Subcontracting and PPV Scenario

HI Gurus,
I have a scenario where I cant find a feasible solution.
- Assembly A consist of Engine E and Component C
- We buy the Engine E from Vendor A in and get shipped to Vendor B in for Assembly so we get the invoice for it and we pay them
- Vendor B uses some components c AND Assembles and ships it as Assembly A and he send the invoice for Assembly and components
- In our system Assembly A has a std cost of 100 and Engine E cost 50 dollars and Component C cost 35 dollars
Sol -1
I can create 3 different purchase orders separately so everything will be resolved.
sol -2
One PO for Engine for Vendor A and other PO for Assembly and have the po price as assembly price 35 dollars from vendor b because thats what the vendor sends the invoice for but this one hits the PPV and i dont want the PPV.
Is there any other solution that could possible be easier to run this process down/
Any help would be appreciated.
thanks

I presume that your PO with vendor B is subcontract PO where-in consumption of Engine is working fine, but the component C is not working fine hence this issue.
Does your BOM includes Component C, if so how the related inventory is handled. Provided inventory of Component C is not handled by your company then this is typical tolling process solution for which SAP doesn't have standard solution. So you have to go either pick Sol-1 or create a user exit solution to get your account postings correct.

Similar Messages

  • Subcontracting in MTO scenario.

    Hi,
    We have an MTO sales order against which we are raising a subcontracting PO. At the time of goods receipt, movement type 101 'E' and 543 'O' has triggered. 3 controlling entries have taken place:-
    1. Cost for Goods issue to subcontractor is debited to PSG. (543 'O')
    2. Credit for goods receipt from subcontractor is credited to SDI.  (101 'E')
    3. Service charge for subcontractor is debited to SDI.
    The above entry has happened only once and is leading to excess credit on the sales order.
    When we replicated the case in test environment, we found that all the costs have gone to PSG (as per OKB9). The movement types are the same as before.
    We replicated a case where we triggered 543 'E' instead of 'O' and the costs are still going to PSG for all the entries. This was done by changing the 'individual/collective' indicator in material master. I believe this is the recommended SAP setting for subcontracting in MTO scenario as per following link.
    Subcontracting for Sales Order Stock and Project Stock - Managing Special Stocks (MM-IM) - SAP Library
    Can anyone explain when does system overrule OKB9 and take sales order as cost object?
    What can be the probable reason that system is behaving differently for only one occassion?
    Is there any other indicator in material master that I should look for?
    Can I look at OMJJ for possible causes?
    I know this has been asked several times on the forums before but I have not been able to explain above situation. So thanks in advance.

    OKB9 is only functional in the case where a "cost object" has not been assigned to a P&L transactions. That's why it is called "Default Account assignment". In the Case of your MTO, the sales order is really considered as the cost object and hence would take precedence over other default...once a cost object is determined, any further assignment of a cost collecting object becomes statistical depending on the type of cost objects. Basically cost objects have precedencies: I believe Sales order, internal orders, Cost center, etc in that order. Meaning, when 2 are assigned, the one in the lower order become statistical. In any of these cases, OKB9 takes a back seat. OKB9 only comes to play when the internally generated accounting entries will result in no cost object assignment, then SAP looks to see if you have a reference maintained in OKB9.
    Basically, for your MTO, the sales order (an maybe the cost center, etc assigned the to sales order) becomes the cost holder. OKB9 will not feature.
    OMJJ will help you simulate the goods movement and see how the accounts are derived/cost assigned. If OKB9 features, you will also see it referenced. But I don't think it will, unless your goods movement results in an accounting entries that internally does not reference the sales order, then OKB9 kicks in.

  • Component material to be used for both MTO and MTS scenario

    Hello All,
    What is the setting required at IMG or at Master data level, in order to use the component for both MTO and MTS scenario.
    Detail description of problem:
    In the system already MTS process is exist. And now business wants MTO scenario, in order to have sales order specific stock.
    So i have made the necessary configuration in requirement class (special stock - E in account assignment field) and the basic requirement is working fine. Meaning when i create prodcution order manually using transaction CO08 with reference to sales order i am able to create it. And no problem in executing GR for the prodcution order. Also noticed that after GR the stock is under the salesorder created.
    But the problem is when i try to do the goods issue for the component to the prodcution order, system is expecting sales order specific stock for components too.
    But business wants to use components from unrestricted stock as of Make to stock scenario.
    Please guide me how to achieve this? This is critical to business so expecing quick recommendations from experts.
    Best Regards,
    Krish

    HI
    For  your component if you dont set indi/collective requirement indicator as 2 collective reqmt MRP 4 view then only system will not allow you to use r special stock E  for sales order
    if you want to make all stock avaliable and PR and PO not sales order wise then maintain above indicator as 2 in MRP4 view.
    Regards
    Anupam Sharma

