I want stock from one particulat storage loc from one plant only to be excluded from MRP planning in PPDS.
I have activated in SPRO R3 -MRP , Storage location to be excluded from MRP
Now, I have a list of material master data in R3 and also in APO under the plant and stor loc. Also the integration model exists for material and stor loc stock
Do we need to change the master data in R3 for the stor loc indicator in MRP4 view for each and every material in R3 and then re activate the integration model
If not, is there any other process or transaction which automatically does?
Pls thr me some light on this
regards
Vijay

Vijay,
You should activate the MRP 4 view indicator. The MRP cutomizing is only for defualting the value during material master creation. The material master setting is only considered in MRP run. I am not sure about the integration model.
Regards
Ram

Similar Messages

  • Safety stock not covered by schedule lines in planning run

    Hi !
    In our organization we are trying to implement scheduling agreements and automatic creation of delivery schedule lines through MRP. We have MRP type PD and it considers the reservations created by PM orders and Production orders as requirement elements. When I do the planning run, it creates schedule lines for the PM order reservations and purchase requisition for safety stock. I need it to create schedule lines for all scenarios. Kindly help and suggest a solution.
    Regards,
    Satya

    Hi,
    Please refer the below links.
    Schedule Lines not getting created in MRP
    Re: No Scheduling line is generated when RUN MRP
    Hope it helps you.
    Thanks.

  • Exclude availability check for a particular stor. loc.

    Hi,
    I need to exclude a stor. loc. for availability check. MRP should not be excluded.
    How can I do that?
    Thanks in advance.
    Sonal

    Hi ,
       For exclude the storage location from availability check plz follow the below
    1. Go to transaction OPPJ
    2.Select Determine Check
    3.Select the availability type which you use and go to details
    4.There you can find the Storage location check tab
    5.put the check mark in No Storage location inspection and save.
    So that the storage location will not be included.
    Hope it will clear you.
    Regards,
    Vijay.

  • Split valuation based on stor. loc.

    Dear Guru,
    Please guide me how may I configure split valuation based on stor. loc. My company in multi level marketing (MLM). We have stor at Brunei as well. Our business set different price if any stocks parked at Brunei stor. loc.
    Exp: Material A - RM1 at M'sia stor loc.
    - if this material transfered to Brunei branch, it should calculate as RM1.50
    - so stor. loc. should shows different valuation
    I need to configure this for existing material. Bus. use PO, GR & IR for this procurement.Please assist me guru.
    rgds,
    nantha

    Hi,
    Valuation category is used if you want to have a split valuation i.e. you have an option of differentiating partial stocks of material according to particular criteria & handling them differently regarding valuation within a plant.
    Why Required? : 1)Your valuation of  Brunei & M'sia may be different
    Following configuration reqd.
    1)In global setting we have to define Valuation category( Say storage Location) & Valuation type( Brunei & M'sia
    2) Active split valuation in MM
    3) Assign valuation type to category in customizing
    5) In Material Master enter valuation category in accounting view & choose price control V
    6) Extend Material Master view for both valuation type
    7) valuation category to be active /assign for plant
    8) In local definition Define Valuation category to Valuation area.
    Then for every transaction (Valuation relevant) may be GR, GI, and Phy. Inventory you must mention valuation type during transaction to get your material valuated separately.
    By this u will able to map your requireemnt & able to valuate diffrently.
    Vivek

  • Stock transport orders within one plant

    Hi all,
    I am wondering how to process a stock transport order, that is created to transfer stock within one plant (from one stor.loc to another). My general scope is to use the shipping module to process the logistic part of that transaction.
    So I created a stock transport order (purch. order type UB) where the shipping plant and the receiving plant are identical. Now I can't create the delivery note (VL10B does not show the order. In SAP docu, I found only a hint that a STO can be also used within one plant, but how to create the delivery note?
    Thanks to all for answers
    Jörg

    Hi
    Please go thru the following navigation to set up STO between Storage location with delivery.
    SPRO-> Material management -> Purchasing -> Purchase order -> Set up stock transport order -> step up stock transport order between storage locations
    In first step Activate Stock transfer between storage locations and do other configurations.
    Regards
    Ramakrishna

  • During MRP run unwanted plant and storage location include and exclude

    Hi There,
    During MRP run how to include and exclude the unwanted plant and storage location pls let me know the required configuration settings.
    Thanks in advance.

