Hi guys,
I'm planning a finished goods FG with strategy 81 (dynamic assemblies with ATP check on components ) but the availability check in the sales order does not createthe schedule line as I expect.
In the first level of the BOM I've only a component C (planned with strategy 70).
I insert a monthly production plan (PIR) for component C,
the MRP reacts with planned orders for component C.
Oct 2008 100 pcs PIR-100 pcs plan. ord
Nov 2008 100 pcs-100 pcs plan. ord
Dec 2008 100 pcs--100 pcs plan. ord
Jan 2009 100 pcs-100 pcs plan. ord
If I insert a sales order line for 300 pcs for FG , SAP
creates 2 "assembly" planned orders for FG 
( and  "consume" correctly the PIRs) and propose as confirmed qty/date :
100 pcs in October (assembly lead time is 0)
200 pcs in December
This in my opinion is not correct, I expect that SAP propose to me
3 schedule lines.
Oct 2008 100 pcs
Nov 2008 100 pcs
Dec 2008 100 pcs
Any suggestions?
Thanks
Francesco

Hi Michael
I have done the basic setup (activating the basic functions) settings for sales order scheduling in ECC and TM.But i am facing issues at the time of sales order scheduling.
1.I have maintained the control key config with SOS active
2.Delivery & transportation sch is active for my sales document type
3.In my shipping point i have maintained the pick/pack time & loading time in days as 1 day each
Now when i run the SOS in ECC it returns a error message that no MBDAT can be  determnied,error in TM.
On  the contrary if i define a working hours for my shipping point and maintain the pick/pack time & loading time in HOURS  as ex. 1 hour each(basically maintaining precise scheduling in ECC) then the system runs fine.
More over i want to make another imp note that i am having direct FO creation from my OBTR. I have also implemented the note 1659577 for this which basicallt considers the FO dates as well in case no FUs are created but it doesnt work.
Request your inputs on the same.
Thanks
Sanjeev Bose

Similar Messages

  • Interesting and an  imporatant issue at sales order schedule line.

    hi all,
    interesting and an  imporatant issue at sales order schedule line.
    i created a sales order with 10 qty.and the system proposed a two schedule lines.
    let's say to order created date is 27.11.2008.and the requested delivery date is 27.11.2008.
    but the stock is not available today then the system proposed two more schedule lines apart from the 27.11.2008.so now there are three schedule lines like below.
    schedule line date                      Material availabilyt date   delivery date                   
    27.10.2008 with zero quantity.     
    28.10.2008 with 5 qty.                28.10.2008                     29.10.2008
    02.10.2008 with 5 qty.                02.10.2008                     03.10.2008
    now the delivery and pgi already for the schedule line 28.10.2008.
    then when i run the availability check on 01.11.2008 system is over writing the material vailability date as today at the scheduleline number two.
    now i can able to view only two schedule lines only.
    schedule line date                      Material availabilyt date   delivery date                   
    28.10.2008 with 5 qty.                01.11.2008                     29.10.2008
    02.10.2008 with 5 qty.                01.11.2008                     02.11.2008
    now my concern when we reschedule the avalability check it should notchange the Material availability date of the schedule line which i already delivered.
    Regards,
    sheshukumar

    can any one repsond for this.....

  • Sales order item data & sales order schedule data

    Hello,
    I have a Sales Orders cube which is pulling data from two DSOs (one for sales order item data and the other for sales order schedule data). The common fields between these two DSOs is the Sales Order number but in my cube I have dual entries for each Sales Order document (item and schedule info).
    Example of how the data looks now:
    Sales Order . . Item Cat. . . Article . . . Net Price . . . Delivery . . . Act GI Date
    1. . . . . . . . . ...TAN. . . . . ABC123. . . .10
    1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 . . . . . . . . 01/01/2000
    2. . . . . . . . . ...TAN. . . . . CBA321. . . .15
    2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 . . . . . . . . 01/02/2000
    How do I merge the data on the Sales Order number in the cube so it looks like below?
    Sales Order . . Item Cat. . . Article . . . Net Price . . . Delivery . . . Act GI Date
    1. . . . . . . . . ...TAN. . . . . ABC123. . . .10 . . . . . . . . . .1 . . . . . . . . 01/01/2000
    2. . . . . . . . . ...TAN. . . . . CBA321. . . .15 . . . . . . . . . .2 . . . . . . . . 01/02/2000
    Many thanks,
    Matt

