Stock Transfer Plant to Plant under one company

Hi All,
While transfering Stock from one plant to other plant I wanted to add some freight cost or may be some discount to other plant to dispose of inventory under one company code.
Problem is under one company no accounting document is getting created. And MAP of recieving plant should also be affected by this freight cost and discounts. I mean in case of freight cost MAP of recieving plant should go up. In case of Discount it should go down.
How I can achieve this.
Thanks
Sanjay

Hello,
While I am doing STO for doc type UB and want to define condition following error is coming.
Function not possible for this item
Message no. 06096
Diagnosis
The function cannot be performed because either
invoice receipts are not allowed for this item (that is, IR indicator = -), or
conditions are not relevant to the item (e.g. in the case of contracts with the item category 'W'), or
taxes have not been defined for the item (that is, the VAT code has not been maintained).
Any more suggestion since I am not able to define freight condition in STO.
Thanks
Sanjay

Similar Messages

  • Stock Transfer Between two plants within same company code

    Hello,
    We are using scenario-'Stock transfer between two plants within same company code. Scenaro is like Plant A is receving plant and Plant B is delivering Plant.
    Plant A release PO for 100 nos to Plant B
    Plant B issues 100 nos (via delivery) to Plant A
    But Plant A receives only 50 nos physically so they do Goods receipt for 50 nos , but document got generated for 100 nos (when plant B issues material).
    Now Plant A do not want to receive remaining 50 nos physically, but wants to reduce material document which got created when goods issue posted by plant B
    Now stock in transis (mb5t) is 50 nos.
    How to reduce this material document. or any another alternative solution for this?
    Thanks,
    Shailesh

    Hi There
    Reversal of partial is not possible ,
    But you can use the Mov Type 557 and 558 to do the adjustments in Stock in transit qty
    Few more details on STO adjustments
    Hi There
    it can be settle in many ways,,,
    1. Receive the goods as 100 and Scrap the 50 nos from the received plant,,- If the receiving plant is responsible
    2.Revert the PGI/Transfer movement(Vl09) and send the 50 nos again from the supplying plant- of the Supplying plant is responsible,
    3.Also we have the movement type 557 and 558 without doing the above two steps you can correct the qty from stock in transit itself,,
    4. also you can check the below similar thread
    STO - material lost during tranfer from plant A to plant B
    5. If above are not ok, then receive the goods as 100, And raise the STO as your plant as supplying plant and receiving plant is (Supplied 50 nos less) plant,, Do the process without sending the material.. in this way that 50 nos can be adjusted,,
    6.Here is some more details
    557 Issue from stock in transit (adjustment posting)
    Only use this movement type (also the reversal movement type) under the following circumstances:
    Using movement type 557, you can correct purchase-order-independent stock in transit if
    - a good receipt cannot be posted to a purchase order without stock in transit, even though there is still stock in transit according to the purchase order history
    - stock in transit still exists, even though there are no open stock transfer orders for the particular material
    This movement type may ONLY be used in the cases mentioned above after careful analysis, to correct stock in transit that has rounding errors.
    This movement type may not be copied.
    Note!
    Before using this movement type, note the following:
    - 392205 Analysis stock in transit / Correction if split valuation
    Possible special stock indicators:
    E, Q
    7. As previous post says if you have the note for this issue you can use that also
    You can use any one of the way to solve the issue, Hope it helps
    Cheers
    Senthil P

  • Plant to plant subcontracting(Under one company code)

    Hi,
    I need a help on one issue.
    We are having multiple plants under one company code.
    Material goes with 57F4 challan for subcontracting plant to plant.
    How to do the subcontracting process for plant to plant.
    Please explain step by step.
    I know the normal process (with vendor)
    Also, if I have create a subcontracting PO, how the receiving plant will come to know about this?
    How will he receive the material which I have send?
    How the production activities at their end?
    Do I need to do the MIRO?
    Please thrwo some light.
    Thanks in advance,
    Piyush

