Strategy 60

Hi gurus,
Here i am going to use strategy 60 but before that i am confirming the scenario by running it in testing server with test data.
My test data is
Finished good material = FV10
Semifinished good      = sv10
Raw material                = raw10
Planning material         = FT10
Both Planning material 'FT10' & FERT material 'FV10' have startgy 60 in material master.
Planning material 'FT10'has been assigned in FERT material 'FV10' with planning plant & conversion factor & uom.
FERT material has a bom with a component 'SV10' & Semifinished good material 'SV10' has a bom with a bom cmponent 'raw10'
I have created a bom for planning material with the same component 'SV10'.
When i creating a PIR with req. type 'VSEV' for planning material 'FT10' & running the mrp the out is only coming for planning material under net segment planning with assembly with order type 'VP' , which will not convert till the sale order comes for main FERT material FV10'.
But the requirement is not generating for semifinished good material 'sv10' & raw matreial 'raw10'.
Pls help me if i am doing some wrong process.
Regards
Piyush

Dear ,
I am following sap help instruction to configure this strategy.
http://help.sap.com/saphelp_erp60_sp/helpdata/en/cb/7f9b7043b711d189410000e829fbbd/frameset.htm
Regards
Piyush

Similar Messages

  • Questions on SAP Strategy Management

    Dear Experts,
    I am very new to SAP Strategy Management (SSM). I already tried to find some information about it in the web, but unfortunately most documents only provide high level information (mostly marketing slides). Therefore I would be grateful if you could answer the following questions:
    1. SSM provides charts for data visualization. Is there an overview of supported chart types? Is there a source which gives further information about chart customization?
    2. SSM provides a collaboration functionality that enables user to add comments. Can comments only be maintained on query level, or also by navigation state (e.g. comment is only shown, when navigating to Calendar Year 2006 and Company Code 4711)?
    3. Is it possible to print comments / export comments combined with charts / reports to PDF
    4. Can users upload documents (e.g. MS Word docs)?
    5. A new version was just released which is supposed to have a better integration with SAP BI. What are the improvements in terms of integration? How can SAP BI data be accessed?
    6. What are the current system requirements for SSM?
    7. Where can a documentation on SSM be found (I could unfortunately only find an installation guide on service.sap.com)?
    Thanks a lot for your help!
    Marco
    Edited by: Marco on Sep 15, 2008 10:22 AM

    Marco,
    Here is some information about SAP Strategy Management:
    1. SSM provides charts for data visualization. Is there an overview of supported chart types? Is there a source which gives further information about chart customization?
    Strategy Management provides out-of-the-box packaged reporting templates: Benchmarking, Trending, Percent Contributions within subtotals, Exceptions, Rankings, Ad-Hoc reporting of multiple dimensions & metrics.
    With Strategy Management, you can also provide links to reports or charts in other applications for further drill-down or exploration. 
    2. SSM provides a collaboration functionality that enables user to add comments. Can comments only be maintained on query level, or also by navigation state (e.g. comment is only shown, when navigating to Calendar Year 2006 and Company Code 4711)?
    Comments are added by users to specific areas and can be defined as to which user groups have access or visibility to these comments. These comments are directly associated with a specific area (i.e. objective, KPI, initiative, etc.) with a tagging icon to show individual users if there are new, unread, comments since their last access to system.
    Comments are added at the user interface level and would be stored in either the MaxDB or SQL database, depending on how the implementation was configured. 
    3. Is it possible to print comments / export comments combined with charts / reports to PDF
    Strategy Management has an Operational Review function that allows users to capture screenshots, annotate them and publish as a pdf report.
    4. Can users upload documents (e.g. MS Word docs)?
    Throughout Strategy Management is the ability to provide links to other reports, internal or external documentation, as well as other applications. Best practices would have an associated link to documents.
    5. A new version was just released which is supposed to have a better integration with SAP BI. What are the improvements in terms of integration? How can SAP BI data be accessed?
    The improvements are an administrator tool that provides a basic user interface to simplify the handling of BI connectivity: importing schemas, defining virtual measures, creating scorecard metrics, and importing data.
    6. What are the current system requirements for SSM?
    That information can be found in the installation guides.There is a Master Guide and a Sizing Guide which will both be helpful.
    7. Where can a documentation on SSM be found (I could unfortunately only find an installation guide on service.sap.com)?
    The best public resource for documention about SSM is the BPX Community> Enterprise Performance Management
    Hope this is helpful,
    Bob