    > Hello,
    >
    > I have a Sales Orders cube which is pulling data from
    > two DSOs (one for sales order item data and the other
    > for sales order schedule data). The common fields
    > between these two DSOs is the Sales Order number but
    > in my cube I have dual entries for each Sales Order
    > document (item and schedule info).
    >
    Two previous remarks:
    1) If you need to report on very detailed data consider doing an info-set joining both datastores. 2 reasons why:
    - not a good idea to report on very detailed information (sales order, GI dates) on cube level, if you have a scenario with lots of data. You end up with big dimension tables a poor report times;
    - there are better alternatives, like drill-through from cube query to DS query with report to report interface or Datastore-based reporting...so...
    With this solution you do not need to change the data model, I think, but test to be sure. See if the reporting times are acceptable. If not...
    2) First confirm your requirements, because what you show in your example as "to-be" have details that do not make sense, probably..
    - if you have more that one schedule line for each item then you would have many times the item information like material/price;
    - if not or if you could cope with that, then you can consider:
    2.1) create a new DS that agregattes from the previous on, with the same key of sales order item; do you have schedule line kf's? if so you these KF's should be additive in DS update; But if you may have more one scheduled line for 1 item then you have to decide what to do with the GI data (keep the last one posted, use code..) and other characteristics.
    2.2) update the shedule line datasource to the sales order item DS; same comments apply.
    2.3) maintain the missing data in the cube update rules from sheduled lines DS. Using code, refer to the respective item in the order item ODS. You would have to make sure that DS's data are correctly activated before updating the infocube.
    What solutions to choose?
    2.1 is better in terms of flexibility and architecture...because you could re-arrange the new DS to answer future needs, without loosing the 1st line DS's data;
    2.2 choose if data volumes and disk space are a concern...
    or
    2.3 it's OK, but i do not like it because of what explained in point 1...
    Message was edited by:
            Miguel Costa

  • Sales Order Schedule line not populating in the Production order

    Queation: Is there a way to tell the system to look at the sales order, line item AND schedule line. It is displayed in MD04 but it doesn't carry over to the Production Order. We are a MTO and this information is relevant in a number of ways. 
    Please Help.

    Vickie,
    If you are using MTO scenario then when you run the MRP for the material, it will create a planned order for that sales order based on the dates calculated from the sales order schedule line (Shipping tab)...
    So now when you convert the planned order to production order, all the sales order details will get copied.
    try and revert back.
    Swapnil

  • Sales order schedule line quantities in decimals

    Gurus - Required your help to resolve the following scenario.
    I'm facing with the problem where schedule lines of a sales order allocated with decimal quantities even though materials with UOM as EA(Each). For example Material A of sales qty 13 has the schedule lines allocated as 11.960 and 2.040. The delivery has been created as per the schedule lines with qty 11.960 and 2.040 and it has been pick/packed and delivered to the customer. Now, while issuing goods for the delivery, received the error message as <b>"Serial number management only allows whole numbers".</b>
    Can anyone provide what are the possible ways to round the delivered qty and issue the goods, when the delivery is complete?

    Sree - Question 1 - Why would you deliver the product and then try goods issue it (In general ;)...anyway....I know, a lot of companies do that way....
    Question 2 - How much exactly did you ship out, surely must not have shipped products in decimals, since you've EACHES defined and not KGs....or LBs...
    I would suggest finding out the correct quantities shipped out and then cancelling this delivery document....you can then go on to modify sales order schedule line accordingly and then process it again..."WHAT ABOUT PICK PACK DETAILS"....before cancelling this delivery doc out..capture the packing details (HUs) and then apply them to the new delivery doc... if you are using external system for packing HUs.....process the IDOC (or file etc) using the new delivery doc number....
    Hope you got the direction )
    Thanks
    Nikhil

  • Sales order schedule date is a (working) day before Scheduled ship date

    In MRP/MPS planning, the forecast consumption is occuring for all sales orders at a date (sales order schedule date) which is always a working day before the Scheduled Ship Date (SSD). What is the logic?
    Time fences are not used.
    E.g. Sales order is scheduled to ship (SSD) on 30th Nov, in forecast set > Forecast items > Consumptiion > Detail, the sales order schedule date is a day before SSD.

