Stock report as per BOM level component
Hi All,
Is there any report for stock materials in sap which will give stock as per BOM component. Requirement is like if header material is A which is having component X, Y and Z, if i want to know what is the stock level of all this items as per mention in BOM.
Regards,
Rajesh
Hi Rajesh,
If you check your FG in MD04 there's a button on the left, under the menu (I'm not before SAP I don't know its exact name). If you push that button you can get e tree-structure of the components and clicking on the components you can get their stock/requirement list. You can check them one-by-one...
As per my knowledge there's no BOM-component specific stock report that would display the stock level of all the components. Maybe this kind of stock report wouldn't be very useful because stock level itself doesn't give a full picture of the planning situation / availabilty of your component.
I mean you should know the whole planning situation of your component and it's very likely that stock level itself is not enough - you may have orders, reservations, etc for your goods and these MRP elements have an effect on material availabilty...
Additionally, you may have components that build not only into one BOM but into several ones...
Please try to use MD04 (there's a collective display tab as I remember).
But if you adhere to our idea, you can get the components e.g. via transaction CS12 and after ctrl+c you can insert them in MB52's apropriate selection field...or you can create an own query but my advice is to please check whether MRP-transactions are good for you.
BR
Csaba
Similar Messages
-
Profitability Reporting at Package (BOM) level
How do other companies address this issue:
We sell product solutions (packages) consisting of one or more components and for logistics purposes need to process at component level in sales order, delivery, material doc etc. However from a finance, marketing and customer perspective the product being sold is the sum of the components and so we want to measure profitability at this level. However costs get posted to FI accounting documents at component level whilst revenue is posted at BOM level. The package is entered as a BOM in the sales order and are normally fixed components e.g. as below:
Revenue Cost
Package: DT100 2000
Component: A100 100
B200 50
C300 50
Profit= 2000-(1005050) = 1800
Ideally I need to get a posting that shows the related product package for the component cost otherwise I have to do clever reporting to look back to original sales documents to find related product package to link component costs to. Does CO-PA assist here or can I just do it in FI accounting in some way. I also considered using the product hierarchy i.e. the product hierarchy for both component (cost) and product package (revenue) is the product hierarchy for the product package.
Much appreciate any insights.
Happy Xmas and best wishes for New YearHave u defined item description in foreign langauge in item master data ?
Edited by: Jeyakanthan A on Jun 18, 2009 12:50 PM -
Opening and closing Stock report at Storage location level- date wise
Dear all
Is there any standard report to view opening and closing stock at storage location level? ( we have MB5B which resets the entry screen if we enter SLOC details).
Thanks
SamDo I have the option of selecting Storage Location wise opening and closing stock on a particular date or period, that is what I have requested? Is it possible, evenafter selecting storageloc/batch stock and entering all the SLOCs in the selection creen, the report output does not contain any SLOC, and using ctrl+F8 or display variant does not have SLOC as a field also.
pls gudie
sam -
Hai SAP Guis
Can u provide me the T code to take the report for all stock quantities not only the unrestricted use which can be easily exportted to Excel , my client version is 4.5B.If std is not not available please guide me in the querry route .
ThanxHI,
Use MB52,In the bottom select NON hierarchical display.After executing change the layout according to ur requirement & save the layout.Then u can export to excel.
murugan
Edited by: Murugan mgl on Aug 5, 2009 10:36 AM -
Standard stock report for Stock Commitments
Hi gurus,
Is there any standard report available to see the Stock like Reserved qty,stock transfer,scheduled for delivery against each batch in a same transaction like MMBE.
In MMBE by selecting the Read Stock Commitments indicator we can get.
the constrain is here we can able to see against only one material.
if i goto MB52 i am not getting the above said stock type.
Expecting Your Valuable Suggestions!
Regards,
D.K.Vijaya BhaskarMMBE can be used as a report for individual material & MB5B is very useful Transaction Code as stock report for multiple material. It requires to be explored more & more, so that most of the stock report as per requirement is avialble.
Regards,
Rajesh Banka
Reward points if helpful. -
Sales order BOM with component price
Dear All,
In PP module is there any report sales order BOM with component price?
please help
regards,
Anwar Shaikh
SAP PP / QMHi Anwar,
Please see if the below link is helpful to your cause.
[Recalculate the price of the sales order;
Regards,
Abhay Kapase -
Dear Gurus,
Good Afternoon!!
My user' requirement is,
he wants a BOM wise stock report.
He will just enter the Header Item, Plant and the storage location,
and system should list all its sub-items with the stock available in that plant & the storage location.
PLease tell me if this is possible.
