Stop waiting for event 'SEND_OK_TRANSPORT' of CL_SWF_XI_MESSAGE

Hi,
I designed a BPM with a sender requesting for a Transport Acknowledgement.
But earlier I defined via IDX_NOALE, that no Ack. should be sent.
My problem is now, that I have a lot of messages waiting for the event 'SEND_OK_TRANSPORT' of object type CL_SWF_XI_MESSAGE.
How can I stop these workitems (>10000 workitems
Is there a report to fix this problem?
Thanks a lot
Regards
Wolfgang

Hi Wolfgang,
If you go to SXMB_MONI_BPE you can see various options to play around with work item and work flows.
if you want to change workflow state manually just execute Diagnosis Processes with Error option here you can edit work item and workflow states.
Cheers,
Jag

Similar Messages

  • NiDCPower Wait For Event

    Hello,
    I am using the PXIe-4139 SMU to source a current sequence that starts when a trigger is received and takes about 40 seconds to complete.
    After the niDCPower Initiate VI I have inserted the niDCPower Wait For Event VI with a timeout set to 300 seconds to allow for enough time to receive the trigger and complete the sequence. This VI waits for the Sequence Engine Done Event.
    Now this works fine, however, when the user wishes to stop the programm for whatever reasons, they have to wait the full 300 seconds until the Wait For Event VI produces a timeout error and stops the programm. This is rather inconvenient. How can I change the programm so that the user can stop it even when the Wait For Event VI hasn't reached its timeout?
    I tried this:
    But this doesn't work. For some reason, I get a timeout error with code -200474 but the boolean operator returns FALSE.
    Any other ideas?

    If there an output on the wait for event VI that flags a timeout? If so, set the timeout short (like 100 msec) and wait for 3000 timeouts before continuing on.
    Oh, and use an event structure. Timeout event (timeout=0) checks the wait for event, value change event for button breaks out of loop.
    Mike...
    Certified Professional Instructor
    Certified LabVIEW Architect
    LabVIEW Champion
    "... after all, He's not a tame lion..."
    Be thinking ahead and mark your dance card for NI Week 2015 now: TS 6139 - Object Oriented First Steps

  • Wait for Event FIPP - Completed Logically Deleted

    Hi WF Experts,
    We have a WF for Release of payments.
    It has 1 Fork with 2 parallel branches (both necessary).
    1 Branch has the approval process for Amount release and the other branch calling the Account assignment approval Subworkflow.
    The approval process branch has the until loop with increment counter and it picks the agents within the loop until a loop condition is reached and thereby till no more approvals required.
    The other branch, before calling the subworkflow, it checks a WAIT FOR EVENT FIPP->COMPLETED with container element FIPPID.
    Both these branches needs to be completed so that the forks gets ended and the wf comes out of the fork.
    The approval process branch is working perfectly. But in the other branch the WAIT FOR EVENT FIPP->COMPLETED  gets logically deleted and thereby, this branch does not go firther to start the Account assignment approval Subworkflow. This way the Fork with the 2 necessary branches does not end, and thereby, the WF stops here and could not go further to set release indicators (Which is a backgorund task).This will confirm the end of WF process.
    When I pass the WI ID for this Wait event in the SWIA, it shows the status as CANCELLED.
    The WF User log as a whole shows the status as COMPLETED as all the approvers has approved the release.
    Why is the Wait for Event gets logically deleted ?Please advice.
    Edited by: Sameer Anwar on Jun 12, 2011 9:17 AM
    Edited by: Sameer Anwar on Jun 12, 2011 9:21 AM

    Dear Experts,
    Any update on this . I am unable to sort this out why the Workflow is getting stopped.
    -Anwar

  • Wait for event - contradiction between SAP help and SDN?

    Hello,
    I try to employ an advice from SDN for "How can I 'advance in dialog' with asynchronous tasks?", which says "use a synchronous task instead e.g. by using a wait for event in a separate branch". But when I define step Wait for event, I can read on the control tab "You should not use this step type in a fork to wait for an event that is triggered in another branch of the same fork."
    In my understanding these two advices are in contradiction - am I right? Why we "should not use this step type in a fork to wait for an event that is triggered in another branch of the same fork"?
    Thanks for explanation.
    Miroslav

    Hi..
    Wait for Event you can use in the Fork, but each branch should triggered separately.
    E.g. If I Claim a Travel Expense a workflow will trigger from the Event  "RequestCreated", then after few hours i want to change the Travel expense and re-submit again, now "Changed" event and "RequestCreated" event will Occur. At this time the Old Workflow has to stop and new workflow has to trigger.
    So, here a fork has to be place, in one branch the normal approval steps and in another branch wait for "Changed" event has to be place.
    So now the previous workflow will closed and new workflow will trigger using the new values.
    Regards,
    Surjith

  • Workflow -  Wait for event

    I have a requirement like this:
    In the workflow, judge an object is released or not. If not release. the workflow will stop.
    Now we need to write a program to check the status of the object every 15 mins, if the object is released, then an event will be raised to allow the pending workflow to continue.
    How do I achieve this?

