Storage type & Storage Bin determination in MB1B

Dear all,
I want to configure the system like this-In MB1B T-Code for movement type 301 system determine storage type and storage bin from where Stock has been transfer.How I achieve this?
Thanks & Regards
Dipayan Bose

Hi
This is possible in standard SAP once you save the Material document.. Make sure your Plant and storage location have warehouse assigned.
Do transfer posting in MB1B with Mvt type 301 with Plant and storage location.
Alos ensure your material master has been extended to WM 1 & 2 views.
Check in MB03 for the Item details there is button called WM parameterer click this to see the storage type & Bin
System has to create the Transfer Requirement document then only you can see the storage type & Storage bin and this is possible once you save the transfer posting document.
Hope it is clear.
Karthik

Similar Messages

  • Storage type & storage bin field in mb1b

    Dear all,
    I want to put storage type & storage bin field in MB1B from where material has been transfer through 301 movement type to another plant.Our client want to put this field manually.What is configuration regarding this?
    Thanks & Regards
    Dipayan Bose

    Hi
    I assume that you are doing transfer posting between plants which have warehouse managed.
    Check in OMLR for Immediate TO Creation  ''A' for mvt type 301. Remove this
    In OMLJ - Remove both TO item confirmation & Propose confirmation check boxes under confirmation field group.
    Remove any Auto TO indicator in IMG>LE>WM>Transfers>Define Movement type.
    Now you go to MB1B and do the transfer posting with Movement Type 301.
    Next step go to LT06 to create TO from Material Document No. Give the Transfer posting doc no and press enter.
    Inside the transaction you have button called create TO online, click this it will take you to another screen where you can enter the Storage type. storage section & storage bin manually.
    LT12 - Confirm the TO to complete the transaction
    Karthik
    Karthik

  • Destination storage bin determination issue

    Hi Experts,
    When we deconsolidate the ASN, some of the products getting into correct destination bin and some products are not getting into correct destination bin, getting into one inbound over flow storage type defined. When i looked at product master, strategies and storage types configuration the difference i see between actual storage types and overflow storage type is:
    1. HU requirement option. i.e. for actual storage types - HU requirement not allowed and for Overflow storage type - HU requirement allowed but not requirement.
    2. For actual storage type ---- Mixed storage selected as "several HUs with different Batches of the same product" for putaway rule: Addition to existing stock/empty bin and for Overflow storage type - Mixed storage without limitations
    Can you please help me if anything is wrong with above selection at storage type level?
    Thank you...
    Sridahr
    Message was edited by: SRIDHAR B

    Hello,
    I suspect the issue is from because of Capacity Check Method. Try removing Capacity check Method. If it works fine, then, build the right capacity check method based on your need.
    This should solve your problem.
    Regards,
    Sathish

  • TO storage bin proposed u00BF?

    I have a material with stock in storage bin 1, 2 and 3 that belong to the same storage type. The material picking strategy is F (fixed) and the material has the storage bin 1 setted in the material master.
    I created a TO and it proposed to pick from storage bin 1 and 3, while storage 2 has stock ...
    Have you idea why could be this happening? I checked the storage bin and it isn´t locked, the material has stock ... what other condition is working in storage bin determination?
    thanks in advance

    Ahh, ok! but what of all the dates that are in LQUA table is considering? I have the following, and there is not the creation date, what date are you meaning?
    Last movement
    Last placement
    Last removal
    Last add to stock
    GR Date
    thanks!

  • Storage bin does not exist error when during transfer posting in MB1B

    Hello All,
    I am getting the error message "  Storage bin [WH no, Storage type] does not exist Check your entry"  during transfer posting in MB1B from one storage location  to another for ex 0007 to 0001. But i can able to do transfer posting from 0001 to 0007 without any error.
    Please provide your solutions/suggestions
    Thanks
    Benny

    Benny Sampath wrote:
    Here is the error message "Storage bin 56A 870  does not exist (check your entry)"
    >
    > Thanks
    > Benny
    I can only see 2 values instead of the expected 3.
    what is 56A ? is it bin, warehouse or storage type?
    what is 870 ? is it bin, warehouse or storage type?
    one variable that is need  to have a hit in table LAGP is missing, hence you get this error.
    you have to find out why this variable is missing.
    But there is a wide area to look. Hence you should first answer the questions, as this would limit the options where to look.