Thanks & RegardsHi,
As per my knowledge, don;t have std report for this requirement, but you can customise this, use below tables and let your ABAPer can develop own customised tcode
MAST, STKO, STAS, STPO - BOM table's
MARD, MBEW, MCHB - Stock tables
Regards,
Sankaran -
Dear Gurus,
Good Morning !!
My user' requirement is,
he wants a BOM wise stock report.
He will just enter the Header Item, Plant and the storage location,
and system should list all its sub-items with the stock available in that plant & the storage location.
PLease tell me if this is possible.
Thanks & Regardsyou may have to get a custom development done for this:
If I understand coreectly, there are two major steps in this:
1) Get the detailed BOM
To do this, you may use teh data from transatcion CS03(display material BOM), or from CS13 (Display summarized BOM) based on teh requirement. You may have to read table like MAST/STKO/STPO. For summarized BOM, you may use the function module CS_BOM_EXPL_MAT_V2
2) Get the available quantity
If your requiremnt is simple with the avialable qty, you may get the read the unrestrcited qty availble in tables MARC and MARD for quantities of a materila/ sub-items at the plant and storage locations level respoectively. If the requiremnts is to get more poslished available stock, you may use the std availability check concept (where we specify whether other stocks like quality check, in transit, etc need to be considered, or not). In this case function module AVAILABILITY_CHECK may be used and teh paranmter may be material, plant, Checking rule, etc.
Hope it helps. -
If a material reports to two higher level assemblies in the BOM /Is there a
Hi,
If a material reports to two higher level assemblies in the BOM would creates two planned orders for it. Each of the orders has a different date?
For example
Z is final assembly
In that Y is one assembly in that says X1material in level 2
And the again same material X1 is reporting to Y in levels 5 so here my question is it would create two planned order with different dates?
And
Is there any report to see confirmed time to say machine time / labor time or shall we go for report.
Thx....SriniSrini,
CS15 can be usefull to check the usage of component in assemblies.
if its used then more then once it can be easily located through this report.
another concern what you expressed is not clear.
But what i understand is same component is used at level 2 and level 4 of a BOM.
assumption from the word levels is , X is used in level 2 its used directly in BOM of Y and Y have some differnt component G which inturn again have X in it .
so at both this levels if the dependent requirement is different, you can get 2 differnet orders use individual /collective indicvator for this material as individual .
If your concern is for BOM position (Item Number) field in BOM then system will create a single plan order even if you set it for individual requirement in material master.here some work around can be possible by maintaining lead time offset IN BOM in item detail screen.
check and come back
Hope it helps you
Regards
Ritesh -
Stock report in BW (valuated stock and Storage Location level)
Dear All,
Regards.We got an situation here,
Case 1: R3 (MB5B) (Both "Storage loc" and "Valuated stock" shows the same Stock Qty)
1).The BW Stock Report shows values the Correct Values for "Receipt Qty" and "Issue Qty" with the Correct "Quantity total Stock" aswell.
Case 2 : R3 (MB5B) (Stock is different between "Storage Loc" and "Valuated Stock")
1).The BW Stock Report shows the "Quantity Total Stock according to VALUATED STOCK Level(MB5B),but the "Receipt Qty" and "Issue Qty" according to STORAGE LOCATION Level(MB5B) .
We followed the "How to Handle Inventory "Doc with the proper sequence of Loading of Infosources and Compression.The data is sitting fine at the cube level.
It would be great if someone can throw some Light on this issue,on how the Query shows a COMBO of both Valuated stock and Storage Location stock....Held up with this issue for quite sometime..Had a look at the Oss Note (589024)...........
Manythanks
ArunHI,
In Inventory we have two quantity fields given to satisfy the requirement.
Valuated stock Qty - 0VALSTCKQTY
Storage Location qty - 0TOTALSTCK
You can make use of them based on your requirement. Hope this helps for you.
Thanks,
Arun -
Reconciliation fo stock report at stock type level
Hi gurus,
I want to compare the stock quantities in a stock report with ECC when I drill down the report at Stock type level. I have tried to do it through MB5B but I found it not appropriate as the stock type calculation in BW as based on some LIS logic. also I found it is not always same as in MB5B.
Please suggest me how can I cpmpare the data at stock type in ECC.
thanks in advance
Regards,
JitendraHi,
Use 2LIS_03_BX, 2LIS_03_BF, 2LIS_03_UM to 0IC_C03 Cube and design the report.
Use :
0VALSTCKVAL " for Value
0VALSTCKQTY " for Qty
0CALMONTH " for Month
Use the above combinations in New Selections in columns and go it.
For Qty Opening:
New Selection bad drag abd drop following things
0VALSTCKQTY " for Qty
0CALMONTH " for Month and restrict with less then or equalto option variable (single value, user input) and set the offeset
value = -1 bcoz if user will give 12.2009 , so it will display 11.2009 closing stock, this is opening for 12.2009.