    1)  Create Subcontracting Purchase Order with `0` Cost
    2) Transfer of Components to Subcontractor
    3) Create Subcontracting Challan
       a)Receive the Components as non valuated Materials
       b)Process the Materials to get the SF Product
       c)Create the Outbound Delivery without Ref. To Sales Order
       d)Endorse the Subcontract Challan Manually
    4) Post Goods Receipt
    5) Reconcile Subcontracting Challan
    6) Complete / Reversal / Re-credit SubcontractingChallan
    During Reconcile the Subcontract Challan - J1IFQ,Enter Manually into the Assigned Quantity Field the Components that are actually assigned for this Subcontracting Process.
    Regards,
    eswarmanu...

  • Billing in Stock Transfer between two plants of two different company codes

    Hi Friends,
    I am doing the scenario of stock transfer between two plants of different  company codes.
    I have some issues in Billing for this..
    What are the settings do i need to to for Pricing in SD point of view.
    Ex:
    Supplying         /         Receiving
    Com.Code:2000     /        CompanyCode:1000
    Plant:2100              /         Plant:1100
    SA:2000/10/00      /          SA:1000/10/00
    I created Customer 5555 w.r.t sales area of supplying company code (2000/10/00)
    I created Vendor  7777 and assigned Supplying Plant 2100 in add purchasing data.
    In IMG Settings:
    Define Shipping Data for Plants: In Receving Plant i assigned customer 5555 and sales area blank
                                                        In Supplying Plant i assigned customer blank and sales area as 2000/10/00
    Create Checking Rule: Standard(B SD Delivery)
    Define Checking Rule: Standard(Avallability-01assigned to checking rule B)
    Assign Delivery Type and Checking rule: Document type(NB)-Supplying Plant(2100)-Delivery Type(NLCC)-Checking Rule-(B)
    Assign Doc Type:Supplying Plant(2100)-Receving Plant(1100)-Doc type(NB)
    What are Pricing settings in SD i have to do?????????
    Process:
    ME21N->VL10B->VL02N(PGI)->VF01(IV)->MIGO->MIRO
    I have gone through many threads in Forum but confusion in Pricing Part..
    Some are mixing with the inter company sales proces..
    Pls guide me..
    With Regards

    Do the following steps for STO Customizing:-
    1. Create a customer master record for the issuing plant.
    2. Create a vendor master record for the issuing plant, and enter customer account number in the Customer field on the Control screen.
    3. Repeat steps 1 and 2 for the receiving plant.
    4. Assign the plants to the customer master record in Customizing for Materials Management (MM), by choosing Purchasing <Purchase Order < Set Up Stock Transport Order< Plants.
    The Process Flow would be as follows :-
    Create a stock transport order, following the standard procedure, and send the order to the issuing plant.
    Issuing plant has processes your order, and when it is ready to ship,the storeperson at the issuing plant issues the goods using a transfer posting. The excise clerk there creates an excise invoice.The excise supervisor verifies and posts the excise invoice.It then sends the goods to you, together with the excise invoice.
    Once the goods arrive, you follow the standard procedure for incoming excise invoices:
    The excise clerk captures the excise invoice, using the stock transport order as the reference document. The storeperson enters the goods receipt, again using the stock transport order as the reference document.Alternatively, you can first enter the goods receipt and then capture the excise invoice.
    The excise supervisor then posts the excise invoice.
    Best Regards,
    Ankur

  • Stock Transfer between the Plants Abroad

    Dear Experts,
    I need any one of your guidence in step by step configuration of stock transfer order between the plants situated in two different countries under one company code in EOU.This STO requires billing document to be posted to A/C with Zero Value for INTRASTAT purpose.Any guidence will be appreciated.
    Thanks in advance.
    Regards
    kumar

    Dear Kumar
    Please check the links
    [Plants Abroad|http://help.sap.com/saphelp_46c/helpdata/en/e5/077f984acd11d182b90000e829fbfe/frameset.htm]
    [Plants abroad: Sales-specific settings |http://help.sap.com/saphelp_46c/helpdata/en/34/60b19dae724effe10000009b38f91f/frameset.htm]
    thanks
    G. Lakshmipathi

