Storage Location exclusion from MRP problem

Hi all,
I have added some Storage locations to exclude from MRP, via SPRO cust.
(Production>MRP>Planning>Define st. loc. MRP per Plant)
However, when I want to verify it, I go into MD04 and for a material, the excluded storage loc. lis does not show up in the end.
What additional cust. do I have to do?
Thanks,
Screens:
https://picasaweb.google.com/koray.tulumen/Paylasacaklarim

Hello,
To exclude the storage location from MRP Run
Check the following settings:
1.In OMIR you can exclude particular storage location. input values as 1
2.MRP - 4 view For storage location option input value as 1
3.in MMSC - same input value as 1
Hope the iformation is useful
Regards

Similar Messages

  • Storage location exclusion from MRP run

    Dear Experts,
    please how do i exclude a particular storage location from being considered in MRP Run? and from which table(s) can I get the list of open production orders

    Dear Vincent,
    in OMIR you can exclude particular storage location. input values as 1
    MRP - 4 view For storage location option input value as 1
    in MMSC - same input value as 1
    For your scond query what exactly you mean be open Prd orders
    You can get all details in COOIS by inputting system status
    Regards
    Madhu

  • Storage location exclusion from planning run

    Hi All
    I have excluded material from planning run by putting storage location  exclusion indicator in MMSC for material.
    Iam using kanban replenishment.
    In material master, production storage location is same as  that of put in MMSC.
    I have created Planned independent requirement in MD61, when i do MRP system created planned order.
    Please inform if storage location is excluded from MRP in MMSC then why system  is considering requirement for that material at that storage location.

    Hi Krishna
    Please read help for Storage location MRP indicator
    Storage location MRP indicator
    Indicator that you use to exclude storage locations from material requirements planning at plant level.
    If you do not set this indicator, stock, requirements, and receipts are included in MRP at plant level.
    Use
    You can exclude storage locations from MRP at plant level in one of two ways:
    By excluding storage location stock from MRP
    If storage location stock is excluded from MRP at plant level, no receipts for this storage location will be created in the planning run.
    By planning storage location stock separately
    If storage location stock is planned separately, the storage location is replenished with goods if the stock falls below the reorder point.

  • Storage location exclude from MRP execution

    Hi,
    I want know how to exclude any particular storage location from MRP execution .
    For example,
    1.     ABC is FERT material.
    2.     BOM of ABC is consisting of RM & PM material.
    3.      There  are  two storage location
                 a.            Central Godown   
                  b.            Shop Floor Godown
    4.     Stock of shop floor does not want to consider in MRP calculation.
    I have set from t-code OMRI storage location MRP indicator as u2018 1 u2018 .  But this is not solved our purpose.
    Please let me know me how to solve the problem.
    Regards,
    Amit Biswas

    In responce to reply ,
    Reply to first SAP user,
    1. Activate mrp for mrp area OM01
    2. Define MRP area OMIZ
    This is not clear to me. If you kindly elaborately explain then it will be helpful for me.
    Reply to Mr. Himanshu,
    I have already done through OMRI but this is not solved my purpose.
    Reply to Mr. Akil
    In your cases, in every material mrp indication has to be set.
    My objective: through standard configuration, entire material will be excluded u201C particular storage location u201C on MRP execution.
    Please let me know your valueable guidance.
    Regards,
    Amit Biswas

  • How can I include the minimum stock of storage location in the mrp run.

