Sub-contract without BOM

Hi
How to create sub-contract without BOM..We want to create a subcontract for a customer return finished product .Even this Product have bom.We don’t want to send any components with the FP.We want to send some service materials with this FM.How to do this in SAP?
Thanks
Nick

hi Nick,
have not tried in one company code, any way you can try this with creating another plant as subcontracting vendor & process in the same way how you process for sub contracting.
1) Create plant as sub-contracting vendor
2) create po with item category L
3) send components
4) receive materials.
but since it is within a company code check for legality involved with FI, you can customize special transaction key for this may be with movement types since it is within a company code, that is the reason i asked you is it within a co.code
Regards
Ranjit

Similar Messages

  • Sub contracting process BOM - In case of material to be disassemble

    How to create the reverse BOM in case of Material to be dis assemble at the vendor end.
    In this case we will be issuing one assembly to the Sub contracting vendor and he has to dis- assemble the assembly in 4 or 5 different components. How to create the BOM for the same.
    Material will be issued as one parts on 541 movement, How to receive the material in the above cases.
    Will the Sub-contract PO will contains the disassemble parts of Assembly.
    Please reply in detail mentioning the debit credit account also.
    Edited by: Csaba Szommer on Jan 10, 2012 8:45 AM

    Hi,
    Please refer the below links..
    Subcontracting Parent material - HOw to MAP in SAP
    http://sap.ittoolbox.com/groups/technical-functional/sap-log-mm/reverse-subcontracting-4238643
    Thanks.

  • Sub-Contracting where BOM contains NLAG's

    Hi All,
    We currently are using the Sub-contracting process but we have an issue with adding a material of type NLAG to the Bill of Materials.
    We are getting the error message " Material type NLAG cannot be used with item category L"
    If i remove the Inventory Mgmt checkbox in the Item categories table it will allow me to add the material to the BOM.
    Is this the only way around this and could it have any possible detrimental side-effects?
    Thanks in advance,
    Micheal

    Hi vikrama,
    Thanks for your response. I have done what you said and added the NLAG's using the item category N. However I have another query on this.
    If I go through the sub-contracting process of creating a Sales Order which creates a Purchase Req which we convert into a PO, the NLAG components are not visible in the PO.
    However if I create a PO direct, all the components of the BOM are visible.
    Does anyone have any ideas why this may be so?
    Thanks in advance,
    Micheal
    Edited by: Micheal McGrath on Jan 3, 2008 3:45 PM

  • In sub contract PO no error shown for without BOM material..

    Dear All,
    I am creating subcontracting PO with item catagory "L" for material "XYZ" and for material "XYZ" i have not created any BOM.
    Then also system is not giving any error while saving PO.
    Generally it should give the error "Not possible to determine any components"
    Also in mesage determination i have assigned mesage ME154 as error still it is not showing as error.
    What could be the reason and what need to do to solve the same.
    Naren

    Dear Jurgen,
    If it is giving an error i will able to use the notes...
    Here i am not getting an error which is my concern
    what i should do to get the error if i am putting material without BOM in PO andnot entering any components..
    Naren

  • How to select the Alt BOM in the Sub-Contract PO

    Dear All,
    please tell me how to select the alternative BOM in the sub -contracting purchase order.
    for the above said requirement i have cretaed production versions and the BOMselction method also i have selcted in the material master data as "2" means BOM by produ ction version.
    so how can i select the alt BOm in theSub-contracting PO.
    Thanx in advanvce
    regards
    Srinivas

    Hi,
    SAP help says you have to write the production version in the subcontracting info record:
    http://help.sap.com/saphelp_46c/helpdata/en/b2/fa1ed4d51d11d1a69e0000e83235d4/frameset.htm
    http://help.sap.com/saphelp_46c/helpdata/en/35/b0e96787a62488e10000009b38f9b7/frameset.htm
    (I've checked a subcon-info record but sorrowfully I havent found a field for this...if you can find please let me know)
    BR
    Csaba

  • Problem in BOM explosion for a operation Sub Contract.