  • Stock Transfer Order Between plants

    Hello Everybody,
    Can someone tell me the steps and configuration involved in STO between 2 plants?
    Please help me .
    Thanks,
    Sneha.
    Please dont post basic and repeated questions.  Do search in the forum
    Edited by: Lakshmipathi on Feb 26, 2009 2:23 PM

    Hi Read this fully and configure accordinngly
    Configure Inter company Stock Transport Order
    Material should exist in both the plants (Delivering & Ordering),
    Internal customer should be assigned to the ordering plant ( MM -> Purchasing -> Purchase Order -> Setup stock transport order -> assign the internal customer to the ordering plant and assign the Sales area of the internal customer.
    Assign its Sales area to the delivering plant
    Assign the document type and Delivery type NB and NLCC
    Assign the Supplying plant --> Receiving Plant --> NB
    Take the delivering plant and assign the sales area.
    Vendor master has to be created and assign the supply source (Delivering Plant).
    Create a purchase order ME21N ---> Save
    Delivery VL10 G ---> Calculation rule (appropriate) --> Assign the purchase order number here and execute.
    Select the Delivery creation line and do the back ground process.
    Start the log display and see the delivery document number by the documents button
    Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery document.
    Billing (Intercompany pricing conditions should be set).
    AND
    1. Customer No. for the Goods Receiving Plant - OMGN
    2. Availability Check- Checking Rule (if necessary) - OMGN
    3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders, NLCC)
    4. PO type (which i believe you have done) - OMGN
    5. Assign Vendor No. to the Supplying Plant (done) - VK02
    6. Assign Customer No. to the Purchasing Plant for the Inter-Company Invoice (but you need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
    IMG-SD-Billing-Inter Company Billing-Define Internal Customer No. by Sales Org
    ***and by the way for the Invoice to work between Cross-Company Plants, you need also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure
    INTERCOMPANY PRICING:
    PI01 Inter company: fixed amount per material unit
    PI02 Inter company: percentage of the net invoice amount
    These condition types specify that the price charged by the delivering plant to the sales organization is shown as a statistical value in the sales order and an effective charge in the internal invoice.
    The condition records you create and maintain for inter company billing are the same kind of records that you create for pricing in general.
    IV01 Inter-company Price ERLOS Revenue
    IV02 Inter-company % ERLOS Revenue
    STO:
    STO CONFIG:
    The following steps have to be followed in order to configure stock transport order between two plants.
    1. Create a vendor for the Company code of the receiving plant using account group 0007 via T-Code XK01.
    2. In the purchasing data view assign the supplying plant and the schema group
    3. Create customer with the sales area of the vendor.
    4. The shipping conditions, the delivering plant and the transportation zone determine the route in the STO.
    5. In the pricing procedure determination relevant to the STO assign document pricing procedure and customer pricing procedure to get the pricing in the invoice.
    6. Maintain condition records for pricing condition.
    7. Maintain carrier as a partner in the customer master.
    8. In OMGN select the supplying plant and assign the company code and sales area. Similarly select the receiving plant and assign the company code and sales area (The company code to which the plant is assigned to).
    9. Assign the delivery type and checking rule to the document type.
    10. And finally, assign the purchasing document type to the supplying plant and the receiving plant.
    11. Create the STO using T-Code ME 21N and save.
    12. Check for release strategy if any and release using T-Code ME 28.
    13. Create delivery in background using VL10G.
    14. If delivery is created, it is an indication of correct configuration and master data creation.
    Stock transfer between two plants in different company codes is known as inter company stock transfer.
    Material shoud be maintained in both supplying and receiving plant MM01
    Sotck should maintain only in supplying plant MB1C
    Create receving plant as a customer in suplying plants company code and sales area XD01
    Assign this customer number in receving plant detials OMGN
    Assign supplying sales area in supplying plant details OMGN
    Assign delivery tupe NB for in combination of supplying/ receving plants.
    Create STO ME21N
    As it is normal there in the item details wer should get shipping date i.e customer number
    Go for Delivery VL10B
    Shipping point *****
    Select PO go for execute
    then select the delivery then go for delvy ............create delvy,,,, delvy nubmer generated.
    Goods Issue VL02
    Delvy doc **********
    Click on picking
    enter the picking qty
    Click on PGI
    in the mean time check in the PO history you will get the details
    Goods receipt MIGO
    Stock overview the stock will be updated....
    P.O Order types and Delivery Types
    STO: - Stock Transfer Order
    Stock Transfer between Two Plants with One Company code.
    The Purchase Order Type is Used in this case is "UB",
    And the Delivery Type Used here is "NL"
    STPO:- Stock Transfer Purchase Order
    Stock Transfer Purchase Orders Between Two Plants with Two Different Company Codes.
    The Purchase Order Type is Used in this case is "NB",
    And the Delivery Type Used here is "NLCC".
    INTRA COMPANY STO.
    1. There should be two plants in the given company code for intra STO to
    happen.
    2. Assign Purchasing org of the ordering to the supplying plant.
    3. Create a customer in the supplying sales area.
    4. Assign the customer to the ordering sales area.
    5. IMG > MM > Purchasing > PO > Setup STO > Define shipping data for plants
    here go to supplying plant and mention its own sales area.
    6. In the ordering plant assign the customer created in the supplying sales area
    and also the supplying sales area.
    7. Maintain checking rule as 01.
    8. Assign the delivery type NL supplying plant checking rule and PO Doc type
    UB.
    9. Assign document type UB supplying plant and ordering plant then decide up
    on either 1 step or 2 steps.
    10. Create PO with doc type UB.
    11. Go to VL10B give the PO No. and enter, select the line item and click back
    ground. (Where Del. Will be created in the back ground)
    12. Go to VL02N for picking and PGI.
    13. If 1 step no need of doing MIGO else for 2 steps do MIGO.

