Hi all,
I am wondering how to process a stock transport order, that is created to transfer stock within one plant (from one stor.loc to another). My general scope is to use the shipping module to process the logistic part of that transaction.
So I created a stock transport order (purch. order type UB) where the shipping plant and the receiving plant are identical. Now I can't create the delivery note (VL10B does not show the order. In SAP docu, I found only a hint that a STO can be also used within one plant, but how to create the delivery note?
Thanks to all for answers
Jörg
Hi
Please go thru the following navigation to set up STO between Storage location with delivery.
SPRO-> Material management -> Purchasing -> Purchase order -> Set up stock transport order -> step up stock transport order between storage locations
In first step Activate Stock transfer between storage locations and do other configurations.
Regards
Ramakrishna
Similar Messages
-
Stock Transport Orders within AII, also using HUM
Dear all,
we currently have the following issue at my customer:
We are implementing SAP AII on top of an existing solution, using WM and HUM.
In the current solution for STOs from 1 plant to another, the GI of an outbound delivery triggers the SPED output and an inbound delivery will automatically be created in the receiving plant, copying the batches and HUs. All pretty standard so far.
However, when using AII, the GI of the outbound delivery triggers an eASN, which will load the serial numbers in AII and at the same time create an inbound idoc DESADV that is supposed to create the inbound delivery in the receiving plant. IF we would not be using HU, this process works fine and the IBD is created. BUT when using HU's we get the message that the HU is already GI'd and cannot be used again.
When we take out the HU of the idoc, have the inbound delivery created and later on add the HU manually to the delivery it works fine as well, so the error is really linked to the idoc (HUSELECT008). We have already checked each and every note related to inbound idocs and the mentioned error, but no solution was found.
Did any of you also experience this problem while implementing AII for a complex environment with STO's?
Any help would be very much appreciated.
Thanks in advance!Hi
Please go thru the following navigation to set up STO between Storage location with delivery.
SPRO-> Material management -> Purchasing -> Purchase order -> Set up stock transport order -> step up stock transport order between storage locations
In first step Activate Stock transfer between storage locations and do other configurations.
Regards
Ramakrishna -
SLoc - SLoc stock transport rek within a plant
we have a SLoc that is geographically located far away from the plant. according to legal requirements and to capture shipping costs we want to have stock transport reks to handle shipping.
I tried to explore storage location mrp and mrp area options and according to help document,
1) if I use MRP areas and have the special procurement key "stock transfer from plant to mrp area" system will create stock transfer reservation, which i dont want because i cant do shipping against reservation
2) if I use storage location mrp, looks like it wont give me expected results too. please correct me if I am wrong here.
what are my options to have mrp run create STR for my situation?DB49,
yes I agree that I cant do shipping against STR. but I convert mrp created STR to STO and then do shipping against it.
I cant convert a stock transfer reservation into STO and do shipping , right?
Anyhow, when you were testing your version of SPK 45, did you try selecting 'purchase req' in the "Stk Transf." parameter?
Thanks, will try that.
Also,
can I do that same thing using storage location mrp instead of creating mrp area? or mrp area is the only thing that is suitable to my situation. I appreciate your help answering this. Thanks -
Stock transport order for same plant -UB
Hi,
I created STO with UB and when created delivery giving error material has zero quantity. I checked in MMBE , stock is available.
Can nyone plese give soem solution and suggestions.
Thanks in Advance.
SmithaHi,
Then please check any safety stock has been assigned to the material, check it in the respective material master.
Also,
1. check the material movement in MB51.
2. check the STO's delivery schedule line, whether any delivery block has been maintianed.
3. check whether order is blocked for credit, you cna check it in VKM1.
Please check delivery date in schedule line of sales order same as delivery date in VL01N
Thanks
Hrishi
Edited by: Hrishi on Apr 18, 2011 3:54 PM -
Stock transport orders between 2 plants
Hi,
Daily lot of STO orders will be booked,but i am getting one planned order comibining all STO's when i run MRP,i want individual planned order per each STO for finished product.Hi,
In MRP4 view put 1 in individual/collective field and than again run MRP.
Probably this will solve your problem.
Reward points if it helps.
Rgds,
Anup Dubey -
Cannot Input Goods Receipt for a Stock Transport Order
Dear all,
I created a stock transport order from one plant to another. But in the following "MIGO" transaction, the system indicates "Document xxxxxxxxx does not contain any selectable items".
In the stock transport order, I simply input the supplying plant, material, the receiving plant for the material. The item category is "U" (Stock Transfer).
Anybody have any idea?
