Storage bin for Project items (Q) MSPR .

Hello gurus,
In MM/IM - The storage bin for regular  items resides in MARD.
I can't find in any table the storage bin for Project items (Q) MSPR .
Have any idea ?
Thanks
Amnon

Hi ,
First ,  only IM no WM.
No "Special stock" field in MARD.
No sucjh table - VKLAB ,
Thanks

Similar Messages

  • Storage Bin for Interim Storage Type 902 for GR

    Hi,
    We know that the the dynamic storage bin for goods receipt for PO is the PO number. However, when we are posting GR, system creates TR with interim storage bin as material document number.
    I looked into the movement type config. However, we can only state that whether interim bin should be cordinates or fixed bin or dynamic bin. It has no way to mention what that dynamic bin would be.
    Can you please suggest a way to change the dynamic storage bin as PO number instead of material document number.
    Thanks,
    Shekhar

    Dear Shekhar,
    Could you please check in view V_T308 (transaction code OMNF) whether the indicator "Dynamic bin material document" is set for your warehouse number and requirement type B?
    Best regards,
    Christiane
    Edited by: Christiane Schnellenbach on Apr 12, 2010 10:25 PM

  • Storage bin for storage type

    Hi ,
    How to maintain storage bin for storage type in WM
    Regards
    RB

    Hi
    Check it in LS01N.
    This will do
    Regards,
    Raman

  • Capacity control in storage bin for material

    Hello,
       I am trying to set up following scenario: I want to set the capacity of storge bin for material for example 16547. For one storage bin fit only 200 pieces of material 16547. So I set this in material master WM2 tab. Then I order 400 pieces, TR is generated, then I want to create TO in background, but it display error: Maximum quantity for storage bin will be exceeded. Then I have to create TO in foreground and confirmation 2 times.
    So my question is: is there any way to set up that TO will be created in background and confirmed one time?
    Thank you

    a TO split will not be triggered by remaining capacity, never.
    The TO split has to happen earlier, SAP is always trying to putaway the entire quantity of a single TO item into one bin. Hence you need to have many TO items.
    This is controlled by Palletization (WM2 view).
    If you get 200 on one pallet, the enter 200 in WM2 view and SAP will give you 2 TO items if you receive 400.

  • Problem in Source storage bin for returs

    Hi,
    i did  PGR for a returns delivery and when i tried to create TO
    for the same system is taking the source bin as 000000000 and not the delivery number. i checked  the movement type 651 where my entries are correct ie,.. in source storage type i have given 904 and checked the field " source" . 
    can any body tell me why the system is taking 00000000 as source storage bin rather than the del no............
    waiting for ur quick reply.....
    thanks

    Hi Csaba / rajasekar
    i have those requirement tupes maintained correctly.
    and further i have gone through OSS notes, it is very helpful.
    here i would like bring one more thing to ur notice that this problem i am facing intermittently and not each and everytime.
    System is picking up delivery no sometimes and some times it is not.
    Further i'll take this oppurtunity to ask u one more question ie...
    in OMLR transaction assignment of WM-IM mov types, i have not maintained 601 mov type entry ie,... the entry IMmov type 601 and WM mov type 601 with all the fields in between....but i wonder how the system is allowing me to create TO for the delivery and reverse the same...and even i can find WM mov type 601 in delivery at the time of creating this TO......pls try to anser me how the system is automatically picking this WM mov type and allowing me to create TO........
    waiting for ur response

  • Putaway Block in Storage Bin for any specific Material Code

    Hi Experts,
    We have a problem, we have allowed mix storage, addition to stock in the storage type, our requirement is this, that we want to block one bin aa-01-01 for some specific material code xxxxx, but we want to allow putaway other material codes to that bin.
    How can we achieve this. Can we use LS07 or some other solution. Please suggest at the earliest.
    Regards
    Ishu