    Hi All,
    Please advise how to explode a BOM or Assign component in a Purchase order with Item category (L) for a Operation SubContract External Processing  oriented material for which no material code is created from a Series Operation production order .
    Actually in my scenario, no raw material component will send to the Sub -Contract Vendor. Only Assembled operation material lets say operation 20 from a routing ( which is not having material code ) from an In - house production from a shopfloor has to be sent to the vendor to create a operation 30 material , which is also not having a material code." How to explode a BOM or component allocation for the Non- codified Item in a PO".
    regards,
    YK

    Hi
    Change the control key of the operation to PP02. System will prompt u to PR data screen where u have to tick on Subcontracting checkbox. Enter other mandatory field like material grp, cost element, purchasing grp etc. On saving system will create PR with line items. System will trigger the components reqmt based on the assignment to operation. Example if for operation 20, materials M1 & M2 are assigned, then in the PR u will find M1, M2 in the component screen which u have to send to the vendor.
    Hope it is clear to u.

  • Single BOM across multiple plants in sub-contracting

    We have a single purchasing organisation managing sub-contracting for around 17 plants. This organisaiton purchases sub-contracted items for all the plants.
    The problem we are facing is having to maintain the same BOM for all the 17 plants.
    The central purchasing org is going to create the PO with multiple lines - requesting delivery from the vendor to the different plants.
    How can we avoid having to create the same BOM in every plant?
    Regards,
    Praveen.

    hi 
    u can  avoid  by choosing  the  recurrcive  allowed  for  BOM  can  avoid it
    kishore  reddy

  • Is it possible to selectively block re-explode BOM in Sub-contracting PO ?

    In our business scenario, sometimes we are directly adding PO components in the Sub-contracting PO in addition to the existing components that have come in through BOM. After saving and somedays later when the user goes to edit PO through ME22N, since the components button & re-explode BOM button are very close, users by mistake press re-explode BOm and also save the PO. The directly added components go out and hence not consumed while GR. Is it possible to selectively block the re-explode BOM  through PO user exit or any other method?

    Some amount of user training should help.
    If not discuss with your abaper if badi - ME_PROCESS_PO_CUST can be used or you can find user exits with a search using MM06E*

  • BOM Selection in Sub Contract PO

    Hi,
    Is it possible to select BOM in Sub Contract PO?
    Scenario:
    3 BOMs available for a Material.
    Depending on Material Availability respective BOM (BOM1/ BOM2/BOM3) will be selected during Sub Contract PO, for this is it possible to get an option for selecting BOM1/ BOM2/BOM3 in PO.
    bye
    Sridhar Thota

    Hi
    may be it is possible through alternative bom. u can select the where ever bom is required.
    reward me if u got the answer
    thanks and regards
    ram

  • BOM Explosion in MRP runs for sub-contracting PO

    Hello Experts,
    We have sub- contracting Purchase order in business scenario.
    Subcontracting PO is required to be considered as demand for MRP. As I have checked PO is showing in MD04, after MRP run using transaction code
    MD02 subcontracting BOM not exploding.
    Sub contacting PO raised on “X” procurement type material, PR is required on BOM item “F” Procurement type 
    Please suggest what all special setting is required as master data & configuration data.
    Thanks in advance!!!

