Stock with WM activated

Hi gurus,
I have a simple question, in an ERP System with WM activated, stocks indicated in transaction MB5B is real ? or this transaction is not correct because WM is activated and then user has to use transactions from WM (LS24 for example)?
Thank you
I will reward points all answers!

Hi,
When WM is activated u need to follow thro WM tcode like LS24 only.
Pl ensure that IM transactions are done before checking in WM
Always IM and Wm stock wont match
pl reply
guru

Similar Messages

  • PS subcontracting with external activity

    Hi,
    I have a couple of questions about "PS subcontracting with external activity" I have not found any information about this for PS subcon flow, I was looking for a subcon PS Wiki but no succeed.
    The scenario is to use a  external activity to a subcontractor and put the material components to deliver in the  external activity and check the subcon check box. Then use the valuated project stock for holding the materials.
    For material components there is an option in tab "Proc. Param" and fiel "Mat. Prov. Ind." = "Material Provision Indicator", do you know if this option can be use or be available in PS? This field is grey so I can not do anything with it, so my guess is that option use only by a BOM, could you confirm that for me?
    Right now I have a problem in the system so I can not save a project when creating a external activity and use the subcon check box, this is at OSS right now. But I was wondering if I put the material components in a external activity, how will it be represented in the PO?
    Will it be only one item in the PO, the service from the external activity? and inside this item will hold all my material components? this can be found in tab "Material data" -> "Components".
    Please share if you have some information about this,
    Regards
    Jose
    PS Note that this scenario is not a MM subcon

    abdul,
    I'm talking what you can do in the system, there is 3 posibilities I have in mind:
    Alternative 1 
    Is when I will send all the parts, thats right separated parts to be one. The material which will be the final material, is not in my stock/company. It is a new material Im manufacturing with the help of a subcontractor.
    In PS I want to create a subcontracting external activity, create a PR from PS, create a PO and deliver it to the receiver in other words the subcontractor who will put it together to the final material.
    For this alternative I think I have to create the material which the subcontractor will put together and have it as a head material in a BOM. The BOM will represent the parts Im sending for assembly, so when the material is deliver back to me, I will do a goods receipt of the head material.
    My question is in this if I have thought this right, if you have experience of this please contact me.
    Alternative 2
    Is when I will send a existing material and all the parts which will be use to maintain/repair this particular material from my stock/company to a subcontractor who will do the work. This material will have the same material no. when I do the goods receipt.
    In PS I want to create a subcontracting external activity, create a PR from PS, create a PO and deliver it to the receiver in other words the subcontractor who will maintain/repair the material.
    For this alternative I think I can use a BOM, create a BOM of this existing material which will be maintain/repair with the parts I will send.
    My question is in this if I have thought this right, if you have experience of this please contact me.
    Alternative 3
    This alternative is almost the same as alternative 2 with the exception that the material Im sending will change the material no when its back from the subcontractor. So I will send a existing material and all the parts which will be use to maintain/repair this particular material from my stock/company to a subcontractor who will do the work. This material will get a new material no. when I do the goods receipt.
    In PS I want to create a subcontracting external activity, create a PR from PS, create a PO and deliver it to the receiver in other words the subcontractor who will maintain/repair the material.
    For this alternative I think I can use a BOM, create a BOM of this existing material which will be maintain/repair with the parts I will send. Then I have to put the new material in my external activity as a material component with negative quantity as part of the subcontracting delivery
    My question is in this if I have thought this right, if you have experience of this please contact me.
    I hope my question is now clear for you, we are using the defence and aero solution so what I know I do can use the subcontracting with valuated project stock

  • Stock with project

    How to find on hand stock on project ?
    With MBBS, I can find stock with WBS element, what @ network ?

    Hi,
    Account assignment 'N' is for non-stock materials. So by definition, you cannot have a stock of these materials.The materials are,ofcourse, account assigned to network. When you make a GR for such materials, it is treated as network consumption. Stock (plant, or project)does not get updated.
    Moreover, please note that network / activity cannot hold stock.
    If this clarifies the issue, you may like to close the posting.
    Muraleedharan.R

  • Creating Handling Unit for Inital Load with SU active

    Hi,
    What is the best way to create Handling units for WH with SU active during Initial load.