  • HT5622 I have been using one apple ID for my family as it makes it easier to manage itunes purchases/rentals on all of our devices.  Now that my kids are getting old and my wife has recently purchased an Iphone, I can see that I need to change my strategy

    I have been using one apple ID for my family as it makes it easier to manage itunes purchases/rentals on all of our devices.  Now that my kids are getting old and my wife has recently purchased an Iphone, I can see that I need to change my strategy. I plan to add a few more iphones to the family very soon.  What is your recommendation to manage all of our devices (iphones, itouch, apple tv) for my family?  Can I continue to function with one apple ID or is it time to take the leep into attempting to manage multi-apple ID's? 

    There's a few ways of managing multiple devices on a single computer (and keeping seperate content on each). The following document is worth checking through:
    How to use multiple iPods, iPads, or iPhones with one computer

  • Multiple websites, multiple woes: Best IWeb 09/MobileMe strategy?

    I'm still a bit confused as to the best strategy for using IWeb 09's much-touted-in-reviews but apparently rather limited ability to publish to two or more separate MobileMe accounts.
    In IWeb 08, I would set up several different user accounts on my Mac, associate each one with a separate MobileMe account from my Family Pack, and maintain separate domain files for each (all stored in the same folder on my hard drive, but given different names like "Domain_personal" or "Domain_business"). This worked fairly well, despite the inconvenience of sometimes not having a photo I wanted to use readily available, as it might be part of an IPhoto library that belonged to another account.
    (I would generally log-in to the user account I wanted to use and work on the MobileMe domain file I had "assigned" to that account. But now and then I might forget, and start working on a domain file for the "wrong" Mac user account. That didn't seem to be a problem -- I could still save my latest changes, log out and then log in to the "right" user account, where I could publish my revised domain file to the intended MobileMe account.)
    But in IWeb 09, my previous strategy is resulting in a slew of problems. Unexpected crashes. Or IWeb refusing to save a file after I've changed it (it just tells me the file cannot be saved, no explanation). Or images and/or video files that will suddenly go missing. Last night I found that one domain file/site I had published over and over with no problems in Iweb 08, now appeared to be a complete mess in IWeb 09 -- numerous missing images, including some png files that are apparently part of the Apple-supplied IWeb design template. Yet the graphics (mine and Apple's) were suddenly back when I opened that same domain file in another user account on my Mac.
    So my IWeb 08 strategy does not seem to be working in IWeb 09. I guess an alternative would be: Do all my IWeb work in the same user account, swap domain files as I'd been doing before, and reset my MobileMe identity for that user account every time I want to publish. Or -- essentially the same thing -- use IWeb's ability to maintain multiple sites in the same domain file. But once again, I'd typically need to manually change my MobileMe identity to a different account at publishing time, to get an individual site going to the right place. And hope like heck that I don't accidentally mess up ICal, etc., by accidentally syncing to "wrong" Mobile Me account, to which I've logged in solely to accommodate IWeb.
    Am I missing something here? Is there some logical reason why Apple would set up IWeb 09 to allow you to publish multiple sites, stored in one domain file, to various multiple external sites via FTP with ease? But make it essentially impractical to publish to several different MobileMe accounts, without the hassles I've mentioned?
    It seems to me that if I want to use IWeb 09 for multiple web sites, the only sane thing is to drop my extra MobileMe accounts as soon as possible, and add some more external sites --- since (if you can do the RSS, etc., yourself) Apple has just made it so much easier to publish to anywhere-else-but-MobileMe.
    Anybody have a different take on this? Or a better solution?