    Hi all,
    I have in plant 1030 storage location 1001 and 1006.
    MRP1  Lot Size = EX
               MRP type = PD
               Reorder Point = 5
    MRP2  Safety Stock = 5
    MRP4 for 1001 is not filled
    MRP4 for 1006 Sloc MRP Ind = 2
                             Reorder point = 2
                             Replenishment qty = 3
    If no stock and I run the mrp I get
    a PurRqs for 8 with a automatic MtlRes of 3 going to storage loc 1006
    If I create a reservation in 1006 for 10 units and run the MRP again
    a PurRqs for 15 with a MtlRes of 10 going to storage loc 1006.
    I want the result to be PurRqs for 18 with a MtlRes of 13 going to storage loc 1006.
    10 for the reservation and 3 to fill storage loc 1006 with the replenishment qty.
    How can I acheive this?
    Best Regards!
    Curtis

    Hello Curtins
    Please observe what is stated on question 6 of FAQ note 550954, regarding storage locations planned separately:
    6. Question:
        A storage location should be planned separately. Is it possible to
        consider external requirements?
        Answer:
        No. The storage location MRP is a very simple reorder point planning
        procedure, during which only reorder point and replenishment
        quantity are defined. More complex settings can be implemented via
        storage location MRP areas.
    Therefore, I'd suggest you to use MRP areas to map this scenario.
    Best Regards
    Caetano Almeida

  • Storage location determination with MRP

    Hi GURUu2019s,
    I need to know what set up decides which Storage location is used for MRP if there is more than one storage location per plant.
    Please guide me.
    Cheers,
    Kumar.S

    Dear
    Pleaae do the following :
    1.Check in OMIR keep the indicator as  Blank  (IMG-Production-MRP-Planning-Define Storage Location MRP per Plant-It should not be 1 OR 2 .
    2.Make sure that materials in those storage loaction should not have indicator 1/2 in MRP4 view .
    Bssically , you do nto need to change any configuration setup in case  because it will by defalut as Blnak in OMIR -means all the  materials in varioaus storage location are MRP relevent .Those storage location should be under plant which hase activated for MRP (spro-mrp-activate MRP for Plant )
    Hope this helps
    Regards
    JH

  • Storage location consideration during MRP Run

    Hi All,
    Within a company code, i am having 2 plants namely PS12 & PS13. In plant PS12, i am  three storage locations namely 1201, 1202,1203. Similarly in plant PS13, i am having stores 1301,1302,1303.
    During MRP run, i do not want to consider the stock in all the storage locations of PS12. The storage location 1203 to be exclued during MRP run. How to set this?
    Your input will be appreciated very much,
    Thanks
    Kumar

    Hi Kumar,
    Goto SPRO>Production>Planning>Define Storage Location MRP per plant, add the storage location to be ignored during MRP and select indicator '1' against it. Thereafter, all the materials created with this storage location will be defaulted with value '1' in the field 'SLoc MRP indicator'. However this can be modified later if required.
    For existing materials, select indicator '1' in the field 'SLoc MRP indicator' avaialble in MRP view under the column 'Storage location MRP'. Go for a mass update for a huge list of materials.
    Check this and revert for any clarifications.
    Regards,
    Murali

  • MC44 configuration for 'storage location exclusion'

    Hi all,
    I want to know if it is possible to exclude a certain storage location (1006 in my case) from the MC44 u2013 Inventory Turnover report.
    By default i can filter results by several parameters like ABC indicator or material type, but i want to exclude all materials in a storage location. Can i configure it to do so?
    http://www.kowboyz.nl/blog/wp-content/uploads/2009/07/MC44.png
    Many thanks,

    this cannot be solved thru customizing.
    you have to create Z-report

  • Excluding certain storage location stocks from planning

    Hi experts,
    We have a requirement as under:
    A plant contains certain stocks of a product.  Part of this stock is kept in a separate storage location.  This stock is reserved for local "over the counter" sale at the plant gate.  So this stock should not be considered as available in planning as well as in deployment.
    Can we exclude this stock at particular storage location during transfer to APO?
    Thanks in advance.
    Nitin

    Hi Nitin,
    I don't think we can exclude any stock at particular storage location during transfer to APO.
    In APO, we always have stock at plant level which is the lowest possible level.
    And even logically thinking it should not be possible. Least I can say is, this is not the standard APO functionality.
    But, we can always explore customer exist.
    Instead of doing that, what I would suggest is to make this stock a "Special stock" in ECC.
    So, it will not be used for the purpose for which it is not meant for.
    Hope this helps. Let us know if it refrain you from making it as a special stock.
    Regards,
    Abhay Kapase

  • Assembly and Task list : storage location defaulted from task list

    Hi all,
    Can anyone tell me the different steps (with details) required in master data (assembly, task list,...)  to get the 'storage location' filled by default in the general maintenance task list : how assembly is used in that process?
    Thanks,
    P.