    Hi,
    To upload stock please refer below steps.
    1.You can write a program or create LSMW to upload stock. In my experience I used program to upload stock in WM. To upload stock I used transaction LT01 in program.For this I have to give input file which will have material,plant, storage type ,bin ,storage unit type, qty etc.When you run this program system will create automatically TO &SU for the material with the given bin.This TO can be automatically confimed in system.
    2.To perform your program your whole warehouse structure should be in place.
    I believe you got the answer.
    Regards,
    Prashant

  • I recently got an iPhone 4 out of nowhere it has decided to go to connect to iTunes screen/emergency calls only when I plug into iTunes it states we are unable to continue with your activation at this time please try again later, or contact customer care

    I have recently got an iPhone 4 out of no where it has decided to think that my headphones are in and they are not but does work with headphones in.
    Then later on within the same day it after turning my phone on and putting it on charge it comes to the screen stating to connect to iTunes/emergency calls only/no service so I connect it iTunes and it says we are unavailable to continue with your activation at this time. Please try again later, or contact customer care.
    HELP!

    the same problem but i used it already for 3 years my iphone 4, when i update to ios 6.1.3 version, now is failure like said.
    we are unable to continue with your activation at this time please try again later, or contact customer care
    any help please. i am here in saudi arabia city of jeddah.
    thank you very much in advance
    pabs

  • Inventory opening and closing stock with value report

    Hi All,
    Is it possible to get details of both opening and closing stock with value of each items of last financial year (2009-10) in inventory report?
    Mizan

    Hi..
    you can  try this query
    Declare @FromDate Datetime
    Declare @ToDate Datetime
    set @FromDate =
        (Select min(S0.Docdate) from OINM S0 where S0.Docdate >='[%0]')
    set @ToDate =
        (Select max(S1.Docdate) from OINM S1 where S1.Docdate <='[%1]')
    select * from
        SELECT T0.itemcode,
        min(T0.Dscription) as 'Item Description',
        min(B1.ItmsGrpNam) as 'Item Group', W1.Whscode, C1.Location,
        (isnull((
            Select sum(isnull(inqty,0))
            from OINM O1
            where O1.itemcode=T1.itemcode
            and O1.Warehouse=W1.Whscode
            and O1.docdate<@FromDate ),0)-
        isnull((
            Select sum(isnull(outqty,0))
            from OINM O1
            where O1.itemcode=T1.itemcode
            and O1.Warehouse=W1.Whscode
            and O1.docdate<@FromDate),0)
        ) as [Opening Stock],
        isnull((
            Select sum(isnull(inqty,0))
            from OINM O1
            where O1.itemcode=T1.itemcode
            and O1.Warehouse=W1.Whscode
            and O1.docdate>=@FromDate
            and O1.docdate<=@ToDate and O1.inqty>0
            and O1.transtype in (20,18)),0
        ) as [Purchase Quantity],
        isnull((
            Select sum(isnull(outqty,0))
            from OINM O1
            where O1.itemcode=T1.itemcode and O1.Warehouse=W1.Whscode
            and O1.docdate>=@FromDate and O1.docdate<=@ToDate
            and O1.outqty>0 and O1.transtype in (21,19)),0
        ) as [Purchase Return Quantity],
       isnull((
            Select sum(isnull(outqty,0))
            from OINM O1
            where O1.itemcode=T1.itemcode and O1.Warehouse=W1.Whscode
            and O1.docdate>=@FromDate and O1.docdate<=@ToDate and O1.outqty>0
            and O1.transtype in (13,15)),0
        ) as [sale Quatity],
        (isnull
            Select sum(isnull(inqty,0))
            from OINM O1
            where O1.itemcode=T1.itemcode and O1.Warehouse=W1.Whscode
            and O1.docdate<=@ToDate),0
            isnull((
                Select sum(isnull(outqty,0))
                from OINM O1
                where O1.itemcode=T1.itemcode and O1.Warehouse=W1.Whscode
                and O1.docdate<=@ToDate),0)
        ) as [Closing Stock]
        FROM OINM T0
        INNER JOIN OITM T1 ON T0.ItemCode = T1.ItemCode
        INNER JOIN OITW T2 ON T1.ItemCode = T2.ItemCode
        INNER JOIN OITB B1 ON T1.ItmsGrpCod=B1.ItmsGrpCod
        INNER JOIN OWHS W1 ON T2.WhsCode = W1.WhsCode
        INNER JOIN OLCT C1 ON W1.Location=C1.Code
        Group by T1.itemcode, T0.Itemcode, W1.WhsCode, C1.Location
    ) a
    where (a.[Opening Stock]
            +a.[Purchase Quantity]
            + a.[Purchase Return Quantity]
            +a.[sale Quatity]+a.[Closing Stock]
           ) !=0
    Regards,
    Bhavank

  • Do we have standard report to show sale order stock with amount?