    No Problem Yu,
    See below. Rough steps but I think you can fill in the meat on bones.
    Creating event.
      Step 1. Execute SWO1  it is O not zero.
      Step 2. Create business object. If you do not have one already. I assume you do not have one. Make sure you define key fields which uniquely identifies your object.
      Step 3. Create one event under events node. Make sure key fields are part of event parameters. Save and activate object.
      Step 4. Now triggering the event. In your besopke program which will run as background job. Once you decide object is released. The call function module SWE_EVENT_CREATE to trigger workflow. example given below. Check where used list of this FM you will find many examples. Use any example where EVENT_CONTAINER parameter under tables is being used you'll need this to pass data to event parameters.
    CALL FUNCTION 'SWE_EVENT_CREATE'
      EXPORTING
        OBJTYPE                       =  T_OBJTYPE
        OBJKEY                        =  T_OBJKEY
        EVENT                         =  T_EVENT
            CREATOR                       = ' '
            TAKE_WORKITEM_REQUESTER       = ' '
            START_WITH_DELAY              = ' '
            START_RECFB_SYNCHRON          = ' '
            NO_COMMIT_FOR_QUEUE           = ' '
            DEBUG_FLAG                    = ' '
            NO_LOGGING                    = ' '
            IDENT                         =
    IMPORTING
       EVENT_ID                      = T_EVENT_ID
    TABLES
       EVENT_CONTAINER               = T_EVENT_CONTAINER
    EXCEPTIONS
       OBJTYPE_NOT_FOUND             = 1
       OTHERS                        = 2
    Creating wait step.
        When you insert a new step in workflow it will ask you the kind of step you want to insert. Choose wait for event and after that it is not very tough all you have to give is give business object and event name. Do binding, this is important as this will make sure your workflow is reacting to correct instance of object.
    Warm Regads,
    Anuj Nagpal.
    Edited by: Anuj Nagpal on Sep 17, 2009 5:32 PM
    Edited by: Anuj Nagpal on Sep 17, 2009 5:33 PM

  • Process chain Error: This AND process is not waiting for event RSPROCESS

    Hi All,
    I am facing an error in the process chain in PRD.
    Error message: This AND process is not waiting for event RSPROCESS.
    We had a process chain which had two sub chains which run parallel and below of this we had AND process type and below of the AND process we had 4 more jobs.
    Once the two subchains got successfully loaded, the and process should turn to green and further 4 jobs should start.
    It is a daily load , it worked fine from past years,but suddenly the AND processtype is getting failed.The thing is in the two subchains if one got completed, the AND process process is not waiting for 2nd subchain to get completed.The AND process is turning to RED (status: cancelled) . I tried to repeat the AND process once after above 2 subchains loaded, but it didnt worked.
    And i removed the existing AND process and created a new one and placed it in same place and activated and schedules again.but still it is getting failed with same error.
    Thanks in advance,
    Sai Chand.S

    Hi,
    If you did any transports related to that metachain we face similar kind of issues.
    not only the AND process , we need to remove all the process before executing the AND process and create it again.
    It helps you, you said your in production So you should take the proper approvals and do it.
    Regards,
    Yerrabelli.

  • Query on Using fork with wait for event

    Hi All,
    I have a scenario in which a fork has two branches and one branch has the multiple steps along the line and also calls a subworkflow in one of the steps.
    The second branch has a single wait for event to complete the workflow in case of a cancel event.
    My understanding is that when the branch one executes and is on a single step decision or have gone inside a subworkflow and wating for user decision on the workitem created
    Whenever the wait event is triggered on the main workflow the second branch gets executed completing the workflow and all the branch one steps and the subworkflow gets logically deleted removing all the workitem from the inbox.
    Do I have to do any specific process control in main workflow to make sure that the subworkflow is deleted .
    Please clarify on this.
    Thanks,
    Charan.

