Hello Experts
I have set up my DMR as skip 10 lots after one insection.
What I am looking for is to stop skip lots generation as I need to run batch job job QA17 to complete the UD for all skipped lots.
What I am looking is that each 11th receipt is inspected , without generating the skipped lots .
That way system will have less lots and I do not have to execute the batch JOB QA17.
btw in my DMR definition my selection is DYNAMIC MODIFICATION at "lot selection"
Appreciate your feedback.
Thx
Gaurav

Hi Gaurav,
As per my understanding, you want to inspect one lot and after that you want to SKIP next 10 lot inspect 1 lot & SKIP 10 lot ................. Correct??
Let me correct if my understanding is wrong.
If this is the case then do DMR following way it should definitely work in your case.
Create DMR - QDR1
Select DMR for UD (If you want to update quality level after UD)
Select DMR at lot creation (If you want to update quality level after lot creation)
Stage 10: InspServ - 4, SKIP - blank, ISt - Select check box, Short text - inspection, StC -select, No. of inspection - 1, Ma SKIP duration - blank, Next - Stage - 20, Reject - 1, Next - 20.
Stage 20: InspServ - blank, SKIP - Select, ISt - blank, Short text - SKIP, StC - select, No. of inspection - 10, Next - 10, Rejection - 1, Next - 20.
Let me know if you have any question on this.
Thanks!!!

Similar Messages

  • Block goods receipt if open inspection lot for source inspection (SAP QM)

    hello!
    i would like to block the goods receipt for a purchase order item, if there is an open inspection lot for source inspection. i know how to block, if it rejected, but not what to do in this case.
    thanks!
    matthias

    Hi matthias,
    can you tell me how to block GR if inspection is rejected in source inspection??? as you said u know. please let me know.
    Thanks!!
    vinay

  • Restrict to create lot for 08 inspection type

    Hi,
    In our busibess scenerio we are creating Inspection lot through 08 inspection type with movement type 322(from unrestricted to Quality) but we want to restrict 311 movement type to create Inspection lot for the same material. I have deactivated configuration setting for the movement typy 311 but still it is creating inspection lot. Kindly advice me the correct process to restrict lot in QA32.
    Regards
    Neel

    Dear,
    You can also try that remove inspection type from material master.
    Sandip

  • Inspection lot for recurring inspection was created without user decision

    A manual inspection lot was created for recurring inspection. When reporting results QE51, the user decision option is disable, therefore I can not move the batch from Quality Inspection to Unrestricted.

    I still don't see how you are manually creating the lots.  From the way you described it, the qty. is already in QI and you are then manually creating an 09 using QA01.  If this is what you are doing, the manually created 09's will NOT be linked to the inventory in QI and they will not be able to be used to move the stock out of QI.  NO MANUALLY CREATED inspection lots, (i.e transaction QA01), EVER control stock.  To control stock, the inspection lot must have been triggerred by another event or transaction that caused the lot to be created., (QA07, GR, stock transfer, delivery creation, etc...)
    What I don't know, is how you got the material into QI in the first place.  How was the material moved into QI?  When stock is moved into QI that should trigger an inspection lot.  If QM is active for a material you shouldn't be able to use standard stock movements to place the material into QI.  If you moved it and then activated QM you should get errors when activating an inspectoin type unless you have followed specific procedures for creating 08 lots for exisitng QI inventory.
    So  I think we are still missing some informaiton.
    FF

  • Skip lot across multiple batches for same material

    Hi,
    I am looking for a way to control skip lots across multiple batches for the same material.
    We need to do a quality check in production after a certain quantity produced (on a machine, for a material). My idea was to do skip lots (for GR)  until we reach a threshold (say 10.000 pcs) and then do an inspection for the next GR for that material.
    Any ideas how to set that up?
    Thanks for any hint
    Andreas

    Hi mergler,
    Ref to your query pls check this link Stock Posting for Skip Lots
    Thanks in advance

  • Customer number not in the inspection lot for a make to order scenario

    Hi All,
    I know that standard SAP will get the Customer number into Insp. lot only for insp. types 10/11/12.  I am wondering if someone know a way to get the customer no. into insp. lot for insp. type 04 where the material is make-to-order scenario and the Production/Process order has the Sales order and customer no. without activating User-exit.  The quality users want to be able to see the customer no. in insp. lot without having them to go to process order. 
    It makes no sense to me why the customer no. is not brought into insp. lot when that is available in the Prod/process order, which can further be used to select the customer specific insp. plans for 04 insp. type Insp. lot without using Variant configuration.
    Any light on this topic is appreciated.
    Thanks.

