SUBCONTRACT SCENARIO, SAP MM

I have requirement from client -
my company issue raw material to subcontractor for processing. 1] Vendor1 processes oper. 01 it and directly sends it to another subcontractor for next 2 operations.
This process is done to reduce extra cost.
After completion process 2, Vendor NO 2 delivers semi finish material to my company.
Can we configure it in SAP? please explain in detail, that how it will work in SAP MM?
Thanks in Advance !

Hi,
It can be done in SAP. You need to perform the following steps,
1. Create Po for subcontracting Vendor 1 and in delivery address  tab , you can find a vendor tab and SC vend where make the tick and give the subcontracting vendor 2 and save the PO. And do goods issue to Vendor through  ME2O  transaction.
2. Once the operation 01 is complete the vendor will directly deliver the goods to Sub-con vendor 2 and where they will perform the remaining operations.
3. Do GR against the PO and complete the first cycle.
4. Create an another PO to sub-con vendor 2  and do goods issue through ME2O.
5. Do GR against the second PO and complete the whole cycle.
Regards,
abi

Similar Messages

  • Subcontracting Scenario -urgent

    Hi all
    our clients requires different scenario how would we map these into the SAP
    1-We send the material to Sub contracting Vendor for Machining operation suppose 100 piece. but Vendor make the some pieces faulty (Rejection) like 10 piece.
    2- by default vendor send some pieces without doing any machining operation.like  5 piece out of 100
    3- Some times we issues material defect pieces  to subcontracting  vendor by default 
    4- Component we have already received but some of them are get reject on production line but component can be rectify and for rectification we send the component back to Vendor for precessing without paying anything to vendor for this rectification
    How would we map these four scenario in SAP
    These are the scenario  please gives your valuable suggestion to map into SAP
    Thanks
    Edited by: JAM SAP on Feb 10, 2008 4:23 PM

    Dear Jam as far as my knowledge is concerned you can refer the Subcontract Scenario mentioned below :
    1) 100 Pcs sent for subcontracting ,GRN of Sucontracting PO takes Place and in Quality 10 Pcs gets rejected 90 is accepted
    In this scenario -if you are having quality check then material will be in blocked stock in quality rejection,and the material can be sent to scrap(or Rejection) stores but if you dont have quality check in that case when GRN of subcontracting PO is done for that you can do 542 movement of the raw material on which processing is done ,transaction code is MB1B and you can select the scrap(or rejection) stores during that movement.
    2)100 Pcs sent for subcontracting ,GRN of Sucontracting PO takes Place and vendor sends 90 with processed and  10 pcs without processing
    In this scenario-you can simply do 542 movement of the raw material on which processing is done ,transaction code is MB1B and you can select the Rawmaterial (which was sent to vendor for processing) stores during that movement.
    3)100 Pcs sent for subcontracting ,out of which 10 pcs of RM which was sent for processing is defective GRN of Sucontracting PO takes Place and vendor sends 90 with processed and  10 pcs without processing which are defective from our side back.
    In this scenario-you can do 542 movement of the raw material-defective pcs which was sent to vendor ,transaction code is MB1B and you can select the scrap(or rejection) stores during that movement.
    4)100 Pcs sent for subcontracting ,GRN of Sucontracting PO takes Place and  100 pcs is accepted but during processing it is found that the component which is in WIP which was received from subcontractor 10 pcs are not machined properly so it has to be reworked and to be sent back to subcontracting vendor for
    reprocessing and this processing should be w/o charges.
    Well in this case the WIP component which is found that it is not m/ced properly can be taken back into stock with 502 movement -T code-MB1C or it material to material transfer can be done ...i.e from WIP stock i am doing RM stock with 309 movement ,T Code-MB1A so that my original RM can be in stock and i can send this RM or WIP item to the vendor for reworking.
    For this you will have to make a subcontracting PO of the 10 Pcs which has to be reworked with Free Item to be ticked in PO(Because you dont want the charge of processing to be given to vendor). You will be doing the 541 movement so that in system it will show that stocks are lying with vendor , Create Challan ,
    T Code -J1if01 and after processing vendor will send it back .so you will do GRN of this subcontract PO and now the same can be utilised for further production purpose.
    WELL DEAR FRIEND HERE IN ALL THE SCENARIO I HAVE NOT MENTIONED ABT SUBCONTACTING CHALLAN RECONCILATION (J1iFq),You will have to take care of that in each of these scenarion mentioned above.
    Hope this information will be of some use to you
    Regds
    Shailesh