    webalias rex wrote:
    Anybody have a different take on this? Or a better solution?
    The following may not be a better solution, but it does provide a different "take". I haven't tried it myself, so I wouldn't be surprised if there's a fatal flaw in the idea. Anyway, taking that risk...
    Since we don't know what, in iWeb '09, is causing your "slew of problems", it's not possible to say whether this proposed approach would make any difference. But in theory it would enable you to:
    • maintain your separate Domain files
    • publish to your multiple MobileMe accounts
    • from the same user account on your Mac.
    Take a look at this Apple doc:
    MobileMe: How to publish a custom website
    The idea is to publish your iWeb sites to different MobileMe accounts from a single Mac user account as +"custom websites"+ and, as that doc says:
    "If you only plan to publish custom sites to your MobileMe account, you can make your site's URL shorter by placing your site (and its main index.html file) in the main Web/Sites folder instead."
    ...Presumably iWeb 09's integrated non-MobileMe publishing is FTP only, not WebDAV that iDisk requires. So you would need the free Cyberduck or pay for Transmit to publish your sites via WebDAV protocol to a MobileMe account's iDisk. And for a Domain you are about to publish, you would have to remember to use the appropriate MobileMe "destination" of the several you've set up to use in Cyberduck or Transmit.

  • Enforcing a strategy plan to only produce one order in a single month

    Hello All,
    I have created a strategy plan that kicks out orders monthly, quarterly, semi-annually and annually. I have used the cycle unit of "MON", so orders get generated in cycles of 30 days. Everything is working great.
    Now, here's a business requirement: only one order can be created in a single month. So, if this strategy kicks out an order on 01/01/09, and they complete it the same day, the next order will be created for 1/30/09. What is the most effective way to enforce SAP to only allow creation of one order in a single month?
    Thank you for your help in advance.
    Alex
    Reference:
    http://www.sapfans.com/forums/viewtopic.php?f=7&t=334722

    Hi,
    As Mr. Venu said along with the Key-date option the scheduling start date and call horizon is also important.
    Reg,
    NNR

  • Batch search strategy based on goods receipt date

    Hello,
    Can some one help me with setting up Batch search strategy based on goods receipt date currently is on batch number.
    Thanks a lot
    Thanks!
    Best Regards
    Srw

    Hi
    If you want to set up Batch search strategy based on goods receipt date......then you have to create GR Date as one charecteristics in T.Code: CT04 and assign this charecter in Class with respect to class type  023
    Then assign this class in Material Master Classification view..
    Make sure in Material master, Purchasing view...you have activated Batch management active check box....
    Then when ever you do GR in MIGO, In batch tab, In classification field maintain the GR Date..
    Then Create sort sequence in  T.Code: CU70 and you can maintain in what basis ie)in assending or desending GR Date you have to search the batch..
    And then Create Batch Search Statergy in MBC1 and there you assign the sort sequence in Details...
    Now  you do your regular procedings.....the material Batch will be searched based on GR Date...
    Reward if useful
    Regards
    S.Baskaran

  • PR Release Strategy tab processor field is not getting displayed

    Hi Experts,
    While creating Purchase Requisition, In the Release Strategy tab processor field is not getting displayed which should be showing the name of the user id which has been configured in the SPRO.
    SPRO--> Rel Proc for PR > Rel Group> Rel Code--> Object type (US) and --> Agent (User id who has to approve the PR).
    release strategy - Release code  -work flow 1
    That processer name is not displaying
    Thanks
    chandoo

    This is the workflow forum.

