Stock transfer in quality certificate

Hi all,
  I have one question i have activated indicator stock transfer indicator " transfer posting and stock transfer order "
    I am transferinfg one batch from one plant A ( company codex) to another plant  B ( company code Y)
      Now the question is weather sysytem will consider this batch inspection data which in plant A while printing certificate for the from plant B
                   I know in case of stock transfer in same  company code it is possible but not 100 % confirm in case stock transfer within two different company codes
ASD

It depends on the set up of your COA profile.  If you have results coming from the inspection lot and you do not specify an inspection type in the COA profile header, then yes..it will.
If you specified an 04 lot in the profile, then no, since the stock transfer lot should be an 08 inspection lot.
Cert profiles are not plant specific so you can't specify an 08 inspection type.  Otherwise some shipments in plant A will fail to get a COA since it is possible that no 08 inspection lot will exist.
Craig

Similar Messages

  • IDOC - message type WMMBXY(Stock transfer from quality to unrestricted)

    Hi Gurus,
    I have IDOC problem.
    Inbound message type WMMBXY(Stock transfer from quality to unrestricted), The status if I check in WM02 of Doc is "51-Application document not posted"
    Error Message ""Required function
    MB_CREATE_GOODS_MOVEMENT is not being processed".
    Please Help.
    Prashant

    Hi
    The Idoc whcile Posting using Message type WMMBXY calls the Function module L_IDOC_INPUT_WMMBXY & in turn this calls the function module MB_CREATE_GOODS_MOVEMENT.
    This function is not getting executed.
    Please check if the Movemnt type used is not active for WM movemnts.
    If you have used previously this movemnt type & now it is not working. Please take hlep of ABAPer  for debugging & finding the Root cause
    Thanks & Regards
    Kishore

  • Stock Transfer to quality without Inspection lot creation

    Hi,
    I want to do stock transfer from unrestricted stock of Plant A to quality stock of Plant B. However I don't want inspection lot to be created.
    Is this possible?
    I am using Movement type 301 and Inspection Lot of type 08 is active in Material Master.
    If I deactivate QM for movement type, can I post to quality without inspection lot creation.
    Thanks

    Do you have any inspection type setup for material in plant B? If yes then you would be not able to transfer stock in QI without creating an inspection lot. If inspection type is active in material master of plant B(destination) then system would through you error message saying - "transfer stock in QM only". The reason is you would not have an option to move stock from QI using 321 (QI to UNR) in plant B if QM is active. 321 managed by an insp lot.
    If inspection type is not setup in material master at plant B then you would be able to post stock in QI without creating an inspection lot. Then move stock from QI to UNR using 321 (MB1B).
    Hope this clarify you.

  • Stock transfer under quality type

    Hi,
    A material u2018X1u2019 was purchased six month before from external vendor.    At the time of procurement quality parameter was checked and material was transferred to unrestricted type. Now we want to sale or stock transfer of this raw material to other plant. Corresponding stock transfer order has been prepared.  Receiving plant want, after MIGO material status will be u201Cquality type u201C.  So that quality parameter further is re-checked.
    Please explain step by step standard configuration.
    Thanks & regards,
    Amit Biswas

    Hi Amit,
    You can carry out inspection at receiving plant. Letu2019s assume A is supplying plant and B is receiving plant.
    It does depend upon which movement type you use for inwarding the material in B plant.
    1.     If you are doing one step transfer by 301 movement, then activate inspection type 08 in material master of B plant
    2.     If you are inwarding by 101 movement, then activate inspection type 01 in material master of B plant
    Regards,
    Anand Rao
    Edited by: Anand Rao on Aug 23, 2011 2:14 PM

  • Incoming Certificate Request for Stock Transfer(inspection type 08)

    Hi Everybody,
    The system asks for incoming certificates when a material is received from external vendor(Inspection Type 01).
    Can we configure the QM system such that system requests incoming certificate for material coming via Stock Transfer(Inspection Type 08) also ? If yes, please give details regarding how to do it.
    Regards,
    Manish.