  • External processing in the plant as vendor under same company code

    Hi friends,
    In our project under implementation we have following scenario.
    we have 4 plants under one company code. one of the plant does powder coating as manufacturing activity. Other 3 plants sends components to the powder coating plant for coating purpose.
    In IDES Standard scenario of external processing, a purchase requisition is raised thro info record maintained for the external operation. This scenarion works if the vendor is external.
    In our case, the vendor is one of the other plant under same company code/client. Also the powder coating needs to be done without any profit margin for internal customers.
    Our FICO guys have the opinion that, intra plant can't be a vendor; because raising invoices among plants under the same company codes is against accounting standars.
    If anybody has faced this type of scenario nd found the solution, Please share it here.
    Thanx in advance

    Hi Shiva
    STO scenario
    You can not create only STO as you need to send the unpainted components to another plant through SAP & have them painted back with only payment of paining charges without margin.
    Subcontracting scenario
    You can not create the Subcontracting PO as this is not your external vendor.
    Does this involves excise?
    Then the PR/PO ctreated should be of combination of STO and subcontracting. If so this is not possible, as item category is the only field in PR/PO that identifies it as STO and subcontracting. obiviously it cann't have 2 values.
    My suggesion on this as...
    Create a BOM for painted component with sp procurement key as produced in another plant(paining plant). this will have STO cretaed for paining plant. This will inturn cretae a production order in painitng plant.
    The BOM in painting plant will have the unpainted component with sp procurement key as produced in another plant ( fabricated plant) this will have STO created for unpainted components.
    I hope I am clear & not confused you much.
    Regards
    Mahesh
    Regards
    Mahesh

  • Stock transfer between Excise Plant and Non Excise Plant

    Scenario : Stock is imported from say Singapore. One of the import duties can be claimed back as CVD and pass the benefit to customer.
    Requirement : Stock transfer between Excise Plant and Non Excise Plant
    Question : i) If I do stock transfer from Excise plant to non-excise plant, can I transfer the CVD amount which I captured in RG23A - Part1/Part 2?
    ii) If I do stock transfer from Non- Excise plant to Excise plant, can I get the benefit of CVD and pass on that benefit to customer?
    Pls let me know the possiblity of above two in SAP and Legally?
    thanks in advance
    Sridevi