  • Oracle BPM / SOA Suite and Big and Complex Scenarios

    Hi people,
    I have worked for a company that in the past chose Oracle BPM (ALBPM at the time) and one of the big problems that the company had was in relation about big processes and complex scenarios.
    This company is for the e-commerce area and our processes can have many instances at the same time, for example, a process to all the "order flow" can have thousands, maybe millions instances at the same time.
    So we choose to abort the BPMS option in the past and now we back to talk again about BPMS and one question is always made by the company board: if we use BPM again, the new versions can be support all the our volume data?
    To be honestly, I don't have this answer so I like to know if any people here has a paper or report about Oracle BPM 11g and big scenarios with many instances. If anybody has a case too, it will be relevant.
    Another and the final question: how does the oracle bpm engine treats the case when my engine reboots and before that the engine had many instances active? The istances will be lost?

    11g ADF is not certified with 10g SOA Suite. What I mean by this is that your 11g ADF will need to run on WLS 10.3.1 and SOA Suite 10g will eith run on oc4j or WLS 9.2.
    ADF is just JDeveloper, you deploy to WLS 11g (10.3.1).
    This is the most detailed 10g SOA Suite guide I know for 10g
    http://download.oracle.com/docs/cd/E10291_01/core.1013/e10294/toc.htm
    note that it is for 10.1.3.3, you just need to subsitute for 10.1.3.5 (latest release)
    cheers
    James

  • Resource Related Billing: Time and Material Scenario

    Can we use internal resource time through CATS for Resource Related Billing: Time and Material Scenario instead of external time of resources through service entry sheet

    Yes you can
    Please read sap help for more details

  • Central Contract, MDM Catalog, and classic scenario

    Dear SAP experts,
    We are in SRM 7.01 with backend ECC 6.05 deploying classic scenario. We are using Central Contract Management in which we negotiate contract in SRM and later distribute it to ECC. We also plan to use SRM-MDM Catalog.
    We notice that if we are using classic scenaro, the contract that is used as reference is the contract number in ECC (the one distributed from SRM). So at first we assume that if we want to push the contract data to MDM, we should have pushed the ECC Contract number. However we find out that actually SAP block the ECC Contract coming as distribution from SRM to go to MDM.
    Our second option is to use distribution of contract from SRM to catalog. It does using SRM contract number. We create SC and then we pull the catalog item from the catalog (which contain SRM contract number) and then we order. However we end up with 'error in process' in which the system try to create a PR instead in the ECC (meaning that the contract number cannot be read).
    We're puzzled with this. How can we use the combination of central contract, MDM catalog and classic scenario? Can we use the combination?
    Best regards,
    John

    Maria
    If you want the contracts to be in SRM and do not want them to send to Backend, then check this out.
    Create a Vendor list for those items in SRM by assigning the local contracts to the vendors.Activate Vendor list for sourcing.
    Then local contract data should pick as SOS from the vendor list.
    If you can create contracts in Backend for stock material then SC would pick the backend contract as SOS in classic scenario.
    Let me know if the above works or not.
    PS : Reward points if helpful.
    Regards
    Jagadish

  • Can you explain steps in the Async and Sync scenarios JDBC to RFC.

    Hi,
    Can you explain some basic steps in the Async and Sync scenarios for sending data from JDBC to RFC.
    Like,
    The data is picked up from the  database table through JDBC adapter.
    It is passed on to SAP  by calling the RFC. RFC gets executed         
    successfully. The status is returned by the RFC. The status needs to be
    updated back into the SQL database table.
    Is this a sync case or async case.
    What si the diffrences in the sync and async scenarios in the above JDBC to RFC scenarios.
    Soorya

    hi check the below link
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/5474f19e-0701-0010-4eaa-97c4f78dbf9b
    JDBC Synchronous call using BPM  
    Data Types -
    1) File Input
    2) JDBC Req
    3) JDBC Response
    4) File Response of similar type of JDBC Response.. ( This you can avoid also..let it be for first time)
    Message Types
    4 for each data type
    Message Interfaces
    1) Async, Outbound, Interface, to receieve the file
    2) Async, Inbound , Interface to send the file from XI
    3) Async, Absract , Interface of type File message type to recieve the message in the BPM
    4) Sync, Abstract Interface with Req message type as File Request, and Response Message type as a file Response
    5) Sync , Inbound interface for JDBC with Input message type as a JDBC Request and Output Message type as a JDBC Response
    Message Mapping:
    1)Mapping between File Req to the JDBC req
    2) JDBC Response to File Response
    Interface mapping:
    1) Sender Interface as a Sync,Abstract Interface created for the file type and target interface as Synchrnous JDBC interface.
    Use corresponding mapping for Req and Resp..
    note:reward points if solution found helpfull.....
    regards
    chandrakanth.k