    Hi Srikant,
    I guess.........
    Normally the inspection lot refers the triggering document that are the trigger cause for them.
    - Inspection type 01: - Purchase Order and GR material document.
    - Inspection type 03: - Pro. Order Number
    The same way...
    The inspection type 10\11\12 are purely related to the SD, and directly integrates QM and SD. Hence in the inspection lot for the inspection types directly integrated to SD, it will furnish the Sales order number \ Customer.
    But the inspection type 04 is purely have it's relation to Production process. So it will have the details related to integrations it has i.e. the "Pro. Order." Hence it integrates QM-PP, it have the data related to PP (Pro Order), not the SD's one.
    But I think one way you can achieve it,
    Assign the Customer number also to the inspection plan along with the Material. So I think at the time of assigning the inspection plan to the inspection lot, it will refer the Customer number also and will display the Customer number along with Task list Group\Group Counter, in the inspection specification screen in QA03/02
    Regards,
    Shyamal

  • Stop Automatic Creation of Inspection Lot for a condition

    Dear Gurus,
    While Creating a Delivery through a Sales Order, Config is maintained such that "Inspection Lot" will be automatically Generated.
    Now Business wants to Stop this Automatic Creation of Inspection Lot only for a Particular Delivery Type and for a particular mode of Transport.
    Do we have any User Exits / BADIs to achieve this requirement.
    Please let us know.
    Thanks in advance.
    Regards,
    Vinay Mutt

    Hi
    To meet you above mentioned requirement you have to modify the program RQAAAS10 as per your logic both to create lot for Expired Material and to consider project stock or vendor stock as In standard SAP these stock are not considered.
    regards
    Manish

  • Inspection time Capacity Updation in work center for skipped lots

    Hi Guys,
                 I am using in process inspection type 03 along with DMR criteria at lot level i have defined the DMR rule and assigned it in routing header.DMR rule is inspection lot 1 in 5 will be inspected i.e when the inspection lot will be created and if there is no quality level exists it will first create the quality level with 1st inspection lot which will not be skipped lot and then it will skip next 4 lots and 5th will be inspected again.Quality level is updated during lot creation level.
                 what i am looking is when you have the skip inspection lot he capacity which has been planned for inspection for that work center should not be considered since there is no inspection done because of skipped inspection on that work center although it's the part of Routing/production process.
    please let me know if any more inputs required.
    your inputs/feedback is really appreciated
    Regards
    Ashutosh Shende

    Hi Krishna,
    It is distributing unevenly because of the Int. Dist. key maintained for "Labour" capacity category.
    Following are the available dist keys.
    I think for your scenario, you should select SAP020
    SAP000     Overall load for latest start date
    SAP010     Overall load for earliest start date
    SAP020     Equal distrib. earliest dates, fact.cal.
    SAP030     Equal distrib. latest dates, fact. cal.
    SAP040     Equal distrib. latest dates, discrete
    SAP050     Equal distrib. earliest dates, oper.time
    SAP060     Equal distr. latest dates, operat. time
    SAP070     Overall load at latest finish date
    Please let me know if this works for you.
    Regards,
    Abhay Kapase

  • No Inspection Lot required for Skipped Lot

    Hi Experts,
    I have used DMR to skip 10 lots from a particular vendor and inspect the 11th lot. But the client's requirement is even inspection lot should not be generated for the skipped lots.
    Also, if the material is procured from some other vendor, then the inspection lot should be generated everytime.
    How can I map this?
    Please advise.
    Regards,
    Rahul