    Do we have standard report to show sale order stock with amount?
    I try to use MB5B and MBBS but they don't show value.
    MB5B show only qty
    MBBS no any report.
    Please kindly help.
    Thank you very much.

    Okay Thank you very much for your suggestion.
    I think I have to create a new ZProgram. T_T

  • Opening stock with subcontractors

    Hello Experts,
    I am doing a report on Opening and closing stock with the subcontractors...
    My report's requirement is..
    Mat. No.   -   ekpo-matnr
    Part No.   -    resb-matnr
    Opeining stock (for Resb-matnr)     -         ( movement type 541542543+544 from Mseg)
    Please advice me how to calculate opening stock for the Parts as  ekpo-matnr is linked to ekbe-budat
    and I have to take the opening stock by linking mkpf-budat. And for single material (ekpo-matnr)
    there will be multiple part no (resb-matnr) and I want the openinig stock for each part no.
    Please advice...your help would be highly appreciable.
    Thanks
    R.Karthik.
    Edited by: Karthik R on Feb 17, 2009 4:38 AM
    Edited by: Karthik R on Feb 17, 2009 4:39 AM

    Hi,
    I want to multiply finished good menge with raw material menge , both the menge are from different
    tables.
    eg - A pen is finished good and  its raw materials are top , refill etc.
    Matnr  (finished goods)  =  Pen  ,  Menge =  2 and its corresponding raw materials are:
    Raw mat1 - its Menge is  5
    Raw mat2 - its Menge is  3
    Raw mat3 - its Menge is  2.
    Now I have to multiply these whole raw mat menge with finished goods menge ie 2.
    But when I tried only the first line ie Raw mat1 is getting caluclated.
    Please advice.

  • Report for Storage location wise Stock with value..?

    Hi guru's
    Can anybody explain me what is T.code i want to use to get a report for STORAGE LOCATION STOCK  with VALUE..?
    Urgent reply me  ..
    Thanks
    sap-mm

    Sorry Mr chetan,
    I want to see only the stock available in my company with Value and storage location wise..
    Please try to get report for this
    Thanks
    sap-mm

  • Storage location stock with value on a particular date

    i m in search of a report or logic which can fetch stock as in mb5b on a particular date. mb5b shows sloc stock but without value and show valuated stock without sloc. can anyone help me out to find such report or give some logic or table from where it can fetch sloc stock with value.
    Edited by: Husain Husain on Jan 28, 2010 4:00 PM

    Hi,
    All the stock related reports like MC.1,MC.5,MCBA etc will give you stock for a particular months range. he only report giving stock on a date is MB5B .However in this report you will not get the storage location stock value.
    Now try the report in T Code J3RFLVMOBVED which will serve your purpose .Here in the material parameter tab give your storage location and the date range in the main tab Posting date range and than execute.
    Dhruba

  • Can we have more than one attachement to the "Email with Attachment" activity

    Guys,
    I have a requirement  in which the process has n number of approvers in the flow, and each  approver can add attachments to the form in the list<document>  variable which carries the attahced documents.
    At the end of the process i am supposed to send a email with all the attached files to a help desk team.
    I know that the Email with attachment activity supports one attachment. is there any posibility or other  activity that i can use to send an email with any number of attachments?

    Hi Ashok
    The service you want is called "Send with Map of Attachments". This service is not on the toolbar.
    If you drag on the Define Activity step and type "email" in the Find box you will see under Foundation that there are 3 email services.
    Choose Send with Map of Attachments.
    For help on this service see: http://help.adobe.com/en_US/livecycle/9.0/workbenchHelp/help.htm?content=000570.html
    Diana

  • View for active Incidents related to WI (Problem) with status (Active) works but can't be changed.

