Strategy Plan-with different Counters??

Dear Experts,
I had a scenario, which my client want :
There are many similar equipments say "Pumps". So, for 5 similar pumps, they want a single plan which will include all 5 pumps (say in OBJECT lists). Now the thing is that 2 of the pumps are standby for some period and can be brought in running after some time or some running hours.
So, they would like to attach counters to each pump(equipment) and based on measuring documents, call object /order should generate only for those which have completed stipulated running hours.
As I didn't find to assign more than one counters in a plan, so i am unable to fulfill this demand.
Is there any way to complete this scenario???
Regards,
Rajesh

Hello Rajesh,
You can assign multiple counter  by defining the cycle set for multiple counters defined for equipment.
SAP does support Maintenane planning for equipment with multiple counter.You can define the and/or condition for multiple counters.
Let me know if you need more details.
Thanks
Vinay

Similar Messages

  • Strategy Plan with task list

    Hi all,
    can any one help me?
    I create a strategy plan with one maintenance item and one task list, with one task list item, for example. After scheduling I get a maintenance order with two items. One item from the task list and one from the maintenance item and it´s necessary to confirm both order items.
    It´s possible to create a maintenance order with only items from the task list?
    Thank you for your support
    Detlev

    Detlev,
    The PM/CS Order operations should only come from the task list that is assigned to the maintenance item.
    If you are getting additional operations than are on the task list then its possible that you have:
    - a system bug
    - developed some new functionality
    PeteA

  • Maint plan with different diemensions(Strategy & Performance )

    Dear PM experts
    let me know how to get the preventive  maint order get  generated with both performance based and strategy based , Which ever is earlier  , against  that order must get generated. how to use Cycle set concept
    regards

    Hi
    I just like to add some points here. You may need to decide based on business scenario what business have.
    Single cycle plan u2013 if user will carry out same operation at regular interval then you can suggest them to use Single cycle plan. Example every one month or every 100 hrs
    Strategy plan u2013 if user will carry out difference operation at different interval then you can suggest them to use Strategy plan. You have to define time based or performance based strategy in IP11 Transaction. Example inspection work after one month & replacement work after 6 month ( Time based) or inspection work after 100 hrs & replacement work after 500 hrs.( performance based)
    Multiple counter plan - if the user will carry out same operation after 3 month or after 300 hrs whichever come earlier then you can suggest them to use Multiple counter plan. You have to define cycle set for IP11Z transaction.
    Let me know if you need anymore information
    Jeny

  • Strategy plan with package to be executed only once

    Hi All,
    Created a time based maintenance plan with strategy. Included 4 maintenance packages in the strategy. One of the maintenance package should be executed only once upon scheduling the maint. plan and should be due on the date on scheduling.
    What scheduling parameters are to be maintained?
    Regards,
    Abhijit

    Hi Abhijeet,
                      The Functionality of Offset is actually different.
    Suppose you procure a new Equipment, you have erected and comissioned, but the use will anly after 3 months as the predessing and subsequent Equipment needs some time for the Erection and comissioning, in this case, you maintenance plans should start after 3 months only,
    for this reason the Offsetting Field is used.
    that is if you maintain the offseting of 3 months then the cycle will start after 3 months.
    it means that if today is 20th December and you have a cycle frequency of 1 month and you give the offseting for 3 months then your plan will be only activated from 20th march,and the first order will be generated 1 month(cycle period) after that.
    that is 20th April.
    Hope it further clarifies your doubt.
    Regards,
    Yawar Khan

  • Family share plan with different contract dates

    We currently have a Family Share Plan where my two daughters were added at different times, so we have 3 contract end dates within the same year.  Is there any way to get these dates in synch without any penalties or changes to the plan we've been grandfathered with?  It seems that any changes would penalize our family.  Any ideas?

    jewelsy wrote:
    My daughters are in college now and, hopefully, one of these days they'll be ready to take on their own bills and make their own choices.  Let's say they choose to go with another company and we agree I carry them until their contract end dates.  Wouldn't that break *my* contract under the family plan, automatically switch me to another plan and penalize me? 
    As for the same-day renewal, are you saying if my contract date is tomorrow and theirs are later this year, I can renew them so that we all expire in January 2015?
    Your contract would not be broken by dropping lines. You'll remain on the same contract plan until the owner of the account(you, I assume) chooses to change plan. You can even go back to a single line "Nationwide plan" assuming you're on the Nationwide plan now.
    As far as contracts you'll have to wait until they all reach the 20 months and then "upgrade" them all at the same time.
    FYI,  If any line has an unlimited data plan, you lose the unlimited data for that line if you upgrade at a discounted(phone) price.