  • CRM UI Strategy

    Hi,
    I hope most you know that SAP's UI strategy is ABAP webdynpro except SAP CRM.
    SAP CRM is using BSP for its UI........is there any plan to move to ABAP wyndro for the forth coming release in CRM or SAP CRM will continue with BSP ????
    Do you people have any idea on this??
    please post it here.
    Thanks

    Shankar,
    I would personally expect SAP shift the UI focus away desktop on-premise CRM in certain scenarios and strongly more focus on either mobile or on-demand solutions.  That being said, I'm not sure if SAP wants to spend the money to migrate CRM over to webdynpro ABAP, nor explain to customers why its a good business proposition.
    The PCUI to Webclient UI was a pretty easy business case to sell.  The PCUI was not easy to use and difficult to maintain.  There would be need to be compelling story like the PCUI/SAP GUI to webclient UI migration in order for such a transition between webclient -> webdynpro to make sense.  Keep in mind even if it ever did happen the transition period would probably still be a long one.
    Finally if you asked me to make the decision, I would say don't worry about migrating technologies and instead focus on a core mobile/ondemand solution instead as the replacement.  I don't see any business value right now in using web dynpro ABAP instead of the webclient UI for CRM. 
    Take care,
    Stephen

  • Release strategy for purchase requisition does not kick in

    Hi Gurus!
    I've been struggling with this issue for some weeks now.
    I have set up the release strategy configuration for purchase requisitions with classifications.
    However, if I create a purchase requisition the release functionality is not taken into account by the system.
    See below some more information regarding my configuration:
    1. I've created a new characteristic "REL_PR_GROUP". Status: released, Multiple values, Number of Chars 3, 7 values (TR1, TR2, TR3....TR7), Table name: CEBAN, Field name: EKGRP, Procedure for value assignment set to not ready for input.
    2. I've created a new class: "REL_PR_ANPC". Class type 032, Status: released, Same classification: do not check, Char: "REL_PR_GROUP"
    3. I have one release group "T1", Rel. object 1, OverReqRel is marked, Class: "REL_PR_ANPC"
    4. I have 5 release codes. Grp: T1, Code: 01....05
    5. I have 2 release indicators:
    "R = Released", Rel. for ordering is marked, Changeabil: 4, Value chgs. 100,0
    "X = Blocked",  Changeabil: 4, Value chgs. 100,0
    6. I have 1 release strategy:
    "T1 with Grp T1"
    - one release group, 01 Manager
    - release prerequisites not applicable because of only one release group
    - release status, nothing marked = blocked, 01 marked = released
    - classification, purchasing group is TR1 or TR2 or TR3 or TR4 or TR5 or TR6 or TR7
    I intentionally kept the configuration as simple as possible so I can try to get it working first.
    Now if I create a purchase requisition for an item with release group T1, I would expect the release strategy to be activated. However, this is not the case. I don't see the "release status" tab in the PR, and if I try to relase via ME54 the system says the PR is not relevant for release.
    Could you please assist in getting this working?

    Hi,
    Have you checked in CL30/CL30N if your release strategy is derived successfully?
    See section 3 of Note 365604. A small section of it:
    You can use transaction CL30 search for an object using the data
    of the purchase requisition/purchase order. Here, it is important
    that the object search determines exactly one strategy. If this
    is not the case, this indicates that there are overlapping
    strategies in the system or that the release strategies in
    Customizing do not correspond with those from transaction CL24.
    See the previous point. If the object search returns more than
    one result, the system subsequently determines an incorrect
    release strategy or no release strategy at all.
    If it is derived successfully, next, check the user exit EXIT_SAPLEBND_001 as per Note 371667:
    The following assignment statement has to exist within activated SAP
    enhancements M06B0002 (include zxm06u13) and M06B0005 (include zxm06u31)
    for purchase requisitions:
         E_CEBAN = I_CEBAN.
    Regards,
    Purnima.

  • How can I create an EntityStore for a Database?  Advice on DB strategy?

