Subcontract vendor settlement

Hi Gurus,
The scenario is like this.
I have maintained a Non stock material as part of the BOM for a finished product which is basically the conversion charges for the finished material.
when a production order is created for the finished material a Purchase requisition gets generated for the non stock item. after doing the GR for the finished material we convert the PR of the non stock material into purchase order and settle the vendor.
is there any way we can avoid the whole purchase cycle for the non stock item and directly settle the vendor?
Note: the non stock material is unique for each finished material and it needs to be a part of the BOM.
Thanks and Regards
Mallikarjun Patil

What you are saying is standard subcontract process. For the header material, in material master mainatin special procurement key 30 and procurement key F. Use same BOM what you have now. Subcontracting PR will be generated for header material. Convert as PO with subcontracting charges (you can maintain info record also)Issue the components using 541. and when the process is done make GR with 101. All issued component will be consumed.
Regards
Antony

Similar Messages

  • How to trigger event CREATED for Bus.Obj BUS2126003 (Vendor Settlement)

    Hi
    I want to start a workflow inside Agent Business, when Vendor Settlement (BUS2126003) is Created.
    The problem is that the event does not get triggered when Created. Not even the CHANGED event is tiggered during change.
    Currently I have workflow on the objects BUS2144001 (Customer Settlement - Agency Business )
    and BUS2100001 (Settlement request list - Agency Business). Both these objects gets triggered when created (EVENT = CREATED).
    I try to find out a way to trigger CREATED for Vendor Settlement. Do you have any suggestion for this?
    I've tried to find any exits, Badi's, ...from where I could trigger the event myself.... but with no good result...
    Best reg
    Henrik

    Hi HA,
    are you talking about ERS (Evaluated Receipt Settlement) in SRM?
    If yes, check with the settings in IMG, there is an ERS flag in Vendor master record that needs to be set for that vendor.
    Hope it helps.
    Aditya

  • Sale Order Subcontracting & Vendor wise stock

    Dear Gurus,
         I have one doubt we are doing sale order subcontracting transfer posting by 311 E to vendor. so is it really need to create vendor wise storage locations to track the stock at vendor end,  as we have no. of vendors for subcontracting and storage location is part of organization structure.
    so is it advisable to go like that ? or please suggest me any other way to track the stock at vendor end sale order wise.
    Thanks & regards,
    Akshay

    Hello Sir ,
    As it is not possible to send material which are already in special stock (sale order stock ) to subcontractor by 541 movement type , it is recommended to transfer by 311 E my MB1B or MIGO...
    while doing good receipt 101 E and 543 E will going to happen , for 543 E system will automatically ask storage location. i have done already this but there only one subcontractor was there,
    and in this client we have more than 80 subcontractor so i am hesitating to do this....
    Subcontracting for Sales Order Stock and Project Stock - Managing Special Stocks (MM-IM) - SAP Library
    Sale Order Subcontracting & Vendor wise stock 

  • Sending material from one subcontracting vendor to another vendor

    Hi Experts
    we have a scenario we have more than one subcontracting vendors.so the unused raw material should be send to one vendor to another.so how can we configure it.please give me feedback.
    Thanks in advance...

    Hi Madhu ,
    What do u mean sending unused material from one vendor to another ?
    In subcontracting u can send material to only one vendor at a time.
    Regards
    Ramesh Ch

  • Overhead on Subcontract Vendor Charge

    We have implemented Raw Material Costing, adding overhead through use of a costing sheet.
    We use subcontracting (PrcTypF/SpcPrcTyp 30). In most plants it is a minor portion of the cost, so we did not need to know how to add overhead to the vendor charge
    At One of the plants that we are converting now to Raw Material costing, the Subcontract vendor charge is 80 - 90% of the value. We need overhead added to that charge.
    I thought I could just check the box in the valuation variant for Overhead on Subcontract Materials and it would calculate.
    It did not..
    I did add the subcontract cost element to the BASE on the costing sheet.
    What else do I need to do to get the overhead
    thank you
    Althea

    Have you specified OH costing sheet under the tab overhead? This costing sheet needs to be specified for the Finished/semi finished field.
    Please check if you can see the OH sheet under the valuation tab. Also check if the cost element in OH costing base is showing in itemization.
    I think it is a OH costing sheet issue and not subcontracted material issue.
    Sanjay Wagh

  • Error : T161W: Vendor+subcontracting vendor not allowed for 2-step stock tr

    Hi Gurus,
    When we creating a STO to sub contractor vendor ( in the delivery address tab we are entering the vendor # and activating the SC vendor check box)we are getting the error message as "T161W: Vendor+subcontracting vendor not allowed for 2-step stock transfer".
    Message no: MEPO140
    Note:
    The STO is creating with out error in ECC 5.0 for the above scenario but when i'm  trying  the same in ECC 6.0 in another system I'm getting this error, Can any one please advice.
    Thanks in advance,
    Sai

