Sub-contracting External Processing PP-PI
hI,
I am trying to create sub-contracting order through SAP PP-PI.
I have a FG - X, with components X1 & X2.
I have 3operations and 3 phases in the Recipe for X.
The 2nd phase is having the control key for external processing, because of which i had to assign Purc.Info record to this phase.
( Pls note that its not allowing me to enter a PIR of material/vendor combination, hence had to create for Material Group/ Vendor).
Now when i Create and release a Process order for X, there is a Pur req created but it has no material, and i cant change anything in this Pur. req.
Please help.
Hi,
When a Preq is created for external processing, the material is not copied in to the Preq. This is std SAP behavior. However with EhP4, this functionality is made available. You need to activate this functionality and then some code changes has to be done in the BADI in order to copy the material from order to Preq. I don't remember the BADI, but I am sure there is one.
Thanks
Similar Messages
-
Sub contracting CIN process.
Hi SAPERS,
Please any body provide me the subcontracting scenarios, If CIN is implemented in any organization in india.
i.e. Is there any time we need to pay CENVAT, VAT to governament, If it is what are the registers to be updated? For which type of Material/Procurement it will happen?
Thanks in advance,
PrasadHi Janardhanan,
Thanks for quick answer, I have cleared the most of the part in my problem.
If the components supplied to the sub-contractor is imported items which having Customs duties, Excise, then we will pay the what ever the duties to the government, till this point i am clear.
The components provided to the subcontractor is raw/semi finished material, in that some % of the material scarp is generated. the scarp cost is 5% of the original component. Then the component cost is reduced to 95% onlythe charges of the subcontractorfright charges+miss. charges is become to Finished product cost.
In this case the scenario what is the tax to be paid for the subdontracting process?
Thanks in advance,
Prasad -
Sub contracting service Process
Hi,
In my scenario I am sending material i.e Shirts ( item) for ironing process to the vendor as subcontracting ironing service through order. I would like to get back the material from vendor w.r.t PO order and payment to made to service performed throgh invoice verification w.r.t service entry sheet.
My thought up on the process to create subcontracting PO on subcontracting vendor along with articles. Article will be received to vendor as subcon article w.r. t subcon PO. After completion of service it will be return to our end w.r. t PO. GRN will be performed. Since it is regular practice, I would like to create service master for repective services and will be treated /incorporated in PO similar to service purchase order. Based on this purchase order SES will be created and payment of service will be settled through invoice verification w.r.t service entry sheet.
Please let me know whether my thinking are in line or not. if not please suggest the alternative.you can reach through phone also.
Thanks & regards,
Sanjay Rahangdale
09327162228Thanks.. In IS retails system , I want to send Shirt for Reprocessing vendor and get it back after reprocessing . After receipt of the same I will process the payment process for Service provided by the vendor.
For example
Shirt 30001001,qty 100 sending to vendor ABC for refinishing( ironing ) and after Refinish proceess I will get back the 100 qty .
Charges of refinishing is Rs2/ per unit.. I have to pay 200/- to vendor. and settle the bills.
At the same time I want to know the inventory stock at vendor end as vendor is supplying /returning shirts in incremental process.
Please revert.
Sanjay rahangdale -
Dear Experts,
I need to complete a sub contract sales process in SAP.
My requirement is
We will dispatch Rawmaterial ex: 10000 TON to sub contractor who will process the Raw material and will supply us back ex: 6000 TON of finished good.
I tried completing this process through standard SAP process
(1 ) Creation of 3rd party sales order
2) Creation of 3rd party PO against the PR number generated from sales order
3) Stock transfer through MB1B
4) GR through MIGO
My issue since I have tp dispatch TONs of raw material, I need a system to record all the good moevemnt truck by truck.
ex: Against a PO 30 truck dispatched, but through MB1B i am able to do only bulk.
Please guide on how I can include this process alsoin SAP.
Thanks.you try to achieve this?
- Create a PO for 100000 Ton of material.
- This should be carried/transported by 30 trucks/dispatches to the Subcontractor.
- Create a goods Issue to Subcontractor
The conversion of base unit of measure seems a bit complex here due to the variance in truck weight ( one truck can be loaded 1 Ton and a second truck be loaded 3 ton).
Are these trucks leaving the plant at the same time/day?
Do you need to issue goods on a per truck basis, or can you do it on weight basis?
regards
Sidi -
I need sub contract in sales.
Ex:
Customer sent material to plant they need some process in our plant for that I need scenario and configuration.
How we allow customer material into plant?
