Hi Guru's ,
While creating production order the storage location and backflush for the Components (ROH Articles) inside the Production order are manually selected.
Is there any way, where i can set them (storage location and backflush) as a default whenever i create a Producton order ???  This means whenever i enter the components in a production order the system must automatically show the Storage Location and backflush as ticked.
Pls help on this thing ....
Best Regards,
Gurpreet Singh Saini.

Hi,
To set the backflush always then in the material master MRP2 view set backflush " Always".
To set the automatic storage location then you can define the "Stock determination group".
This is will be help full if ur keeping material in more then one storage location.
If you are keeping in the single storage location then in the MRP2 view maintain the storage location in the "production storage location " filed.
Regards
Vijay

Similar Messages

  • Storage location and Batch updation for components in Production Order.

    Hi Friends,
    After creating Production Order,need to update components with Storage Location(RESBD-LGORT) and Batch(RESBD-CHARG).
    Plese any one can help me by providing FM/BAPI for the same(Update Component level)
    Points will be rewarded.
    Thanks,
    Prb.

    Hi Prathap,
    Path - OCHA
    Condition type,access sequence, strategy type,
    Work on automatic batch determination. Assign standard search procedure to order type dependent parameter, check against manual entry.
    Make sort sequence for material by CU 70, tick ascending order, Then assign component in COB1, enter selection values and sort sequence. In finish product material master set automatic batch determination.
    System will copy the required material with batch & storage location, also check against manual entry.
    I think it will solve your problem.
    Regards,
    Suhas

  • Automatic release of production order for perticular work center

    hello,
    any body please help me how to set automatic release of production order when creation for a particular work center. please suggest me.
    Thanks & Regards
    Bhakta

    Dear,
    Use T Code COHVOMRELEASE here select work center as ZPACK then in header menu Program--Schedule in background here define as perodic job and set ferquency as Hr.
    Or Use Transaction SE38 to create  the variants for program PPIO_ENTRY and schedule it through SM36 or use standard variant as SAP&RELEASE.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Automatic creation of production orders via planned orders

    Hello experts!
    is there a way via customizing to trigger an automatic creation of production order from a planned order when the planned order finished date is within the next week?
    thanks

    David,
    Not in customizing.
    Most people create a job step after the RMMRP000 program step in their MRP job, using program PPBICO40.  Dynamic date range is available as a selection criteria against the opening date, which is the standard criteria for selecting and converting planned orders (not finish date).
    Best Regards,
    DB49

  • Automatic creation of Production order when credit limit lock got released

    It seems that production order will be created only when the sales order is created without credit lock error from the first.
    Once credit lock happened, even if user release the lock, production order will not be created automatically anymore.
    Is there a way to change the setting so that production order will be created automatically after credit unlock?
    don't want to create production order manually every time when credit lock happens

    Hello Manish
    If you have used Standard Requirement 102 in Config T code OVB5 (Maintain Requirements For Transfer Of Requirements) , then it should behave as you wish, that is once you release the credit block,  system should create Purchase Reqs/ Planned/production orders in the background. Check what you have there and/or choose appropriately here. While here, check out OVB8 (Maintain Requirements For Purchase And Assembly Orders)  if anything needs to be done there.
    Also ensure that there are no required fields ( for production order) missing, i.e.,  required entry fields that cannot be supplied automatically for this process.
    For conceptual clarity, check out OSS note 396791 - Credit release of sales orders with third-party items which deals with 3rd party transactions but draws a parallel and mentions 'Production orders' also.

  • Automatic creation of Production order when PP/DS planned order is CIFed.

    Hi PP Gurus,
    The requirement is when PP/DS Planned order is created and CIFed to ECC R/3, Automatically system should create Production order for that planned order. In this case, is Trigger points will serve the purpose or need to adopt for some other way? I think since APO PP/DS is in sync with ECC R/3, something SAP might have given in this regard?
    Thanks & Regards,
    Abu Arbab

    Dear Abu,
    In SPRO PPDS global parameters and defaults, you can set "create transfer events from conversion indicator".
    After this the planned order is transferred to R/3 only when a conversion indicator is set against planned order.The conversion indicator can be set through RRP3 or RRP4.  You can put mass conversion indicator.
    When such planned order is transferred, it will automatically create production order.
    Regards,
    Nitin Thatte
    Edited by: Nitin Thatte on Apr 20, 2009 4:59 PM

  • Automatic Locking of Production Order on release

    Dear Experts,
    When the production order is released, the order should be "Locked" automatically. When changes are required, the production order is unlocked manually and changes are done. This is our requirement.
    Is it possible to lock the order on release.
    If yes what are the settings?
    Regards,
    Jejesh

    Hi,
    Go to T.code BS02.
    - Create new Status Profile , if required do it by copy any standard one.
    - Then go to Detail screen.
    - Assign order status.For your reference I have used 2 order status.
    - CRTD - Created.Set this one as Initial one.
    - LOCK - Release and Locked.
    - Now assign Object type to this status Profile.You have to select PP/PM Order Header.
    - Now double click on Status CRTD and press New Entry tab to find and set allowed Transection.Here you have to select and restrict transaction types this status.
    - Now go to Status LOCK and double click.Then press New Entry tab.You will find the list of transactions.
    First select Transaction Release and make it as allowed and also activate radio button for Set.It will activate the status LOCK automatically after release of order.
    - Now make forbidden of all other transactions like change of order,Confirmations etc. as per your suitability.
    - You can assign any other user status also for further transaction control.
    - Then save your status profile.
    - Now assign this Status Profile to Order type using T.code OPJH.
    Regards,
    Dhaval