    Hi,
    This is a complex issue; best solution is by using APO/GATP.
    If not, then in ERP only, the second best is:
    1) Work with assembly processing in SO, meaning that a production/planned order is automatically created in the customer order during order creation.
    2) Then, after the order is created it is scheduled, and the delivery date proposal is based on that.
    3) Now you can check in the order that there are no capacity overloads, and all capacity required to produce on the proposed date is available. If yes, you're done. If not, it gets a bit complex, since you actualy need to switch to capacity planning, do capacity leveling and dispatch (PP), and the you get a new feasible schedule proposal based on that.
    APO/GATP could do all that automatically!
    Regards,
    Mario

  • Sales order schedule line quantity update

    Hi
    I'd like to know if there is a FM to update the Sales order schedule line quantities.
    In particular, the fields in VBEP:  WMENG, BMENG, LMENG, CMENG.
    Thanks.

    Hi Lily,
    Can you please tell us how you updated BMENG using the BAPI BAPI_SALESORDER_CHANGE?
    Thanks,
    Vitz.

  • Sales Order schedule line from CN to CP

    Hi,
    When i  update the sales order schedule line from CN to CP , the quantity is not showing in the MDO4.
    Can any one help me.
    Thanks in advance
    Suresh S

    Once the schedule line category is changed to CP,  just hit the enter key and save.  Now check in MD04
    thanks
    G. Lakshmipathi

  • Mapping between Sales Order-Schedule-Line and Delivery-item

    Hi together,
    I want to extend the Datasource 2LIS_12_VCITM (Delivery-number, -item, Order-number,-item is available) by Sales Order Schedule Line.
    Could not find any ERP table (VBEP and LIPS allow a mapping only on item level) for the mapping between Sales Order Schedule Line and Delivery item yet. The use of the extractor 2LIS_12_VCSCL for the extention (e.g. infoset) afterwards is no option.
    Thanks for your help in advance!!
    Assign full points!!
    Sven

    Hi Reddy,
    thanks for your answer.
    I know that I have to add this field.. but the problem is, how to fill this field. I don't know how to map the delivery-item with the schedule line-item.

  • Creating Outbound deliveries based on the sales order schedule lines

    Dear all.
    Is it possible to create outbound delivery documents based on the sales order schedule lines?
    Eg:
    Let's say I have sales order line item 10 with below mentioned requested delivery dates in its schedule line level.
    30.07.2009
    10.08.2009
    20.08.2009
    30.08.2009
    Will it possible for me to create different deliveries for those 4 schedule lines individually? I should be able to create 10.08.2009 delivery without clubbing 30.07.2009 delivery with it.
    Appreciate your help!

    I'm not sure because I'm not before SAP but try transaction VL10E that is to create delivery for schedule lines. I'm not sure what are the split criterias.
    Please check OSS note 113411 tha has many OSS note reference in this subject.
    Regards,
    Csaba
    Edited by: Csaba Szommer on Jul 29, 2009 2:38 PM

  • Sales Order Item Data & Sales Order Schedule Lines

    Hello,
    I have a Sales Orders cube which is pulling data from two DSOs (one for sales order item data and the other for sales order schedule data). The common fields between these two DSOs is the Sales Order number but in my cube I have dual entries for each Sales Order document (item and schedule info).
    Example of how the data looks now:
    <b>Sales Order . . Item Cat. . . Article . . . Net Price . . . Delivery . . .  Act GI Date</b>
    1. . . . . . . . . ...TAN. . . . . ABC123. . . .10  
    1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 . . . . . . . . 01/01/2000
    2. . . . . . . . . ...TAN. . . . . CBA321. . . .15  
    2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 . . . . . . . . 01/02/2000
    How do I merge the data on the Sales Order number in the cube so it looks like below?
    <b>Sales Order . . Item Cat. . . Article . . . Net Price . . . Delivery . . .  Act GI Date</b>
    1. . . . . . . . . ...TAN. . . . . ABC123. . . .10 . . . . . . . . . .1 . . . . . . . . 01/01/2000 
    2. . . . . . . . . ...TAN. . . . . CBA321. . . .15 . . . . . . . . . .2 . . . . . . . . 01/02/2000  
    Many thanks,
    Matt