  • What is Standerd Process of Subcontracting in SAP B1?

    Hi experts,
    I want to know standard process of Subcontracting in SAP B1?
    as i know only the scenario that i have production of chair and i want that chair to give for subcontracting to vendor and again receive that chair and sale it
    so how this process is done in SAP B1.
       please help me

    Hi,
    Try this way:
    1. Create item master for chair
    2. Create item master chair-sub-con without selecting inventory and sales item
    3. Create PO for chair-sub-con item to send to vendor for processing and receive item through GRPO.
    4.  You should have work instruction to follow sequence of operation ( You need some add-on for this)
    Thanks & Regards,
    Nagarajan

  • Please help with subcontracting scenario............

    Hi All,
    Can anyone please help me in dealing with subcontracting scenario with scrap taken into account. Please provide the screen shots from BOm creatio to challan closing. the requirement is urgent. please help me. all replies will be suitablly rewarded.
    regards,
    vvr sharma

    Sub Contracting Cycle
    (1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity. 
    (2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor. 
    (3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor.  As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor" 
    (4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated: 
    DR FG Stock/ SC By-Product Stock 
    CR Change in Stock (FG/ SC By-Product ) 
    (for finished goods received) 
    DR Subcontracting Charges 
    CR GR/IR Clg 
    (for moneys payable to Subcontractor) 
    DR Consumption (Components) 
    CR Change in Stock (FG/ SC By-Product ) 
    (material provided to Vendor is now charged to expense) 
    (5) You do the IV for SC Invoice, and the process is complete. 
    Process of Subcontract in MM
    Sub-contract business process: 
    You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor . 
    Vendor shall process the item / use the item provided & supply the final item. 
    SAP process: 
    1.Create the finished goods material code. 
    2.Maintain the BOM for the material. 
    3.Create PO with item category as "L" . 
    4.Issue material to vendor with movement type 541 
    5.Receive the material against the PO with movement type 101. 
    6.MIRO to account for vendor's invoice for the service charge& material used by him. 
    Can anybody tell me how a process has to be given to subcontracting?
    Suppose, I have 3 operations  1)weaving 2)dyeing 3)cutting & packing 
    if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
    The following process to be followed for subcontracting. 
    1. Item code(material master) to be created at the stage of before dyeing. 
    2. Item code(material master) to be created after Dyeing as subcontracted item.(F30) 
    3. Bill of material to becreated for the material(2) calling for material(1) 
    4. Inforecord and source list to be created for material(2) with the corresponding vendor 
    5. PO to be released for material (2) 
    6.Along with PO the material(1) to be issued to vendor 
    7.On receipt of material when GR is made the stock with vendor will get updated. 
    How to Create a Subcontract Order?
    To create a subcontract order, proceed as follows: 
    Enter the material you want to order and the item category for subcontracting (L) in the order item. 
    Press ENTER to display the screen for component processing. 
    Enter the components that the vendor requires to manufacture the product. 
    Please note: 
    – You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER. 
    It is calculated as follows:
    Delivery date of the item - Planned delivery time
    – If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F). 
    – You can determine whether the components are available on the date required by selecting Edit -> Availability check. 
    If you entered a bill of material as the material in the subcontract order, the components are created automatically. 
    If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material. 
    Save the purchase order. 
    When you print the purchase order, the components are printed per order item
    Subcontracting - Key Points
    Special Procurement Process.
    Item category: L
    Order type: NB
    In info record vendor should be maintained as subcontractor.
    Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
    Your company should place a purchase order for the finished product.   In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
    Stock check at vendor level: ME2O
    Company stock check: MMBE
    GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
    GI to subcontracting vendor: through movement type 541.
    GR from sub contracting vendor: through movement type: 101
    Movement type 543 is displayed to cancel the material cost account.
    If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
    - To create the Subcon Info Record : Tcode ME11 - Info Category - Click Subcontracting
    - To create Material BOM : Tcode CS01
    - With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N
    Hope this is helpful.
    Regards
    Ravi