    Hello All,
    How can I create an com.sleepycat.persist.EntityStore for a com.sleepycat.db.Database? Advice on DB strategy?
    I'm looking to create an application prototype that creates a database dynamically and can delete it programatically. Is openDatabase/removeDatabase what I'd want to use for that?
    So far, the Direct Persistence Layer is an amazing piece of technology and has the potential to make my team's application faster than we every though possible, so kudos to the author.
    I've built a high-security application using the DPL and a single database for hundreds millions of users. I'd like to attempt to create a database for each user for security and manageability purposes. Our mission statement doesn't allow us to execute queries for sensitive data across more than one user account at a time, so I don't get any benefit from having every user's objects in a single database. I'm investigating if giving each user their own database will speed up insert times and SecondaryIndex queries. It'll certainly be more secure as each database will be encrypted with a unique password.
    My design is that I have an app with dozens of com.sleepycat.persist.model.Entity beans which I persist and query on their Primary and secondary indexes. I've been accessing things through an EntityStore as illustrated in the Getting Started Guide. Can I access a database created with openDatabase through an EntityStore and com.sleepycat.persist.PrimaryIndex?
    Thanks in Advance,
    Steven
    Harvard Childrens Hospital Informatics Program

    I closed this as I found another way to solve my issue.
    Thanks,
    Steven

  • Advice on a migration - or networking - strategy ?

    Hello. I am trying to map a logical strategy on how to do the following.
    I have a recording studio with an IMac 24 running 10.6.  It has all of my must-have apps and internet
    connectivity.
    I want to have identical capabilities on a separate IMac - located in another room. 
    I bought a used IMac which came loaded with 10.6 and is base set of apps/features.
    It seems I have a couple of options... Some form of networking where the added computer somehow
    would access the 'main' computer - or - running Migration Assistant and transferring the identity and
    contents of the first computer over to the newly bought computer.  I'm looking for the simplest and
    easiest solution.
    All computers have either ethernet and/or wireless access to my Airport Extreme/router connected to a Cable Modem. 
    I have never really messed with networking per se.  This second machine would easily be in range for wi-fi web connection.
    It's been quite a while since i've needed to deal with Migration Assistant and I don't want to wind up doing something
    irreversible.  If I were to connect the newly purchased Imac to the existing computer, do i have the option to selectively
    choose what gets carried over and what doesn't - like...if i don't want to clutter it with a lot of stuff that doesn't need to
    be on the target machine - just the must-have stuff -  like my recording, web access settings, Thunderbird email app and
    settings, and want to leave out excess things it really wouldn't require, would Migration ***'t allow me to itemize things
    that way i.e. customize the transfer?   
    Is there any reason i would have to "wipe" the OS on the target drive to do this
    or can i get away with just leaving the OS that's already installed on it, as-is, before i would run Migration Assistant?
    I'd hate to get into some weird Permissions issues that might be introduced...i never know quite how to resolve those
    situations as it's happened in the past.
    What i simply want to come away with is another Mac with pretty much all the same apps and internet/email access as
    my other machine... IF it was simple enough to use networking and make this 2nd machine capable of accessing/using
    all the main IMac's features and internet/email connection, i would consider that route but it seems more complicated...
    Sorry but i'm only an IT guy when I am forced to make changes and i just want to do it right 'the first time' so i appreciate
    any step-by-step on how to get this done in a sensible and straightforward way....and thanks very much!
    MIke

    Hi Mike,
    Best/easiest way is with the old one in Target mode...
    http://support.apple.com/kb/HT1661
    Use MA on the new one to Migrate everything, no detailed choices so it's best to get it all & remove what you don't need later.
    Other way would be the new one in Target mode...
    http://support.apple.com/kb/HT1661
    Then clone the old one to the new one for identical everything.
    Get carbon copy cloner to make an exact copy of your old HD to the New one...
    http://www.bombich.com/software/ccc.html
    Or SuperDuper...
    http://www.shirt-pocket.com/SuperDuper/

  • Release strategy for PO and Contract

    Hi,
    I maintain characteritic for PO
    Plant
    Doc Type
    Net Order Value
    Purchasing Group
    I maintain characteristic  for contract
    Company code
    Target Value
    Doc Type
    Purchasing group
    My class consist of
    Plant
    Doc Type
    Net Order Value
    Purchasing Group
    Company code
    Target value
    Q1: Do i need to maintain ALL characteristic value when i define my release strategy for PO or Contract as some characteristic only apply to PO only or contract only?
    Q2:  What option do i have if i need to maintain all characteristic value ? leave it blank ? empty
    Currently my PO release is working fine but when i try to maintain the contract release inside the class . my PO release is not triggering . I maintained diffrent release group for both PO and Contract .
    Thank for your advice

    First of all
    For purchasing like PO,pr,contract you can able to get in ekko table.No need to maintain separate release unless if it your business requirement.Take Document type as one of the characteristics it will distinguish whether it is PO or contract.
    You have to maintain all the characteristic value then only it will trigered release.
    Check the release indicator as well.
    Hope it will help.