    Ok! Thanks for the replies. Pls let me allow to elaborate the earlier requirement.
    Trading Goods say A gets imported to India. Issue was :
    1) We need to issue Excise invoice only to few customers. So, we thought of treating one batch as excise batch and remaining as non excise batch per day.
    2) Stock price varies every day being batch wise produced in say Singapore.
    Means Mateiral is A but price varies evey day and because of the duty payment also gets varied. For a single material master we do have different prices for each batch and also excise/non excise scenario. So, how can I get material value for each of this combinations in the system and how to identify the same.
    Because of the above reasons, we thought of having two plants. I can not configure depot here because cleint requires single plant for each state as of now.
    Am I clear? If not, pls let me know,
    regards
    Sridevi

  • Transfer Customer Master records from one company code to another company.

    hi ,
        working on a rollout project ,
    needed to transfer Customer Master records from one company code to another company code.
    is there any sap standard BDC/T-code as in case of Vendor Master FK15,Fk16(T-CODE) .
    thanks in advance.
    rahul
    Edited by: RAHUL SINGH on Jul 22, 2009 9:05 AM

    Hi,
    I think you should ask this question in functional consultant forum.
    Thanks,

  • Multiple currencies under one company code for contracts

    Gooday!
    We have a new schenario ( In RE-FX) where we have a couple of contracts which were negotiated with the landlord that needs to be settled in Rand, whilst the company code are setup for another currency, which is dollar (caters for the bulk of the contracts). So each time you create a new contract the currency is already greyed out (Dollar), which obviously means that it cannot be changed there.
    Apparently the company code can be setup in FI to accommodate secondary currencies, however, this seems not to be the case in RE-FX.
    My question is this, is it possible to have multiple currency contracts under one company code in RE-FX, and if so, do one set it up in FI or RE-FX?
    Any assistance would be greatly appreciated!

    Conditions in Foreign Currency (New)
    As of SAP ECC 6.0, Enterprise Extension Financials, Enhancement Package 2 (EA-FIN 602), Business Function Real Estate (RE_GEN_CI_1), you can enter conditions for contracts, rental objects, or contract offers that are in a currency that differs from the local currency of the company code.
    You can enter the currency directly when processing conditions. You can also enter a currency translation rule in the posting term. The rule is then used for all conditions to which this posting term is assigned.
    You specify in Customizing which currency translation rules are allowed for each contract type and usage type.
    See SAP Note 123819.

  • How to see all the customers under one company code?

    hi,
    I would like to know, is there any standard transaction code to see all the customers under one company code?
    thanks.

    Hi,
    You can check through :
    1). SAP Menu ->  Accounting -> Financial Accounting -> Accounts Recievables ->Information Syatem -> Reports for Account recievable accounting -> Master Data -> Customer List
    2). Run Txn SE16 -> Enter Table name (KNB1) -> Enter Company Code -> Execute.
    Reward Points if this helps.
    Regards,
    Harsh

  • Sevaral Balance Sheet under one Company Code in SAP

    Is it possible to generate profit center wise, branch wise, balance sheets and income statements including other reports under one company code in SAP separatly.

    Yes. It is possible through Financial Statement Version. Further Report Writer or Report Painter helps to create your own Profit Center Reports.
    Regards
    Sampath
    Edited by: PSampath on Nov 25, 2009 11:08 AM
    Edited by: PSampath on Nov 25, 2009 11:08 AM

  • Stock transfer between two plants under the same company code at profit

    Hello,
    Hello,
    I have a scenarios. One plant is selling a part to other plant at a margin. Both plants belongs to the same legal entity.
    How can I map this scenario in SAP?
    What will be the cost of my part in these two plants?
    What mechanism I would use to transfer the stock from supplying plant to the buying plant?
    Your urgent reply is appreciated.
    Thanks,