    Hi,
    In standard system, you can block one specific bin for the specific material with Putaway strategy "Fixed bin" by maintaining this bin in material master. It is unclear that you set "allowed mix storage" and again required material specific putaway in bin.
    You can change "Mixed storage" indicator to blank. Which explains "___"  Mixed storage is not allowed
           All storage units in a storage bin must contain the same material and batch (one quant).
    If you don't want to change any of current setting you'll need to use the user exit and maintain custom table where you can maintain specific bin for the material for the warehouse. After determination of the bin to putaway in the standard code you can check if it is conflicting to the entry in your custom table.
    Hope this'll help.
    Regards,
    Sudhir

  • Manage stock qty. in Storage bin for Inventory management

    HI all,
    We are implemented Inventory Management (display stock of material for storage location).
    I want to know is there any method in Inventory Managment to Manage stock of specific material in bin also.
    Means User exactly should know the stock of specific material is located in Storage Bin.
    Please suggest me the hole process or any customization
    Regards,
    Vraj

    Hi V raj,
    I don't know whether i understood your question well. But i will answer in the way i understood.
    To serve your requirement you need to have a Warehouse management, means to have a smooth warehouse bin wise storage.
    But some companies are not willing to implement WM and they are finding a way with batch classification. They maintain batches for material and storage bin are maintain in a batch classification. So you can view it in MMBE also by going into the batch classification of the relevant batch.
    And if you want to have a detail report you can develop a simple report or a query to retrieve batch classification data.
    For batch classification activation:
    1. Material must maintain "Batch management" tick in Purchasing and storage plant data views
    2. Create a seperate class for this using CL02
    3  Create batch characteristic using CT04 (this is to maintain Storage Bin)
    4. Add classification view to each material and the relevant batch class.
    5. When you are doing the GR use "Batch" tab and "Classification" button to maintain relevant Storage bin data. (To update mass scale you can create a "Z" report getting help of a developer in your company)
    6. Now each batch you are maintained your storage bin view it trough MMBE (But only one batch classification) or in-house developed report ("Z") program
    Thanks & BR
    sandun

  • Do we need to create Storage Bins for each Client?

    Hi,
    I have defined the storage bin structure etc which I could transport.
    But does the creation of bins (using LS01N) need to be done separately for each client? If on the test client we dont have access to Create Bins then what is the right approach to get it done.
    Thanks.

    Thanks. I tried using LS05.
    What entries should I make?
    I entered Warehouse and Storage Type
    The Default Session was showing as RLLS0500 and I left it as it is.
    But I am getting Error message "Check you entry for manual storage bin creation".
    Any suggestions?
    Thanks.

  • Multiple storage bin for single material

    Hi,
    We wanted to assign multiple storage bins in the material master as the material is stored in mutilple storage bin in the same storage location. We are not using WM.
    We want to resolve the issue without implementing WM.
    Please advice where and how do we maintain the same.
    In plant data / stor 1 view there is a provision for maintaining only one storage bin.
    Thanks,
    Reddy

    it is not possible without WM.
    As workaround :
    You either create for each storage bin a storage location,
    or
    you active batch management and let the batch work as bin.

  • Creation of New storage bins for storage type 007 in Production

    Hi Gurus,
    Coudl you please give me a clairty, storage bins can transport from Qaulity or we have to create seperately from server to server like Qulity and production.
    thx
    r

    Hello,
    As correctly mentioned storage bins never transported from one environment to other. You have to create through LS10 or LS01N.
    The bin structure can get transposted from one environment to other & then you can open the structure & create bins in numbers.The bin structure can be seen through LS10 & created through same transaction.
    Regards,
    Prashant

  • Specifying storage bin for quality inspection.