  • Planning With different versions

    Hi Experts
    We are using 001 and 000 version in Planning.
    As the users input the forecast in 001 and copied to 000 Version.
    There is Consensus Planning book where our users want to see Final forecast of 001 & Final forecast of 000 version in the Interactive Demand Planning.
    How can we see Values of Final Forecast KF  in 001 and 000 in the interactive Planning in the planning table.
    There is Indicator for Version Reference of a Key Figure in the planning book , i have flagged and given reference as 000 to the Final forecast then i have assingned final forecast<variable> to the Data View.
    In the interactive demand planning , i cannot see the values of 000 and 001 at a same time.
    If we right click on the dataview in SDP94 then its asking variable version when i select it i can see the values of variable version only.
    My requirment is to view final fcst of Version 000 and 001 at the sae time when i load data from the selection ID.
    Please guide.
    Thanks in advance

    Hi Mani
    Thanks for sparing  your time.
    In this case if you want to copy into version 000, I suggest you create another Pbook/Dview with just the necessary KF. Create that KF with ref to v001. In this case the Base version will be 000 and the ref version will be 001. Hence you can now copy from 001 to 000.
    Now you will see only 2 KF in your planning book, KF and KF (001). Write a macro with a simple logic of KF = KF(001). And that shud do the work.
    With reference to the above message:
    Created a Planning book with  Final Forecast Key Figure, then in the keyfigure attributes i have given reference version as 001.
    In the data view keyfigures tab i can able to see Final forecast <variable> & draged it to the dataview keyfigures and activated the dataview.
    In Interactive Demand Planning I have created 2 selection with 001 & 000.
    Inputed the values in 001 as follows:
    Final Fcst week12= 1000
    Final Fcst week13= 2000
    Final Fcst week14= 3000
    Created the macro Final forecast= Finalvforecast <variable>
    When i excute the macro i am getting short dump.
    But i cannnot see the values in the Final Forecast <Variable> also.
    Please can explain me the details.
    my requirment  is Planners will input values in KF X in 001 version and i need to copy it to KF X 000 version  fro which it releases to snp for further planning.
    Thanks

  • GL Accounts Planning with different value in each period through SPL ledger

    Can any one help me for the below issue:
    We want to load ( EXCEL  SHEET) planning amount through special purpose ledger against each GL account or all P&L and Balance sheet accounts, perhaps, a different value in each period.We would want to compare actual and budget figures by using T-CODE F.01.
    The example Given below:
    GL - 250112                
    PERIOD 1  - 10,000    
    PERIOD 2  - 10,500         
    Pd3           - 10,500       
    Pd4           - 8500    
    Pd5           - 8000    
    Pd6           - 9500        
    Pd7           - 10000     
    Pd8           - 9400          
    Pd9            - 10500          
    Pd10          - 11000        
    Pd11          - 6000     
    PERIOD 12 - 8400               
    Can anyone give me step by step procedure to do this.Thanks in advance.
    Edited by: DhanuSAPFICO on Dec 28, 2010 5:52 PM

    Hi,
    A bit not clear requirements. You are trying to create separate accounts for Opening and Closing? Looks strange! Please, use Flow dimension for this things. Trying to emulate it on the report level will create a lot of misunderstanding...
    B.R. Vadim

  • Maintenance Plan with Counter

    Dear All,
    I have the following requirement, would be of great help if you can help me get the solution:
    Their is a pump which is to be maintained. The orders need to be generated on the basis of two parameters:
    1. Number of hours the pump has ran. This can be recorded against measuring point.
    2. Number of calendar days elapsed.
    The maintenance order should be created which ever condition is met first. For example: Every 200 hrs the pump runs, a maintenance order should be created also if the time elapsed is 2 months the order should be created. Now whatever of the above two comes first the order should be created against that only.
    Can anyone please tell how to achieve this.
    I have thought of two options though they dont look good:
    Option 1: Create two maintenance plan. Delete/TECO the extra order generated.
    Option 2: Create one maintenance plan with multiple counters, one for running hours and the other for calendar days. Keep OR relation. But here we need to update calendar days counter every day which is not feasible.
    Thanks
    Geravine

