Hello all,
At what price stock is valued if the material is maintained at X(Procurement type
) ie it is both valued both wise, at Moving average price and at Standard Price through std cost estimate..
Wht is the T Code for looking at the stock value..
Regards
KM Naidu

Procurement types guide procurement and the creation of a standard cost estimate.
If PrcTyp=E then MRP creates Planned PRODUCTION Orders and cost estimates require a BOM for costing.
If PrcTyp=F then MRP creates Purchase requisitions and cost estimates follow purchase material costing rules - no BOM is used.
If PrcTyp=X then MRP create a requirement, but "someone" but decide if it will become a production order or a purchase order and the Cost estimate will calculate using a BOM if exists or cost it purchase material costing rules if there is no BOM.
None of this has anything to do with the price your stock will move at.  The value of your stock movements is either moving average or standard price and that depends on the price control in Accounting 1.
This is discussion is based on 10 years of product costing in a standard (no user exit) costing environment.  If your system has customization, please explain your configuration so that your question can be answered.

Similar Messages

  • Problem with project stock valuation class

    Dear All,
    We have an issue regarding the Revenue Inventory and Capital Inventory. There is a certain balance amount which should be in capital but system is showing in Revenue and vice versa.
    The reason for this is that when the material was created, in some materials the main valuation class was 3032(Project) and in some it was maintained as 3030(revenue). But project stock valuation class was not maintained.
    Now the problem persists in the G/L balances, the G/L of project stock (132006)displays some amount of revenue(132000) and vice versa.
    We tried to maintain the project stock valuation class (3032) for materials for which the main valuation class is 3030 (Revenue),but still the G/L for revenue (132000) is getting hit.
    At the end, the requirement is that G/L for revenue (132000) should hit when revenue procurement is there and G/L for capital (132006) should hit when capital procurement is there.
    Kindly suggest the way forward.
    Regards,
    Harsh

    Thanks Venkat, we have thought of the same as a last stop but there are hundreds of materials which has this problem and there would be many open documents for them.
    If anything could be suggested other then this, and I wanted clarification on one more point that the materials for which main valuation class was 3030 and later we added 3032 in project stk Val class but after maintaining it. When we procure(Capital procurement), it is still showing the balance in G/L 132000(Revenue).
    Regards,
    Harsh

  • Stock valuation down to Storage location level

    Dear all,
    System setup for stock valuation is till Plant level. And understand that's how data stored in table MBEW and MBEWH until plant level only.
    Eventhough that is system standrd, is that possible to get the stock valuation until Storage location level?
    For eg: In MB5B, there is opening stock, closing stock and the material movement posting. I need to get opening and closing stock for each storage location.
    Could you please comment if there are tables store these data? Kindly comment.

    Hi Afshad Irani,
    Thanks for your reply. Understand from the previous post that stock valuation for storage location can be done via table MARDH or report MC.9, but this tools are excess base on period/month basis.
    My case, i need to report storage location stock for both (1)last month 06.2010 and (2)yesterday's stock 06.07.2010. So i can use MARDH table to report (1)last month stock for each storage location. While for (2) yesterday stock, table MARDH isn't help.
    Could you please advice further?

  • Stock Valuation - Inventory Management Cube

    Dear Sap Gurus,
    We have implemented the Inventory Management Cube in BW.
    Quantities are correct, but we have difference on the stock valuation.
    For some material stock value are correct, for some other they are not correct.
    A saw a lot of OSS notes and how to on this subject, I am trying to solve this issue using these documents, but based on your experience could you explain me how you solved this issue ????
    Thanks,

    Hi
    Did you follow the correct steps?
    Initialisation of BX data in the first step.(Loading of Opening Stock)
    Then The request in which the opening stock was loaded must always be
    compressed with a marker update
    Init load of BF And UM in the second step
    The request in which the historical material documents were contained
    must always be compressed without a marker update and
    Successive delta uploads must always be compressed with marker
    updates
    Check this whether you have done this or not.
    Because of missing the steps here also would give you wrong values,
    Regards
    Ram

  • Storage location wise project stock valuation

    Hi all,
       I am tying to generate a report for storage locationwise project stock valuation. MBBS is giving the data valuation type as well as WBS element wise valuation.That is fine. I want to show the data storage location wise. So, I have taken MSPR table where I am getting data storage location wise. For this stock, i am picking up unit price from QBEW table. My user says there will be cases that the material comes in with different prices in a same financial period.Here I am facing issue when there are two prices for the same material with same Val.area and same WBS element .Pls tell me how can I pick up the correct price.