    Hi,
    In the header or parent material (the material that is being produced bu your subcontractor) you have to maintain the following data:
    Procurement type = F
    Special Proc Type = 30
    MRP Type = PD
    Lot Size, Minimum Lot Size, Rounding Value: Enter what is convinient for your business.
    Be sure you have a BOM (CS01)
    Create a Production version indicating the BOM (C223)
    Enter Selection Method 3 in the MRP4 view of the material master
    Create an Info Record (type Subcontracting).. (ME11)
    Create a Source List (ME01)
    Run the MRP and check MD04
    Kind Regards,
    Mariano

  • Sub contract in sales

    I need sub contract in sales.
    Ex:
    Customer sent material to plant they need some process in our plant for that I need scenario and configuration.
    How we allow customer material into plant?
    After finished work how to deliver products to customer and billing also.
    Please help me any one

    Hi Dharmananda rao
    Sub Contracting Cycle :
    (1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity.
    (2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor.
    (3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor. As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor"
    (4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated:
    DR FG Stock/ SC By-Product Stock
    CR Change in Stock (FG/ SC By-Product )
    (for finished goods received)
    DR Subcontracting Charges
    CR GR/IR Clg
    (for moneys payable to Subcontractor)
    DR Consumption (Components)
    CR Change in Stock (FG/ SC By-Product )
    (material provided to Vendor is now charged to expense)
    5) You do the IV for SC Invoice, and the process is complete.
    Process of Subcontract in MM :
    Sub-contract business process:
    You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor .
    Vendor shall process the item / use the item provided & supply the final item.
    SAP process:
    1.Create the finished goods material code.
    2.Maintain the BOM for the material.
    3.Create PO with item category as "L" .
    4.Issue material to vendor with movement type 541
    5.Receive the material against the PO with movement type 101.
    6.MIRO to account for vendor's invoice for the service charge& material used by him.
    Can anybody tell me how a process has to be given to subcontracting?
    Suppose, I have 3 operations 1)weaving 2)dyeing 3)cutting & packing
    if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
    The following process to be followed for subcontracting.
    1. Item code(material master) to be created at the stage of before dyeing.
    2. Item code(material master) to be created after Dyeing as subcontracted item.(F30)
    3. Bill of material to becreated for the material(2) calling for material(1)
    4. Inforecord and source list to be created for material(2) with the corresponding vendor
    5. PO to be released for material (2)
    6.Along with PO the material(1) to be issued to vendor
    7.On receipt of material when GR is made the stock with vendor will get updated.
    How to Create a Subcontract Order?
    To create a subcontract order, proceed as follows:
    Enter the material you want to order and the item category for subcontracting (L) in the order item.
    Press ENTER to display the screen for component processing.
    Enter the components that the vendor requires to manufacture the product.
    Please note:
    – You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER.
    It is calculated as follows:
    Delivery date of the item - Planned delivery time
    – If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F).
    – You can determine whether the components are available on the date required by selecting Edit -> Availability check.
    If you entered a bill of material as the material in the subcontract order, the components are created automatically.
    If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material.
    Save the purchase order.
    When you print the purchase order, the components are printed per order item
    Subcontracting - Key Points
    Special Procurement Process.
    Item category: L
    Order type: NB
    In info record vendor should be maintained as subcontractor.
    Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
    Your company should place a purchase order for the finished product. In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
    Stock check at vendor level: ME2O
    Company stock check: MMBE
    GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
    GI to subcontracting vendor: through movement type 541.
    GR from sub contracting vendor: through movement type: 101
    Movement type 543 is displayed to cancel the material cost account.
    If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
    - To create the Subcon Info Record : Tcode ME11 - Info Category - Click Subcontracting
    - To create Material BOM : Tcode CS01
    - With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N
    Reward if useful to u

  • Can u explain full T-code and Sub contracting steps from 541,544,545,554

    hi experts
    can u please explain all the steps involved in sub-contracting
    process with
    ME2O and scrap material
    cancellations of sub-contracting
    thanks
    ganesh