    Hi...
    First of all you have to create the Measuring Counter for your Pump using the T.code IK01 and then post the initial measurement  document against the measuring counter using T.code IK11.
    After above create the Cycle set for Multiple counter using T.Code IP11Z, and define the Cycle for your Multiple Counter Plan.
    In your condition, define the cycle length as "2" and UOM as "MON" and second cycle length as "200" and UOM as "HRS" and also provide the short text for Cycle short text as per you convenience. This is one time activity.
    Then create the Multiple counter Plan using the T.Code IP43 and cycle set created in earlier step. Provide the Technical Object i.e. Pump (Most probably Equipment) all other details are copied from it. Enter the created Measuring Counter for your Technical Object in the Maintenance Plan Cycle Tab against the 200 Hrs Row in Counter Columns. In the Second Tab i.e. Maintenance Plan scheduling parameter Choose "OR" Link . Enter the value Scheduling Period which help you to show the future plan in advance.
    And as per requirement you can also check the box  available for Completion Requirement, Check the box if you required that New Maintenance Order  will not be generate until the previous order is get closed.
    Hope this will resolve your query

  • New Products Lunch - Planning with Planning Material

    Hello All
    WE Plan we planning material (strg 63).
    Each finish good is assigned to a planning material and in each planning material we maintain parameters like consumption mode and consumption periods.
    For products current in production this strategy works fine, but for new finish goods that are not yet in production the ,confirmation is a challenge.
    Imagine a planning material that contain both types of materials, in production and a new materials that start production in month 3.
    The consumption indicator is 2 (backwards and foreword) and the backward consumption period is 30 days.
    if you enter a sales order today and if planning allow he gets confirmed for today even thou production only start in month 3.
    Any advice to make sure SAP only confirms after the 3 month even thou planning exists before? and how to make sure that only the planning that  is maintained after the production start is considered even thou the backword consumption is define to look back
    any comment / suggestion is appreciated
    Thanks
    PCoelho

    hi
    In Planning with planning material Planning material  means if there is a material which determines the profitability of the company or which is of great importance to the company.
    The planning strategy "Planning with planning material" is particularly useful if you have several
    finished products with the same main assemblies.
    Here, you define a planning material which contains the common assembly and its BOMs.
    The planning run is carried out for the planning material which triggers the production and
    procurement of the planning material's components.
    The sales order for a finished product which refers to the planning material reduces the planned
    independent requirements of the planning material and simultaneously triggers final assembly.
    When processing the sales order, you can check whether the planned independent requirements
    quantities cover the demand (that is, the availability check as a check against the planned
    independent requirements).
    In the material master record of the planning material, you must enter strategy 60, the consumption
    mode and the consumption periods. In the material master records which refer to the planning
    material, you must enter the planning material as a reference and strategy 60. The consumption
    periods are calculated starting from the planned independent requirements of the planning material.

  • Maintenance Planning with Cycles of Different Dimensions

    Hello All,
    I am having trouble finding the solution for the following requirement in PLM310 "Maintenance Planning with Cycles of Different Dimensions": I am having trouble creating a maintenance strategy that can handle both time and measurement.
    SImple version of the requirement: perform car maintenance every three months OR 3000 miles, whichever comes first.
    I can see where SAP can handle multiple counters, but where I can mix time and performance measurements.
    Thank you all for your help in advance.
    Alex

    Hi,
    You can achive this in two ways.
    1. If you have strategy only as you mentioned 3Months or 3000 miles then you can use T code IP43 Multiple counterplan.
    2. Is you create cycle sets in IP11Z tcode and use them as like strategy. In this typr you can maintain different UOM.
    Regards,
    N.Nagaraju

  • How to generate and output 3 TTL square waveforms with different pulse widths using counters of NI 6034E

