Stock transfer between locations involving two different excise duty

Hi,
While doing delivery confirmation under O4H1 transaction, I'm facing below error:
E OB 048
ED status from valuation type does not match ED status handling type TA UNTAX
I'm trying stock transfer between locations involving two different excise duty
statuses.
-Yati

>
YatiAnand wrote:
> Hi,
>
> While doing delivery confirmation under O4H1 transaction, I'm facing below error:
> E OB 048
> ED status from valuation type does not match ED status handling type TA UNTAX
>
> I'm trying stock transfer between locations involving two different excise duty
> statuses.
>
>
> -Yati
Hi Yati,
The Handling type on your STO and the Valuation type (valuation status) determined at discharge are differing.
SO your Handling type on STO seems to be a Taxed one and the valuation you are trying to discharge is UT.
Try using a handling type which is Untaxed but make sure its consistent with rest of the tables.

Similar Messages

  • Stock transfer between 2 projects of different plants.

    Hi All,
    We have two plants and each plant as multiple projects. Some time it is required to transfer stock between two project which are of different plants. Currently we are using MOVEMENT TYPE 415Q , where stock transfer is done using 4 steps. Our client is insisting to do it in SINGLE step.
    Please advice whether it is possible.
    Thanks,
    Vengal Rao.

    Thanks Venkat,
    For the quick reply, but here I think using 415Q in MB1B  it has more than one step, and our projects are in different plants, I mean both project are of different plants.
    Please clarify.
    Vengal Rao.

  • Billing in Stock Transfer between two plants of two different company codes

    Hi Friends,
    I am doing the scenario of stock transfer between two plants of different  company codes.
    I have some issues in Billing for this..
    What are the settings do i need to to for Pricing in SD point of view.
    Ex:
    Supplying         /         Receiving
    Com.Code:2000     /        CompanyCode:1000
    Plant:2100              /         Plant:1100
    SA:2000/10/00      /          SA:1000/10/00
    I created Customer 5555 w.r.t sales area of supplying company code (2000/10/00)
    I created Vendor  7777 and assigned Supplying Plant 2100 in add purchasing data.
    In IMG Settings:
    Define Shipping Data for Plants: In Receving Plant i assigned customer 5555 and sales area blank
                                                        In Supplying Plant i assigned customer blank and sales area as 2000/10/00
    Create Checking Rule: Standard(B SD Delivery)
    Define Checking Rule: Standard(Avallability-01assigned to checking rule B)
    Assign Delivery Type and Checking rule: Document type(NB)-Supplying Plant(2100)-Delivery Type(NLCC)-Checking Rule-(B)
    Assign Doc Type:Supplying Plant(2100)-Receving Plant(1100)-Doc type(NB)
    What are Pricing settings in SD i have to do?????????
    Process:
    ME21N->VL10B->VL02N(PGI)->VF01(IV)->MIGO->MIRO
    I have gone through many threads in Forum but confusion in Pricing Part..
    Some are mixing with the inter company sales proces..
    Pls guide me..
    With Regards

    Do the following steps for STO Customizing:-
    1. Create a customer master record for the issuing plant.
    2. Create a vendor master record for the issuing plant, and enter customer account number in the Customer field on the Control screen.
    3. Repeat steps 1 and 2 for the receiving plant.
    4. Assign the plants to the customer master record in Customizing for Materials Management (MM), by choosing Purchasing <Purchase Order < Set Up Stock Transport Order< Plants.
    The Process Flow would be as follows :-
    Create a stock transport order, following the standard procedure, and send the order to the issuing plant.
    Issuing plant has processes your order, and when it is ready to ship,the storeperson at the issuing plant issues the goods using a transfer posting. The excise clerk there creates an excise invoice.The excise supervisor verifies and posts the excise invoice.It then sends the goods to you, together with the excise invoice.
    Once the goods arrive, you follow the standard procedure for incoming excise invoices:
    The excise clerk captures the excise invoice, using the stock transport order as the reference document. The storeperson enters the goods receipt, again using the stock transport order as the reference document.Alternatively, you can first enter the goods receipt and then capture the excise invoice.
    The excise supervisor then posts the excise invoice.
    Best Regards,
    Ankur

  • Stock transfer between plants without STO and storage locations

    Hi.
    In case of stock transfer betwen storage locations with one step it is possible to do stock transfer between different stock types. But in Two step it is only possible to do stock transfer from unrestricted to unrestricted.
    In case of Stock transfer between Plants without STO in one and two step stock transfer, it is possible to do stock transfer  from unrestricted to unrestricted.
    Is there any reason for this?