    Hi,
    If stock with different price under 1 plant and 1 WBS Element put into different storage location based on the material price then in table MSPR we can have LGORT (storage location) as indicator there. Otherwise, since valuation type is not implemented, there is no other way you can differentiate stock based on price as you mentioned before.

  • Stock valuation Report problem in crystal

    Hello
    I have created Stock Valuation report on crystal & give parameter For Selection 'from Date' To 'To DATE'
    I maintain 'On Hand' field for quantity available in between selected period
    But Suppose I have Item code 'X01' having actual balnce qty 67 between 1 Jully 2011 To 31 jully 2011 when i run the
    report by same date it display 67 qty it right but the Item 'X01' Sold out 5 Qty on date 2 Augst and i again run the report
    between date 1 Jully 2011 and 31 jully 2011 it Show 62 qty but upto 31st Jully i have 67 Qty remaining but it show 62 this is wrong
    so how i brought 67 qty upto 31 Jully in Crystal Report  
    In Inventory audit Report it show perfect qty on date selection  but i want right value in my crystal report

    Hi,
    The on hand balance is dynamic. You can not get it from any table for historical balance.
    You have to create a temporary table to calculate from day one of inventory transaction for the item.
    Thanks,
    Gordon

  • Closing Stock Valuation doesn't matched physicallly

    Hi SAP Gurus.,
        Can you please assist me reg this issue"Closing Stock Valuation doesn't matched physicallly".
    May I know the possible rectification ways to solve this problem.
    Thanks in Advance,
    Regards,
    Balaji Bhonsle

    Physical Inventory...
    http://www.sap-img.com/materials/physical-inventory-process.htm

  • Stock valuation at store level

    Hi Experts
    I've added the charactaristic 0STOR_LOC to cube 0RT_C36 to have stock cost by store, however, it's not working as expected, totals for any other characteristic (plant, material, month, day .. ) and ratios quantity and stock value are working fine but when I drill down to plant->store the quantities are ok but the stock value is not.
    the question is, it's possible to have stock valuation at store level?, i understand that the valuation in R/3 is at plant level not store, but in infosource 2is_03_bf we have 0STORE_LOC, so it makes sense to have a finner grain isn't it?
    I compare data from bw with transactions MC.5, with transaction RWBE its not possible have stock value at store level. 
    thanks for any help

    Thank you for your quick reply
    I've checked the link, which is just what I was looking for ...
    by the way, do you know where the these how to papers have gone?, I used to get them in
    http://service.sap.com/bi -> service & implementation -> HOW TO ... Guides -> BW 3.x (or something like that)
    now there is a list under
    http://service.sap.com/bi -> service & implementation -> HOW TO ... Guides -> Guide List Sap BW 3.5 - part of NW 04
    a list like this appears:
    Cross-Component Technical Scenarios
    Portal, KM and Collaboration
    Web Application Server
    Business Intelligence
    Master Data Management
    Exchange Infrastructure
    which is almost empty, so where the howto papers are gone?
    thanks again

  • Actuals for stock valuated materials in a valuated project stock

    Hi friends!
    Iu2019m working with materials in the project, and we are going to do direct external procurement from the project. The material we are using are valuated stock and in the project I have valuated project stock.
    The requirements are that the vendor give us the material prices, and the material will not be consumed by the project(WBS/network). All the material will be collected to the special project stock until we decide to move the material to the unrestricted stock to be consumed by another department in the company. All the actual cost must follow-up in the project.
    This is what I do:
    From the project I create material components and I create the PO requisition I got the same price as in the project. Thatu2019s ok.
    When I convert the PO requisition to the PO I got no price but if I save I got the latest used price for the material and this could varied and it´s ok but should not work like this for this scenario.
    My doubts are when I do the goods receipt (MIGO) and the price of the material in the PO are not the same as the stock valuated price I got the difference as actuals in the project and the valuation of the material are in the project stock. If the price of the PO is the same as the valuation price I got no actuals in the project.
    When I register the invoice from the vendor (MIRO) I got no actuals either so I cannot do my project follow-up costs. When I check the cost they are in accounting (balance sheet account).
    When I do the material movement with 411Q to unrestricted stock I donu2019t get any actuals in the project either.
    Is this a normal behavior when using stock valuated materials in a valuated project stock?
    I SAP help I found this information for non valuated project stock:
    u201CAll the actual production costs appear in the project because no price variances can occur and all external procurement follow-up costs are debited to the WBS element.u201D
    But if the best practice is to use valuated project stock why follow-up costs cannot be done in the project?
    Please give me some ideas of this,
    Best regards
    Jose Marin

    If the mateiral was created using the no stock material material type then yes you can see this material in MM60.  Search using material type 'NLAG' for non stock. 
    Regards,

