Stop excess raw material consumption against production order

Hello
Please Guide
Is there any  control to Stop the excess or less consumption of raw material against the Production Order confirmation.
Eg
Prod order Qty - 10
Ram material reqd A- 10 piece & B- 10 Piece
So now Order confirmation Qty - 10
raw material consumption A - 10 & B- 10
so for A or B if i want to issue (261) excess or Less qty than system should not allow this. System response to be as an error message in case I increase or decrease the Qty of A or B other than 10 against the prod order confirmation of qty 10.

Hi,
You have to use user exit only to avoid it.
1.CONFPP02 - for checking good issue during confirmation
2.MBCF0002 - for Checking Confirmations during the Goods receipt.
For this you need to Use the User Exit:
Enhancement - MBCF0002
Functional Module - EXIT_SAPMM07M_001
Include - ZXMBCU02
Regards,
R.Brahmankar
Edited by: R Brahmankar on Sep 9, 2008 12:41 PM

Similar Messages

  • Raw material -scrap-against production order

    Hi all,
              I withdrawn 10 qty of raw material for production order using mvt type :261. Due to some wrong machine Operation  2 qties of the Raw material is become unusable(scrap).
    I want to return this 2 qty of raw material to warehouse.
    what is the movement type can i use?
    Please advise me in this....

    Hi Kumar,
    Please make your question clearer.
    Have you made a confirmation against a PrdORd? I mean:
    1. confirmed 10 pcs of FGs
    2. withdrawn 10 pcs of raw materials
    3. Later you recognized that 2 pcs of FGs were not good because of the wrong quality of raw material.
    In this case you can cancel your confirmation in CO13 (and do it again only for 8 pcs of FGs and scrap the 2 pcs of wrong raw materials) or you can ask for 2 pcs of raw materials from WH and produce the missing 2 pcs of FGs (physically). In this case you can scrap (MB1A 551) the latter 2 pcs of raw materials.
    Other option is that after getting 2 pcs of raw material and producing the 2 pcs of finished goods you book an excess consumption in MB1A + MVT 261 + PrdOrd reference. It based on your concept...(in which way you want to handle the scrap).
    BR
    Csaba

  • HU managed material consumption against Production Order

    Hi Gurus
    I am struggling to determine how we will consume HU managed goods in production.  The scenario is for the rework or repack of finished goods.  
    1)      The HUs are staged to the production area (either PSA or ST 914 in WM) based on need for rework or based on a production order
    2)      Production Order is confirmed and the inventory on HUs is goods issued.
    There are a few variations:
    Ø  In a rework the HUs are reused with a reduction; that is, they will send in 100 pallets to be reworked and get back say 90.  In this case they would reuse the 90 HUs and the remaining 10 would be inactive.
    Ø  It is also possible that 100 HUs are staged to production and not all the inventory is consumed in the production order.
    The basic question is:
    How do we capture the actual HUs used in the production order or staged but not consumed in the production order?
    Any kind of help will be highly appreciated,
    Thanks
    SK

    dear SK
    if i understand your process correctly - you're after the "Post Goods Issue with HU via Production Order"?
    as far as i know:
    -you create a production order and release it;
    -WM creates a pick request from which you can create a transfer order. the execution of the transfer order results in the components that are managed in HUs at the storage location, being withdrawn and made available for production;
    -you post the goods issue. depending on your organizational structure you can either use an outbound delivery or a transfer requirement as a picking document.
    good luck!