    The only alternative I can think of would be to use a development.  Set up the inspections to happen .  No DMR.   You then would use a user exit, (I believe QAAT002, maybe QAAT001 would work). One of those allow you to set a flag in the user exit that supreses the creation of the inspectoin lot.
    You would have to have the user exit look up the GR's for the vendor/material/plant combination since the last inspection lot for this combination.  Then if the count is equal or greater than ten, you create the lot.  If less then 10, you suppress the creation of the lot.
    I would be careful how you code the user exit.  You'll probably only want this to apply to certain materials so you have to come up with a way that allows flexibability in what materials this is used for.  I might suggest using the QMin procuremnet control key.  If you have no procurement functions, you usually define a control key 0000 for this .  Copy that to 1001 for instance.  It will have no functions.  But your user exit would only run if the control key was 1001.  It would immediately exit for any other control key in use.  You might need additional control keys if you do use other features of the conrtol key such as COA receipt.  In that case you might have two control keys that trigger your user exit.  1001 and 1002.  1002 would require a cert.
    I hope this is clear.
    FF
    Edited by: FireFighter on Sep 22, 2011 2:50 PM

  • R12 PO Inspection vs. Quality Skip Lot

    We have been performing PO inspections without the Quality module for over 10 years. There is project to move many of our key suppliers to an Evaluated Receipt Settlement program. The accounting folks want to throw these suppliers into some sort of Skip Lot process. However it appears that to go in this direction all Inspection Required receipts will now have to have a Quality Plan associated to it. Is this true? Is there anyway to commingle the two inspection methods?
    Thanks in advance!

    Hi Rahul
    You may need to set following to meet your need,
    1. In Quality Collection Plan Set Item Inspection required - for a Particular Supplier or Supplier + Site
    this will invoke Quality plan only if above conditions meet and hence it will feed this to skiplot engine.
    Skiplot engine is designed with skipping lot, irrespective of mode of receiving materials.
    Hope this helps.
    Any questions let me know
    Cheers
    Kamal
    0044-7533787829

  • How to do single usage decession  for multiple inspection lots

    we are clearing Usage decision each & every lot for which taking lot of time, if any setting for  a GR Document number/Multi GR document nos connected lots to be cleared at a time automitically,

    Hi,
    In addition to Anupam's reply,
    Follow the SPRO path for Auto UD---> Select your plant for AUTO UD settings -
    > then go to InspLot completion tab where you need to define following time fields under Automatic Usage Decision tab page :
    Delay time for skip lot (in Mins)
    Waiting time (hrs) & Waiting time (Mins).
    Waiting time is the time which must elapse after inspection lot creation after that only system will carry out automatic usage decision.
    Save above settings.
    Further as a master data part, you need to maintain tick in Automatic UD check box for the respective material for which you want activate automatic UD.
    Hope this clears your doubt.
    Revert if still any query.
    Regards,
    Tejas

  • How partial inspection is done for a inspection lot & vendor payment done based on inspection result

    Dear Gurus,
    In our business 1000 bag material is received in one material document. So one Inspection lot is created.
    Now business take randomly 10 bags from that 1000 bag & inspected. The Bags are inspected on various parameters such as Weight , Fabric , Valve Size , Cross Sec Area, Print Quality , Stitching Thread , etc . The values for all this types of parameters are prepared in an excel sheet in a prescribed format.
    The Values for each Quality Parameters are then matched with the desired prescribed average figures.
    Based on the Values which deviate from "Average" figures , deductions are computed
    Logic is 1% for single defect in a bag for 1 parameter . Likewise if more defects is found then add 1% in multiples
    e.g 1% + 5 defects then .05 * basic Raw material cost .
    This figure along with proper description is recorded under "Remarks" column of the report format and send to Accounts department for the
      deduction process from Vendor
    we need to capture the inspection parameters in system as per the above process.
    And please tell me how I configure this process in SAP .
    Thanks & Regards,
    Bubai

    Hi Bubai,
    you can create a QM Control Key (which is used to QM View of Material Master) which you have to set the indicator Block Invoice. This indicator is blocked invoice with blocking reason I (I = Inspection) if there is still no usage decision for the inspection lot or the inspection lot is reject.
    (SPRO -> Quality Management -> QM in Logistics -> QM in Procurement -> Define Control Keys).
    Best Regards,
    Apostolos

  • One inspection lot for all GR per day.