Thanks, JeromeHi
What is your process? is it via shipping or via only purchasing?
If it is ony via purchasing, have you moved stock from Supplying plant to stock in transit. Then you can make MIGO.
If it is via shipping, create delivery VL10B and PGI, Then do MIGO.
regards
Srinivas -
Sales order stock with stock transport orders
Dear all,
We are on ECC 6.0.
We are using intracompnay stock transport orders from one plant to other. Sales orders are created in one plant with a purchase requisition and then converted to a purchase order with order type UB on the supplying plant. The supplying plant is also defined as a customer using the different account group for the plant as customer.
When this purchase orders are delivered from the supplying plant using replenishment delivery NL we get an error performing the goods issue for the delivery.The error message is M7 184 -Sales order stock & & does not exist. System is checking for the sales order number in the supplying plant while performing the goods issue. However the sales order is in the receiving plant.
Does some body have an idea how to resolve this?
We are also using material ledger and the transfer pricing mechanism between intracompany sotck transfers.
Thank you in advance.
Regards,
Kartik ShahHello ,
i have the same issue.I checked in MD04 transaction and for this delivery i get this message
Diagnosis
The finish date of the order proposal lies in the past.
System Response
This exception is displayed in the MRP list and in the stock/requirements list.
This situation may occur if in Customizing for the plant in question, the automatic forward scheduling was switched off for MRP.
Procedure
Check whether the order proposal should be rescheduled.
anyone can help me ?
Regards -
Stock Transport Order Without Delivery
I m trying to transfer stock from one plant to another (within same company) without delivery.
what all configuration do i need to do.
pls. guide.
I m little bit confused over stock transfer,
Regards,
Pramod KumarOh no, not at all! This forum is meant to answer all your problems!
Configure Inter company Stock Transport Order
Material should exist in both the plants (Delivering & Ordering),
Internal customer should be assigned to the ordering plant ( MM -> Purchasing ->
Purchase Order -> Setup stock transport order -> assign the internal customer to the
ordering plant and assign the Sales area of the internal customer.
Assign its Sales area to the delivering plant
Assign the document type and Delivery type NB and NLCC
Assign the Supplying plant --> Receiving Plant --> NB
Take the delivering plant and assign the sales area.
Vendor master has to be created and assign the supply source (Delivering Plant).
Create a purchase order ME21N ---> Save
Delivery VL10 G ---> Calculation rule (appropriate) --> Assign the purchase order
number here and execute.
Select the Delivery creation line and do the back ground process.
Start the log display and see the delivery document number by the documents button
Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery
document.
Billing (Intercompany pricing conditions should be set).
AND
1. Customer No. for the Goods Receiving Plant - OMGN
2. Availability Check- Checking Rule (if necessary) - OMGN
3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders,
NLCC)
4. PO type (which i believe you have done) - OMGN
5. Assign Vendor No. to the Supplying Plant (done) - VK02
6. Assign Customer No. to the Purchasing Plant for the Inter-Company Invoice (but you
need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
IMG-SD-Billing-InterCompany Billing-Define Internal Customer No. by Sales Org
***and by the way for the Invoice to work between Cross-Company Plants, you need
also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure
STO:
STO CONFIG:
The following steps have to be followed in order to configure stock transport order
between two plants.
1. Create a vendor for the Company code of the receiving plant using account group 0007
via T-Code XK01.
2. In the purchasing data view assign the supplying plant and the schema group
3. Create customer with the sales area of the vendor.
4. The shipping conditions, the delivering plant and the transportation zone determine the
route in the STO.
5. In the pricing procedure determination relevant to the STO assign document pricing
procedure and customer pricing procedure to get the pricing in the invoice.
6. Maintain condition records for pricing condition.
7. Maintain carrier as a partner in the customer master.
8. In OMGN select the supplying plant and assign the company code and sales area.
Similarly select the receiving plant and assign the company code and sales area (The
company code to which the plant is assigned to).
9. Assign the delivery type and checking rule to the document type.
10. And finally, assign the purchasing document type to the supplying plant and the
receiving plant.
11. Create the STO using T-Code ME 21N and save.
12. Check for release strategy if any and release using T-Code ME 28.
13. Create delivery in background using VL10G.
14. If delivery is created, it is an indication of correct configuration and master data
creation.
Stock transfer between two plants in deffernet company codes is known as inter company
stock transfer.
Material shoud be maintained in both supplying and receiving plant MM01
Sotck should maintain only in supplying plant MB1C
Create receving plant as a customer in suplying plants company code and sales area
XD01
Assign this customer number in receving plant detials OMGN
Assign supplying sales area in supplying plant details OMGN
Assign delivery tupe NB for in combination of supplying/ receving plants.