    It should be taken care by itself. No additional steps required.
    Regards, IA

  • Error in Workflow wait for event node

    Hello Experts,
    I am working on one QM notification. I shall explain the scenario first:
    1) User will take the usage decision on inspection lot in QA11. When user will take decision and save inspection lot BUS2045 event USAGEDECISIONMADE will be triggered and initiate my workflow here.
    2) After workflow initiation system will create notification and send to approver, but here i have wait step in my workflow for BUS2078 - Created (Notification).
    wait for Event step
    BO: BUS2078
    EV: CREATED
    I am posting error below:
    Error when starting work item 000000294361
    Error when processing node '0000000060' (ParForEach index 000000)
    Error when creating a component of type 'Wait Step'
    Error when creating an event item
    Error within method CL_SWF_RUN_WIM_EVENT->_CREATE_WORKITEM_CONTAINER
    Error within method CL_SWF_RUN_WIM_EVENT->_GET_INIT_WORKITEM_CONTAINER
    Workflow 000000294361 wait step 0000000060: No valid object ID in container element 'Notification
    Node 60 - wait for event step.
    Re.,
    Guri

    Hi,
    Based on your description what I felt is you are making use  of a wait step in which you have choose to wait till BUS2078 event CREATED is occured ... right.. Now can you please clear me that where and how this event will triggered.
    or is it some thign like you are making use of event creator step and in this case, When ever you are making use of the eventcreator  step and a BOR object inside it make sure that specific BOR object is already instatitaed in the workflow container , if it is instantiated then only it will try to identify the instance  or the BOR and it will try to rasie the event.
    Regards
    Pavan

  • Bpm:message being sent and wait for event

    Hi,gurus:
    My scenario is about BPM.In the integration process I used a loop and correlation.The scenario worked successfully yesterday,but after I changed some thing,it did not work.The outbound status of the message in sxi_monitor said "message being sent".And when I clicked PE to see the workflow log, it said " wait for event".
    Thanks in advance.

    Could you tell me how to reimport the integration progress in ID?
    reimport means...delete the already imported BPM from ID.....this would affect the corresponding ID objects....save and activate....and then again run the import Integration Process wizard....create the objects once again.....seems time consuming.....hence mentioned it as the last option in the list:(
    Also from SWWL delete only the instance with status as ERROR.
    Edited by: abhishek salvi on May 20, 2009 9:30 AM

  • Message being sent and wait for event - BPM help.

    Hi Experts,
    I am doing BPM interface, in that i am receiving two files. Between these two files, i have set the coorelation in the BPM and included in the BPM's receive step1 and receive step2. After execution, when i look into the sxmb_moni, message status shows processed successfully, but when i look the Process engine status, it shows Message Being Sent and when i look into the BPM monitoring it shows message wait for event in the coorelation object.
    I have gone through the following forum :
    Link:[https://forums.sdn.sap.com/click.jspa?searchID=27600139&messageID=7561954]
    but everything is green and messages are set to Message being sent status.
    Experts kindly advise me.
    Regards
    Mani.

    Hi Abhishek,
    Here i have given my BPM design,
    Start
    Fork - two branches
    Branch1 - Receive File1
    Branch2 - Receive File2
    Transformation
    Send
    End.
    In coorelatin editor, i have specified container,involved messages and properties clearly.
    I have gone through the SAP basis contents as per your previous reply.
    One thing is, i have used the same design for my other interface, it is going through, but specifically for this interface i am getting error. If you could send me your mail, i will send you the exact screen shots, so that you can advise me.
    Pls i need to complete this in a short period, kindly help me to come out.
    Regards
    Mani..
    Edited by: mani_sg on Jun 18, 2009 10:21 AM

  • Problem with wait for event

    Hi everyone,
    I'm using wait for event step in my workflow of a custom event called zevent2.
    I'm not using the event as a start event of the workflow.The event is getting triggered at a certain point of the workflow programmatically.
    So for that what should be the entry in SWE2? I've maintained the following entry for zevent2 at swe2 tcode.
    Object type: BUS2000126
    Event: ZEVENT2
    Receiver type:
    Receiver function module: SWW_WI_CREATE_VIA_EVENT_IBF
    In swel I'm finding out that event got triggerd but it is giving error "No Receiver Entered".
    And the workflow is getting stuck at 'wait for step event'.
    So can anybody please tell me what is the step am I missing? is the swe2 correct?
    Thanks & Regards,
    Anirban

    HI....
    you have to specify RECIEVER TYPE without which you will be getting this error
    goto SWE2 and give the value and your problem will be done
    regards
    Edited by: Mohit Kumar on Feb 20, 2009 10:50 AM

  • Thanks for the reply to my question regarding sound in iMovie and sending me the online links.  however the online links are impossible to play as they upload too slowly with the result that the playing keeps stopping waiting for the content to catch up

    Thanks for your reply to my question regarding sound in iMovie.  However I cannot follow the links you sent as they upload too slowly and therefore the instructional movie keeps stopping waiting for the content toload.  Surely theremust be a solution for this??
    Thanks in advance
    lolly

    Please continue posting in your original thread.
    With the amount of traffic on these forums it is impossible to chase around finding this.