After finished work how to deliver products to customer and billing also.
Please help me any oneHi Dharmananda rao
Sub Contracting Cycle :
(1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity.
(2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor.
(3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor. As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor"
(4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated:
DR FG Stock/ SC By-Product Stock
CR Change in Stock (FG/ SC By-Product )
(for finished goods received)
DR Subcontracting Charges
CR GR/IR Clg
(for moneys payable to Subcontractor)
DR Consumption (Components)
CR Change in Stock (FG/ SC By-Product )
(material provided to Vendor is now charged to expense)
5) You do the IV for SC Invoice, and the process is complete.
Process of Subcontract in MM :
Sub-contract business process:
You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor .
Vendor shall process the item / use the item provided & supply the final item.
SAP process:
1.Create the finished goods material code.
2.Maintain the BOM for the material.
3.Create PO with item category as "L" .
4.Issue material to vendor with movement type 541
5.Receive the material against the PO with movement type 101.
6.MIRO to account for vendor's invoice for the service charge& material used by him.
Can anybody tell me how a process has to be given to subcontracting?
Suppose, I have 3 operations 1)weaving 2)dyeing 3)cutting & packing
if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
The following process to be followed for subcontracting.
1. Item code(material master) to be created at the stage of before dyeing.
2. Item code(material master) to be created after Dyeing as subcontracted item.(F30)
3. Bill of material to becreated for the material(2) calling for material(1)
4. Inforecord and source list to be created for material(2) with the corresponding vendor
5. PO to be released for material (2)
6.Along with PO the material(1) to be issued to vendor
7.On receipt of material when GR is made the stock with vendor will get updated.
How to Create a Subcontract Order?
To create a subcontract order, proceed as follows:
Enter the material you want to order and the item category for subcontracting (L) in the order item.
Press ENTER to display the screen for component processing.
Enter the components that the vendor requires to manufacture the product.
Please note:
You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER.
It is calculated as follows:
Delivery date of the item - Planned delivery time
If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F).
You can determine whether the components are available on the date required by selecting Edit -> Availability check.
If you entered a bill of material as the material in the subcontract order, the components are created automatically.
If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material.
Save the purchase order.
When you print the purchase order, the components are printed per order item
Subcontracting - Key Points
Special Procurement Process.
Item category: L
Order type: NB
In info record vendor should be maintained as subcontractor.
Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
Your company should place a purchase order for the finished product. In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
Stock check at vendor level: ME2O
Company stock check: MMBE
GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
GI to subcontracting vendor: through movement type 541.
GR from sub contracting vendor: through movement type: 101
Movement type 543 is displayed to cancel the material cost account.
If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
- To create the Subcon Info Record : Tcode ME11 - Info Category - Click Subcontracting
- To create Material BOM : Tcode CS01
- With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N
Reward if useful to u -
hi friends,
for the item in sub contract change process lcop is done. so this is marked as completed and new line item is created with the all the changes is required.
but using this new item i need to find the old sub contract item.
can anyone give some clue on this?
thanks
Sarita.Hi
First of al l you need to link up the old and new subcontract for this you might be using your own customsed transaction code
go to product data tab when you maintain in product hierchy
you can view and link this 2 contracts using customised TC
regards
venkat -
Sub-contracting Quality Rejection issue in QA32.
Dear sir.
when i am returning material to vendor in QA32 , i am getting the bellow error .( it is sub-contracting return process , scrap quantity is also there.).
1 KG Incorrect posting back to vendor, error message:
Goods movement not possible with mvt type 546, M7 96
message number M796.
please help me out in this issue.
regards
JRPDear.
You receive error message M7096 "Goods movement not possible with mvmt type 546" right.
You can use Transaction OMJJ to include the table entries. Enter 546 as the movement type and select the 'Allowed transactions' option. Make the additional entries here.
Or,
Insert a new entry in table T158B.
Call Transaction SM31.
Table -> 'T158B' -> select the function 'view maintenance'
Select the function 'New entries'
Movement type (MvT):546, Transaction (Tcode):QA32; ENTER
F3 back; F11 save.
It will work for you.
Regards,
R.Brahmankar -
Sub-contracting for the Customer
Friends,
Here is one scenario where I need your suggestions
Scenario
Client A is subcontractor for their customer B
B receives 10 Components from A along with a subcontracting order from B to assemble material X (consisting of the 10 components supplied by Customer).