  • What role of sd functional consultant in  ale and idoc  scenarios

    Hi friends,
    I am sd consultant having worked for indian support projects and implementaiton project. i do not have idea of ALE and IDOC scenarios. Now i am on foreign offshore support project where they asked for ALE AND IDOC knowledge. please guide me how to go ahead and please inform what role and responsibilities should have. i  heard support may be for order management and delivery from sd module
    please give me details steps and T.codes.
    Regards,
    Veeresh

    hi
    <a href="http://help.sap.com/saphelp_470/helpdata/en/0b/2a6695507d11d18ee90000e8366fc2/frameset.htm">http://help.sap.com/saphelp_470/helpdata/en/0b/2a6695507d11d18ee90000e8366fc2/frameset.htm</a>

  • Business Service and Business scenario

    Hi,
    Does Business Service and Business scenario are alike ?
    Rgds,sofia

    hi,
    Business System : is a logical entity assigned to a Technical System in a SLD
    Business Service: is an Abstract entity without having assigned to a Technical System in a SLD
    for more:
    Business System: http://help.sap.com/saphelp_nw70/helpdata/en/42/c817d9d2296bb2e10000000a1553f6/content.htm
    Business Service: http://help.sap.com/saphelp_nw70/helpdata/en/c7/301640033ae569e10000000a155106/content.htm
    Hope this helps,
    Also refer to some previous threads
    Business service or Business system??
    Re: Business Service <--> Business System
    Difference between Business service, Business system and Business process
    Business Service vs Business System in Integration Directory.
    Business Service (vs) Business System in Integration Directory.
    What is the difference between Business System and Business Service?
    business system and business service
    Diff b/w Business service & Business System?
    Thanks
    Sanjo
    Message was edited by:
            Sanjo Eapen

  • SRM, ROS and SUS scenario question

    Hello Experts,
    We are in the process of implementing MDM, ROS, EBP and SUS scenario in our present project. I went through the documentation. I have couple of questions.
    1. Do we need to have seperate clients for ROS and SUS. What is the best practise.
    2. Since we have SUS, once I transfer BP from ROS to EBP, check the portal vendor box, I would like to know how the registration code will be sent to supplier. Do we need to create the userid in EBP or with the receipt of registration code supplier will be able to create his first initial userid? Also how we can implement this with CUA and EP as part of landscape?
    3. Also since we have MDM, how the new BP information can be migrated or mapped in MDM and how new BP can be sent to backend system? I understand there is BP monitor to check and approve the changes, but how the new BP will be transferred? Do we need to develop new XI message for this? if Yes, from where that can be managed? from EBP or MDM?.
    I searched through help.sap.com for any documentation but no success.
    Thanks in advance
    Vijay.

    Hi,
    1.Refer the foll thread:
    Re: Supplier Registration without SUS or XI?
    2.For supplier registration,SUS is not mandatory.You need to configure ROS for this scenario.The extrenal vendors will register in ROS and then be replicated to R/3.
    You can use EBP only for Supplier registration.
    SUS,ROS and Bidding engine make up the SRM server 5.5/EBP component of SRM 5.0.
    Pls refer the foll link for the complete process:
    http://www50.sap.com/businessmaps/8F152C1AE8F1426FA3B442F905815F54.htm
    For detailed settings/config  of supplier registration,refer the foll threads:
    Re: Not able to transfer suppliers from ROS to EBP
    problems with ROS_PRESCREEN application for screen suppliers and manage bp
    Re: SUPPLIER DIRECTORY (ROS) link not appearing in EBP in "SCREEN SUPPLIERS"
    Supplier Directory
    Re: Supplier Self registration
    Re: SRM Supplier registration config
    Re: External Web Service setting for Supplier Registration ROS to EBP
    Re: Problems when transferring supplier from ROS to EBP...
    3.Not worked on MDM so cant help you on this.
    BR,
    Disha.
    Do  reward points for useful answer

  • A2A and B2B Scenarios

    Hello Friends,
                  Can any one explain what is A2A and B2B Scenarios and please explain what is asynchronous and synchronous communication.
    Thnks&Rgds,
    Dinesh