    Hi Charlie
    I had same issue and we sloved it. but i have one more issue here.
    We have created Po and SC Vendor is not check marked. When we go into the change mode of Po i can't see the field at all. but its availalbe in disply mode.
    I am using ECC 6.0, Please suggest why this is happening. I need to put check mark for SC vendor.
    thanks,
    Raju

  • Subcontracting Vendor and Purchase Vendor

    Dear All,
    I have created separate Pricing Procedure for Subcontracting PO, since the requirement is to calculate the price on issuing qty. I have put Formula Based Condition type.
    We issue 100 KG of material and receive less than 10 KG (say 90-95 KG) but the vendor charges for issuing qty (100 KG)...so I created a new condition type which calculates for total price for 100 KG and calculates for receiving qty...Suppose Rs. 10/KG then in this case its Rs.1000/- but system should calculate unit price for 90 KG i.e. 1000/90 = 11.11 ...this is working fine as long as Iam calling Subcontract Vendor where this Schema Group is assigned in the Vendor Master..
    My problem is, for some Vendors, he is both Subcontracting Vendor and Purchase Vendor...so Iam not able to calculate for Subcontracting calculation with this requirement...where as I have separate calculation schema for Purchase Vendors...
    How to meet this..
    Kindly Suggest
    Regards,
    Gopala.S

    Hi
    Thanks for your quick reply, please give me some brief info on routine, how and where we need to do settings.
    Regards,
    Gopala.s

  • Subcontracting in Production, 2 subcontracting vendors involved

    Hi,
    We have a scenario where in production 4 operations needs to be performed, one of which is a external process [subcontracting]
    Process 1 - Drilling
    Process 2 & 3 - Subcontracting [External process] u2013 2 processes
    Process 4 u2013 Finishing
    After drilling process, material is sent to subcontractor A for cutting, after this is done Vendor A will sent product to Vendor B directly for further operation . Once this is done We receive from Vendor B
    Then it will go to Process 4 [Finishing]
    Can you please help in mapping this scenario in SAP
    If there is only one vendor involved then I believe process will be like one subcontract PR [system creates automatically], we issue goods and we receive finished goods
    In this case Subcontract vendor A sends directly to Vendor B
    Both Vendor A and B sends invoice to US
    Any pointers in this regards will be of great help
    Thanks

    Hi ,
      While raising the subcontracting order for vendor A enter Delivery address vendor B address & save.
    Raise one more P.O(subcontracting ) with vendor B
    when vendor supplied material to vendor do the migo.
    then in sap stock will increase at vendor B.
    when material recieved from vendor B do migo stock will increaes in respective plant.
    you can procees invoice with P.O wise
    Try this one & let me know
    Rgds
    venkat

  • Ordering components to subcontracting vendor

    Hello gurus,
    We have a scenario where we are manufacturing one product at our subcontracting vendor. The assembly contains materials we are sending to our SC vendor stock from our company (with ME2O), but it also contains materials, which are ordered directly to the stock with subcontractor from another vendor. Now when we are creating Purchase order for this kind of component, we have to fill in subcontractor's vendor number and tick the "SC vend" box (delivery address tab) every time.
    Is it somehow possible to have this SC vendor's number and SC vend box already marked in Purch. req. (which MRP run creates)?

    That's what I was afraid of.. Thanks for the info. That same component is used also in other products which are not manufactured at subcontractors location, so I need also a logic to find out which purchase requests were generated by SubReqs.

  • Intra company stock transport order with delivery to subcontracting vendor

    Hi Friends,
    We have an issue with Intra company stock transport scheduling agreement with delivery to subcontracting vendor.
    We have a scenario where the component is provided by another plant (Plant A -Intra company) directly to subcontracting vendor and the subcontracting vendor processes the component and sends us(
    Plant B) the finished good.
    We have a subcontracting scheduling agreement created with the subcontracting vendor with Item category u201CLu201D for plant B .(Document type LPA)
    And we created the stock transport scheduling agreement with document type LU (Between Plant A to Plant B) by entering the subcontracting vendor number to the "EMLIF- Vendor to be supplied/who is to receive delivery" field but the check box "LBLKZ-Subcontracting vendor" is hidden in the delivery address tab.
    Field selection with document type (LU) and Field selection with transaction code (ME37) did not help to bring the field to the delivery address tab.
    As a result, when we do PGI from the supplying plant, the stock is posted to "in transit" (Movement type 641) instead of "Component provided to vendor" (Movement type 641 u2013 O)
    The same behavior for purchase order with document type UB as well/
    Is the movement type u201C641-O u201C supported by standard SAP or do we have any other workaround to address the requirement. ?
    Now we are in ECC 6.0 EHP3.
    Your inputs will be highly appreciated.
    Regards
    Gobinathan G

    Hello,
    This EhP4 feature addresses only the one step Stock Transport Order to subcontracting vendor for intra company.
    Does anybody know how to do a two steps Stock Transport Order to subcontracting vendor for intra company?
    By "two steps" I mean:
    1- Goods Issue from supplying plant A to in-transit stock of the subcontracting vendor at receiving plant B.
    2- Inbound Delivery Notification (IDN) at receiving plant B + Goods receipt against this IDN into the subcontracting stock at receiving plant B.
    Thanks and regards,
    Stéphane

  • Multiple BoMs for Same FG and Subcontracting Vendor

    Hello Gurus, I have a situation where client get job-work done for a finished good with multiple BoMs .... It is only decided at the time of creating PO when they decide which components/ child items to be used (Product Version). Even if the check for update info record is unchecked, the system don't ask for the choice 2nd time the subcontracting PO is drafted. Please guide what can be done under such circumstances.