Part Number of the 10 components are also used by B for their other finished products which are sold against Customer Purchase Orders. This means they are Quantity and Value managed material. They are valuated material for them
Q1. How does B receive 10 components from A (T Code and movement type)
Q2. How do we prevent valuation of these 10 components in my plant. (Because the same part numbers are used by me and valuated in my plant)
Q3. Is there any implication if I include them in the BOM and the cost roll will not include the cost of those 10 components.
Thanks in advance for your response.Sub-contract business process:
You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor .
Vendor shall process the item / use the item provided & supply the final item.
SAP process:
1.Create the finished goods material code.
2.Maintain the BOM for the material.
3.Create PO with item category as "L" .
4.Issue material to vendor with movement type 541
5.Receive the material against the PO with movement type 101.
6.MIRO to account for vendor's invoice for the service charge& material used by him.
Note:: At the Time of GR 543 Mvt is up dated for Raw Material.
Can anybody tell me how a process has to be given to subcontracting?
Suppose, I have 3 operations 1)weaving 2)dyeing 3)cutting & packing
if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
The following process to be followed for subcontracting.
1. Item code(material master) to be created at the stage of before dyeing.
2. Item code(material master) to be created after Dyeing as subcontracted item.(F30)
3. Bill of material to be created for the material(2) calling for material(1)
4. Info record and source list to be created for material(2) with the corresponding vendor
5. PO to be released for material (2)
6.Along with PO the material(1) to be issued to vendor
7.On receipt of material when GR is made the stock with vendor will get updated.
How to Create a Subcontract Order?
To create a subcontract order, proceed as follows:
Enter the material you want to order and the item category for subcontracting (L) in the order item.
Press ENTER to display the screen for component processing.
Enter the components that the vendor requires to manufacture the product.
Please note:
u2013 You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER.
It is calculated as follows:
Delivery date of the item - Planned delivery time
u2013 If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F).
u2013 You can determine whether the components are available on the date required by selecting Edit -> Availability check.
If you entered a bill of material as the material in the subcontract order, the components are created automatically.
If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material.
Save the purchase order.
Q1. How does B receive 10 components from A (T Code and movement type)
see above
Q2. How do we prevent valuation of these 10 components in my plant. (Because the same part numbers are used by me and valuated in my plant)
Use split valuation so for sub contracting compenent will be one valuation and other component is other value
Q3. Is there any implication if I include them in the BOM and the cost roll will not include the cost of those 10 components.
No, costing is depend how you do costing -
SAP PP-difference between External processing & Sub-contracting
Hello SAP-Guruu2019s
What is the difference between External processing & Sub-contracting w,r,t PP moduleHI
Operations that are performed by a third party are called external processing operations
The detailed data you can enter in external processing operations can be divided into two basic groups:
External processing data
Procurement option data
External processing data contains information from the supplier on net price and planned delivery time. The procurement option data contains vendor account and purchasing information, such as the purchasing info record, purchasing group and organization.
In subcontracting, the vendor is provided with materials (components), which he uses to produce the finished product.
This section describes how to procure materials using a subcontract order. It describes how subcontract orders are processed in Purchasing, Inventory Management, and Invoice Verification.
In subcontract order processing, the vendor receives materials (components) with which it produces the end product. The following are involved:
You order the end product using a subcontract order. The components that the vendor needs to manufacture the end product are specified in the purchase order.
In Inventory Management, the components are posted to the stock of material provided to vendor. The components are then supplied to the vendor.
The vendor performs its service and delivers the ordered material (the end product). The consumption of the components is posted.
If, after the goods receipt has been posted, the vendor informs you that a larger or smaller quantity of the components was actually consumed than planned in the purchase order, you must make an adjustment.
The vendor charges for his or her service. The invoice is posted in Invoice Verification.
The quantities of the components to be provided to the vendor are entered into the stock of material to be provided to vendor. This stock has the following features:
It is managed as part of your total valuated stock, and is available for MRP.
It is only managed at plant level, since it is not stored at your own company but on the vendor's site.
Two stock types are possible:
unrestricted-use stock
quality inspection stock
Stock can be transferred between the two stock types. Withdrawals can only be posted from unrestricted stock, however.
You can take a physical inventory of the stock of material to be provided to vendor
-ashok -
Sub-contract process with T.codes..?urgent
Hi
can anybody explain me ,
what are all procedures to be followed to carry Sub-contract process with T.codes.