    Hi Dinesh,
    1. A2A integration involves configuring your system landscape, designing your integration scenarios, configuration of the scenarios, handling messages. In which you communicate at application level.
    2. B2B Integration
    Its something in which two business are integrated like: we develop scenario like legacy system to  MDM using XI.
    Now two businesses are communicating. See the link:
    http://resources.ecommercetimes.com/search/keyword/ecommercetimes/Definition%20B2B/Definition%20B2B
    3. Asynchronous communication:
    Means you will send the data but no response will come from the receving end called Asynchronous communication. You will just send, disadv: your data may lost.
    4. Synchronous:
    Every time sender will send the data, receiver will give a response say acknowledgement to the sender that data received.
    Adv: if data is not going to receiver it can be delivered again.
    Rewrads if found helpful.
    BR,
    Alok Sharma

  • Partial quantity of Material in Extended and Classic Scenarios

    Does it possible to pass partial quantity of Material into Extended and Classic Scenario ;for instance we have 100 qty  for a material & out of them 60 qty goes to Extended PO and 40 qty goes to Classic in backend system .
    If yes so how & what criteria would be ?

    Hi Lalit,
    Until now we did not use both classic and extended classic for one organization.
    Are you using that or you just have a doubt??
    Regards,
    Satish

  • What ia A2A and B2B scenario

    Hi all,
    Can any body please guide me about A2A and B2B scenario? What are both and what are the differences between the two.
    Thanks,
    Kulwant

    Hi Kulwant,
    Pls check the following conversations to understand A2A and B2B
    can anyone explain A2A & B2B  AND  BPM & ccBPM  with an example..
    A2A and B2B
    A2A Vs B2B
    What is the real use of party ? When we will go for Parties?
    B2B weblog
    /people/shabarish.vijayakumar/blog/2006/09/08/b2b-and-the-hype-about-the-party
    Regards,
    Ram

  • How do you differentiate business process and business scenario

    how do you differentiate business process and business scenario???
    pls help

    Google says;
    A <b>business scenario</b> is a description of a business problem, which enables requirements to be viewed in relation to one another in the context of the overall problem. Without such a description to serve as context, the business value of solving the problem is unclear; the relevance of potential solutions is unclear and there is a danger of the solution being based on an inadequate set of requirements. A key factor in the success of any other major project is the extent to which it is linked to business requirements, and demonstrably supporting and enabling the enterprise to achieve its business objectives. Business scenarios are an important technique to help identify and understand business needs.
    A business process -
    http://en.wikipedia.org/wiki/Business_process

  • Integrate SAP postal code in PA30 and ESS scenario

    Hai Experts,
    does anyone have a manual how to integrate SAP postal code in PA30 and ESS scenario.
    SAP does have postal code tables which by customizing can be integrated in SAP HCM.
    I need to know which customizing i need to do to activate the postal functionality en the progam to read and updat the SAP tables with the postal codes and address data delivered by out national post host!
    Grtz en thanks in advance
    RIchard

    This solution is for NL country localization:
    Activate NLADR feature with X; "For infotype Address Data (0006) this will result in the system checking the postal code for a given address."
    The rest of what you need is in MP00064N include logic subroutines verify_address_nl.
    *&      Form  verify_address_nl
          Verification of address data in infotype 6 against the address
          data in Central Address Management.
         -->P_STRAS  Streetname
         -->P_HSNMR  Housenumber
         -->P_PSTLZ  Postal code
         -->P_ORT01  City
         -->P_LAND1  Country
    FORM verify_address_nl  USING    p_stras
                                     p_hsnmr
                                     p_pstlz
                                     p_ort01
                                     p_land1.
    Hope it helps,
    Regards,
    Antoine

Maybe you are looking for

  • JDBC Sender adapter - message split

    All, Scenario: Oracle Stage table - PI - ECC or R3, (depending on a particular value the record goes to ECC or R3 to post a transaction). After the record is picked, flag is updated and depending on posting the transaction on SAP, the flag is updated

  • Error handling -- what am I doing wrong?

    When I run the following code in the console: try { var x=blah(); console.println(x); catch(e) { console.println("error!"); I get: blah is not defined 2:Console:Execerror! I thought the try {} wasn't supposed to print out the error.

  • Mapping Templates creation and use

    Hi All, I am trying to use mapping templates. I am trying to create mapping templates from a message mapping . But "Create Template Based On Mapping" option is disable here. So how can I create mapping templates? Again how to use that template? Any k

  • Oracle Grid Infrastructure installation on Windows  2008 SRV R2

    Hi There are many problems to configure and install grid infrastructure in windows 2008 server. is there any step by step documentation for this case? how can i configure the storage for OCFS, ACFS is not supported on Windows 2008 server. How can i m

  • If i need 2 send an Object that allready exist like Image .....

    Hi Folks , i need an Advise to my problems. My problems is like that I need 2 send an Object a lot of times throw the Soket for this i need packing my Objects and send them 1 after 1 i will try say more clearly i need 2 send a lot of Frames (Image Ca