    Hi
    Thanks for your reply. But i could not understand the sentence - But this is not possibles with 2 step procedure. becasue 2 step is recored will be maintained . In 2 step it not possible. Can you please eloborate on this
    Regards,
    Vivek Swarnapuri

  • Stock transfer between Excise Plant and Non Excise Plant

    Scenario : Stock is imported from say Singapore. One of the import duties can be claimed back as CVD and pass the benefit to customer.
    Requirement : Stock transfer between Excise Plant and Non Excise Plant
    Question : i) If I do stock transfer from Excise plant to non-excise plant, can I transfer the CVD amount which I captured in RG23A - Part1/Part 2?
    ii) If I do stock transfer from Non- Excise plant to Excise plant, can I get the benefit of CVD and pass on that benefit to customer?
    Pls let me know the possiblity of above two in SAP and Legally?
    thanks in advance
    Sridevi

    Ok! Thanks for the replies. Pls let me allow to elaborate the earlier requirement.
    Trading Goods say A gets imported to India. Issue was :
    1) We need to issue Excise invoice only to few customers. So, we thought of treating one batch as excise batch and remaining as non excise batch per day.
    2) Stock price varies every day being batch wise produced in say Singapore.
    Means Mateiral is A but price varies evey day and because of the duty payment also gets varied. For a single material master we do have different prices for each batch and also excise/non excise scenario. So, how can I get material value for each of this combinations in the system and how to identify the same.
    Because of the above reasons, we thought of having two plants. I can not configure depot here because cleint requires single plant for each state as of now.
    Am I clear? If not, pls let me know,
    regards
    Sridevi

  • Stock transfer between Plant/Storage location to Plant/Storage location

    Dear Experts,
    This is a MM component of SAP Retail.
    We have 4 brands ( Plants of type B, Plants of type C etc) that needs inventory from the same Distribution center (Plant A) for some common products. Here the direction is to prioritize the inventory per brand. The requirement is one brand should not take the inventory of the other brand.
    To overcome this problem , the solution proposed is to have different storage location for different brands in the same DC.
    When we run replenishment  planning for the brands and do a ATP check, the availability check should consider only the one issuing storage location in the DC which we allocated for the brand.
    I do see the following set up in SPRO and I have done the following.
    Step1: Activate Stock Transfer between Storage Locations
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations-> u2018Activate Stock transfer between storage locationsu2019
    Step2: Assign Delivery Type and checking rule according to storage
    SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations->Assign Delivery Type and Checking Rule According to Storage
    Step3: Define Shipping Data for Stock Transfer between Storage Locations
    SPRO ->Material Management ->Purchasing ->Purchase Order ->set up stock transport order ->set up stock transport order between storage locations -> Define Shipping Data for Stock Transfers between Storage Locations

    Step4: Define Rule for Determination off Shipping Point
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations -> Set-up Storage-Location u2013dependent shipping point determination->Define rule for determination of shipping point
    Step5: Shipping Point Assignment According to Storage Location
    SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations-> Set-up Storage-Location u2013dependent shipping point determination-> Assign Shipping Points According to Storage Location
    Question.No:1- After completing the above set up  in me21n, the issuing storage location field is greyed out. I am not able to enter any value here. Can you please help.
    Question.No:2
    I do see the following setting.
    Under IMG ---> Material Management ---> Purchasing --> Purchase Order --> Set up Stock Transport Order -->Business Add-In for Determination of Issuing Storage Location
    Display the IMPLEMENTATION
    Double click on the method GET_SUPPLYING_SL
    Click the Execute button
    Click the detail button on IF_EX_MD_EXT_SUP
    Execute GET_SUPPLYING_SL
    There is a prerequisite for this BADI .I have done those things.What i dont understand is where to force the combination of supplying site/issuing stor.loc/receiving site/receiving stor.loc
    Kindly provide your inputs.
    Thanks,
    Vasanthan

    Dear,
    Have You configure MRP in second plant (where you want to transport the Material).
    Please try with this and do again Po for stock transport.
    Regards
    Piyush Patel