    Hi Pete,
    In the component overview for a given operation,  when assigning a component : further on the right, there is a storage location field.
    Pete.

  • Exclude purchase order on storage location from MRP

    Hi Everyone,
    We have excluded storage location 1200 from MRP.
    The result shows only stock on 1200 excluded from MRP, PO on storage location 1200 (storage location 1200 in PO) still considered in MRP.
    Is there any way to exclude PO on 1200 i MRP also?
    Best Regards,
    Bin

    Dear,
    Go to MRP 4 view of the material master .
    In the field SLoc MRP indicator field "1".
    If it is for a material than in the material master level it can be done. If you are looking for all materials in that storage location, than it is better to define this in SPRO->Production->MRP-->Planning-->Define Storage Location per MRP plant. Here for that storage location in that plant you need to define "2" - Storage location stock planned seperately or "1" - Exclude Storage location from MRP.
    Also u can use t.code MMSC.
    Select Material & Plant and Assign MRP =1 for the Sloc to be excluded
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 14, 2008 9:32 AM

  • MRP run by excluding storage location

    Dear PP experts,
    I have excluded storage location e.g. storage location 0001 from MRP in OMIR and also maintained the same in MRP 4 view in material master. As far as MRP run is considered system is ignoring the stock and giving the results.
    But now we are facing the problem in quantity confirmation in sale order in transaction code CO06. The stock is existing in storage location 0001and is not confirmed for any other sale order.
    We need to exclude the storage location in MRP but it should allow stock determination in sale order.
    Pl. let me know how this can be achieved.
    Thanks in advance,
    Regards,
    Prashant

    Dear Prasobh,
    Thanks for the reply. There is no storage location mentioned in the sale order. I tried confirming the sale order by activating the No storage location check box, still it does not confirm the quantity. If we keep the check box "Check without RLT" blank then the sale order quantity gets confirmed. But the problem here is that it confirms quantity greater than what is available in stock i.e. if we enter any quantity it is confirmed.
    I would like to ask one more question. The sale order confirms quantity available as per the ATP logic. When we have excluded the storage location from MRP the quantity is seen at storage location level and not at Plant level and hence it is not proposed in cummulative ATP quantity. Should the quantity be available in cummulative ATP quantity. If yes, how can be get that quantity in cummulative ATP quantity?
    Is there any impact of MRP area? as we have MRP area activated. Within this Plant we have one MRP area at storage location level and the other MRP area as Plant excluding this storage location.
    Regards,
    Prashant

  • MRP4 view exclude storage location & material provided by vendor/customer..

    Hi
    Could anyone please tell me in MRP4 view for a material,where is the option so that i can exclude or include the storage location stock from MRP?
    and also in which T code i should indicate the material is provided by vendor/material provided by customer?In CS01wher's this option?
    Please help me
    Thanks & regards
    Raj

    Hi Karthik,
    MRP area is nothing to do with storage locations settings in MRP4 view. If you want to activate MRP area and use the MRP run at MRP area level then you have to customized MRP area either at storage location level or sub-contractor level (in MRP master data settings )... then you need to assign this MRP1 view of the material and with valid MRP type.  Now when you run the MRP then planning will be carried out at this MRP area for this part.
    With storage location indicators in MRP4 view (must enter with putting the stoarge location values from MM02/MM03) you can exclude the stock of this storage location (indicator 1) in the palnning run or you can plan seperately with indicator2 with using re-order level. Here no need of MRP area.
    If helps rewards points.
    Regards
    TAJUDDIN