  • Subcontracting scenario in MM-SUS

    Dear Gurus,
    have anyone of you used subcontracting scenario in MM-SUS scenario? does it require development effort from PI and webdynpro ABAP in SUS?
    Any input will be highly appreciated.
    Regards,
    Ranjan

    Hi Ranjan,
    Subcontracting is not supported in MM-SUS.
    Which PO's are/not supported in MM-SUS ?
    Question on MM-SUS - PO Processing
    Not sure if it can be achieved by development too.
    May be you can raise a ticket with SAP and tell them that you are not able to send subcontract POs to SUS and see what they reply.
    Regards,
    Nikhil

  • Complex Subcontract scenario

    Dear Sir,
    We have a following complec Subcontracting scenario .
    We are in the business of Machine Manufacturing . The Frame of Machine is manufactured on subcontract from outside vendor . As per the BOM of the Frame , it consist of  3 different cut-size plates in some specific profile . Depending upon the workload situtation , we some time give cut size plates to Vendor as the input material .  But some time we do not give the cut size plates , rather we give to Vendor a Full long size plate and Vendor cut the plate and fabricate the Frame . The remaining  plate is used by Vendor in the Subcontract orders which will be comming in future .  The amount is paid to Vendor based upon the weight of the Frame received .
    Pl guide us , as what steps we have to follow in SAP so that we are able to send /control the material to Vendor and make the correct payment also .
    We assure to give full marks for the suggested solution please .
    Rgds
    B Mittal

    Hello Mittal,
    You can also carry out planning for components to be provided in subcontracting using an
    MRP area by defining an MRP area for every subcontractor and assigning the components to be
    provided to the MRP area of the subcontractor. You therefore plan the requirements to be
    provided for these components for one subcontractor separately from all other requirements.
    a. Create Purchase Requisitions with item category L (SC). You can use standard Purchase Requisition (AB)
    b. Create and release Purchase Order with item category L(SC).
    We can use standard purchase order document type NB.
    c. Provide the components in the PO that are required to
    manufacture the items. If the items are created using CS01 (BOM) use explode BOM button and select the parts that are required to be provided to the vendor.
    d. Check the availability of the goods.
    e. Provision of components to vendor. The stocks are managed
    under stocks provided to vendor. The components are transfer posted from UR stock to Stocks provided to the vendor.
    f. The vendor delivers the goods and the GR is made.
    g. You can check the stocks provided to vendor using MR8
    transaction.
    h. The SC vendor furnishes Invoice that can be entered using
    MIRO
    And as per last reply  you can manage the goods you are sending out while creating a outbound delivery from ME2O.
    Regards
    R.Brahmankar

  • Scenario SAP R/3 --(RFC)-- XI--(RFC)-- JCo.Server

    Hello,
    I am wondering if anyone can send me some feeback for such scenario. SAP R/3 version is 4.6c, SAP XI is 3.0 and JCo are 2.0.12.
    I am having some trouble which I think are link to the fact that the SAP XI is Unicode and not the JCo.Server ... However I was thinking SAP XI will adapt, since it works well for scenario SAP R/3 (RFC)> XI (RFC)> SAP R/3.
    Thanks for your feeback.