    HI,
    To control whether a particular storage location will be included or excluded from the MRP run.  (MD02/MD41).
    To exclude it from MRP run :-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.         1 - storage location stock excluded for MRP
    To include it from MRP run:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.      space - storage location stock also planned at plant level and save it
    Next go to transaction MM01 - tick only view MRP 2
    Key in Plant and Storage Location
    Look at the Storage Location MRP section
    change the SLoc MRP indicator to space  and save it
    MMD1 - Create MRP Profile - MRP profile is a useful entry aid and makes it easier to manage MRP data.
    You define which fields are filled with values when MRP data is entered in the material master record, which of these values can be overwritten and which not.   You use the information stored in a profile is standard information that is needed again and again in similar constellations when material master records are maintained.
    Regards
    KK

  • Want to Exclude Stocks during Optimizer Run

    Hi ,
    Is it possible to exclude stocks during optimizer run which are available in the plants and sales Branches?
    Ajay

    Hi,
    In SNP, all the receipts and requirements are calculated based on the category group maintained with the Key figure.
    Please check what is the Category group maintained for the Receipt key figure. If you remove the stock category from that category group, I think the optimizer will exclude the stocks.
    Regards,
    Manimaran M.

  • Different stock between Acount view and Plant stock in MM03

    Hello Experts,
    In MM03 Acount view,  I found the Total stock is 1, but in plant stock view, I found the stock is Zero.
    There is not really any physcial invnetory so it must be a problem on the report.   
    And on mm03 that it was only on the finacial view screen that stock showed, it does not show on the normal stock screens. 
    What cause this difference? and How to clear the stock from the financial view?
    Thanks

    Hi
    Please run MB5K for the problem material. If it shows difference, then there might be inconsistency between accounting stock and plant(storage location) stock. If that is the case, physical inventory can't help. The correction(direct table update) is necessary and can only be done by SAP.
    Hope the information helps.
    Regards,
    Polly

  • Stock transfer to Non-Excisable Plant

    Hi All,
    I need to confirm the understanding for this scenario. Our client is doing stock transfer from manufacturing unit to non-excisable plant (same company code) but they do not update RG23D register. they post excise invoice during such stock transfer to non-excisable plant but when they sale from there to customer , they do not pass on any excise duty. I could see numerous threads for STO in CIN but they are all with Depot sale with RG23D getting updated. Am I missing something or is there a way to handle this in SAP?
    Thanks
    Binita

    Hi Binita,
    There are two types of scenarios in case of STO's from manufacturing plants to depots.
    1. STO from manufacturing plant to exciseable depot:
    From sending plant PO->DELIVERY->PROFORMA BILLING DOCUMENT->EXCISE INVOICE.
    From receiving plant(Exciseable depot) GOODS RECIEPT->CAPTURE EXCISE(RG23D REGISTER UPDATION)->SALES ORDER->DELIVERY DOCUMENT->DISTRIBUTE EXCISE(DEPOT EXCISE INVOICE & RG23D UPDATION)-> BILLING DOCUMENT.
    2. STO from manufacturing plant to non exciseable depot(e.g Ware house or CFAs)
    From sending plant PO->DELIVERY->PROFORMA BILLING DOCUMENT->EXCISE INVOICE.
    From receiving plant(Non exciseable plant) Goods receipt will be done & the duties will be inventorized in the purchasing price. No need to update any registers. Excise values will be loaded on to the material cost.
    Hope its clear now.
    Regards,
    S.Himavanth.