From sub-contract PO to Subcontract challan output
Explain me step by step process with t.codes
Thanks
sap-mmHi,
Sub Contracting Process with t.codes are:
(1) You have create material in MM01(Finished Goods ,mat type FERT) that can be procured externally, and you have maintained BOM (CS01) with components (Raw Materials , Mat type ROH). Any waste generated as scraps or by products received during subcontracting process can be maintained as component with negative quantity or in % basis in the BOM in CS01.
(2) Create a subcontracting PO (ME21N, Item Category L). Maintain Purchase Info Record (ME11)for Subcontract category for material and subcontractor.
(3) You make a transfer posting to issue components(Raw Materials) for SC PO(In ME2O directly or by MB1B with 541 Movement type). Material is sent to subcontractor. As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor" .So no accounting document generated by supplying raw material to Sub Contracting Vendor.
(4) You receive (MIGO) finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated:
FG BSX acc. Debit Acc.
GR/IR Cle.acc. WRX acc. Credit Acc.
FRL Acc. Debit Acc.
BSV acc. Credit Acc.
BSX acc. of components Credit Acc.
GBB - VBO Acc. Debit acc.
PRD acc. Some time Credit &
Some time Debit
(5) Invoice Verification (MIRO) for SC Invoice.
(6) Payment in F-53
If you are activate Price Diff. Acc. for SC-Vendor in....
OLMB -
> GR -
> Price diff. acc.for SC order while you do GR for your Plant......then Price Diff. Acc. also will be trigered...
Regards,
Biju K -
541 & 543 Mvt for Sub Contract Process with Split Valuation
Hi all,
We have activated SPLIT VALUATION for sub contracting in ECC 6.0
We have clasified into 3 Valuation Catergories as New,Repaired & Faulty.
The logic & naming convention of the materials are
New Material : C1
Repaired : C2
Faulty : C3
The details are as.....a faulty material can be converted into Repaired by the external Vendors,for which we raise a PO and do MB1B with 541 mvt type with ref to this PO.
The Acing Entries are
PK GL Code Material Value
99 117000 C3 10
89 117000 C2 100
93 600530 90
While in process the GR w.r.t the above mentioned PO ,we are getting 6 accounting entries (which is delivered by Stand SAP) they are as
PK GL Code Descrip Value
89 117000 Stock 100
96 117400 GR/IR 150
91 600530 Sub Cont 100
86 600863 Sub Service 150
99 117000 Stock 100
81 600530 Sub Cont 100
Can any please explain me how the system calculates the above Accounting Entry.
We are confused why the system calculates ( entries) for the 91,81,86 Posting Key.
I have uderstood that PK 89 for goods inward, 96 is for GR/IR clr, 99 is for reversal of 541 mvt type.
Other 3 entries i have the confusion ........
Can anyone please guide me and explain in detail how ,why andfrom where the system is calculating the entries.
Hope that you will help me in this regards
Take Care
God Bless
Regards
Praveen.
Edited by: Praveen Singh on Sep 16, 2008 8:07 PMGo to OMWB and click on simulation and here enter you mateirla number, plant and Mtype 101
Then click on account assignment
you will see all the entries
Posting Lines Text VlGCd AGC VCl PK Acct D PK Acct Cr
Gain/loss from revaluation -e- -e- -e- 83 440700 93 440700
Inventory posting -e- -e- TRA1 89 130000 99 130000
Incidental costs of external a -e- -e- -e- 86 460820 96 460820
External activity -e- -e- TRA1 86 460960 96 460960
Change in stock account -e- -e- TRA1 81 460820 91 460820
Purchase offsetting account -e- -e- -e- 40 --Missing- 50 --Missing-
Purchase account -e- -e- -e- 40 --Missing- 50 --Missing-
Materials management exch.rate -e- -e- -e- 40 440600 50 440600
Cost (price) differences -e- TRA1 83 440000 93 440005
GR/IR clearing account -e- -e- TRA1 86 210005 96 210005
Inventory posting -e- -e- TRA1 89 130000 -
Delivery order for sub-contract processing scenario
Hi experts,
We got a requirement from our users to sub-contract certain production processing steps (or called external processing per SAP). Same part number would be used for the goods issue and goods receipt. But would like to make the delivery for the goods issuing as the delivery for normal sales parts. (Purchase order -> Delivery order -> Shipping and Packing)
Sub-contract processing will generate purchase order like service order which only contains service fee item, and we found that no outbound delivery order can be created with reference to purchase order in standard SAP.
Have you experienced such scenario before and could share to us please?