  • In Project stock valuation during GR MAP is picked up from VMVER field

    Hi!
    We are facing an issue during the GR of Material in Production order.
    I will explain the scenario:
    The main material is valuated in MAP (Moving average price).
    On creation of the production order the planned value is coming ok ( summation of components).
    As it was a project valuation, the MAP values are getting stored in the table QBEW.
    The point of concern is at the time of doing GR the actual value is getting picked up from the field VMVER (=MAP/Period unit price in previous period)
    and not from the field VERPR (= MAP/Period unit price).
    As per the scenario the system must consider the latest MAP value that is from VERPR and not from VMVER.
    Can't find out what setting is affecting this selection.
    Abhra

    Hi,
    I am still having problems with this issue. The material is extended for plant 1200 and a valuation class and project stock valuation class have been set.
    Is there a configuration setting required?

  • Stock value in Stock Valuation Report

    Does anyone know how you shouid use the stock cost shown by the Stock Valuation Report?
    I am looking at a database which uses standard costing, and trying to use the Stock Valuation Report to see what the stock value would be at Moving Average.
    Some of the records on the Stock Valuation Report have a zero stock quantity but a stock cost (supposedly Moving Average) and a stock value. There are also records with neagtive stock costs and values.
    I have found SAP Notes which confirm that you can get stock values where there are zero quantities. However if you ignore the zero quantity liines, is the Moving Average cost shown accurate or is it the case that this report is essentially useless if you have a continuous stock system?
    Regards,
    Douglas

    Hi Douglas,
    I found this in one the SAP Notes.
    Symptom
    In the Stock Audit Report, generated for a specific warehouse, a value is shown in the 'Cumulative Value' column even if the item does not have quantity.
    Other terms
    Inventory Audit Report, Stock Audit Report, warehouse, cumulative, value, zero, quantity, average cost, System Initialization, per company, use perpetual inventory, SAP Business One
    Reason and Prerequisites
    Consulting
    Solution
    The 'Manage Item Cost per Warehouse' setting in the Administration -> System Initialisation -> Company Details -> Basic Initialisation tab determines the information displayed in the Stock Audit Report.
    When this option is selected, each warehouse defined in SAP Business Onemaintains its own cost. This warehouse cost is calculated whenever there is a movement of the item in the specific warehouse.
    When this option is not selected, a single cost is maintained for the item per company. This cost is determined by the movement of the item within all warehouses.
    SAP Business One uses the calculated costs to reduce the inventory value when stocks are issued. If the cost is managed by warehouse, then,the item cost will be from the specific warehouse where the stocks are issued; otherwise, the item cost will be the single cost.
    With the difference between the specific warehouse's and the entire warehouses' costs, there is a possibility that costs remain in the specific warehouse even if the quantity is already zero. In this scenario, viewing the Stock Audit Report per warehouse may not provide accurate cumulative value of the stock in that warehouse since the valuation is a combination of different warehouses. The Stock Audit Report then can be used to check the quantities per warehouse. If the valuation of the stock is needed, the report must be generated for all warehouses
    Hope this helps.
    Thanks,
    Joseph

  • Period wise project stock valuation

    hi all,
    is there any function module or any possibility to calculate the project stock valuation period wise? Please let me know if possible.Thanks in advance.

    Hi Jaya ,
    Provided Material Ledger is active in the Valuation Area , you can get your Stock valuation Periodwise
    in transaction CKM3,but with single selection of  WBS/Sales Order for Special Stocks .
    I am not sure in that area to give you a step by step process of how to activate the material Ledger
    or its consequences and impacts on costing. May be you can approach some consultants in your
    company who are  well versed with this functionality  and check if it serves your purpose.
    regards
    Kish

  • Multiple Stock Valuation without AVR

    Hi,
    We have requirement to keep and book 2 actual costs stock valuation version which are according to IFRS and local.
    Understand that SAP standard solution is AVR. But we can't use it because our upstream business not using PP at this moment.
    Please advice if any best solution for this ?
    Thank you

    Hi,
    I don't know what you mean by AVR, but in MM the standard solution for your requirement is called "split valuation".
    Or do you mean having the same stock but valuated to two different prices? In such case the "material ledger" functionality in CO can help you.
    BR
    Raf

  • Special stock valuation

    Dear Experts,
    Can any one tell me whre we will do project stock valuation .
    and how the table QBEW-LBWST will get updated
    Thanks
    Bhaskar