    Hi,
    Presently when I am doing GR for a material system generates a inspection lot per GR.But when I am doing GR for same material several times per day system should generate inspect lot once only.or if material belongs to same supplier also it should generate one lot for that day .how to do with dynamic modification rule?  
    manoj

    hi
    1. if same material per day-one lot
    Create a DMR with Reset period 1 day.
    Two stage DMR with First stage : Inspection 1
                                      Second stage: 99 skip reset 1 day.
    Now apply this DMR in task list Header.
    Go to QA16 and set auto UD after Every 30 mins for 01 inspection type.
    Also QCC0->Basic setting>plant level>Insp lot completion>Auto UD-->
    maintain 30 mins here for skip & auto ud
    this will create first lot every day & will come to inspection.
    from second lot all lots will come to QI but stock posting will be done by system.
    2.if same vendor material -one lot
    in QP01>material Assignment>enter vendor material combination  here.
    rest of the things will remain same.
    Regards
    Sujit

  • Error in Setup Tables for QM Inspection Lots

    Hi,
    I have an issue when I attempt to fill the setup tables for QM that I receive the following error for the Inspection Lots (QV) only. When I fill the setup tables for Notifications and Inspection Results, then these are OK and use the same standard function module 'qmex_inspection_lot_import_ini'.
    "Internal error in program SAPLQMEX, function module / subroutine qmex_inspection_lot_import_ini, code 1".
    Has anyone any ideas of the cause or have you experienced this before?
    Thanks,
    Scott

    Hi,
    The most likely reason that leads to the above error message in your
    system is an inconsistency of the inspection lots.
    To get the inconsistent inspection lot,please check your system in the
    following way:
    - transaction OLIQBW for running Setup table
    - switch on debugging mode
    - set break point in the function  QMEX_INSPECTION_LOT_IMPORT_INI
    on the line:
    ELSE.
       MESSAGE e011(qmex) WITH sy-repid
                               'qmex_inspection_lot_import_ini'
                               '1'.
      > then excecute F8 to go to this break point.
    - double klick on ' l_qals-prueflos'
    on line 77 in the same function  QMEX_INSPECTION_LOT_IMPORT_INI:
    READ TABLE qave_tab INTO l_qave
                        WITH KEY prueflos = l_qals-prueflos  <      here !
                        BINARY SEARCH.
    Please check following note:
    305244 Missing operations for the inspection lot
    89541 Inspection lot exists w/o status object: EM BS001
    536769 Inspection lots without status object
    Thanks,
    Venkat

  • Inspection type 04 should not generate Insp.lot for specific Process orders

    Hi Guyes,
    I Want to skip the Inspection lots generation for specific process orders of a particular material during Goods Reciept and stock should be directly posting in to Un-restricted stock.
    In the material master assigned with Inspection type 04.
    Please advise me the possible options to map this scenario.
    regads,
    Rao

    In  QDR1
    stage 10-click on insp stage
    stage 10
    no. of insp : 5
    new insp stage : 20
    rej : 1
    new insp stage : 10
    stage 20 - tick on skip
    stage 20
    no. of skip : say "5"
    new insp stage : 10
    rej : 1
    new insp stage : 10
    Now use this DMR in Header of inspection plan of material of process order.
    what this will do is after 5 inspections it will skip the next 5 inspection lots.
    Make sure :
    You can maintain setting for "maximum skip duration in plant level.
    In QM view click on Skip & auto UD
    Create variant in QA16 & run through QA17
    Here in QA17 maintain the duration after which you want to take UD
    Also make sure that in selected set maintain stock posting proposal for unrestricted.