RegardsWhen moving subcontracting part to your subcontractor you can do it via:
1. simple goods movement
2. delivery
1 Simple goods movement (transfer posting)
- /w reference to PO (MB1B + 541)
- w/o reference to PO (MB1B / MIGO + 541)
2 Delivery
Using the before mentioned ME2O you can create the delivery w/o reference to PO
Please note that even if you use the MB1B541PO reference solution, system just suggests the component qunantity on the PO w/o making a real link between PO and goods movement. You can example do the MB1B541PO reference "as many times" as you want...
So, as per my best knowledge there's no solution for your requirement.
I guess one reason of system's behaviour might be that provision of compoenents doesn't depend on one single PO - if you want to reduce your shipment cost you will send out lots of components at once, more than the amount needed for one call-off.
Regards,
Csaba -
my client running fg sub contracting (electro plating )cycle through the MRP
after return from vendor with mvt type 105 (543) i check document list with MB51. i found following g/l account effects :
SFG consumption for sub contract account = 602026
Gr/IR Clearing Account = 164335
SFG-inventory account = 323055
for sub contract account = 602130
Inventory account = 320010
Costs of goods mfg = 602200
but if do whole sub contracting cycle without MRP i can see effect in following G/L a/C:
Manual Cycle .
Inventory account = 320010
Gr/IR Clearing Account = 164335
Price Differance Account = 602155
change in stock = 603010
Sub Contract expense = 603000
SFG-inventory account = 323055
SFG consumption for sub contract account = 602026
my question is why this differance comes ?
if i want gl accounts hit by manual process in MRP process what changes to be made ?Hi
Kindly check with the following:
In customizing for that plant price differences should or not be posted during GR.
SPRO->IMG>MM>Inv MGmt>GR-->price differences for subcontracting at GR
Thanks -
Sub contracting Process issue for A/c entry
Hi All,
While doing the GRN for subcontracting process ,cost object error is appearing for stock change SFG account ( BSV).
Business would like to do not assign the Default cost object for change in stock account. Kinldy confirm whether it is possible to determine Internal order number ,whcih same assigned to GRN for stock in change account SFG.
Any alternative method would be apprecaite
Rgds
SumaManiThanks to all of us for answers !!
We solved problem as mentioned !
1. Created separate SFG Stock change over subcontracting GL account and assigned same in OBYC - BSV & profit centre wise internal order defaulted in OKB9 settings.Also created sub contracting expenses GL and assigned OKB9 profit centre wise. ( Problem has been solved with separate GL account of stock change over)
It can be possible to solve with using of substituion GGB0 with module pool RGGB0*
Rgds
SumaMani -
Shipping Point Determination for Sub contracting Process
Dear Experts,
While processing the GR for a Sub Contract Purchase Order, we are getting an Error 'VL 100 - Shipping Point XXX doesn't exists'
However, I am not understanding where from this Shipping point is picked.
Checked the Shipping point determination based on Loading Grp, Shipping conditions & Plant. But that is a different shipping point, and it is being picked while processing the outbound delivery for sending components thru 541 Movement.
It is clear that the Shipping point XXXX is not existing, but not sure, as where from that Shipping point is being determined while doing GR
Request for your inputs please
Thank you,
Best Regards,
Ramakrishna MangenaHi Ramakrishna ,
What u earlier said is perfectly right : Shipping point determination based on Loading Grp, Shipping conditions & Plant
Check the following :
Are u posting GR through VL31N .
If yes, just check the receiving pt entered in Header Data - Shipment Tab.
Regards
Ramesh Ch
Maybe you are looking for
-
XI Challenging scenario !!
The scenario is like I am reading data from the attachment of an email using mail sender adapter and creating a file at unix server. The mail attachment looks like this : Lead code:12929 Order ref: sp/jaksd/1212 order type: S Item code
-
As we know, in Purchase orders, Condition type PB00 flows from Outline agreements/inforecord/Condition records etc, while condition type PBXX is to be maintained manually.Also PBXX if maintained supersedes PB00 i.e is considesed for Gross/Net price
-
is there a good tutorial anywhere on how to animate text in Flash? is it best to use the Type tool and create the text in Flash or import it from another application?
-
Logic doesn't respond anymore! Who can help me?
Hello, I'm using a macbook pro. Soon after I open Logic it wil not respond anymore to commands I give wth the keyboard or the Transport-tool. I made no changes (till now it worked fine), I only updaterd iWeb. What do I do wrong, or who can help me? H
-
I,m a radiologyst in the caribbean an the medical center i work for has Kodac carestream PACS that only runs under IE plattform. What can i do to solve this issue. I don't want to go back to PC just to solve this issue. By the way my MBP quit playing