  • Error in "Wait for event" step

    Hi,
    I try to use a wait for an event (CREATED) on a delegated subtype to business object KNB1.
    Container element in the wait step is empty at the time of creation of the runtime wait item but I know what the key of the container element has to be so my idea was to set in a check funktion module in trx. SWEINST and filter out irrelevant events.
    But when the waitstep is to be created, the workflow goes into error: WL 442 No valid object for the container element.
    Should this not be possible?
    Any suggestions for another solution?
    I have also tried to instantiate the object before the wait for event step - but since the object does not exist in the database yet - method GENERIC.INSTANTIATE goes in error, too.
    WAS 700 sp 11 with ERP 6.0 but also tried on a 620 with 4.7
    Thanks,
    Regards,
    Claus Lücking

    Hi Mark,
    Yes, you are right - I am waiting for an event on a object not yet created:
    I am waiting for a customer to be created in FI via change documents (table KNB1). Since the customer is going to be created in a company code that has a one-to-one reference to the sales organization where it is created first, I know the key of FI customer to be created.
    Example: A Customer 23 is created in sales area 1000-01-01 and the workflow is triggered via an event KNVV.CREATED. Then I would like to wait for event KNB1.CREATED for customer 23 in company code 1000.
    Thanks,
    Claus.

  • Error in wait for event activity

    hi all,
    i am gettin gfollowing error when i am using wait for event activity in my WF.
    wait step 0000000088: No valid object ID in container element 'EVENT_BOR'
    'EVENT_BOR' is my container element of type BOR object which contain event.
    please tell me correct way to use wait for event step.
    i am using this on one parallel branch of Fork.
    thanks.

    Hi,
    check the event in SWO1 if there is an import parameter defined. If there is one you have to define the binding in the task waiting for event. You have to bind the relevant object type from workflow to containerelement &_WI_OBJECT_ID& of the event container.
    reagrds,
    Steffen

  • Workflow WAIT FOR EVENT STEP deadline not working

    Hi,
    Need some inputs for the experienced people;
    I have a wait for event step in a workflow with deadline monitoring (Latest End) but it doesn't seem to work.
    Ofcourse, all the required setting are in place and deadline works fine for other Activity steps.
    The problem is specific to Wait for event step.
    The alternative is having a fork but I just want to know why the wait step with deadline doesn't work.
    Thanks,
    Roopesh

    Hello Ajay,
    Can you share with us what did you do to solve your problem?
    I'm facing the same thing in my project now, I'm wandering if you could help me with this one.
    I have this wait for an event step wich is configured to wait 4 minutes since the work item creation. I've also selected 'Modeled' on the Action field, and a display text for the outcome.
    But in one of my tests, the event hasn't occurred and the workflow stuck in this task forever.
    Thanks in advance.
    Regards.
    Actually, I think I got this handled. This thread was really helpful to me: http://scn.sap.com/thread/47482
    Message was edited by: Leandro Farias dos Santos Abreu

Maybe you are looking for

  • How do I use Typekit fonts within Edge Animate

    I have applied a 'Pragmatica' Typekit font to a website.  I'm using Edge animate to construct some pages and within these pages want to add Type; however, Edge Fonts does not include the Typekit font 'Pragmatica' and the instruction for the page to u

  • E2500 name and password help

    My connection was very slow so I reset my device.  Now the wireless network name i created does not show up when I try to connect my computer to the internet.  The cisco network shows up, but when I click on it and try to go to a website it says I am

  • Student.

    hello, I'm studying to upgrade my MSCA on windows server 2012 and so I set up a lab at home using Virtual box and created a Domain.local and it is working fine.  Now I'm trying to create a child domain but getting an error that says the following " "

  • Accessing Other TimeMachine drives

    If you have several TM drives connected, you can now easily browse them by holding down the Option button when you click the new TM icon in the menu bar. Just select "Browse Other Time Machine Disks" Message was edited by: nerowolfe

  • Adobe Illustrator in Network User Environment

    Hello, I am the computer lab administrator for a small liberal arts college. We are encountering multiple issues with Adobe Illustrator CS3, and I have been unable to find any definitive solutions. So, rather than rehashing the issue, I would like to