Create STO ME21N
As it is normal there in the item details wer should get shipping date i.e customer number
Go for Deliveryy VL10B
Shipping point *****
Select PO go for execute
then select the delivery then go for delvy ............create delvy,,,, delvy nubmer generated.
Goods Issue VL02
Delvy doc **********
Click on picking
enter the picking qty
Click on PGI
in the mean time check in the PO history you will get the details
Goods receipt MIGO
Stock overview the stock will be updated.... -
HELP for all 5 TYPES of STO Stock Transport Orders with detailed scenario
PLEASE help me understanding the detailed scenarios for all 5 TYPES of STO s
as in my day to day job activities , i frequently handles issues related to STO s
PLEASE HELP WITH DETAILED STEP BY STEP SCENARIOSHi Jagatram,
Standard SAP has the following methods For Stock transport order:
1) One Step Transfer stock without using purchasing documents; Use movement type 301.
2) Two Step Transfer stock without using purchasing documents; Use movement type 303 in Supplying plant and movement type 305 in receiving plant.
3) Using Standard Transport Order (STO) without delivery in two steps. STO created in T-Code ME27, receiving plant posts goods issue (for returns), movement type 351 and supplying plant post goods receipt from using movement type 101.
4) Using Standard Transport Order (STO) with delivery in one step. STO created in T-Code ME27, Receiving plant creates shipment and Goods issue document (for materials to be returned) with movement type 647 and goods receipt document with movement type 101 both created in one step.
5) Using Standard Transport Order (STO) with delivery in two steps. STO created in T-Code ME27, Receiving plant creates shipment and Goods issue posted (for materials to be returned) with movement type 641.Goods receipt is posted in the supplying plant, movement type 101.
6) Using Transportation scheduling agreement (TSA) with delivery in two steps. TSA created in T-Code ME37. Receiving plant creates shipment and Goods issue document (for materials to be returned) with movement type 641. Goods receipt is posted in the supplying plant, movement type 101.
To achieve it, necessary configurations has to be done in Tcode- OMGN.
SPRO>> Materials management>> Purchasing>> Purchase Order>> Set up Stock transport Order:
1. Plant: For the receiving plant, maintain customer No-Plant (If using STO with delivery), for the Sales Org, Dist channel and Division.
2. Checking Rule: Create checking rule.
3. Define checking rule : Usually no change required here.
4. Assign delivery type/checking rule: Assign the document type(UB) - Supplying plant- Delivery type(NL).
5. Purchasing document type: Maintain the supplying plant- Receiving plant relationships for the doc type-UB, either 1-step or 2-step, as per business.
Hope this helps!
Regards,
Shilpa -
Stock Transport order with Freight Charges- Payable to an external vendor
Hello
we are implementing the stock transport order between two plants in SAP 4.7. The document type is UB and it has to be a two step process. We need to post the Freight Charges as well. The freight Provider is external vendor.
What is the best way of configuring this scenario for freight cost?
I did put the freight forearder vendor code on the conditiond tab detail of condition tyep FRA1 but can't do the invoice verification for the same.
Any tips are appreciated.Hello,
This EhP4 feature addresses only the one step Stock Transport Order to subcontracting vendor for intra company.
Does anybody know how to do a two steps Stock Transport Order to subcontracting vendor for intra company?
By "two steps" I mean:
1- Goods Issue from supplying plant A to in-transit stock of the subcontracting vendor at receiving plant B.
2- Inbound Delivery Notification (IDN) at receiving plant B + Goods receipt against this IDN into the subcontracting stock at receiving plant B.
Thanks and regards,
Stéphane -
Inter and Intra Company Stock Transport Orders
Hi All,
has anyone set up the following scenarios?
1. Intra Company Stock Transport Orders between 2 plants in the same company code and same Sales Org
i.e Plant 0001 (Supplying Plant) exists for Company Code 0001 and Sales Org 0001
Plant 0002 (Receiving Plant) exists for Company Code 0001 and Sales Org 0001
2. Inter Company Stock Transport Orders between 2 plants in different company codes and different Sales Orgs
i.e. Plant 0003 (Supplying Plant) exists for Company Code 0002 and Sales Org 0002
Plant 0002 (Receiving Plant) exists for Company Code 0001 and Sales Org 0001
We are unable to get both scenarios to work at the same time due to the fact that only one Sales organization for intercompany billing can be assigned to a plant.
Regards
ChrisHi chris,
Followings steps are involved for configuring intra stock transport order.