  • Automatic GR for Production Order

    hi,
    after partial confirmation or TECO of my production order, automatic GR should be done.
    For example, i created my production order for 100 quantities. i partially confirmed the order with 50 quantities. My requirement is whenever i confirmed the quantity, then GR should be done respective production order.
    Where i have to do the settings for this.
    because if i went for WIP, without GR it is showing full quantity.
    Srinivas

    Hi Sateesh,
    For automatic GR to happen, you can use "Backflushing" option. The configuration required has to be done by PP cosnultant in "Operations". Whenever you confirm some quantity in "Conform Operations - CO11N" and when you save, GR will be will be posted automatically for that quantity. You dont have to post GR manually.
    Srikanth Munnaluri

  • Automatic creation of production order form demand

    Dear Gurus,
    In my cycle,
    I want to copy monthly plan from EXCEL sheet through BDC to SAP System.please tell me on which screen it will upload(in md61 or some other).
    After uploading is there any option according to date wise production order should create automatically for each date separate wise.
    Thanks
    Alok

    It will come day wise only if you [split the demand|Re: Automatic splitting of MRP requirements for components] or give the demand in days. Or else while creating the Z program for upload write program in such a way that it will
    1. take the monthly requirement divide the value with no. of working days.
    2. The value got after dividing will be enter evenly for all working days.
    Regards
    Abhijit Gautam

  • Automatic creation of production order

    Hi,
    My clinte wants Auotomatically create production order whenever crate the sales order, or Auotomatically create planened  order whenever crate the sales order,
    please sugest reqire IMG Settings
    thanks in Advance
    Sriram

    Hi sriram,
    Please do the changes in SPRO.
    Material master 40 strategy is required.in MRP view.
    Path - SD > Basic function > Define requied class > (For 40 strategy - 50 is the req. class) tcode - OVZG.
      Changes - Assy type -3, Tick on automatic planning & define order type.
    Please check,Hope this will help you.
    hemant

  • Automatic creation of Production order through Project

    Hi all,
    Could you pls  explain how we can create production orders automatically through a project

    Dear Mr Smith / Rama Shanker
    I have read the reply posted by you and is very usefull . Can you please tell us the Tcode to be used for the mentioned steps in your reply .
    Also kindly help me on the following requirement .
    In our business scenario we have to define seperate budget for Material procurement and seperate budget for Manufacturing expenses .  To achieve this , one posiible option can be that Purchase Requisition (for Procurement) are generated in reference of one WBS element and PR for production order are generated in reference of another WBS element . But as FERT (material with BOM) is assigned to aan activity in one WBS element then during MRP run all requirement  (PR plus Production Order) will be in reference of the same WBS . So how can we distinguish between them .
    Or there may me some other alternate option which we are aware off .
    Kindly help us . We assure to award full points for the suggested solution pl .
    Rgds
    B Mittal

  • Automatic creation of production order against the sales order.

    Hi Experts,
           My client requirement is he wants the production order to be generated or created automatically as the sales order is created, please suggest weather it is possible or not.
    Regards,
    Naveen.
    Edited by: vaddapalli naveen on Mar 13, 2010 9:03 AM

    Hi,
    It is possible by selecting proper Planning strategies.
    Example you can use the planning strategy Assemble to order with Production order, it is possible.
    please refer the below help link for more details,
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/41/191eb845fd11d188ff0000e8322f96/content.htm
    Thanks,
    R.Loganathan

  • Want to select the Order type automatically when creating production order

    Hi Gurus,
    Please help to select the order type automatically while creting the production order..??
    Please what configuration settings are avialble to make this happen to me.
    THank you in advance.
    Naveen.

    Naveen,
    First priority is the order type defined in the Production schedulling profile(OPKP), assigned to that particular material in workscheduling view. If this is not maintained then,
    Second priority is configuration at MRP Group parameters in transaction in OPPR, this MRP Group if assingned to Material master MRP1 view.
    Third priority is Configuration at Plant level parameters in transaction OPPQ, this defines the order type when convert planned order to Production/Process order.
    Regards,
    Prasobh
    Edited by: Prasobh Karunakaran on May 28, 2009 8:49 PM..added MRP group paramters also

  • Delivery Date not Set in Production Order

    Hi,
    I am trying to settle a MTS (make to stock) production order that is both CNF and DLV. When I try to calculate variances, I get a KV 239 message stating that the delivery date is not set. I set this order to TECO and went to recalculate WIP but the production order cannot settle because this error still remains. When I drill down on the error, it states that there was an error in the program which set this order to DLV status, when no delivery date has been set. I can't see where this is looking for the delivery date. Has anyone come across this issue and if so, how would I go about correcting this?
    Thanks!

    Hi Team,
    Looks like it is not a common problem probably you need to look out for any OSS notes.
    Any you can check the Delivery date of the order by
    1. In the order display mode CO03 hit the "I" - Status Information Icon which on the right side where order status is displayed. Now system should take you to the Display status screen, here place your cursor on the "Delivered" text and go to the menu bar : Extras-->Change documents-->For Status, now system will display when the DLV status was set.
    Other option.
    2.In the order display mode CO03 use the menu Goto--->Documented Goods Movment. Now system will display all the goods moved against this order select the last GR-101 movement and double click the line, now system should take you to the Material Document in this check the posting date... that should be the delivery date.
    Regards,
    Prasobh

  • Delivery Date not Set for Production Orders

    Hi,
    I am trying to settle a MTS (make to stock) production order that is both CNF and DLV.  When I try to calculate variances, I get a KV 239 message stating that the delivery date is not set.  I set this order to TECO and went to recalculate WIP but the production order cannot settle because this error still remains.  When I drill down on the error, it states that there was an error in the program which set this order to DLV status, when no delivery date has been set.  I can't see where this is looking for the delivery date.  Has anyone come across this issue and if so, how would I go about correcting this?
    Thanks!

    Sorry, posted in the wrong forum.