For Qty Closing:
New Selection bad drag abd drop following things
0VALSTCKQTY " for Qty
0CALMONTH " for Month and restrict with less then or equalto option variable (single value, user input) .
In the same way build for Value and other Keyfigures on 0IC_C03.
And
Drag & drop
0MATERAIL
0PLANT " Give some Input Variable.
Reconcile BW Vs ECC MB5B
In ECC goto MB5B and give Material and Plant and Date Range corrctly , select radio button Valuated Stock an dexecute and check teh Opening/Closing Stock for that month.
Once you design your report like above then you can check in ECC in MB5B
See the steps.
Treatment of historical full loads with Inventory cube
Setting up material movement/inventory with limit locking time
If it is BI 7 then for BX in in DTP in Extraction Tab you need to select Extacrion mode = NON-Cumulative option.
Thanks
Reddy -
Report on QI, Blocked, Returned Stocks at Plant & Storage location level
Hi,
Would like to know any reports which gives QI, Blocked, Returned stocks at Plant & Storage location level.
Regards,
Vengathi,
What do you exactly mean say by "Returned stock"..
Also go through by MMBE tcode ...
Regards
Priyanka.P -
Subcontracting multiple BoM levels for Project Stock
Hi,
We are an engineer / make-to-order manufacturer, so we use a lot of "individual" type materials (instead of collective). We are trying to subcontract several BoM levels of work to different vendors, and we are seeing many false requirements.
So we have something like this (this is all in project / wbs element stock):
Make hereSubcontract Requisition
Make hereRaw material
Subcontract Purchase OrderMake here
Raw material
Raw material
Make hereRaw material
The subcontracting items are driving additional false MRP requirements (planned orders and purchase requisitions) for all the raw materials under them.
I figured out how to fix the subcontract on level 3 by transferring the HALB material from project stock to unrestricted stock (411Q), then transferring it to subcontract stock (541) (Is there a better way to do this? Now I can't see my project-specific stock line for that item). But, while that purchase order is still open, there's nothing I can transfer to make the extra, false requirements disappear. Also, I am getting an MRP exception telling me to cancel the PO because it doesn't see the dependent requirement for the subcontract requisition above it.
Does this question make sense? How can we fix it? I need to get that subcontract requisition to see that its material will come from the subcontract purchase order.
Thanks!
TimothyHi All,
Any thoughts or ideas?
Thanks very much,
Timothy -
Dear all ,
I have a bOm for FG containing 45 components , can i check the stock at all BOM levels in SAP ?
Creating Varient and getting stock in MB52 is ok but every time for new assembly i can not create varient .
Whr can i get Stock at BOM level ?
Regardshi
i don't think so we have this option,
better way is go with your idea
-ashok -
Requirement date for 3 level Component in BOM
Iam having Multilevel Sales order bom
Header material requirement date and receipt date given by system is 23.04.2009
first level assembly requirement date and receipt date given by system is is 07.04.2009
second level assembly is phantom
Third level componant requirement date is 31.03.2009 and receipt date given by system is 19 June 2009 .
Gr proceesing time of 2 days is maintained and no planned delivery time is maintained.
Why Third level componant receipt date given by system is 19 June 2009 ?
Edited by: mayuresh bhurke on Jan 19, 2009 6:31 PMMayuresh,
It seems the 3rd level component has a long planned delivery time in material master. Hence the system has pushed the receipt date forward to 19 June 2009 from 31.03.2009. Please check material master time for the 3rd level component.
Hope this helps.
Thanks,
Ram
Maybe you are looking for
-
Debugging Synchronization Problem - How to read PtTrace.log / tif.log?
I believe the following is the portion of the PtTrace.log log giving a clue to why I'm receiving a "Connector Specific" error during synchronization. I've also included the tif.log as KB15294 told me to create these logs, but not how to read and solv
-
Having trouble making the converted pdf to word file work properly under word commands and formatting that have worked for me well in the past. Please help.
-
Adobe Bridge is corrupting my files. What do I do???
I have the Adobe Cloud, so use Adobe CS6 Bridge. In the last 2 days I have run 2 Batch Renames (I've done this multiple times on the same software, same computer) on nikon raw files (NEF). There have been about 200 files in each batch. When the renam
-
Help needed to create a Procedure
Can anyone help me with a small procedure I have to write? Requirement to create Stored Procedure : 1. Create tables A1 A2 B1 B2 ----------- this is done------ Fill the data in those tables ------------this is also done---- Creat
-
The applet is not showing image on applet when running through following url. Remember It runs by simple applet tag in html but not through <jsp:plugin tag in jsp file. the following two links for same inker.jar file. not ok not running=====>"http://