  • Raw Material Consumption to Process Orders

    Hi Friends,
    I need help with changing the way how we consume raw materials in our manufacturing organization.
    Current Process:
    A.     Receive product A in Warehouse, movement type 101. Debit Inventory Account, and Credit GR/IR.
    B.     Move product A to a storage location (out of Warehouseu2019s custody). Movement type 311. No impact to P&L, as no accounting entries.
    C.     Consume product A in a u2018Process Orderu2019 from that storage location 311. Debit Consumption Account, and Credit Inventory Account.
    Product A is listed in Bill of Materials and has to be issued to process orders for final consumption u2013 to give production variance as we are on standard costing system.
    Desired Process:
    We want to have stronger controls in our organization. We want to hit P&L in step B, as soon as Warehouse issues items out. This can be done using movement type 201 GI for Cost Center.
    But we also desire to see final consumption happening in process orders, as all our BOMs and standard costs account for the consumption of product A.
    Please advice how do we issue items to a process order that have already been issued to a Cost Center. What is it that I am missing?
    Thanks,
    Meet A

    I believe we will stick with our current process. See Ajay's reply on the link below:
    Raw Material Consumption to Process Orders
    Thanks and regards,
    Meet A.

  • Material requisition against production order

    Dear all,
    How do i put material requisition against production order. Kindly give me the t-code and total path till material issue from a particular storage location. i.e
    --> requisition against Production order for a storage location
    --> Transfer posting by movement type
    Thanks

    Hi,
    Procurement of RM: -
    1. MM01 - First of all create materials (RM, SF, FG)
    2. CS01 - Create BOM (FG > SF > RM)
    3. MD61 - Planned Independent Requirement for FG
    4. MD02 - MRP Run for FG (System will create Planned orders and PRs automatically as per procurement key - E, F and X in Material Master)
    5. MD04 - Stock / Requirement List OR ME5A - PR List
    6. ME21N - Create PR w.r.t. PO
    7. MIGO - GR w.r.t. PO (Movement Type - 101, Capture Excise invoice here)
    8. J1IEX - Post Excise Invoice
    9. MIRO - LIV for PO
    Goods Issue of RM: -
    1. CO40 - Convert Planned Order to Production Order (Schedule, Release Order)
    2. MIGO - Goods Issue > w.r.t. Production Order (Movement Type - 261) - You can also use MB1A for GI against Order
    3. CO11N - Confirm Production Order
    4 MIGO - Goods Receipt > Order (Movement Type - 101)
    5. KO88 - Order Settlement

  • HU consumption against production order

    Hi Gurus
    I am struggling to determine how we will consume HU managed goods in production.  The scenario is for the rework or repack of finished goods.  
    1)      The HUs are staged to the production area (either PSA or ST 914 in WM) based on need for rework or based on a production order
    2)      Production Order is confirmed and the inventory on HUs is goods issued.
    There are a few variations:
    Ø  In a rework the HUs are reused with a reduction; that is, they will send in 100 pallets to be reworked and get back say 90.  In this case they would reuse the 90 HUs and the remaining 10 would be inactive.
    Ø  It is also possible that 100 HUs are staged to production and not all the inventory is consumed in the production order.
    The basic question is:
    How do we capture the actual HUs used in the production order or staged but not consumed in the production order?
    Any kind of help will be highly appreciated,
    Thanks
    SK

    Hi
    below are the two basic scenario for which I am looking for solutions:
    The clientu2019s product is glass packaging, essentially bottles (beer, wine, etc.).  They are often shipped in cartons that are stacked on pallets.A FG(material number) is defined by the glass container plus the packaging configuration  (including carton, stack height, etc.).
    Scenario 1: Customer orders bottles in cartons in a 8 cartons high SKU, all SKUs in stock are the 10 cartons high SKU.  A repack production order is created to take the 10-high pallets and repack them to 8-high.  Sufficient 10-high pallets are staged to the PSA or 914 based on the TR.  It is possible that the product on all the HUs or a portion of the HUs are consumed to make the new SKU.  In the later, where not all the SKUs staged are used in production, how do we identify the HUs consumed in the production order and/or those left behind.
    Scenario 2: If finished product needs to be reworked, the process would be like the above, except the product on HUs may be consumed in an open production order.  In the case of rework, the goods would most likely be manually staged.
    Thanks