    Hello
    I just have a few questions.
     I am using the NI 6034E DAQ board in order to
    generate simultaneouly 3 different TTL digital signals, with different
    pulse width, and output these TTL signals to an external circuit that I
    am using for this application.
    The following pattern of the TTL pulses will look like this:
    01010101 01010101
    00110011 00110011
    00001111 00001111
    From
    what I understand,  I have to use the 2 counters, Ctr0 and Ctr1, to
    generate the TTL pulses that I desire, because the DIO lines are
    software timed only and I will not be able to produce a deterministic
    output period using these DIO lines.  Am I correct?    Also, do I have
    to use a separate counter to generate a separate TTL digital pulse.  I
    need 3 different TTL pulses and there are only 2 counters for this DAQ
    device.  The three generated TTL signals will be feed to an external
    circuit.  Concerning the hardware connections for my application, I
    assume that the generated TTL signals will be output from
    GPCTR0_OUT(pin 2)  for counter 0 and GPCTR1_OUT(pin 40) for counter 1
    of the NI 6034E. Is this correct?  Is there any way that these TTL
    signals can be output from three DIO lines(DIO0...2). 
    Here is some code that I plan to use in order to do this:
     #include <NIDAQmx.h>
    static TaskHandle gTaskHandle = 0;
    DAQmxCreateTask ("", &gTaskHandle);
    DAQmxCreateCOPulseChanTime (gTaskHandle, "Dev1/ctr0", "", DAQmx_Val_Seconds, DAQmx_Val_Low, 1.0, 2.0, 2.0);
    DAQmxCreateCOPulseChanTime (gTaskHandle, "Dev1/ctr1", "", DAQmx_Val_Seconds, DAQmx_Val_Low, 3.0, 4.0, 4.0);
    DAQmxCreateCOPulseChanTime (gTaskHandle, "?????", "", DAQmx_Val_Seconds, DAQmx_Val_Low, 7.0, 8.0, 8.0);
    DAQmxCfgImplicitTiming (gTaskHandle, DAQmx_Val_FiniteSamps, 5);
    DAQmxStartTask (gTaskHandle);
    DAQmxWaitUntilTaskDone(gTaskHandle)
    DAQmxErrChk DAQmxStopTask(gTaskHandle)
    DAQmxErrChk DAQmxClearTask(gTaskHandle)
    I believe this code should generate the 3 TTL square waveforms that I want for my application.
    Please provide me with some feedback.  It would greatly be appreciated.
    Thank You

     Hi,
    The NI 6034E is a multifuntion DAQ device, this means you have:
      (2) counters
      (8) DIO lines (software timed)
      (16) AI, single ended
      (0) Analog Output
     You have a couple choices here:
       1. Software timed digital output of all three signals, max 1khz loop rate, non-deterministic.
       2. Hardware timed digital output of 2 signals, max 20Mhz.
       3. Hardware timed digital output of 2 signals and software timed digital output of 1 signal.
       4. Find another NI MIO board such as the NI 6251. This board will do 10Mhz pattern generation for (8) DIO lines.
    For the hardware connection, you are correct, the output for the counters will be taken from pin 2 & pin 40.  Here's the pinout for the NI 6034E for reference:
    The output of the Counters can be routed to some of the PFI's or to the RTSI connector. You can see this in MAX
    Message Edited by Matthew W on 11-19-2007 01:24 PM
    Attachments:
    2007-11-19_131609.jpg ‏61 KB
    2007-11-19_132435.jpg ‏86 KB

  • Single Maintenance plan creation for multiple equipemnts with different cyc

    Dear Experts,
    I had a following scenario to map in PM module. can anybody guide me to map this process?
    we had no.of equipments under one functional location and will go through preventive maintenance on yearly basis. For this, i will create the single cycle yearly maintenance plan which comprices of maintenance items, which is fine. out of these equipments some of the equipments will go for routine maintenance like quarterly, half-yearly, tri-quarterly. user want to club these scenarios also in single preventive maintenance plan. when we scdule this plan, system has to deliver monthly orders and as well as yearly orders from single preventive maintenance plan.
    Thanks & Regards,
    Krishna

    Hi Krishna Murthy,
    It can be acheived in the following Manner.
    Create a Strategy say "Test" with Packages 1M, 2M,Q,H,Y packages.
    Create 5(say) Equipment Task Lista for each of the 5 Equipment at that FL.
    1st Task List will have Operations related to say Monthly(1M), Quartely(Q), yearly (Y)
    2nd Task List will have Operations related to say Monthly(1M), Quartely(H), yearly (Y)
    And so on... as per Business Requirement.
    Now create a Maintenance Plan with 5 maintenance Items with respective Task Lits.
    Now Schedule the Plan and give the Last Completion date as the Yearly package (A date one year less than the day you wanetd the yearly plan).
    Then check the calls.
    Regards
    MLN Prasad

  • Same sqlID with different  execution plan  and  Elapsed Time (s), Executions time