  • Stock transfer between storage location in IS -Retail

    Hi,
    I want to have a Stock transfer order between two storage locations in the plant.
    I have activated the "Activate Stock Transfer Between Storage Locations", now i can create a STO and have the "Issuing SLoc" tab.
    Having that i get an error message "Not possible to determine shipping data for material XXX" Message no. 06280.
    I am trying to have the shipping data in customizing for set stock transfer  - "Define Shipping Data for Plants", but my site is not listed due to the use of IS Retail. Is there a way to configure it?
    Tnx
    Lior

    Hello Lior,
    in Retail your distribution center is a vendor and a customer, and your store is a customer. Therefore when you create master data for your distribution centre and store, you also create the vendor and customer masters that are required.
    By this link of the DC / Store to the customer master the shipping data is derived. I hope this answers your question.
    If you have further queries related to this, please do post them.
    Regards,
    Smitha

  • Stock Transfer between Storage Location with Order

    Dear MM experts, 
    I am into SAP SD.
    Our client wants to Transfer Stock from one Storage Location to another Storage Location of the same Plant. (This can be easily done thru MB1B via Transfer Posting)
    But the unique requirement here is they require some kind of Delivery Order or Tansfer Order to be created first & only based on that document user can transfer Stock between Storage Locations of a same Plant. (Similar to Inter-Plant Stock Transfer where we create Stock Transfer PO & then move goods between plants).
    Can you please suggest on how to achieve the above scenario.
    Thanks,
    Jignesh Mehta
    Mumbai

    hi
    Stock Transfer between Storage Locations
    u2022 Function of stock transport orders between storage locations is available from ECC 6.0 onwards.
    u2022 As a result of which user can input issuing storage location with supplying plant.
    u2022 Facility of using different delivery types for different issuing storage locations is available.
    u2022 Shipping Point data can also be determined based on the issuing storage location.
    refer following
    http://sapfunctional.com/MM/StockTransfer/Configure.htm
    http://help.sap.com/saphelp_scm41/helpdata/EN/23/29cf20eabe094e957763a46aa5be9d/content.htm
    regards
    kunal

  • GATP Stock transfer between two sublocations

    Hello,
    Is it possible to use Rules Based ATP to create an Stock Transfer between two sublocations in the same plant?
    The source sublocation (Storage Location) is assigned to a Storage Location MRP Area
    In the Rules we have defined a Location determination procedure that if it does not find ATP quantities in the main location it searches in the Storage Location MRP Area (Location Type 1077). The idea behind this rule is to treat the Storage Location MRP Area as a diferent location, but it does not works.
    I thank in advance for your kind cooperation.

    Hi Loknath / Verma,
    The STR  is between a Production Location an a MRP Area Location.
    I have created the rule, but no STR are created.  It does something very strange instead of what is expected.
    For example,
    I have 2 storage locations in PLANT1:
    - STL1 has 100 units of product 1
    - STL2 has 200 units of product 1. This SL is assigned to an MRP area
    In APO the No check on sublocation level  check is unchecked.
    I have cifed production location and the MRP area so two locations are created: one is  type 1001 and the other is type 1007.
    I have defined a Rule, so if there is not enough ATP cuantities in PLANT1 (Type 1001) it should search in the MRP Area (type 1007)
    If I have a sales order that asks for 150 units, rule is trigered.
    First thing that is very strange: when I see the Storage location substitution list, I cannot see the MRP Area. What I see is the production location.
    The other problem is when i look at the ATP quantities during ATO verification, they do not match with the ones I can see in RRP3.
    Anyway, I have taken a look at the link that Verma sent me, and I understand that if I use RBATP to create STR between storage locations, sub positions are created, and there is a requirement in our project that no subpositions should be created. So, even if I can make it work, I cannot used... Seems that I may investigate the problem in my spare time.
    Thanks a lot for your help.

  • Stock Transfer between 2 Storage locations

    Dear All
    I want to configure Stock Transfer between 2 Storage locations.
    I have activated the same in configuration but can anybody provoide complete details at to how the process happens.Is there any standard document type to be used like UB in case of stock tranasfer between plants,do we craete SD Delivery etc.
    Regards
    Vaibhav Mahajan
    Edited by: Csaba Szommer on Aug 22, 2011 12:56 PM

    Hi
    Stock Transfer between 2 Storage locations,there is no seperate configuration needed( like stock transport order b/w plants  doc type UB), just goto MIGO
    There are 2 options are there for Stock Transfer between 2 Storage locations
    1. one step procedure movement type 311(from unrestricted to unrestricted)
                                                                   323(from quality to quality)
                                                                   325(from blocked to blocked)
    2. Two step procedure movement type 313 and 315(only possible from unrestricted to unrestricted stock)
    During this transfer no accounting document will generate because you are transferrring the stock within the plant,
    Thanks