    Hello all,
    I am wanting to move a material, that is stored in multiple storage bins in our warehouse, into an inspection lot.
    I can create a 322 movement in MIGO however this doesn't specify storage bin location, it looks at the warehouse as a whole.
    So can you please help me to specify the storage bin that I am wanting to create a manual inspection lot on.
    Regards,
    Chris

    you cannot do quality inspections of bins, you can only do quality inspection of material stock .
    the quality inspection in QM module is carried out at inventory managment level.
    an inspection lot is created with QA01.
    This moves the stock into quality inspection.
    Along with the MM posting, a WM posting change notice (PCN) is created to move quantity from unrestricted use to Q-status in WM too. you then process this PCN with LU04 transaction. Here you allocate the quants that are effected.
    when the inspection is done, then a usage decision is made with QA11 transaction, which creates again a PCN in WM.

  • How to compile multiple video clips in a storage bin for future projects?

    I want to stock pile all of my favorite selected video snippets into bins where I can easily access them at will. I don't want the hundreds of optional video snippets clogging up the project I am working on at hand. Is there a way where I can choose and drag my favorite selected video snippets from a separate window into a new project?
    Any wisdom is much appreciated,
    Thank you.

    You can mark certain video frames in events as favorites. Then when you bring up an event, you can select to only see the favorites. Use the Favorites tool. [Here is a good video tutorial|http://www.apple.com/findouthow/movies/#mark]
    You can also mark video on events with keywords, and select by keyword. [Video Tutorial here|http://www.apple.com/findouthow/movies/imovie08.html#tag]
    In both of these solutions, the clips remain in the original event, not in a different bin, however.
    Message was edited by: AppleMan1958

  • Planning suggestion issue for Project item

    Hi
    We have sales order demand and the item is assigned with project and task information.
    Planning suggest 2 planned order and 1 line with project and task and another line with project & task,
    We are in r12.1.3 version
    We are not able to identify why planning suggesting 2 separate line for the same item
    Require some input
    Regards
    VKPK

    Hi,
    You can create a WF for the same.
    Notification can be send by  - Mail Step Type..
    Actions on decisions can be taken by - User-Decision Step Type..!!
    Kindly search SapTechnical -> Tutorials -> Business WF for the same..!!
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/abap/workflow%252bscenario
    If these does not help, just let me know as I have worked on similar scenario's before also..!!
    Hope it helps!
    Regards,
    Kanika

  • More than one storage bin for a Material

    if a Material is maintained in more than one bin,what stock placement strategy will be be better,normally the client uses Fixed bin but some materials are  placed in more than one bin.
    Regards,
    Tafanza

    Hi
    If u r using chemical sort of thing, fixed bin will be better.
    Or otherwise next empty bin will do.
    Regards,
    Raman

  • Report for Material - Storage Location - Storage Bin

    All SAP Gurus,
    Is there any standard report available in which we can find out the storage bins for list of materials?
    (We have not implimented Warehouse MAnagement)
    Regards,

    HI,
    You need to have Warehouse management in place in order to view the storage bins for materials,
    MMBE of MM cannot give you the idea of storage bins.
    Hope this helps.
    Regards,
    Prasanna
    Award pls if helpful.

Maybe you are looking for

  • How to install Discover 4.1.37 on Win XP

    Hi all I need to install Oracle Discover 4.1.37, Enterprise Edition 8.1.7 and Designer 6i on Win XP, what's the steps to install the 3 softwares? Do i need to install Discover first? Thanks, LZ

  • Major Problems connecting ATV to iTunes

    I am having major problems in connecting to my iTunes on my PC. The ATV is not showing up in the devices list at all. It started after I reinstalled windows and reinstalled all the software after having major problems with the internet connection. Th

  • 16:9 print to video - 16:9 Quicktime Export

    Sorry to bother again this those same old 16:9 questions. 1) I have my 16:9 material imported and edited (of course, I have set the configuration for PAL Anamorphotic). What happens, when I go print to video? Does FCE export true 16:9 or does it in f

  • Problem Audio compaq Presario cq40 506TU

    Problem Detect Audio compaq Presario CQ40-506TU

  • Is there a way to export a contact photo taken with my iPhone.

    Right after I gave my wife her iPhone I snapped a picture of her directly into her contact listing in my iPhone. I assumed that it would show up in the photo program, but it doesn't. I cannot find any way to export or import the photo. I can see the