    Hello All,
    The AWR reports for two days  with same sqlID with different  execution plan  and  Elapsed Time (s), Executions time please help me to find out what is  reason for this change.
    Please find the below detail 17th  day my process are very slow as compare to 18th
    17th Oct                                                                                                          18th Oct
    221,808,602
    21
    2tc2d3u52rppt
    213,170,100
    72,495,618
    9c8wqzz7kyf37
    209,239,059
    71,477,888
    9c8wqzz7kyf37
    139,331,777
    1
    7b0kzmf0pfpzn
    144,813,295
    1
    0cqc3bxxd1yqy
    102,045,818
    1
    8vp1ap3af0ma5
    128,892,787
    16,673,829
    84cqfur5na6fg
    89,485,065
    1
    5kk8nd3uzkw13
    127,467,250
    16,642,939
    1uz87xssm312g
    67,520,695
    8,058,820
    a9n705a9gfb71
    104,490,582
    12,443,376
    a9n705a9gfb71
    62,627,205
    1
    ctwjy8cs6vng2
    101,677,382
    15,147,771
    3p8q3q0scmr2k
    57,965,892
    268,353
    akp7vwtyfmuas
    98,000,414
    1
    0ybdwg85v9v6m
    57,519,802
    53
    1kn9bv63xvjtc
    87,293,909
    1
    5kk8nd3uzkw13
    52,690,398
    0
    9btkg0axsk114
    77,786,274
    74
    1kn9bv63xvjtc
    34,767,882
    1,003
    bdgma0tn8ajz9
    Not only queries are different but also the number of blocks read by top 10 queries are much higher on 17th than 18th.
    The other big difference is the average read time on two days
    Tablespace IO Stats
    17th Oct
    Tablespace
    Reads
    Av Reads/s
    Av Rd(ms)
    Av Blks/Rd
    Writes
    Av Writes/s
    Buffer Waits
    Av Buf Wt(ms)
    INDUS_TRN_DATA01
    947,766
    59
    4.24
    4.86
    185,084
    11
    2,887
    6.42
    UNDOTBS2
    517,609
    32
    4.27
    1.00
    112,070
    7
    108
    11.85
    INDUS_MST_DATA01
    288,994
    18
    8.63
    8.38
    52,541
    3
    23,490
    7.45
    INDUS_TRN_INDX01
    223,581
    14
    11.50
    2.03
    59,882
    4
    533
    4.26
    TEMP
    198,936
    12
    2.77
    17.88
    11,179
    1
    732
    2.13
    INDUS_LOG_DATA01
    45,838
    3
    4.81
    14.36
    348
    0
    1
    0.00
    INDUS_TMP_DATA01
    44,020
    3
    4.41
    16.55
    244
    0
    1,587
    4.79
    SYSAUX
    19,373
    1
    19.81
    1.05
    14,489
    1
    0
    0.00
    INDUS_LOG_INDX01
    17,559
    1
    4.75
    1.96
    2,837
    0
    2
    0.00
    SYSTEM
    7,881
    0
    12.15
    1.04
    1,361
    0
    109
    7.71
    INDUS_TMP_INDX01
    1,873
    0
    11.48
    13.62
    231
    0
    0
    0.00
    INDUS_MST_INDX01
    256
    0
    13.09
    1.04
    194
    0
    2
    10.00
    UNDOTBS1
    70
    0
    1.86
    1.00
    60
    0
    0
    0.00
    STG_DATA01
    63
    0
    1.27
    1.00
    60
    0
    0
    0.00
    USERS
    63
    0
    0.32
    1.00
    60
    0
    0
    0.00
    INDUS_LOB_DATA01
    62
    0
    0.32
    1.00
    60
    0
    0
    0.00
    TS_AUDIT
    62
    0
    0.48
    1.00
    60
    0
    0
    0.00
    18th Oct
    Tablespace
    Reads
    Av Reads/s
    Av Rd(ms)
    Av Blks/Rd
    Writes
    Av Writes/s
    Buffer Waits
    Av Buf Wt(ms)
    INDUS_TRN_DATA01
    980,283
    91
    1.40
    4.74

    The AWR reports for two days  with same sqlID with different  execution plan  and  Elapsed Time (s), Executions time please help me to find out what is  reason for this change.
    Please find the below detail 17th  day my process are very slow as compare to 18th
    You wrote with different  execution plan, I  think, you saw plans. It is very difficult, you get old plan.
    I think Execution plans is not changed in  different days, if you not added index  or ...
    What say ADDM report about this script?
    As you know, It is normally, different Elapsed Time for same statement in different  day.
    It is depend your database workload.
    It think you must use SQL Access and SQl Tuning advisor for this script.
    You can get solution for slow running problem.
    Regards
    Mahir M. Quluzade