  • Intra-company stock transfer between two ERP Systems without SAP APO

    Hi,
    I'm looking for information regarding the scenario Intra-company stock transfer between two ERP Systems without SAP APO.
    On help.sap.com, I can only find below image, but I'm actually looking for the configuration settings required to implement it.
    Does anyone have experience with this scenario?
    Thanks & regards,
    Oliver

    Hi Jagdeep,
    Thanks for the reply. I understand that I need to use iDocs and setup communication between both systems. What I am actually looking for is detailed information on the setup of the purchase order type and sales order type. Especially because there is no invoicing involved in this flow.
    Regards,
    Oliver

  • Stock Transfer between plants two steps.

    DearAll,
                 We are using the scenario stock transfer between plants two steps.in the source plant we are issueing the goods  with on 303 movement in MIGO with Remove from storage option. in the receiving plant we are receiving the goods with refernce to 303 material document in MIGO with place in storage option.
              we are using the version SAP 4.7.
    my problem is at the time of goods receipt SAP is allowing to the posting date less than the source plant 303 document date. it should allow the posting date as Greater than equal to source plant document date at the time of GR.
    Any standard pracktise is there.
    for example  source plant 303 document date is 08.06.2009 wrongly i have entered the receiving plant 305 document posting date as 06.06.2009 it is allowing to post it is not throw any information. it should not allow to know.
    i want to control this. any standard controls is there. kindly help.
    Regards
    P.Anandhakumar
    Edited by: Anandhakumar Palanisamy on Jun 9, 2009 10:46 AM

    Except user exit , Is it possible any standard functionality.?
    why SAP not controlled this?.
    this is SAP bug or not?. kindly clarify..
    Regards
    P.Anandhakumar....

  • Stock transfer between the two manufacturing plants

    Dear Experts,
       I am doing the stock transfer between the 2 excisable plants
      1.First we will transfer the Semi finished material from one manufacturing plant to another manufacturing plants.
      2.After receiving the material in the receiving plant, they will convert SFG to FG.
      3.FG material will transfer to another non excisable plant.
    Is we need to pay the excise 2 times (1st time as a SFG material, 2nd time as a FG material)
    What is the exact procedure for this scenario.
    Regards,
    Narendra

    Respected Lakshmipathiji,
    i was little confused here...
    """Coming to your query, you need to levy tax on the selling price / assessabale value when sending the FG to non-excisable plant""""
    Tax means are you talking about sales tax?
    when we transfer the Finished goods from manufacturing plant to Non-manufacturing plant---Will it attracts Sales tax?
    Please throw some light here sir..
    Note to Narendra: this will be completely depends on your client--currently at my client they will transfer semi finished/Finished goods from one plant to another as sales cycle(attracts only excise values)--once after receival of stock--the receiving plant will raise PO to supply plant followed by MIGO and MIRO--there by the same excise values will be settled in MIRO settings(user will enter excise values manually in MIGO/MIRO to match the origin of stock transfer sales invoice)( i was not completely aware why they do so--may be need to get more clarity from my MM counterpart)
    Phanikumar

  • Stock Transfer Between two plants within same company code

    Hello,
    We are using scenario-'Stock transfer between two plants within same company code. Scenaro is like Plant A is receving plant and Plant B is delivering Plant.
    Plant A release PO for 100 nos to Plant B
    Plant B issues 100 nos (via delivery) to Plant A
    But Plant A receives only 50 nos physically so they do Goods receipt for 50 nos , but document got generated for 100 nos (when plant B issues material).
    Now Plant A do not want to receive remaining 50 nos physically, but wants to reduce material document which got created when goods issue posted by plant B
    Now stock in transis (mb5t) is 50 nos.
    How to reduce this material document. or any another alternative solution for this?
    Thanks,
    Shailesh