  • Determine destination storage bin from PP-form

    Hello,
    From an adobe form (based on PSFC_KANBAN) I try in the print program to determine WM-data. To be specific I need the way from the supply area (or other pp-data) to the destination storage bin (Table PKHD).
    It would be very kind of You, if you could give me a hint.
    Kind regards,
    Benjamin

    Benjamin,
    I am not sure but may be you can see the program RLLS4100 or TCODE LS41.
    With this report, you can create cycle lists which are assigned to a storage type.
    You receive a list with the following information:
    Production supply area
    Material
    Plant
    Warehouse number
    Warehouse type
    Production storage bin
    Dynamic destination storage bin
    Staging indicator for production supply
    Try also TCODE OP42 and PK05.
    The discussion below might help you:
    http://scn.sap.com/thread/3172596
    Regards,
    Ashvin

  • Storage Bin for Interim Storage Type 902 for GR

    Hi,
    We know that the the dynamic storage bin for goods receipt for PO is the PO number. However, when we are posting GR, system creates TR with interim storage bin as material document number.
    I looked into the movement type config. However, we can only state that whether interim bin should be cordinates or fixed bin or dynamic bin. It has no way to mention what that dynamic bin would be.
    Can you please suggest a way to change the dynamic storage bin as PO number instead of material document number.
    Thanks,
    Shekhar

    Dear Shekhar,
    Could you please check in view V_T308 (transaction code OMNF) whether the indicator "Dynamic bin material document" is set for your warehouse number and requirement type B?
    Best regards,
    Christiane
    Edited by: Christiane Schnellenbach on Apr 12, 2010 10:25 PM

  • Change Storage Bin Number in 309 movement type

    Hi Gurus,
    I have problems with creation TO for movement type 309(material to material posting), when i want to create the TO for that movement type, i can't change the destination bin.. The destination bin field in that TO is disable, how to make that field enable?
    I try to add an user exit after creation of that TO, the user exit is MWMTO001.. so the user exit used for change the storage bin number after the TO created.. but that user exit never triggered after TO created.. How it could happen?
    Any suggestion, how to change the storage bin number when i want to create TO from 309 movement type(material to material posting)?
    Kind Regards
    Ken

    Hi Kris,
    Ya, i already create the bin number, for example i material A fixed to bin 00001 and material B fixed to bin 00002, when i do movement 309 from material A to material B, why the bin goes to 00001? why not goes to bin 00002? Because material B is fix to bin number 00002..
    For your solution, i just can change the bin during confirmation of the TO? Because, in this case, confirmation of that TO done by external system, so the external system will send idoc to SAP to confirm that TO..
    Regards
    Ken

  • Storage Bin and Storage Type

    Hi,
    Please elaborate on what is Storage Bin, Storage Type, Bin Position, Stock Category and Special Stock, and their function. Also, if there is a link were I can find the definition of these terms, please mention.
    Thanks

    Hi ,
    Here are links
    [Storage Type|http://help.sap.com/saphelp_46c/helpdata/en/c6/f838f94afa11d182b90000e829fbfe/frameset.htm][Storage Bin]|http://help.sap.com/saphelp_46c/helpdata/en/c6/f838f94afa11d182b90000e829fbfe/frameset.htm]
    Storage Section |http://help.sap.com/saphelp_46c/helpdata/en/c6/f838f94afa11d182b90000e829fbfe/frameset.htm]
    Go to Help.sap.com
    Go to Logistics Execution->WareHouse Management -> Basic Functions  you will get everything.

  • Storage Bin Type Search

    This question relates to teh storage bin type search. 
    When a storage bin type is assigned to a number of different storage unit types, when the systen is trying to putaway a material, does it assign preferentially according to how storage unit types are listed in this table or when finding the next empty bin, does it simply check this table to make sure that the storage bin type is compatible with the storage unit type.  For example, if the storage unit type is a half pallet and the next empty bin can hold both a full pallet and a half pallet, will the system try and find a half pallet space or will it simply place the SU into the full pallet space.

    Hi,
    It will work like this in the material master palletization data you will assign the Storage unit type and in OMM1 you will assign  the storage unit type to the storage bin type (search criteria).
    So if you have HP, then in the storage type it is next empty bin it fin the FP and then HP, system will place it in the HP only.
    thanks,
    JK

  • Storage bin for storage type

    Hi ,
    How to maintain storage bin for storage type in WM
    Regards
    RB

    Hi
    Check it in LS01N.
    This will do
    Regards,
    Raman

  • WM auto determination for storage bin

    Hi experts.
    In the WM , presently auto TR-TO is designed and the system determine the storage Bin automatically. when we transfer the stock from interim.
    My question if the material is maintain in more then one sotrage bin. How the system determine the storage bin?
    regards
    DP