  • Alternate material issue against production order if stock is zero

    Hi,
      I have one requirement  we have 3 material codes
    X, Y and Z.  Material X is present in the Bom of ABC  material Y and Z are not in any BOM  but both those codes are use for procurement of material and can be use insted of X  but due to some requirement as material of different make  we dont want to combine the stock of all.
         Now as per BOM when material for ABC is issue as per BOM  the 'X'  will get issue   but in case  the X stock is zero  system should check stock of Y   and if it is avalibale  then it should issue from Y  insted of X and if Y stock is zero  system should check for Z  if stock is there system should issue from Z.
    can this map in system.
    regards,
    zafar

    Hi,
    While maintaining BOM for FG, maintain all materials X, Y & Z with same qty.
    For material line items Y & Z, maintain "AltItemGroup" at Item Detail level.
    Here enter any key for e.g. "AL" and Press enter then it will ask for following;
    Priority
    Strategy - (1 - Manual maintenance/by usage probability OR 2 - 100% check)
    Usage prob.
    After maintaining all these just check the effect in transaction production order, reservation, confirmation.

  • Restricting excess raw material consumption ducring confirmation

    Dear Experts
    Scenario
    The production of the finished product comprises of many raw materials. The goods issue is done by backflushing. After few days , it is noticed that some of the raw materials consumed are a bit more and some are less .
    The Plant manager insists that this needs to be restricted . Please advise how do we restrict this phenomenon . Your guidance will be highly appreciated . Thanks
    Kind regards
    Aman

    Aman Khan wrote:
    Also please advice if we generate a z report what fields and tables  can we consider .
    If you want to create a report program which will show the unplanned issues and over issues of components, you need to read the bom components from table RESB also, but the is problem users can add extra/new components manually in CO02 so you need to look at field STLNR to see if it came from BOM or manually added and then you need to get all the goods issues done to the production order using MSEG, use the quantities of STPO and subtract them from issued quantities of MSEG (mvt type 261) you will get the report you want. Use SE16N and look at all the fields you will understand.
    Edited by: Jeevan Sagar on Feb 11, 2012 2:22 AM

  • Excess Issue of Material against Production Order

    Hi
    For Goods Issue of Material against Production order , i want the system to control excess issue of material against Production order.  How can it be controlled.
    Regards
    Madhesh Kumar

    Hi Madhesh,
    there are many loop holes to issue excess stock against production order
    so better you use user exit so that when ever any material issued against production order and it is in excess then throw error
    Thanks
    Bala

  • Excess Raw Material  issue & FG reciept in Make to order Production

    In MTO Scenario I have created sales order for 10EA.After MRP run planned order of 10EA was created.I converted to Production Order.GI of raw material & GR for FG happens during order confirmation.If for that customer during Production physically 11Ea was produced.How i will show that extra FG (1EA) production & raw material booking against the order..

    Can you clarify, does it  mean you have consumed raw material for 11 EA FG, or you consumed only equivalent of 10 EA and due to production efficiency increase you gtot 11 EA output.
    In any case you can post this as a normal production order output. For additional 1 EA you can add this in Tolerance.

  • Material Staging for Production Order

    Hi,
    I am doing Material Staging against production Order using T Code MF60. We don't have WM setup in the enterprise structure so the Staging is done via IM Mvmt. Type 311. My problem is that the material document created using MF60 does not have a reference of Production order or vise versa. Can anyone suggest a configuration or a user exit that can be used to make a reference link between the Production Order and the Staging Document?
    Thanks
    Arvind

    Hi!,
    Though whatever you are asking for is not possible with standard SAP but you can try this work around solution:
    Click on replenishment element.
    Now in MF60  Menu > View > Table column > Select " All Column" (after clicking ).
    Now system will show some open fields (like Goods recipient, unloading point etc) on replen. element.
    There in one of the field like unloading point (which you are not using elsewhere) you can enter the production order number so when you stage the same that order number will be saved in that document and you can get it from RESB table against the reservation number.
    To automate the same you can use some enhancement with above logic.
    I hope this helps in resolving your problem.
    regards,
    Uday
    Edited by: Uday Parchure on Jul 29, 2009 12:50 PM