    Talk to your purchasing guru.  Stock transports can also be set up to look like incoming 01 inspections.  I believe it has to do with the delivery type that is assigned to the order type.  Using a different delivery type wiht the order, the system will treat it as an external vendor's delivery and will create 01 inspection lots instead of 08. 
    It MIGHT also ask for the certificate.  I won't swear to that as it was stated by the previous poster, this is controlled by the control key and that is usually linked to the purchase orders.  I have known some places to use purchase orders for replenishment supply from other plants.
    Craig

  • No Quality Inspection for Stock Transfer

    Hi,
    There is a scenario now in which a material is activated for quality inspection. This same material is also used for Stock transfer from other plant with same company.
    So if material if received using STO, how can I deactivate Quality Inspection and just transfer to unrestricted use.
    Thank You,
    Raymond

    Hi
    check user exit.
    QAAT0001 Inspection type determination different from variant 01
    You can install enhancement QAAT0001 ,the function modules contained in this enhancement are called up in the
    programs in which you can access the master inspection type if necessary.
    The inspection lot is then created with the inspection type that was
    determined using the enhancement.
    logic will be for STO it will consider Z mvt type of origin 08 ,for STO material activate a Z mvt type & do not tick on Post to inspection.
    For normal stock trnsfer system will create 08.
    I hope this will add some value
    Regards'
    Sujit

  • Quality pending Stock transfer from plant to depot

    Hi all,
    Is it possible to send the quality pending stocks from plant to the depot ?
    Quality clearance for the finished goods in our process would take 2 days. So the client wants to do a stock transfer of this quality pending stock to the depot to save time. If the quality results are successful, the stocks in depot need to be changed to unrestricted status else these stocks need to be transferred back to the plant.

    Ref Option 1 - Not sure why you think you need to enter results twice.  You enter the results for the ones you complete in the first day/hrs....whatever... make the UD.  
    You go in an enter the long term characteristics later.  There is no double entry.  You don't renter the earlier test results.
    Ref Option 3 - You don't need QM in your depots.  The type 10 delivery inspection is created in the plant shipping the materials.
    Ref Option 2 -  In option 2 you would have your regular inspection lot created.  But someone would go in and post the stock to unrestricted stock with restricted batch status.  Not sure what else you want me to elaborate on.   When results are completed, they can go on and make the UD to unrestricted stock, unrestricted batch status.  In the meantime the STO can be created, picked and shipped with the batch in restricited status.  In can be received and unloaded and is posted with restricted batch status.  When the UD is made and the batch status changed, the material at the depot will automatically show up in unrrestricted stock and be available for sale.  One caution.  The batch status affects the ENTIRE batch quantity. So if you for instance you use the same batch number for receiving qty's against the same or different orders, (for the same material), then you'll have multiple inspection lots.  Once one lot chagnes the batch status, it is changed for all the qtys on all lots.
    FF

  • Without ud code my quality stock transfer into unrestricted

    sir,
    When i am doing ud in QA11 without ud code my quality stock transfer into unrestricted.is there any fucntional setting that without  ud code quality stock not transfer INTO UNRESTRICTED.

    Dear Prakash
    There is a standard functionality for the same
    please refer this link
    Link: [http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/601c82e3-b743-2c10-dbb6-ed4c00167157]
    Regards
    Gajesh

  • Quality inspection for stock transfer inspection type 8

    Dear Friends ,
    For inspection type 8 , when there is a stock transfer from plant to plant a inspection lot is created automatically
    and then the stock goes to QI and we do RR and UD and stock posting to Unrestricted stock if pass
    Is my understanding is correct
    Thanks & Regards
    Raj

    Hi raju
    ur understanding is correct after giving inspection type 8 in material master and ur transfering material from plant to plant then lot get genrated and after RR and UD it goes to unrestricted stock
    regards
    sachin

  • GR with quality certificate required

    Hi All,
    I have set certificate require in my PO. During GR, it will prompt me whether I have receive my certificate. If no system will post the stock into block stock as I did not active quality inspection lot. So if I have receive the certificate after GR, will this stock be posted to unrestricted stock automatically ? Or I need to do a manual transfer posting?
    Please kindly advice.

    Hi,
    After you get quality certificate you need to do transfer posting. According to my knolwedge system won't post the stock  to unrestricted stock automatically. Thanking you.

  • Transfer posting Quality to Quality within plant ..mov type 323...

    Hi All,
               I am not able to process Transfer posting Quality to Quality within plant with mov type 323 through MIGO transaction.
    Error : Change the inspection stock of material 936317 in QM only.(Change the inspection stock of material 936317 in QM only
    Message no. QA495
    Diagnosis
    You want to make a stock posting to/from the inspection stock. This is not allowed for material 936317 because the quality inspection control has been activated by QM.
    The following cases can occur:
    The inspection stock should be increased, although an inspection is not foreseen for the current goods movement
    The inspection stock should be released, although  you can only do this using the QM transactions.
    System response
    You cannot carry out the stock posting.
    Procedure
    Check both the QM inspection setup data and the movement type for material 936317 in the quality management view of the material master.
    Exception:
    If you post a return delivery to a vendor with reference to a purchase order, or cancel a goods receipt, the stock indicator from the order is proposed.
    Check and modify this proposal as required.
    The stock may have been transferred already and is therefore no longer in inspection stock.
    Kindly help me to resolve the issue.