    Hi,
    Please check how the alternative BOM can be determined (automatically):
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/b2/fa1ed4d51d11d1a69e0000e83235d4/frameset.htm
    (assign the BOM to production version (C223) >> assign the production version to info record (ME12))
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d2aea44af11d182b40000e829fbfe/frameset.htm
    (lot size; selection date; production version)
    Please check OSS note 458606:
    1. Question
    You work with production versions for selecting bill of material alternatives. How are they determined for SC purchase requisitions or SC purchase orders?
    Answer:
    Purchase Orders:
    In purchasing, the production versions are assigned in the subcontracting purchasing info record. When you create an SC purchase order, the system determines the SC purchasing info record from the combination of vendor and material, and reads the production version. This is then included in the document. It is not possible to manually change the production version in the SC purchase order.
    If you create the SC purchase order with reference to an SC purchase requisition, the system checks whether the production version from the SC purchase requisition matches the version determined from the SC purchase order.
    If the production verions differ, the system displays a dialog box and the user can decide whether the production version from the SC purchase requisition is to be transferred or whether the BOM is exploded using the newly determined production version from the SC purchasing info record.
    A selection of the production versions by date or similar is not available in purchasing.
    Regards,
    Csaba

  • Material rejected at subcontracting vendor

    Dear All,
    I an issue, We had sent the material for subcontracting, but material got damaged. we need to claim that amount from vendor.
    how we can go ahead about this. Please give solution.
    Thanks & regards
    Madhusudan

    HI,
    Get the materials back to your plant using 542 movement type. Post a credit memo to the vendor for the damage charges. Later you can scrap the material if it is not usable.

  • Subcontracting material directly to subcontracting vendor

    hi all
    i created BOM in cs01 for material suppose m for three child materials .these components i procure from a regular vendorA. and give it for subcontracting to vendor C. i am creating a PO  in this at item tab delivery address is of subcontracting vendorC ,SC vend field is ticked and PO is given to vendor A. now when i want to do GR for this material i am getting error that "MATERIAL DATA AND PO DATA DO NOT MATCH"
    any help

    thanks i got the answer it can be planned via mrp

  • Stock transfer to subcontracting vendor through sales order stock

    Hi Gurus,
    MRP run is taken against sales order and subcontracting PR is generated with referance to that PR subcontracting PO is created, in components there are four material and against this component special Stock Indicator E is there.
    Now I want to transfer material to vendor through MB1B with referance to PO.
    when I  enter PO and movement type 541 no material is coming.
    Please advice.

    You create one stroge location like SC01 and Issue the material using the mvt type 311(loc to loc) or 301 plt to plt wherever the location is sitted. We are using this method for  good issue  to subcontracting. Finally using 231 mvt type make consumption entry from SC01.

  • Scrapping the material at subcontracting vendor

    I request your inputs for a particular scenario in which
    A material is sent to the subcontacting vendor for repair. If the material can't be repaired it is scrapped at the vendor location itself without sending the material back to the plant. Is there a partiular movement type or way in which the material can be scrapped at the subcontracting location without taking it back in the plant . 
    Thanks

    Hi,
    Use MB1A 551 O
    Regards
    Merwyn

Maybe you are looking for

  • Another "DO NOT DISCONNECT" problem

    Before I go on I have 2 Nano's , so the problem I have is only with one of them. So this should eliminate many of the potential solutions to this problem ie. it is not my PC , it is not i.tunes , it is not the charging / download lead etc etc. I have

  • HP LaserJet P1505n Printer frequently loses assigned static IP address and goes offiline

    We have replaced printer several times, assigned printer static ip to eliminate network related issues. Ran, Scan Doctor; - reinstalled printer drivers - power cyled printer - check for network connectivity - Printer works perfectly ( for a brief per

  • Comment commander un système de déplacement Charlyrobot avec Labview via le port série RS232

    Bonjour Je souhaite commander un système de déplacement Charlyrobot (moteur pas à pas via module électronique) avec labview via le port série RS232. Si quelqu'un a une idée ou une solution pour y parvenir, pourra-t-il me guider ? Merci d'avance. Jera

  • Hanging ball

    Hello everyone. Does anyone herer knows if there exist a class somewhere that simulate "hanging objects" Im going to do a ball hanging in a small rope, which I can poke with the mouse... can someone help me or point me in the right direction. I dont

  • Is anyone else having problems using the Elements 9 Organizer?

    I have upgraded from Elements 6 to Elements 9 and am finding glitches in the organizer and some of its functions. For example, to share my images online through Photoshop Showcase, I need to unstack them before making an album. If I do not unstack, a