  • Stock transfer order between 2 plants in same company code

    Dear All,
    We have the requirement, where in the stock tranfer order (between 2 plants in same company code) instead of Material valuation price, MAP/Standard (depends on Price Control) gets picked up from supplying plant ,user should be able to enter its own price while creating stock transfer order.
    For fullfilling this requirement, I have created new condition type(where i have changed condition category from internal price "G" to "H" - Basic Price)
    Instead of using condition type- P101 in the stock transfer pricing,I have used above created new condition type, in pricing procedure then also while doing the post good issue against the outbound delivery( move type-"641", moving average is getting picked up.
    Can you please tell,where is the setting where we can make the system to consider manual given price while creating the stock transfer order instead of picking moving average price.
    Its very Important requirement ,please Provide valuable Inputs else provide some alternative.
    Thanks & Regards
    Nitin Chhabra

    Stock Transfer Order between Plants in the same Company Cpde are not relevant for pricing, as there is no billing. Billing only takes place between company codes. As same company code it would be like selling something to yourself - it doesn't make sense.  The stock value in the receiving Plant depends on the price contol there. If standard price, then you must enter the price when creating the material or use material revaluation to change it. When you transfer the material from the issuing plant, the value there will be transferred. In case of standard price any difference is posted to stock transfer differences. If using MAP then the value will be transferred from the issuing Plant in full.
    If you use costing with standard price in main plant, then it is possible that you can transfer the cost from the main plant to the second plant, by using special procurement key for costing.
    Rgds
    Richard

  • Delivery without reference for stock transfer within the same plant 311

    Dear all,
    I need to create a delivery without reference for stock transfer within the same plant, movement 311,  i.e. just from 1 storage location to another storage location.
    I tried to use VL01NO with delivery type UL.
    Now my question is how can I assign a receiving plant for a customer?
    I can't do the MIGO or MB1B document because I need the delivery document (packing list, forms, Texts,...).
    It's possible this option???
    Thank you very much.

    Hi,
    What is the item category you are assigning while doing VL01NO?  Check the schedule line category for that item category assignment.  That Schedule line category has an option for one step GI.  There you can assign 311 or create a separate item category and schedule line category and in that SC assign 311. 
    Thanks
    Krish.

  • STO. How to create the stock in transit if the plant has been block.

    Problem with STO. How to clear the stock in transit if the plant has been block.

    The command builder takes a Select SQL and automatically creates a Insert, Update, and Delete SQL commands.  The database could have Insert priviledge and not Updates and Delete priviledges. But I don't think this is causing the problem.  I suspect
    the Orcacle Client handled an exception that wasn't returned to you code and the client is in an invalid state.  You may need call a new constructor for the client.  I would check the Control Panel : Adminsitrative Tools : Event Viewer to see if
    there were any error messages created when you ran the application.
    jdweng

  • How to tranfor stock from 1200 to 1300 plant,

    How to tranfor stock from 1200 to 1300 plant, we will shift the production line and materials to 1300 plant.furtherly we wont produce any material in plant 1200 so how can tranfer the stock in SAP ?

    Hi ,
    Use T code MIGO or MB1B for transfer from on plant to other .
    Use the movement type 301 for 1 step transfer .
    Use movement type 303 followed by 305 for 2 step transfer .
    Consult your MM counter part for the same as you wont be having the requisite authorization i guess.
    Regards ,
    Dewang T

  • Transaction to see the Open stock transfer order for the plant

    HI ,
    i need to develop one report in that client to make the report for the all open stock transfer order & the cost of the open stock transfer order for the plant .
    I need how to cretae the stock transfer order for the material , whci material master is required for this process.
    please give me step by step details for this .
    regards
    satish
    Edited by: satish kapartiwar on Jul 16, 2009 9:33 AM