    Hi,
    I wanted to create a view of Incidents which are linked to a Problem (any problem).
    I did a quick test using the Incident (advanced) class, selected to display Incidents with status Active and [Work Item] Is Related To Work Item and status for Problem with the status Active.
    At this first test I didn't bother to select any specific columns to display but just went with the pre-selected ( Description, Display Name, Display Name) and it worked. 
    I got a list of expected Incidents in the view but having the Description column made it quite useless.
    So, when I try to select the columns I find useful it will not update and it returns a No items found message instead.
    (image removed due to limitations)
    It is of course possible to group by one of the Display Name fields and collapse to get a more workable view but it still lacks a lot of good information. One would like to include ID, title, Created date,
    date modified, Display Name for Affected User and Assigned to user, and a few others.
    I was just a bit stumped as to why this fails when changing the columns on a view that obviously is possible to create.
    Thanks in advance,
    Daniel

    Consider using the Advanced View Editor( or
    the free edition), since it has much more robust criteria and column editing capabilities. 

  • I tried to restore, update and back up my ipod touch. once it said it was successful i clicked on the label of my ipod in itunes and it had written, "we're sorry, we are unable to continue with your activation at this time." now whenever i click on the la

    I tried to restore, update and back up my ipod touch. once it said it was successful i clicked on the label of my ipod in itunes and it had written, "we're sorry, we are unable to continue with your activation at this time." now whenever i click on the label it just says that and on my ipod it tells me to plug into itunes when it already is. i didnt update restore or back it up with the latest version, so i downloaded the latest version, how do i start the process again so my ipod works!! help this is gay !!

    Hmm, well... iTunes trys to activate your iPod using the Apple server to make sure you have bought it legit.
    Two things come into my mind:
    1) Your iTunes can't access the internet.
    2) Apples activation servers are down.
    That's just my cents, maybe anyone else has an idea.

  • I have restored and updated and I get a message saying WE'RE SORRY, WE ARE UNABLE tO COMPLETE wITH YOUR ACTIVATION AT tHIS MOMENT, PLEASE TRY AGAIN LATER, OR CONTACT CUSTOMER CARE would like to know which means that message and I have to do to activate

    Hi, I have a iphone 4 with IOS 5.1.1 baseband 04.12.01 AT&T recently release me but I have presented a problem with the activation of the device, I have restored and updated and I get a message saying WE'RE SORRY, WE ARE UNABLE tO COMPLETE wITH YOUR ACTIVATION AT tHIS MOMENT, PLEASE TRY AGAIN LATER, OR CONTACT CUSTOMER CARE would like to know which means that message and I have to do to activate hopefully help me with this problem and I have 3 months with the phone saying same message ...
    thank you very much ...

    but can not be unlocked
    If the phone was NOT unlocked, it can't work or be activated with any other carrier than AT&T.  It CAN'T be used with Tigo or Movistar.
    Your post makes very little sense.  Maybe you can get some help with English. 

  • OracleApps HRMS-R12.1.3 Integration with MS Active Directory (win 2008 R2)

    Dear Friends,
    we are using Oracle Apps R12.1.3 and the Microsoft Active Directory : Windows 2008 R2
    we have the following requirement:
    (1)From Oracle Apps to Active Directory.
    -Employee master information needs to be interfaced to Active Directory on a regular interval which should be updated in the active directory.
    (2)From Active Directory to Oracle system.
    -Whenever new email address for an employee is created in Active directory, the information needs to flow to Oracle HRMS.
    Please let us know the method to achieve with minimal latest oracle softwares?
    can it be done over coding from oracle apps without new softwares?
    Is Oracle Apps R12.1.3 certified with Windows 2008 R2 Active Directory?
    Regards,
    DB

    user564706 wrote:
    Dear Friends,
    we are using Oracle Apps R12.1.3 and the Microsoft Active Directory : Windows 2008 R2
    we have the following requirement:
    (1)From Oracle Apps to Active Directory.
    -Employee master information needs to be interfaced to Active Directory on a regular interval which should be updated in the active directory.
    (2)From Active Directory to Oracle system.
    -Whenever new email address for an employee is created in Active directory, the information needs to flow to Oracle HRMS.
    Please let us know the method to achieve with minimal latest oracle softwares?
    can it be done over coding from oracle apps without new softwares?
    Is Oracle Apps R12.1.3 certified with Windows 2008 R2 Active Directory?
    Regards,
    DBPlease update your original thread(s) instead of creating new one(s) -- Integrate Oracle Apps R12 with Microsoft Active Directory
    Thanks,
    Hussein

Maybe you are looking for