    Dear Bhaskar,
    Materials with project stock and standard price price control are valuated as per the following strategy is HARDCODED in the system:
    1. looks into QBEW if any GR/IR has already taken place.
    2. runs user Exit COPCP002 / EXIT_SAPLCK36_001 which is designed
       exclusively for valuated sales order stock.
    3. looks for a marked sales order cost estimate.
    4. looks for planned costs of a production order (preliminary costing).
    5. CU50 if configurable material (only for project stock)
    6. standard price from MBEW (standard cost estimate)
    The first time a goods movement is carried out the system will go through this strategies until it can find a valid price, and then will write an entry in QBEW. The successful strategy number is also written to field LBWST. From then on, the price from these tables will be used for valuating the special stock in every other goods movement.
    You can find this part of the coding in Function Module CK36_STANDARD_PRICE_GET > Form PRICE_STRATEGY_NEW.
    Note 520000 which provides more information about this logic.
    Best Regards,
    Antje

  • Inclusion of indirect material costs in the finished stock valuation

    Gurus,
    I need to include the costs of the indirect materials (such as fuels, consumables) etc. to the finished stock valuation. I want to treat these costs as overheads and include them to the finished stock valuation through cost sheets. Initially I would post these materials against the cost centers, but I am not sure how to include those costs to the finished stock valuation through the cost sheets. Request your advice on the same.
    Thanks in advance!
    Snigdho.

    Hi
    Attach this costing sheet to your valuation variant / costing variant
    Release the std cost based on this costing variant... Your std cost would include Overheads as well... hence, your inventory value would include overhead
    Regards
    Ajay M

  • S032 has incorrect stock valuation quantity

    Hi All,
    We are performing an implementation and are loading stock take-on. We have noticed an inconsistency between the LIS and MB52 (material master stock valuation). After some investigations it only happens when we are loading materials using multiple material docs to accomodate stock ageing.
    e.g.
    We have uploaded the following stock take-ons for material ABC (all have different document dates for the ageing):
    4900005615    1 13.03.2006               10  EA
    4900010309    1 13.03.2006                4  EA
    4900012842    1 13.03.2006               15  EA
    4900013311    1 13.03.2006                2  EA
    MB52 gives a qty of 31 whereas MC.1 transaction gives a qty of 84! MC.1 reads from LIS structure S032 and this has the erroneous record showing qty 84... it should be 31.
    Any ideas? Could this be caused by the S032 setup? Is it being updated incorrectly in standard code? We are using SAP All-in-one so the LIS was pre-configured by SAP. We have an OSS open with SAP but this is getting very urgent.
    Any ideas are muach appreciated.
    Thanks,
    Niall

    Hi Ferry,
    Thanks for your reply. Hmmm. I am a little confused here. While the quantities are incorrect on S032 the valuation is correct. There are no rules against either field (i.e. qty or value) and they are both setup as 'Cumulative updating'.
    When I run an update check on the material document it gives me the correct amount!
    When I check (Updating -> Check) the Info Structure SAP suggests a different field to use. See msg below:
    <i>Valuated stock: Instead of using MCBEST-MBWBEST use <b>MCBEST-BVBEW
    Message no. M!126</b>
    <b>Diagnosis</b>
    You update the key figure Valuated stock with the source field MCBEST-MBWBEST.
    Cumulitavely this is not the best choice, because stock would have cumulated in each goods movement and excessively large stock is created.
    This can cause problems via data transport, because stock fields are always filled. If you do not keep very detailed stock, one stock is overwritten by another (for example, batch stock is overwritten by a different batch stock).</i>
    I am even more confused now!
    Thanks,
    N.
    PS: We have already uploaded the data so a retrospective fix would be ideal.

Maybe you are looking for

  • WLST Domain Creation using JRF template throws SQLRecoverableException

    I am working on domain creation using templates and included the JRF template to use OPSS functionality. I have run the RCU utility to create the required components that will have necessary tables to host OPSS data and also tested that it works with

  • Could not save as (file name) because the file could not be found

    When i try saving sothing it comes up with could not save as (file name) because the file could not be found and need to save this file. i could save stuff before but not anymore if anyone could help i would be grateful im using photoshop cs5.1 Thank

  • Issue with condition in Query

    Hi, I have report on a cube which when  execute vit all main characteristics(highest level char[plant] to lowest level[material] chars) like plant, external-material grp, material type, project-plant and material the report vil come vit correct value

  • RFC to Proxy

    Hello Experts, We are converting our all interfaces from RFC to Proxy for better performance... Just wanted to know that for the Data types that we are going to use in place of RFC, for proxy, do we need to develop it on our own or is there any way t

  • How to  Mb1b 322 or 344 movmenet type trigger out ?

    Hi   Does anyone know if I use mb1b to do 322 or 344 movement, which output type should be trigger out ?  wexx or waxx?  does it need setup conditon in mn21 then it could trigger out type?   Does it need maintian in omb4? eg: 322 , choose print item