sub-components?  The issue screen is blank. 
    Why did it let me "Issue" these components if they weren't in stock in the first place?
    Thanks

  • Customer Material Stock Summary Component vise & Customer Vise.

    Dear friends,
    plz give a report name where we can see material as.Customer Material Stock Summary Component vise & Customer Vise.
    thanks
    zara

    hi G. Lakshmipathi,
    thanks for your valuable reply. and need again help. plz see my new requirement and suggest the solution.
    thanks
    zara

  • Indicator to include component scrap in the details screen of MFBF tcode

    Hi ,
    There is an indicator in the 'Details' screen of MFBF transaction to "Include Component scrap".
    User has to select this indicator everytime he wants to include the component scrap or is there a way to save this setting ?
    If it is defaulted from some config settings ..please let me know where it is maintained.
    Your inputs would be highly appreciated.
    Regards,
    Sastry

    Sastry,
    You need to Implement the solution provided in OSS Notes#361630 for your requirement.
    Regards,
    Prasobh

  • Repetitive Component Scrap for MTS scenario using MFBF transaction

    Hi,
    We are trying to replicate the functionality of posting a backflush document to process Repetitive material component Scrap for MTS scenario with BOM explosion using MFBF transaction into a custom RF program.
    We tried to use 'BAPI_REPMANCONF1_CREATE_MTS' to backflush the Scrap for the above scenario. But it did not help. And no other BAPI's exist. BDC'ing the transaction doesn't help as it contains Table Controls and lot of subscreens an dit is highly volatile for a RF screen.
    In view of above restrictions, we are not able to find a solution of how to implement the above functionailty in a RF program.
    Can someone please help us in this regard.
    Thanks.

    Any Body plz ? .. Even I need this.

  • Component Scrap in CS15

    Hi everybody
    in CS15 output screen, we can find out component scrap. If there are same component in one BOM, SAP only display one data of componets. meanwhile I cann't find out any role. everybody can explain?
    Regards
    Henry

    Hi,
    In CS15, when you enter material & execute on next screen where you enter Plant, usage etc. on top right side you will find output tab under which you have check box of Variable List.So tick that so check box so another field of Display will appear in that you choose required display profile which suits your need.
    Further what do you mean by role in CS15. I dont think any role etc is contained in it.It is just exploration of the particular material which is used in which BOMs.
    Hope this helps.
    Regards,
    Tejas

  • Component scrap and post material for production

    Hi guys,
    If we maintain component scrap in material master data. e.g.:10%. when we need 1000pcs "A", we will buy 1100pcs.
    But, when we post "A" for production, we only want post 1000pcs.
    Is there some method to achieve this?
    Thanks
    Dan

    Hi Dan,
    Create another material say " X "  assign this material in the Bom as component also by-product .In this way you can post
    1000 for production and  100 pcs under by -product during confirmation .
    jayavimal

  • Component scrap in material costing

    Hi all,
    my question concerns component scrap (or scrap in general) in material costing (only in cost estimate). in the bill of material (BOM) we maintain the field component scrap.
    e.g.  we use 100 pieces according BOM and component scrap is added with 10% --> then 110 pieces are calculated. This is SAP standard and works so far!
    Is it possible to avoid or disable this function. This would mean that in my example only 100 pieces are calculated despite the filed component scrap (10%) is maintained??
    are there any user exits or Business Add In's?
    Thanks in advance!

    Hi
    Similar post was there in forum a couple of weeks back.. you can search itfor more details
    The answer to your question is NO... thats not possible.. you either maintain 2 BOMs - one for costing (w/o scrap) and one for production with scrap
    You link the costing BOM with your qty determination structure in costing variant so that costing BOM is considered for costing
    But it is cumbersome.. Every time one updates the production BOM, they have to manually go and update the costing BOM as well
    Ajay M

  • Component Scrap % in a BOM

    In t-code CS03, I see a field called Component Scrap % under the Item screen (when I select an item).
    Techncal help shows the field in Structure RC29P-AUSCH.
    What DB table and field holds the value that I see on-screen?

    The following tables come up when you do a where-used on the data element for this field. Maybe one of them?
    MARC                             Plant Data for Material
    MARC_TMP                         File for Incorrect Data in Direct Input
    MDIP                             Material: MRP Profiles (Field Contents)
    MDSM                             Simulative dependent requirements
    MVRC                             Cross-version fields for MARC
    RESB                             Reservation/dependent requirements
    STPO                             BOM item
    VSRESB_CN                        Version: Reservation/Dependent requirements

Maybe you are looking for

  • How do i remove the restore session button/feature on start up

    I just installed FF4. there is a "Restore Previous Session" feature on my start up page. How do I get rid of this? There are other users on the PC and this presents security issues. I'm using Windows 7 on a laptop.

  • Error text missing in  raising exception (In ABAP mapping)

    Hi, iam using ABAP Mapping for 1 interface. Based on some condition  i am raising exception with error text. When i executed this in SXI_Mapping_test it's showing the Error text. But when i execute the interface directly error text is missing in the

  • Selection Screen Variant does not set Tab as active -

    Hi experts, I have a Z-report. The selection screen of this report has got 8 tabs and sub screens, for different type of reporting ( SO, PO, Invoice reporting etc). Now the issue is, if a user creates a variant for the report with one particular tab

  • Document flow query

    Hi, This query is regarding document flow updating: If we observe Update document flow check is only available in VTLA-ITEM, but it is not available in none of copy controls. My doubt is how delivery to invoice is updating in doc.flow, How Sales orde

  • Is there a way to restrict ability to update iOS?