    Hi,
    Please check the stock of  material 936317  in MMBE , One lot will be in Quality Inspection.
    Clear the lot to unrestricted lot
    try now you will be able to do  Transfer posting Quality to Quality within plant ..mov type 323
    G.Ganesh Kumar

  • Material returns in case of Inter company stock transfer

    Hello,
    In the inter company stock transfer, when material is  recived in the receving company code, it will get rejected in the quality check. what is process in the SAP to return back material to  supplying company code.
    Regards
    Manish

    Hi Manish,
    Here's the process (generally)
    1. (At Recv Plant)
    EITHER:   
             1- a) Create a Return Delivery w.r.t. the Material Doc that Goods were received (Opens the Order qty in PO) and do the PGI (Dlv Ty RLL)
    OR
             1-b) Create a Return PO (with Return Ind) and Return Delivery (does not open PO qty) and do PGI (Dlv Ty NCR)
    2. (At Supp Plant)
        Create Returns Order in SD and Returns Delivery (Dlv Ty LR) and do PGR
    NOTE: The Supp Plant must have a Vendor Master (maintained at CC level) assigned. And the Recv Plant must have Customer master and other Shipping data (SOrg, Ds Ch, Div) maintained.
    After the postings AP and AR accounts are updated to reflect the postings in each CoCd. Verify this in the Accouting Document created as a result of PGI and PGR.
    Let me know this helped.
    Regards,
    -Mewan

  • Cannot create copy of Std inspection type 08 (Stock transfer inspection)

    Dear All:
    I have created a copy of std inspection type 08 as Z08CP. I have made all the relevant assigments in IMG such as Maintain Inspection Lot Origins and Assign Inspection Types, Default values, etc.
    During my unit testing I did use the newly created Z08CP but I have noticed I keep getting the error message " Change the inspection stock of material XXXXX in QM only" BUT THE MOMENT I SWITCHED THE MATERIALS MASTER BACK TO inspection type 08 the problem is gone. Only when I have the std inspection type in the material master I am allow it to post a MB1b (322) and created the inpscetion lot in the background
    Weird !!
    Any ideas.
    Regards,
    Mauricio

    Let me see if i understand exactly what you guys are saying.
    Following entries have been made in IMG
    1. Plant dependent QM settings. Inspection Type for Available Stock in Quality Inspection field is empty
    2. Maintain Inspection types: Created Z08CP as copy of 08
    3. Maintain Inspection Lot Origins and Assign Inspection Types. For lot origin 08. created the following relationship
    Lot Origin 08
    01     08     Stock transfer inspection
    02     Z08CP     Prod Defect: Stock transfer inspection
    4. Default values for inspection type. Copied default values from 08 to Z08CP
    Note i did not make any changes to IMG section "Inspection for Goods Movements"
    I tried again and same error was displayed. what is that I am missing here?
    Regards,

  • Stock transfer 301 Movt Type

    Hi,
    I am doing Movt Type 301 Plant to Plant Stock transfer for unrestricted stock in one plant to another
    The materials has QM activated with 08 inspection Type Active. Control of IL is such that only one IL gets created for plant/sloc/batch
    After doing the first posting, I have done UD for the IL and posted stock to unrestricted. Then I tried to do multiple postngs to same sloc/batch
    For the subsequent postings, for some materials the stock gets posted to quality and for some it gets posted to unrestricted. What should be the normal behaviour
    What can be the reason

    Hi,
    Though I'm not sure I understood it correctly or not but seems you have issues with transfer postings (301 mvmnt with all QM active) and some of them goes to QI stock whereas others go to UR.
    If that's the case, I believe you should check your inspection set up and look for 'Post to insp stock' under inspection type 08.
    ntn

  • Material to material stock transfer

    Is it possible to do material to material stock transfer when the material that is being transfered to recieving material is in Quality?. I am getting error in doing so. Please advice.
    Thanks,
    Sam

    Hi sameer,
    309 Transfer posting material to material
    The quantity is posted from unrestricted-use stock of the issuing material into unrestricted-use stock in the receiving material
    Prerequisite: both materials have the same stockkeeping unit.
    it is not possible to post material to material stock trasfer in quality
    Vishal...

Maybe you are looking for