    Hi Matt,
        Its no possible If you are maintaining data at Order Level.
    Try to introduce one more ODS/DSO in between ODS's and CUBE by keeping Sales Order only key field. Load data from both DSO's in required fields only. Then PUSH delta to CUBE. In this why you can maintain 1 record. Try to compress cube(with delete Zero Record Rows) to delete unnessasary records.
    Hope it Helps
    Srini

  • Sales Order Schedule Lines getting updated

    Hi,
    In my system when I am changing the delivery date of  'AB' confirmation in the Purchase order Item level confirmations, the corresponding  Sales Order' schedule line is also getting updated with the delivery date.
    So, my question is is this a standard SAP functionality or this fuctionality has been implemented through BADI, Exits etc.
    Regards,
    Rachit

    Rachit,
    This is standard SAP behavior. In 3rd party sale process, the changes done to PO (qty, dates) are updated automatically in the sales order.
    TW

  • Blocking RdA creation from Sales Order Schedule Line

    Hi Gurus,
    please do you know if there is a way to block the RdA creation from Sales Order schedule line, for TAS item category? I tried with Header Delivery block without quantity confirmation but even if quantity on schedule lines are not confirmed, RdA is created anyway.
    Thank you very much
    Kind Regards
    Andrea

    thank you

  • Difference between sales order schedule line and item level data

    Hi All,
    Could you please let me know what is the difference between sales order schedule line and item level data?
    Thanks,
    Ramya

    Hi Ramya,
    Sales order schedule line contains del date, order qty, rounded qty, confirmed qty, delivery qty, schedule line category, purchase requisition etc.,  ie It contains the full details of sales order data with respect to the scheduled line of delivery.  The total quantity of a sales order item can be subdivided into schedule lines that contain the various subsets with the corresponding delivering dates.
    Sales order Item level data contains details of the item in the sales order like material code, net price, net value, UoM, PO details, reason for rejection if any, material group,billing date, plant etc., ie this
    contains the full details of item irrespective of scheduled line.
    Regards,
    R. Senthil Mareeswaran.

  • Link between Prod Order and Sale Order schedule line

    Dear all,
    Ours is a MTO (81).
    In Scheduling Agreement / Sale Order , there are multiple schedule lines for a single item .
    Production Orders are generated for every schedule line of the Item.
    The client wants to know (for a custom developed report) , against which schedule line of the Sched Agreement/ Sale Order, the Production Order is generated ?
    This Information can be seen in MD04.But  I am not able to fetch from the tables .
    The schedule line field (KDEIN ) is not updated in AFPO table & the order no (AUFNR) is not updated in VBEP table .
    Say,
    Sale Doc No : 42000506
    Schedule line/Dely date            Order qty          Prod Order No
    06.10.09                                    500kg               100170
    15.10.09                                    300kg               100171
    Pls give your valuable inputs.
    Regards,
    Sheik

    Hi,
    Only Sales Order No & Sales Order Item No is updated in the table.
    Whereas , I want to know the Sales Order Schedule Line no.
    Regards,
    Sheiki

Maybe you are looking for

  • How do i add the same mouselistener to many different instantiated objects?

    This is for a card game. The deck class instantiates 52 cards from the card class. The game has a deck of cards. I am dealing each player their cards, the player is to be dealt 8 cards each of which should have a mouselistener. How do I add the same

  • Ship to party and sold to party changes to same value in VA01 while saving

    Hi Team, In VA01 transaction, i am trying to create an Order with oen Order Type. Now in the second screen, if i give the ship to party as 123 and the Sold to party as 456 and if i give an item number and material number with quantity something and i

  • Buongiorno questo è il mio sfogo personale dopo una chiacchierata con la Apple

    La mia esperienza è iniziata con l'acquisto al modico prezzo di 2.636,00€ per un Macbook Pro da 17" appena tre anni fa'. I primi due anni tutto bene, il terzo anno come per magia dissolvendosi la garanzia, terzo problema classificato sul podio: l'ali

  • HELP! I cant startup my new powerbook

    I cant start up my Powerbook unless the AC adapter is plugged in!! does anyone now why this is and how to fix it?? I didn't calibrate my battery properly when I first got it, (due to excitement and not reading instructions first) is this why?? I have

  • ASR9K XML Interface

    I've been reading about the XML interface in IOS-XR and wondering what XML client is recommended to use.  I have not used XML language but could see how it could be very beneficial with the ASR9K platform.  All the guides I've read do a good job of e