    Hi There
    Reversal of partial is not possible ,
    But you can use the Mov Type 557 and 558 to do the adjustments in Stock in transit qty
    Few more details on STO adjustments
    Hi There
    it can be settle in many ways,,,
    1. Receive the goods as 100 and Scrap the 50 nos from the received plant,,- If the receiving plant is responsible
    2.Revert the PGI/Transfer movement(Vl09) and send the 50 nos again from the supplying plant- of the Supplying plant is responsible,
    3.Also we have the movement type 557 and 558 without doing the above two steps you can correct the qty from stock in transit itself,,
    4. also you can check the below similar thread
    STO - material lost during tranfer from plant A to plant B
    5. If above are not ok, then receive the goods as 100, And raise the STO as your plant as supplying plant and receiving plant is (Supplied 50 nos less) plant,, Do the process without sending the material.. in this way that 50 nos can be adjusted,,
    6.Here is some more details
    557 Issue from stock in transit (adjustment posting)
    Only use this movement type (also the reversal movement type) under the following circumstances:
    Using movement type 557, you can correct purchase-order-independent stock in transit if
    - a good receipt cannot be posted to a purchase order without stock in transit, even though there is still stock in transit according to the purchase order history
    - stock in transit still exists, even though there are no open stock transfer orders for the particular material
    This movement type may ONLY be used in the cases mentioned above after careful analysis, to correct stock in transit that has rounding errors.
    This movement type may not be copied.
    Note!
    Before using this movement type, note the following:
    - 392205 Analysis stock in transit / Correction if split valuation
    Possible special stock indicators:
    E, Q
    7. As previous post says if you have the note for this issue you can use that also
    You can use any one of the way to solve the issue, Hope it helps
    Cheers
    Senthil P

  • Stock Transfer between 2 different instances of SAP

    Hi for all,
    I want to know if anyone has any documentation about how to do a Stock transfer between 2 different instances of SAP, the worst part that I think is how to see a plant from one SAP to another, any collaboration will be appreciate.
    Edited by: Ruy Osório de Freitas Neto on Mar 5, 2008 6:24 PM

    I still don't see the difference between what you are telling me and the material i handled to you....
    This material exactly describes the case where you have to wharehouse working in whatever ERP systems at the same time.
    The ALE configurations are only one step between them.
    The idoc types for purchasing are ORDERS, ORDRCHG,ORDRRSP, Quotes
    For LE are Desadv,Shpmnt
    Processo
    Entrar um movimento de mercadorias no sistema ERP.
    O sistema cria automaticamente um recebimento ou uma entrega com base nesse movimento de mercadorias.
    O sistema transfere o recebimento por meio da BAPI InboundDelivery.SaveReplica (a entrega, por meio da BAPI OutboundDelivery.SaveReplica) do sistema ERP para o SAD, onde representa uma solicitação ao depósito para armazenar ou retirar mercadorias.
    No sistema descentralizado, uma ordem de transferência no depósito é criada para a entrega ou para o recebimento, respectivamente.
    Executar a entrega/recebimento físico(a) das mercadorias.
    Confirmar a ordem de transferência no depósito.
    Após a confirmação da ordem de transferência no depósito, é lançada a entrada de mercadorias para o recebimento (ou saída de mercadorias para a entrega). Isso libera a posição intermediária.
    Essa atividade inicia a confirmação para o sistema ERP por meio da BAPI InboundDelivery.ConfirmDecentral para o recebimento e por meio da BAPI OutboundDelivery.ConfirmDecentral para a entrega.
    O lançamento da entrada ou saída de mercadorias no sistema ERP ocorre automaticamente quando a confirmação é registrada no sistema.
    Quando a entrada ou saída de mercadorias é lançada no sistema ERP, a transferência de estoque é lançada simultaneamente na Administração de Estoques.

Maybe you are looking for

  • SRM MDM Installation error  :MDM Console Install.exe-Bad Image

    Hi, I have installed SRM 5.5 and need to install SRM MDM, but when i am trying to execute MDMConsole Install from GUI _CLIENTS folder getting below error. :MDM Console Install.exe-Bad Image The application or DLL C :\windows\~GLC0000.TMP is not a val

  • Query on SAP Business One..

    Hi Experts, I would like to know if we can set up SAP B1 on the client side project wise.This client is working in number of  projects at the same time.. For each  project this client wants to have all the information as well as access to it independ

  • BADI for Address Check in PA30 in ECC6.0

    Hi Friends, Is there any BADI for Address Check in PA30 in ECC6.0 similar to what we have in BP transaction in ECC6.0. Thanks, Pradeep

  • 2008 macbook pro is running very slow.

    Even simple things like trying to change a font in excel cause the spinning wheel to display before the font selection becomes visible. Any suggestions to resolve this?  I have over 40gb of storage available and 4gb of memory.

  • HT4848 can I create a cd or dvd for recovery disk?

    How i can create a dvd/cd recovery disk instead usb?