  • Excluding storage location from MRP run in Long Term Planning

    Hi,friends,
         In my scenario , i want to exclude storage location from MRP run in long term planning.When i set storage location MRP indicator "2" in SPRO and SLoc MRP indicator "1" MRP4 in material master, i can exclude the storage location after run MRP with MD01/MD02,and i can see the expected result in MD04.But in Long Term Planning scenario the storage location can not be excluded after run MRP with MS01/MS02,and the requirements list in MS04 include the stock in the storage location i want to exclude. i dont know if i miss something.Plz give me some advice.
    Regards
    Joey

    Hi,
    Refer the OSS Note 208017 - LTP: Long-term planning and storage locations
    ==========================================================================
    Symptom
    In long-term planning (Transactions MSBT / MS01 / MS02 / MS03), the MRP indicator of a storage location for a material is not taken into account (material master, view MRP 2 [up to and including Release 3.1I] or MRP 4 [as of Release 4.0A]).
    The storage locations excluded by MRP or planned separately are also planned in the plant segment.
    Additional key words
    LTP, MM01, MM02, MM03, master data, MRP indicator, LGORT ...
    Cause and prerequisites
    The MRP indicator for a certain storage location of a material is only taken into account in operative planning (requirements planning, MRP).
    The long-term planning occurs exclusively at plant level.
    Solution
    This is no error. The system works as intended.
    The individual storage locations should not be distinguished in the long-term planning, in order to perform a comprehensive long-term planning.
    This is important, for example, within the kanban processing where the storage locations with kanban MRP are excluded from the MRP, but in spite of that should be included in the long-term planning.
    ==========================================================================
    Regards,
    Siva

  • Storage location to be excluded from MRP Run

    Dear Gurus ,
    We are trying to exclude perticular Storage location from MRP Run with the Configuration setting
    IMG >>> Production >>>.MRP >>>.Planning >>>>.Define Storage Location  MRP per plant >>>> Indicator 1 is set
    Still the Stock is being considered
    As I know this can be done thr' MRP4 view , but we don't want to go Part No wise ,
    Suggest better sloution
    Thanx in advance

    Vasu,
    Above IMG path is only used  for defulting the storage location exclusion in material master.
    Whenever  materials are extended to this storage nlocation in mm01 or mmsc, this defult value would be proposed automatically .
    However this does not mean setting it in IMG would change existing materia storage location extensions automatically. Also MRP will not pick from above IMG settings.
    Once again above setting is only valid from defulting the values while extending the Materials to storage locations.
    Hope it helps.

Maybe you are looking for

  • Name 1 and Name 2 fields of Business Partner - changes get set back

    Dear Experts, in SRM 7.0 CS, i am facing the following problem w.r.t Messages in the shopping cart. It is known system behaviour, that in case the contend of the fields Name 1 or Name 2 of the Plant Business Partner is longer than 35 digits, than a (

  • There was an error opening this document. The file is damaged and could not be repaired. How do I fix this?

    I found a resolution, but it is beyond my tdechnical skill without guidance as to where to enter this/how to do this: HKCU\Software\Adobe\(product name)\(version)\AVGeneral\bValidateBytesBeforeHeader=dword:00000000

  • Oracle ODBC and BLOB in html

    Hi, I would like to ask you if cad I use Oracle-ODBC driver (whuch version) for reading BLOB (LRAW) column in html(asp) - JavaScript. create table JPG CLZM NUMBER(6) not null, JPG_FILE LONG RAW null , <% @ LANGUAGE=JavaScript%> <% Response.Buffer = t

  • What is the table to track clearing document

    I am tracking clearing document number with accounting doucment number. I am using the table BSAK for this. But lot of doucment are not updated. Is there any other table to track clearing document number wiht accounting document number?

  • Max limit reached for tablespace in SAP BW

    Hi Friends, We are having one SAP BW system on DB6, AIX...in that the max limit for tablespabe is 512GB, which is going to be exceeded soon... So it is planned to move some tables from tablespaces of aggregates i.e. FACTI, FACTD into new tablespaces.