    Dear,
    With stock determination, you can use strategies for material withdrawal for goods issues and stock transfers if the material is maintain in more then one storage bin.
    Stock determination allows you to determine stocks from different source.
       In Customizing of the materials management, you determine a cross-application strategy for stock determination under Materials Management --> Inventory Management and Physical Inventory --> Stock Determination --> Define Strategies for Stock Determination. The system should reduce the stocks on the basis of this strategy.
    You assign a stock determination group to the material in the material master record.
    In Customizing of materials management, assign the stock determination rule to application Warehouse Management under Materials Management --> Inventory Management and Physical Inventory --> Stock Determination --> Assign Stock Determination Rule in the Applications --> Warehouse Management.
    Regards,
    R.Brahmankar

  • Storage Type and storage bin in MB26 pick list

    Hi,
    We want to print a pick list using MB26. The pick list should contain the warehouse number , storage type and storage bin. I have found that in the layout of MB26 pick list, we can pull these fields. However, the values of these fields are not getting pulled in the list.
    Can you please help me to understand if I need to do some setting/config so that warehouse number, storage type and storage bin can be pulled in the MB26 report.
    Thanks,
    Shekhar

    if it is a standard output if you go to the output type you can see what are the standard fields included in the pick list but if it is a custom one please contact your functional consultant who designed or look at the spec to see the design/mapping of fields.
    Please let me know if thhis helps.

  • Storage location-determination of return-deliveries (delivery type RL)

    Is there a difference between picking storage location-determination of return-deliveries (delivery type u201CRL Returns (pur.ord.)u201D/return to vendor) on 4.6C compared to ECC6.0? Is there a SAP-note?
    Within 4.6C-system the storage location is determined based on the customizing settings (Logistics Execution \ Shipping \ Picking \ Determine Picking Location \Assign Picking Locations).
    Within ECC6.0-system the storage location in the return-delivery is always the storage location that is entered in the Return-Purchase Order. It seems like the customizing-settings are no longer beeing taken into account.

    This storace location-determination of return-deliveries (delivery type RL) in customozing that you mention is only true within the 4.6C-system. Within the ECC6.0-system the storage lcoation is always the one that is entered in the return-purchase order. In ECC6.0 the customizing settings you are refering to a no longer valid for deliveries with delivery type RL.
    The questions is why/ and is there an OSS note.

  • Storage bin  not found (enter storage type) L3398

    Hi,
    We have an very critical issue. We have gone live on 14th , only one day before. Now our system is showing the message
    "Storage bin  not found (enter storage type) L3398.""
    We have defined Open storage type in our system where , mix storage is allowed. There are 10 bins in this storage type. There is not capacity check for these bins. Now system is not searching bin from Open storage and we have stucked with TO creation. System is not allowing us to created any TO.
    KIndly do the help
    I will be very thankful if reply fast.
    Regards,
    Manish I

    Hi MANISH, 
    Though there exists many storage bins , the system is not able to find these bins because proper storage unit type is not defined.
    System identifies the destination based on the following criteria :
    Activate Storage Type Search
    Activate Storage Section Search
    Activate Storage Bin Type Search
    Go through the below customising for better understanding :
    SPROLogistics ExecutionWarehouse Management--Strategies
    Maintain the Warehouse Management 2 view of Material master with Palletization data .
    Thanks,
    Swamy H P

Maybe you are looking for

  • Trying to set up a home network

    I used to have an iMac G4 and a PowerBook G4 and a magicolor 2430DL laser printer hooked up to a small network via an ethernet switch. I have a slow dialup account with CWNET. I replaced the PowerBook with a MacBook and got an Airport Extreme Base St

  • WAD: maxwidth for analysis item

    Hi all, I'm trying to limit the number of columns displayed in the WAD <b>dynamically</b> based on the surrounding web-item (containerlayout, screen, etc...).  I can limit it statically by BLOCK_COLUMNS_SIZE but this is not what I want, I would like

  • How to Execute Remote procedures that use DBLinks?

    Using Oracle 10g (RAC Linux) to remote connect Windows 10g to dblink to AS/400 < <I have created a procedure that I execute remotely by issuing the following: CALL GLOBAL.REFRESH_STAGING@KRONOSLINK(); The procedure errors as Error at line 2 ORA-20001

  • Link JDT1 and INV1

    Hi, I try to link JDT1 and INV1 in Query through OINV. However, there was some duplication due to one more one more join. There seems no direct linkage between JDT1 and INV1. Is there anyway that can eliminate the duplication? I would like to create

  • Installation of MII 12.1 on AIX 5.3 TL8 Operating System

    Hi All, I think Ramp-up for MII 12.1 is nearing its end and MII 12.1 getting ready for release. One of our client wants to install MII 12.1 in AIX 5.3 TL8 Operating System. since installation guide for 12.1 is not yet released i went through the inst