  • PO Changeability / Release Strategy / BAPI_PO_RELEASE Issue

    Hello everyone,
    I've run into an interesting problem:
    We have defined several PO release strategies.  Most of these work in the traditional manner, requiring manual approval by a given user.  One release strategy, "99," gets picked up by a batch job and released automatically using BAPI_PO_RELEASE. Either way, the release indicator for all released PO's is set to "R." This all works as intended.
    We have maintained Changeability settings for each release indicator in customizing. "R" is set to "4 - Changeable, new release in case of new strat. or val. change," with a percent value change tolerance of 10%.
    If we make a change to a manually released PO that exceeds the threshold set in customizing, the release procedure starts over as intended.
    If we make a change exceeding the threshold to a PO that was released automatically by BAPI_PO_RELEASE, the release procedure does not start over, and the PO remains unblocked.
    What would cause this discrepancy?  The two records look virtually identical in EKKO, particularly in respect to the fields relevant to release.
    Thank you ahead of time for your help.
    -Jarrod

    Configuration issue/user error.

  • PO Release strategy

    Hi,
    I have a unique requirement in PO release strategy. The requirement is if the PO doesn't have any contract it should be subjected to 2 step release process. If there is a contract then it should be subjected to 1 step release process.
    Now i have created 2 release strategies one with 2 step release and the other one with 1 step release with the same charecteristic values. The only exception is i have used the 'USER DEFINED CHARECTERISTICS' - USRC1 with the value of X in one step release strategy and the value of BLANK in 2 step release strategy.
    After doing all these settings Release strategy is not trigerring at all. Firstly it has to trigger the release then using the exit we can change the release strategies depending upon the conditions.
    Any suggestions are highly appreciated to fix this issue.
    Regards
    Sudhakar

    Hello,
    After you have done config for the release strategy please execute " Check Release Strategies". This will also help you in giving first round of check/errors in your config.
    regards
    anand

  • Release strategy for quantity contract

    Hi Gurus,
    In quantity contract ..  target value will not filled by the value(in header details) as it is quantityt contract.
    We may have different line items with different cost..
    my doubt is how the release strategy will be triggered for the quanityt contract and how the system will consider the whole value of the contract..
    please explain/clarify
    regards
    subbu

    Hi,
    The release strategy for the contract will work in the exact mechanism as for the PO i.e. it will be determined  based upon the total net value of the entire purchasing document.
    Cheers,
    HT

  • Contract & PO Release Strategy

    Hi All,
    We are in the process of designing the release strategy for contract and PO. I  would like to know whether we can have the different release conditions for contract and different release conditions for PO. For example.
    The release conditions for Contract required are
    1)Porg
    2)Pgroup
    3) Value
    Also, for quantity contract how can we make the release strategy trigger based on value.
    The release conditions for PO required are
    1)Porg
    2)Pgroup
    3)Material Group
    4)Value
    The release strategy is not getting determined if we create po with two line items which belongs to two different material group. Is there any way out to solve this issue?
    Request your help.
    Regards,
    Kannan

    Hi Kannan
    Yes your requirement is possible...
    While creating Charectristics in CT04 for External Purchase Documents...Create one more Value  for your Document Category...ie) Table as :CEKKO   and Field  as BSTYP   and choose the Purchase Doc. Category  values K  and F.
    Then create Charecteris for  CEKKO - EKORG,  CEKKO - EKGRP   and   CEKKO - GNETW, CEKKO- MATKL...  and assign these all 4 Chareteristices in your release class.
    And Configure your release statergy according to your requirement...
    Reward if useful
    Regards
    S.Baskaran