    Hi,
    Refer link;
    [Subcontracting Process w/o Payment of Excise Duty|http://help.sap.com/bestpractices/BBLibrary/Documentation/J85_BPP_V2_EN_IN.doc]
    Subcontracting Process
    Subcontracting without Payment of Duty
    - Creation of Subcontracting PO (ME21N)
    - Transfer Posting of Components to Subcontractor (Mvmt Type - 541) (MB1B/ME2O/MIGO)
    - Creation of Subcontracting Challan w.r.t. Transfer Posting Doc (J1IF01)
    - Goods Receipt w.r.t. Subcontracting PO and Refer Subcontracting Challan at the time of GR (MIGO) {GR with 101 and autoconsumption of components with 543 movement}
    - Reconciliation of Subcontracting Challan (J1IFQ)
    - Completion of Subcontracting Challan (J1IF13)
    - Generation of Annexure IV (J1IFR)
    Master Data
    - MM01- Material Masters for Components and FG
    - XK01 - Vendor Master (Subcontractor)
    - CS01 - BOM for FG
    - ME11 - Purchase Inforecord for Subcontracting
    Configuration: -
    - Go to SPRO > Logistics - General > Tax on Goods Movements > India > Account Determination > Specify Excise Accounts per Excise Transaction > Here maintain as following;
    ETT  Subtrn Typ DC ind Acct name
    57FC            CR     PLABED
    57FC            CR     RG23BED
    57FC            CR     RG23ECS
    57FC            DR     CLEAR
    57FC 01         CR     PLABED
    57FC 01         CR     RG23AT1
    57FC 01         CR     RG23BED
    57FC 01         CR     RG23ECS
    57FC 01         DR     CLEAR
    57NR            CR     CLEAR
    57NR            CR     PLABED
    57NR            CR     RG23BED
    57NR            CR     RG23ECS
    57NR            DR     REVERS
    57NR 01         CR     CLEAR
    57NR 01         CR     PLABED
    57NR 01         CR     RG23BED
    57NR 01         CR     RG23ECS
    57NR 01         DR     REVERS
    - And then go to SPRO > Logistics - General > Tax on Goods Movements > India > Account Determination > Specify G/L Accounts per Excise Transaction > Here do Account Determination for the above combination and Excise Group
    Apart from above also do following configuration for Subcontracting;
    - SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Subcontracting Attributes
    Here maintain following;
    Excise Group         XX
    Excise TT            57FC
    Subtransaction Type  01
    Subtran Type Text   57FC CHALLAN
    Subc. Period        180
    Rate-subcontracting
    Mvt Grp Issues      0001
    Mvt Grp Receipt     0002
    Filter Non exise
    EI Items            10
    No. range no.       01
    ***. Val. /Exc Inv
    Subcon Output Type  J1IF
    - SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups
    Here maintain following
    MVT. Grp. MvT S
    0001      101 O
    0001      541 O
    0002      542
    0002      542 O
    0002      543 O
    - J1I9 - maintain No range for object "J_1I57FC" for series group

  • Sub contract

    my client running fg sub contracting  (electro plating )cycle through the MRP
    after return from vendor with mvt type 105 (543) i check document list with MB51. i found following g/l account effects :
    SFG consumption for sub contract  account = 602026
    Gr/IR Clearing Account = 164335
    SFG-inventory account = 323055
    for sub contract account = 602130
    Inventory account = 320010
    Costs of goods mfg = 602200
    but if do whole sub contracting cycle without MRP i can see effect in following G/L a/C:
    Manual Cycle .
    Inventory account = 320010
    Gr/IR Clearing Account = 164335
    Price Differance Account = 602155
    change in stock = 603010
    Sub Contract expense = 603000
    SFG-inventory account = 323055
    SFG consumption for sub contract account = 602026
    my question is why this differance comes ?
    if i want gl accounts hit by manual process in MRP process what changes to be made ?

    Hi,
    Price diffrences arise during valuation @ GR if the material is managed at standard price in MMR.
    Also there is one more setting in customizing that for a plant that price differences should or not be posted during GR.
    spro-IMGMMInv MGmtGR--price differences for subcontracting at GR
    Regards,
    Deepak.