    Hi Grégory,
    I guess I faced a similar problem,  the problem was that in the receiver RFC adapter you have to specify both an RFC target system and a system to lookup the metadata.
    The target RFC system hat to have the same unicodeness of the metadata lookup system that means in your case that if jco server is non unicode also you R3 has to be non unicode otherwhise it will not (never) work, because this is a mandatory requirement of the RFC adapter.
    In my case this was not possible so I was redirecting the RFC call to the ABAP stack of XI (where I had exposed the same function module which was simply recalling the same function module to the target system) and it worked/works.
    Regards,
    Sergio

  • A subcontracting Scenario

    Hi ,
    In  subcontarcting PO scenario please explain me the following.
    I am sending x kg of material A to SC Vendor .
    I am expecting y kg of Material B from SC vendor.
    By product in the procedure is C.
    I have maintained BOM as A material to be send A, finished assebly is B and byproducts C in cs01.
    Steps Involved are
    1. I sent x KG to  SC Vendor . ( Explain how to issue goods to SC vendor with Movement type involved.)
    2. Found that actual consumption was less than expected in BOM, So i want reverse those extra parts i sent to SC vendor.( How to reverse them and using which Movement type)
    3. After completion of process i want to do GR for the Finished product XX.(How to do GR and Movement type envolved)
    4.In last stage i want to recieve the by-products from the vendor.( Movement type)
    5 Scrap generated in process to be recieved in companies own stock( Movement type)
    5. What are various excise document which are involved if vendor sends me the finished product within subcontracting period.( 180 days)
    6. What is the " Reconcillation the SC challan ? Meaning of reconcillation?
    Edited by: Shreya Sinha on Dec 29, 2007 12:30 PM

    HI All,
    Can anybody help me regarding subcontracting. Any help would be much appreciated.
    Talking about subcontracting, right now we are facing some issues.We have right now what we call dismantle subcontracting,
    Scenario 1:
    Normally we send material A,B,C to vendor 1 for subcontract and receive material D.now on vice versa, we want to send material A, to Vendor 1 to receive material B,C and D.
    while Material B,C,D will remain in vendor site after dismantle process is done.
    I know, i can input one of the subcomponent say : A in PO as a parent component then put rest of others as a subcomponent with addition negative quantity for material D.
    but the problem is , a lot of subcomponent for dismantle is involved and the customer is minded if they have to put a lot of subcomponent every time they create PO(while this PO subcontract may vary every time).Any other way for resolved this objection.
    thank you,
    Regards,
    Daniel Tan

  • WS Adapter: Scenario SAP(Client)Proxy= PI= WS

    Hello Experts,
    I have a scenario -  SAP to PI to 3rdParty(NON-SAP).
    This is merely data getting pushed out of SAP ECC to 3rd party.  Not request-response type.
    The REQUIREMENT is P2P Communication Scenario thus will not make use of Integration Sever.
    Data will be sent from ABAP(Client)Proxy => PI => WS Adapter/Direct Connection. 
    Question:
    1.  Is there any application where I can test the webservice?(i.e. INFOPATH)
         If its a request-resopnse type of scenario I can make use of INFOPATH to test the webservice however this is only   
         consuming of service.
    2.  Is there anyway to test the webservice other than connecting to the actual 3rd party?AND I dont want to create a server proxy from another ECC client.  My test should be SAP->PI->NOn SAP.
    Ta!!
    Edited by: el_sapinator on Oct 19, 2010 3:51 PM

    Hi gaurav,
    From client proxy u have to send request and get the response back...
    So, for this create 2 corresponding data types and message types. and mapping will be between request message type which u created and request wsdl message and another mapping for response wsdl message and response message type which u created.
    create service interface outbound synchronous(give the message types which u created) and inbound synchronous(give the wsdl request and response messages).
    Regards,
    Sunitha

  • How to handle sub subcontracting in SAP B1 ?