Intra Company STO Scenario: Plant B receives material from Supplying plant A.
1.create combination of Shipping condition, Loading Group and Supplying plant.
2.Create Customer master with sales org, Distribution channel and Division.
3.Assign customer master to receiving plant with same Sales area.
4.Assign Delivery Type and Checking Rule.
5.Assign Document Type, One-Step Procedure, under delivery Tolerance.
6.Make Sure Assignment of sales organization - distribution channel - plant
7.Create material master with purchasing view in plant B.
8.Extend material master with sales view to plant A.
9.In Plant A create STO (UB), with supplying plant. Check for shipping point XXXX.
10.In Plant B create STO (UB), with supplying plant.Check for shipping point XXXX.
11.Create delivery for XXXX shipping points.
12. Post Goods issue.
Thanks,
Muth's -
Auto Batch Determination For Stock Transport Order/Replenishment Delivery
All,
I have an issue with my stock replenishment deliveries (STPO, Stock Transfer Plant to Plant via standard MRP/Procurement process with a Purchase Order that is a Stock Transport Order).
One question I have is what module should the configuration be for Auto Batch Determination on deliveries from STPO's, is it SD or MM? The reason I ask is because I have the SD side working just fine for example if I enter a customer order for this material and issue a delivery against it I get a batch automatically assigned according to your search/sort criteria. I know with a Stock Transport you have different item categories etc. and I have flagged them as relevant for ABD.
I have been racking my brain regarding this and I have went through the configuration for both Inventory Management and Sales and Distribution. I have went through the steps several times. I am not seeing what I am missing any help in this arena would be helpful I am getting the following error message when I go to the batch tab on the replenishment delivery "Batch determination is not possible because there is no search procedure". I am at a loss to what configuration is needed. I keep going through the steps and I am not finding whats missing. Any help in this area would be most grateful.
Thanks,
JeremyHi Jeremy,
you need to configure batch determination in SD and maintain enteries in the trasaction code V/C5 as below
Sales org + Distribution channel + Division + DL (in salesDoc Ty) + Search procedure + tick check batch
Sales org + Distribution channel + Division + NL (in salesDoc Ty) + Search procedure + tick check batch
also check whether the delivery item category is active for auto. batch determination and maintain the batch condition record in transaction code VCH1
regards,
Santosh -
Stock transport order /stock in transit
Hello
For a stock Transport order scenario { Recieving Plant , Delivering plant } , the documented procedure is:-
1) stock transport order>Goods issue by delivering plant--
>stock in transit(valuated) -- >Unrestricted/inquality/blocked/consumption
just sticking to the above method, how many Material documents & accounting documents would be generated ?
ThanksHi,
It depends on your setting, whether you go for 2-step Stock Transport or 1-step.
If It is 1-step then 1 material document and 1 accounting document.
This material document will be of movement type 647 and stock will not come in transit, stock will directly get moved from Supplying Plant to Receiving Plant.
And if it is 2-step then 2 material documents and 1 accounting document.
1 material document for GI from Supplying Plant to Stock in Transit (Movement Type - 641), and another from stock in transit to receiving plant (Movement Type - 101).
And it will update PO History in both the cases.
You can config. this in SPRO > MM > Purchasing > Purchase Order > Setup Stock Transport order > Assign Document Type, One-Step Procedure, Underdelivery Tolerance > here activate "One-step" indicator if you want 1-step otherwise keep blank for 2-step. -
Very imp stock transfer and stock transport order
hi folks,
please explain me in detail the difference between stock transfer and stock transport order.
regards,meenaHi:
Stock Transfer is the physical movement of material from one location to another location,stock transport order is one way of doing the stok transfer.
Stock can be transfer between plant to plant,company code to company code,storage location to storage location.
However there are different procedures for stock transfers:
1.Stock Transfer using one step procedure: Here Goods issue and Goods receipts happens in single step.
2.Stock Transfer using Two stage procedure:The two-step procedure allows you to monitor the stocks in transit. After the goods issue is posted at the issuing point, the stock appears "in stock transfer" at the receiving point and is managed as such in the system.
3.Stock Transport Order:
This is transfer of material from one plant to other plant or co.code to co.code via SD route.
Here a.receiving plant raise the stock transport order on issuing plant.
b. Issiuing plant creates the outbounmd delivery against STO and PGI.IF it is in India,then excise
invoice creation.
c. Receiving plant post the goods receipt against outbound delivery and post the excise ivoice.
d. Invoice verification.
The main advantage of Stock Transport order is you have a more control because you can have purchasing document behind itand you can check the PO history which would gives all the details for Delivery as well GR documents.