    Hi
    To map this scenario, you should use Profit Centre Accounting.
    Example
    Matl XYZ is to be transferred from Plant 1000 to Plant 2000 at a profit.
    Value of Matl XYZ in Plant 1000 is $100
    Transfer Price: $120
    From FI view point, there would not be any Accounting document as both Plants belong to the same Company Code.
    From PCA view:
    Plant 1000:
    Internal Revenues Dr.  120
    Stock                  Cr.  100
    Profit Margin        Cr.    20
    Plant 2000:
    Stock                                 Dr. 120
    Delivery from Profit Centre    Cr. 120
    Effectively, the value of Matl XYZ in Plant 1000 remains at $100 and in Plant 2000, it is $120.
    Hope this clarifies.
    Thanks

  • Stock transfer between two plants in same company code at price

    Hello,
    Hello,
    I have a scenarios. One plant is selling a part to other plant at a margin. Both plants belongs to the same legal entity.
    How can I map this scenario in SAP?
    What will be the cost of my part in these two plants?
    What mechanism I would use to transfer the stock from supplying plant to the buying plant?
    Your urgent reply is appreciated.
    Thanks,

    Prem,
    Yes, for this scenario, you will have to implement EC-PCA. This is different from CO-PA.
    Detailed information can be found in http://help.sap.com/saphelp_erp2005vp/helpdata/en/eb/13759643c411d1896f0000e8322d00/frameset.htm
    The Stock valuation is different from MM and PCA point of view. Stock Transfer within Co Code does not have any effect on the Stock value from MM point of view. The Stock value changes only from the PCA point of view. The solution works the same way with Standard Cost also. Your Standard Cost can remain the same in both the Plants.
    The PCA entries are triggered by the Profit Centre data in Material Master. The Profit Centres should be different for both the Plants.
    Hope this clarifies.
    Thanks

  • Stock Transfer Report from Plants within company code

    Dear SAP Experts,
    We have posted nearly 50 MIGO of stock transfer from our different plants within the same co. code since last 45 days. Now we want to take report of all stock tranfer receipt in our plant. (Like MIGO No. date, material code qty supplying plant etc.)
    Is there any standard T-code like MB51 which can give us the desired information. As in T-code MB51 there is no option to select supplying plant.
    Full Points if helped.
    Thanks in Advance.
    Ishu

    Hi Ishu,
              Go to SE16 enter the table EKKO or EKPO press enter it will take you to selection screen there you click on settings --> Format list --> Chooge fields , system will take you to all the fields avail in EKKO or EKPO there you click on deselect icon then you select fields Purchase doc,date ,Material,Qty and supplying plant then click on copy, system will take you to the previous screen there you click on excute icon.
    I hope it will full fills your requirement
    Regards,
    Murali.

Maybe you are looking for

  • Cairngorm 3 Questions

    In order to use Cairngorm 3 on my project which I would like to do, there are several things I need to know. 1) When will the Module Library be released?  Right now it is in Beta. 2) Which parts of Cairngorm have been tested with Parsley 2.3? 3) Whic

  • Call Java (Beans) from VisualBasic/COM?

    Is this ActiveX Bridge (that come with the Java Plugin) suitable for Visual Basic programmers to call Java classes/beans/applications?

  • Default view panel upon startup

    Hello! I am running a batch file to open and execute a script in diadem using this command: start "" "C:\Program Files (x86)\National Instruments\DIAdem 2012\DIAdem.exe"  "/CScriptStart('C:\Users\bseward\Documents\Diadem\tdms post process\SingleRepor

  • Getting Errors for not Connected to Internet

    Okay, so this happens with any program that I download that has to connect to a server, (Like Google Chrome), and Adobe.  Please help me.  I am really sad   When I try downloading anything it gives me an error saying please, have an internet connecti

  • Help with Lightroom 4 backups

    Hi!  I am about to upgrade my OS in order to upgrade to Lightroom 5.  I thought before that, I should check my LR 4 backups, and found there have been none ever since we upgraded to LR 4!!!  I checked all preferences, and catalog preferences has "Bac