    Dear all,
    How to handle sub subcontracting in SAP B1 ?
    Let me explain in detail,
    My client doing sub contracting work for parent company,raw material is actually received from parent company
    thru 57F4 challan,raw material sent for further processes in my client company and later converted material
    is sent to a sub contractor for finishing thru 57F4 challan,after finishing material is recieved by client company,
    send it once again to parent company.In this process raw material is received as X and send it to parent company as Y.
    My question is, How to handle sub sub contracting items stock ?
    Expecting u all valuable ideas / suggestions.
    Jeyakanthan

    hai!
    Will u raise any bill for ths. i mean ur child cmpny to parent cmpny.?
    1. Receive the items to your child cmpny through GRPO or GR
    2. Use Production Order cycle to do FG.
    3. Define BOM or use Special Production
    4. Transfer to the Sub- contarct warehouse through Inv.Transfer.
    5. once after processing over, book inv.Transfer to you good down.
    6. Use Goods Return or GR to issue the item out to parent company.
    hope it gvs u a starting..

  • Subcontracting scenario in Warehouse management

    Hello,
    We have an existing subcontracting scenario in IM.
    Recently  we have implemented WM.
    I would like to know whether there are any customizing settings required to be made to take care of WM part.
    And what would be the additional transactions required in WM( I think it will be  LT03 after ME2O and LT06 after MIGO ??).
    Thanks & Regards,
    Pankaj

    HI ,
    In Ware house management you can block the stock for Physical Inventory purpose. You cannot post the stock to the warehouse using Physical Invenory.
    If there is a count going on so the concerned Warehouse bin is to be blocked during Inventory so that no further goods movement is possible during that period.
    Once the Physical Inventory ids done the block can be released so that the movement can again happen.
    The Inventory mangement initiates the transfer requirement. This transfer requirement is used for creating the transfer orders. The transfer order confirmation is done then which actually places the stock in the concerned bin mentioned in the order.
    The stock in WM can be checked in LX24/ LX26 which is same as theat of MMBE of MM.
    Hope this helps.
    Regards,
    Prasanna
    Award pls if helpful.

  • How to manage the Vendor supplied components in Subcontracting scenario.

    Hi experts ,
    I have to complete the finished product say "A" by subcontracting scenario.
    I am supplying A1, A2, A3 to the vendor as components.
    Component A4 is the item required for the final product "A" but this will be supplied by the Vendor.
    Please let me know how can I handle both the material movements and the cost of the product in this scenario thru Subcontracting PO.
    Thanks & regards,
    Rachan.

    what did your purchasing department negotiate?
    do you get billed for the component A4 separately? or is the cost for A4 inlcuded in the service charge for subcontracting?
    does your purchasing department order A4?
    is it in your bill?
    if it is in your bill and you create an extra order for this part, then you should set the SC flag in the delivery address tab of your PO along with the vendor number of your subcontractor.
    Subcontractor will then tell you when the material arrvied and you post a goods receipt, this is then directly posted into special stock at subcontractor. When you receive the finished material A and post GR with MIGO all components will be issued.
    you will then receive a bill for subcontracting fee that is posted to your subcontract order, and another bill for the component A4 that is posted to this component order.
    If costs are included in subcontract fee, then you dont need to manage inventory, do not need an extra PO and extra invoice, and dont need the A4 in your BOM
    Edited by: Jürgen L. on May 6, 2010 9:01 AM

  • Transaction key KDM (OBYC) in Subcontracting scenario

    Hi gurus,
    Our client has the following scenario:
    KDM has been configured in OBYC for foreign exchange differences between GR and IR. The GL account maintained for KDM gets picked up when we do GR and IR for a standard PO.
    However, when we do a subcontracting PO (in foreign currency), then the resulting foreign exchange difference does not flow to the KDM account. Everything flows to the PRD customized account.
    I want to know whether, in the first place, KDM is supported for a subcontracting scenario. If yes, then what changes are required.
    Request anyone who has worked on such a case before to please revert.
    Regards,
    Aditya

    Hiya,
    I have implemented Sub-Contracted before and remember using KDM to capture X-rate differences.
    Have you checked the Val Class assignment? I hope all that config is in place.
    Let me look for some info on this. Meanwhile, could you check the settings for this Val Class against PRD and KDM?
    Cheers.