However ftor STO via SD you need to configure the set up stock transport order in MM>Purchasing>Purchase Order-->Set Up Stock Transoport order.
Also on a data maintanace side you need to maintain the custmor and vendor relations.
Hope this would helps you.
Cheers
Rahul
Awards plz.if helpful. -
Multiple stock transport orders in single inv
hi all,
Pl.tell me how to make Multiple stock transport orders in single inv.
For Ex: We have create 2 Sto's in differnt dates, while going VL10B in Outbound delivery it is splitiing in two invoices.
Pl.can any body explain how to control the Multiple invoices.
kaushikHi Kaushik
Internal customer should be assaigned to the ordering plant ( MM -> Purchasing -> Purchase Order -> Setup stock transport order -> assign the internal customer to the ordering plant and assign the Sales area of the internal customer.
Assign its Sales area to the delivering plant
Assign the document type and Delivery type NB and NLCC
Assign the Supplying plant --> Receiving Plant --> NB
Take the delivering plant and assign the sales area.
Vendor master has to be created and assaign the supply source ( Delivering Plant).
Create a puchase order ME21N ---> Save
Delivery VL10 G ---> Calculation rule (appropriate) --> Assaign the purchase order number here and execute.
Select the Delivery creation line and do the back ground process.
Start the log display and see the delivery document number by the documents button
Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery document.
Billing (Intercompany pricing conditions should be set).
One more Process
STO CONFIG:
The following steps have to be followed in order to configure stock transport order between two plants.
1. Create a vendor for the Company code of the receiving plant using account group 0007
via T-Code XK01.
2. In the purchasing data view assign the supplying plant and the schema group
3. Create customer with the sales area of the vendor.
4. The shipping conditions, the delivering plant and the transportation zone determine the
route in the STO.
5. In the pricing procedure determination relevant to the STO assign document pricing
procedure and customer pricing procedure to get the pricing in the invoice.
6. Maintain condition records for pricing condition.
7. Maintain carrier as a partner in the customer master.
8. In OMGN select the supplying plant and assign the company code and sales area.
Similarly select the receiving plant and assign the company code and sales area (The
company code to which the plant is assigned to).
9. Assign the delivery type and checking rule to the document type.
10. And finally, assign the purchasing document type to the supplying plant and the
receiving plant.
11. Create the STO using T-Code ME 21N and save.
12. Check for release strategy if any and release using T-Code ME 28.
13. Create delivery in background using VL10G.
14. If delivery is created, it is an indication of correct configuration and master data
creation.
Stock transfer between two plants in deffernet company codes is known as inter company
stock transfer.
Material shoud be maintained in both supplying and receiving plant MM01
Sotck should maintain only in supplying plant MB1C
Create receving plant as a customer in suplying plants company code and sales area
XD01
Assign this customer number in receving plant detials OMGN
Assign supplying sales area in supplying plant details OMGN
Assign delivery tupe NB for in combination of supplying/ receving plants.
Create STO ME21N
As it is normal there in the item details wer should get shipping date i.e customer number
Go for Deliveryy VL10B
Shipping point *****
Select PO go for execute
then select the delivery then go for delvy ............create delvy,,,, delvy nubmer generated.
Goods Issue VL02
Delvy doc **********
Click on picking
enter the picking qty
Click on PGI
in the mean time check in the PO history you will get the details
Goods receipt MIGO
Stock overview the stock will be updated....
STO
Reward if useful to u
Maybe you are looking for
-
How i can have only one Apple ID for everything my computer and tab and iphone?
How I can have only one Apple ID for evrything, my computer Iphone
-
Hi, I now try to install Solaris 8 for Intel onto laptop (mobile P3 500Mhz, ATAPI CD-ROM drive, Lynx3DM chipset, XGA LCD panel), and there's a problem. The problem is that after device configuration, it shows Booting kernel/unix .....................
-
Moving HDD from one iMac to another
I recently changed from a white 17" C2D Intel iMac to an aluminium 20" C2D iMac, and in the process moved my hard drive across to the new iMac. The new iMac runs fine off this drive, however it's just occurred to me that the install may be tailored t
-
Dynamically creating properties
Hi, I'm migrating my application from NW 7.0 to NW 7.11 CE. Previously I dynamically created properties from my application and they were automatically created as onlinemodifiable = true. When I migrated my project the properties were no longer creat
-
Is gtx770 and gtx780 compatible with 5.5 adobe master collection?
Is gtx770 and gtx780 compatible with 5.5 adobe master collection?