  • Sub Contracting Process

    my client running fg sub contracting  (electro plating )cycle through the MRP
    after return from vendor with mvt type 105 (543) i check document list with MB51. i found following g/l account effects :
    SFG consumption for sub contract  account = 602026
    Gr/IR Clearing Account = 164335
    SFG-inventory account = 323055
    for sub contract account = 602130
    Inventory account = 320010
    Costs of goods mfg = 602200
    but if do whole sub contracting cycle without MRP i can see effect in following G/L a/C:
    Manual Cycle .
    Inventory account = 320010
    Gr/IR Clearing Account = 164335
    Price Differance Account = 602155
    change in stock = 603010
    Sub Contract expense = 603000
    SFG-inventory account = 323055
    SFG consumption for sub contract account = 602026
    my question is why this differance comes ?
    if i want gl accounts hit by manual process in MRP process what changes to be made ?

    Hi
    Kindly check with the following:
    In customizing  for that plant price differences should or not be posted during GR.
    SPRO->IMG>MM>Inv MGmt>GR-->price differences for subcontracting at GR
    Thanks

  • Goods receipt through Inbound delivery for Sub-Contracting Purchase order

    Hi
    I am trying to do goods receipt for the inbound delivery /shipping notification created for a sub -contracting Purchase order. The Finished product and the component part are batch managed, When I try to perform PGR in VL32N , I am getting a blank screen as error message and Goods receipt is not getting triggered . I checked for OSS note and found 645119 close to my issue but not an exact match . We are in ECC 6.0 with EHP 4. Can some one clarify whether it is possible to post GR through inbound delivery for a Subcon Purchase order .
    Thanks in advance for your immediate response.
    with regards,
    Joseph Anand B

    Hi, The issue may be due to this - the component is batch managed but the batch data is blank in the component list of the Purchase Order Item. Or a batch is maintained in the PO item component list but the stock for the same batch is not available with Vendor, i.e. stock with some other batch may be available.
    In a receipt for Sub-cont PO, 101 happens for FG and 543 happens for component. But there is no option to provide the component details in a delivery. So in standard system, when 101 happens via a delivery, 543 will be posted in the background. So any error in posting 543 will result in a blank screen without any error message.
    You can fix this by maintaining correct batch in the PO component list.
    But there is another issue - you cannot do 'cancel posting' and 'return delivery' for this receipt. Only you can reverse the inbound delivery and you should know that the  recevied stock shouldn't have been processed to do reversal of inbound delivery.

Maybe you are looking for

  • Centro 5 (garnet) and new iMac OS 10.5.6 Can I use my Mac as an internet connection for Palm?

    I have a Palm Centro through Sprint.  I have cable internet via SBC Global (ATT).  I also have a wireless internet network in my home.  I run a Mac with OS 10.5.6.  I would like to be able to get to the internet on my palm via the bluetooth in my Mac

  • Remote Desktop Connection Not Going To Full Screen on EIZO MX340 Monitor 1536x2048 Resolution

    I am using a EIZO Rx-340 as a secondary monitor. So far I am only able to get into full screen by using Ctrl-Alt-Fn-Pause but it does not change the resolution. It does not help to move the slider to large. There is a black space at the top and botto

  • Reg: root.sh script in grid instillation

    Hi, Oracle Version : 11.2.0.1 Operating system : CentOS Here i am installing 11gR2 rac with 4-nodes every thing went fine but when i execute the below script /u01/11.2.0/grid/root.sh I am getting this below error. [root@drc3s5 bin]# /u01/11.2.0/grid/

  • Lead Creation Error thro ABAP Code

    Hi CRM ABAP Experts, I have written a code for lead creation by referring SDN Code. when i execute code , lead is created and transaction get saved in to system. but atlast one error comes. plz help me.  when i pass testrun = 'X'  then i am not getti

  • How to Import dutch language in CProject 3.1 BSP pages

    Hi all, I had installed Cprojects 3.1 in my ECC5 system which installed with Dutch language. I'm not sure full translation of cProjects in Ductch language is possible in version 3.1 as my customer was request for Dutch translation in cProjects Web Ap