  • How to setup a Subcontracting Scenario Part II

    Guys,
    I created a supply chain model to reflect subcontracting scenario. Here are the results as I ran SNP Heuristics.
    1. I have a forecast demand at DC = 10.
    2. Supplier gets a purchase requisitions.
    3. In response Planned Order is generated and dependent demand is placed for components.
    4. Purchase Requisition is created against DC for Component.
    My question is why is it system not generating subcontracting purchase requisition. I was expecting a Subcon purchase requisition to be created a Supplier end for FGI.
    Would it be that subcontracting purchase requisiton will be created in R/3 and then land in APO and APO would assign right ATP Category?
    Regards
    Najam

    Hi,
    Can you confirm which planning book you are using, is it standard planning book for "Subcontracting", if not have you included "Subcontracting" key figure.
    You will get Subcontracting Pur Req only after you have included the key figures for Subcontracting Demand and Receipt.
    R/3 does not generate any Pur req for Subcontracting movement but reserves the stock as Stock to vendor which comes to APO in category 'CE'
    Thanks,
    Sanjog

  • Issue in mapping Operation subcontracting scenario

    Hi all,
    I will explain my scenario of subcontracting, i am getting issue when mapping the scenario in SAP.
    Scenario: For manufasturing 1 SF my client require 4 operations. All the raw materials required will be issued in the first operation. After first operation he will send the product manufactured to outside vendor and again he receives it after some value additiion. He continues the next two steps and finally manufactures SF which inturn will be used to manufacture his FG.
    Configuration: I have assigned a purchase info record in the operation detail. I have not given any WC to that operation because the cost should be captured only from the purchase order during the GR from vendor. After the confirmation of the first operation i am getting a purchase requisition for operation without a material.
    Issue: I am not able to show the material which he is sending to the vendor as my purchase requisition doesnot contain any materials.
    Please suggest me any possible solution to outcome this scenario.
    Thanx in advance
    Regards,
    Krishna Chandra

    Hi all,
    i got my the answer for my scenario by this link
    http://forums.sdn.sap.com/thread.jspa?threadID=1805266
    Regards,
    Krishna Chandra

Maybe you are looking for

  • Why is there a problem with Itunes freezing up at least 1-2 times when using it?

    It is kind of getting old but my Itunes player (does not matter which one as I update to the latest version) has this nasty habit of freezing whether I am trying to listen to the radio or my own library. It is now happening almost every time I use It

  • Aperture 3 not working after upgrading to OS X Lion.

    Did a clean installation of OS X Lion and the re-installed Aperture. Now I can't see previews of pics in Aperture. Many of the pics would not open either. For the pics that open, I can't edit them as I get an error saying the master picture cannot be

  • Line Break in Java for writing to a file

    Hi I am writing some data from excel sheet to a text file. I am using POI for reading the data from excel sheets. Whenever i encounter a value in the cell i want to add it to the text file.. this works fine But when its a new row(in excel sheet), i w

  • Ibooks 2 and iBooks Author!

    Hi guys!! I have some questions about the iBooks 2 Store and the iBooks Author, please help me further with them. 1. Can anyone post self-made books for sale or for free download in iBooks 2 Store? (For example, students at a school that has made boo

  • Cannot Copy File with Group Policy Preferences

    Hi, I am trying to use a Group Policy Preference to copy a simple text file from a network share to a folder at the root of 'C:\' on the clients. It is not happening. I created the preference in the computer section of the GPO. It is set to create, a