  • Multiple DB env with different explain plan

    Hi,
    I have DEV DB and QA DB , both located in USA. There is a table called Customer which contains the respective index , pk, constraints, etc which is available in
    both the environments. Now In DEV DB we have Customer table with 1000 records, but in QA DB we have about 50000 records.
    Now in DEV DB when i take a explain plan the columns are not going for a FULL table scan but in QA DB it is going for a full table scan? Why there is a discrepancies? Is it because of the number of records in QA is more than DEV? I hope that wont be a problem as Oracle CBO/RBO will optimize the query by itself for both the cases using the index, etc. If that is the case I am wondering what might me the problem. Whether we need to inform the Oracle using the hints? Please shed some light into this.
    Thanks.

    First of all it is a good idea to compare the execution plans from differnt environments. Not all developers do that. The cost or time can not be properly compared, but the plan itself yes. if the plan is different, then the behaviour of the query very likely also is different.
    What you didn't show us was the query and the two different plans. Maybe in a broken down test version.
    What is strange is that I would have expected a reversed behaviour. In the dev db you have only 1000 records. Usually the db will do a FULL table scan on this. Simply because the amount of data is so small that it is othen faster to read the table in one big chuck and then deal with it. The parameter db_multiblock_read_count plays a role in that. If it does instead an table access by index rowid then that is fine.
    If you QA Db now uses a "full table scan" instead of the "table access by index rowid" that it is something to think about. Possible reasons can be: Not current statistics. For example do you have an automatic job that collects statistics? Maybe this job didn't run yet, after you imported the data? To use hints as a solution would be wrong. However you can use hints to see, if the performace of the query improves after using the hint. If it does, then the CBO didn't have good enough information. If it doesn't then the CBO already made the right decision.

  • Putaway Strategy I, not allowing second material with different batch

    Hi all,
    Can someone please help me to understand where is the problem
    My config is
    Strg Typ 401
    Putaway Strategy I
    Capacity check - 4
    Mixed storage: X
    Addition to existing stock: X
    Storage section check -active
    Storage bin created for the storage section in the storage type 401
    Maximum capacity maintained in Storage bin
    In material master WM view 1- maintained capacity.
    When system is correctly finding Bin for First material / Batch combination
    But when I am trying to create TO for same material with different batch it does not find storage bin - even the storage bin capacity is still remaining
    Also it is not accepting second material in same bin.
    The only requirement to have startegy I is that same materials can be placed in same Bins (sorry but dont need fixed bin)
    Thanks

    Hi Hiren,
    You are correct I forgot to mention that in my earlier reply. Actually with out storage unit you can store only one quant in a Bin. So it can add stock to the same quant if we use addition to existing sock feature. If the material batch combination changes it cannot use the same quant, so it wont be able to add the stock to existing quant. If a new quant is to be stored in the same BIN it has to be storage unit managed. To in nutshell multi material multi batch your scenario can be achieved with storage unit managed storage type.
    For storage unit setup you can refer below link.
    Storage Unit Management - Warehouse Management System (WMS) - SAP Library
    If you find this useful please close the tread.
    Regards
    Abhishek

Maybe you are looking for

  • Why won't my USB mic work with Facetime?

    I use a headset for chatting on my Macbook Pro because the audio quality is better than the stock speakers and built in mic.  For some reason today when I'm using Facetime, its only receiving audio input through the built in mic on the laptop.  The c

  • About forms and reports services

    just installed forms 10g. I suppose I need to install forms and reports services which I understand is part of Application Server 10g. If you have configured this applications to connect, please give me links containing steps to installaing forms and

  • BAPI/FM for Device Info record

    Hi All, I want to create Device Info records in a mass process. Is there any particular FM/BAPI which i can use. Also i want to do a mass Billing related installation . Is there any FM/BAPI which i can use for this. Regards Haricharan

  • My ipod shuffles even when i dont want it to how do i correct this

    my ipod shuffles even when i dont want it to,  how do i correct this problem

  • Abap bdc's

    Exact code to develop a BDC program for Incoming Invoices that updates the records depending on the source data file from the external systems.