  • Table names for Material Characteristic againgst production order

    Hi Guys,
    Actually I have a problem in finding the table name for material characteristic against production order such as Individual length, factor, color, etc. I really spend more than a day to find this. But I cudn't make it. Finally I found the flow some how, but is working only for few cases. Here is the flow.
    AFKO(RSNUM) --> RESB(OBJNR) --> INOB(CUOBJ) --> AUSP(OBJEK).
    T-code: CO02 / Fast Entry tab / Change Configuration(Item Level) / Change Characteristic values.
    Anybody knows about this. Please help me out on this. And please note that, it is not the material characteristic from MM01, it is against production order from CO02.
    Thanks
    Yasin.

    Hi Yasin,
    The best way to know Table Names in SAP is to use a Transaction Code Called : SQL Trace. Tcode : ST05. This will tell you about all the database tables that have been accessed while the Transaction was executed. And then you do a complete analysis of it, what are all the Tables that have been accessed, the fields and the data transfered. So, it's a complete trace of the SQL Query but you can use the information as needed.
    Have a look at the following Links:
    http://help.sap.com/saphelp_nw04/Helpdata/EN/17/358df9c9fee2469105731e10756921/content.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/d1/801f89454211d189710000e8322d00/content.htm
    The best things is that you can use it across any SAP Transaction as it is available in SAP NetWeaver .
    Hope this helps.
    Thanks,
    Samantak.

  • How to stop excess goods issue against production order from MB1A

    Hi Gurus,
    In our organization goods issue against production order is done by using MB1A T.Code manually.Due to this reason sometimes excess quantity of RM issue against production order.Now I want to stop the excess goods issue against production order by using MB1A but I want to mainatain a certain tolerence.
    Please advice what to do?
    Regards
    Nirmal

    Hi ,
    Use user exit MBCF0002
    This is called when u do goods movement for production order.
    Regards,
    Vishal

  • Excess goods issue against Production order

    HI PP Gurus,
    My requirement is to block excess goods issue of raw material against a production order.
    Ex. Production order qty = 10 , For producing 10 Finish goods i require 10 raw material. When i do confirmation via CO11N  the system automatically shows GR & GI Values in Goods Movement tab. there i change GI value of RM from 10 to 20 the system takes the value and does the GR & GI.
    My requirement is that the system should not do GR & GI if the GI value is more than that is calculated at the time of creation of Prod. Order.
    Thanks in Advance,
    Deven

    Hi,
    Rstriction of excess goods issue against production order is not possible in standard setting.
    For achiving this you have to go for User exit.
    The logic should be
    In MIGO check mvt. type 261
    Pass the order through table RESB and select all the components with quantity.
    Capture the header material of order and use this as input along with the order creation date, plant and BOM application to explode function module CS_BOM_EXPLOSION.
    THis will give you the BOM components which were valid at the time of order creation.
    Now compare these BOM components with the components from RESB with quantity.
    Here conditions will come in picture
    If quantity is exactly matching then GI will be possible
    or if you want to keep tolerance limit say for 10% then accordingly you can map the condition.
    Regards
    Amit Parkhi

  • Error while issue material against production order

    Hi,
      In our development server recently we have created on ecompnay code and plant by copying the one existing company code and plant,  now for this new plant I have created new profit center with KE51  and after that I have create done cost ceneter in that this new profit center is assign   now while goods movment with MB1A with movmen type 201, 202  it works OK system is not giving any error  but while issue the material against production order in MB1A with movement type 261 system is giving error message
    No postings can be made to profit center DUMMYBAOPC in company code MT50
    Message no. KM183
    Diagnosis
    Profit center DUMMYBAOPC cannot receive postings in company code MT50.
    this profit center DUMMYBAOPC we use in old compnay code and for this new company code is not activated  for new we have new profit center  then it is  linking to that  what can be the solution.
    regards,
    zafar

    Hi,
      After asigning new profit center in the Production order problem solve.
    regards,
    zafar

Maybe you are looking for