    Hi Satish,
    You can see open stock transfer quantity in MB5T and stock value in MB5L. If you want to make stock transfer, there is two types intra company transfer(with in same company code) and inter company transfer (different company codes).
    Steps for Intra company stock transfer:
    This is only within the comp.code(w/o SD)
    (w/o SD) 351101 MvT. and (with SD) 641101
    1. Mat.(1434)should be maintained in both the plants.(@1000&1100).
    2. Should have enough stock in supplying plant(1000).
    3. Make its supplying plant as a vendor in vendor master record in receiving plant(1100).
    4. Make it receiving plant as a customer in customization.
    Create customer (xd01) & and define the shipping data for plants in both the plants.
    Path: spro u2013 img u2013 material mgmt u2013 purchasing u2013 po u2013 set up STO u2013 define shipping data
    (1 by1 )
    In Receiving plant (1100)
    Customer num. 123345 (for ex.)
    Sales org. yyy
    Dist. Channel yy
    Sales div. y
    In Supplying plant (1000)
    Customer num. -
    (don't fill)
    Sales org. yyy
    Dist. Channel yy
    Sales div. y
    5. Assign doc. Type is "NL" for intra company STO. If STO is inter company, Assign doc. Type is "NLCC".
    Position doc type is "UB"
    Enter supplying plant(1000) & doc type (NL)&checking rule (ex:01)
    6.Assign doc. Type is "UB" to u'r plants.(PO)
    Go for new entries
    Enter supplying plant(1000) & Receiving plant (1100)&doc type (UB).
    7. Create a PO, choose the doc type is 'UB' & item cat.'U', Enter supplying plant as a vendor in PO of the receiving plant(1100).
    8. Provide this num (PO) to SD people, they will do the delivery by using transactional code is VL10B.
    9. Sales people they will provide "out bound delivery num".
    10. Do the GR. In GR the second tab 05 outbound delivery instead of PO mov.type 101.
    11. See the stock overview in the receiving & supplying plants.
    Steps for Inter company Transfer:
    1) Create one Customer Master in XD01 with respect to Supplying Plant Sales Area and assign this Customer no with Receiving Plant in OLME->PO-> set up STO->Define shipping data for plant and for the supplying Plant assign the above sales area.( Make sure, In Customer Master, sales Area Tab: you are maintaining shipping condition)
    2) For Receiving Plant Pur. Org and Co.Code Combination create Vendor master in XK01 and in this vendor master assign the Supplying plant in Pur.Org.Data screen->Extras--> Add.Pur.data
    3) OLME->PO-> Set up STO------>For your supplying plant assign document type NB, Delivery type NLCC and Checking Rule RP
    4)then For your supplying Plant and receiving Plant assign Document type NB
    5)Make sure you are maintaining Sales View for the material at supplying Plant and in Sales /Gen plant Data view maintain Availability check, Loading group and Transportation group.
    6) In SPRo-->Logistics execution> Shipping->Basic shipping functions->Shipping point Determination>assign shipping points-> For your Loading group, Shipping Condition and Supplying plant combination, Assign shipping point
    these are the configuration settings you have to do in background.
    Then Create STO from Receiving Plant in ME21N with document type NB.
    Based on that STO, Create Delivery in VL10B from supplying Plant
    Do PGI in VL02N from Supplying plant
    Do GR in MIGO at Receiving Plant keeping Outbound delivery as a ref. document.
    Now your STO bet. two plants belongs to diff. Co.Codes will be completed.
    Regards,
    Prasath

  • BAPI for stock in transit for each plant

    Hi,
    i am looking a for a bapi which will return stock in transit for that plant.
    Regards,
    Mukund

    Hi,
    Try FM
    CHECK_S078
    CHECK_S084
    Hope it helps..
    Lokesh
    Pls. reward appropriate points
    Message was edited by: Lokesh Aggarwal

Maybe you are looking for

  • Enabling a Windows user to Only Run One Package

    I am completely new to SSIS. I made a package in SQL Server 2005. I need to import it to another SQL instance, also 2005. I think I can get that done. My question is, how can I set it up so that a different Windows user can execute this package and o

  • (statement cache size = 0) == clear statement cache ?

    Hi I ran this test with WLS 8.1. I set to the cache size to 5, and I call a servlet which invokes a stored procedure to get the statement cached. I then recompile the proc, set the statement cache size to 0 and re-execute the servlet. The result is:

  • PopUp User&Pass / URL iViews / Portal cannot handle this?!

    Hi There, i`ve created some URL iViews and other iViews to Pages (Urls etc) that needs Authentification via User and Password. So the PopUp comes up for User and Pass.. but when i enter the Data and click ok the PopUp comes up again and again... afte

  • I downloaded Photoshop CS6 Extended and it has Raw 7.0 -- where can I get |Raw 7.3????

    I downloaded Photoshop CS6 Extended and it has Raw 7.0 -- where can I get |Raw 7.3????

  • Open With Not Working (Almost)

    When double-clicking a .jpg resource in DW it would not show in PS CS3. Also, Open-With-->Photoshop did not work. In the DW Preference menu I noticed the PS appeard twice. I removed one of them (fortunately the older PS CS version) and then all was f