Subcontracting & BOM  alternative

Hi:
I need be able to select a BOM alternative into the Purchase Order for Subcontracting.
I mean, I've more than one option to make a material in subcontracting (different items for the same material) , then I'd like be able to make this decision.
Anybody can help me?
Regards
Omar Perea

hi
i think u need multiple BOm section i.e. alternate BOM,u can achive this using production versions
for this u have to do following
1.  Define all the materials in your plant (subcontracting and packaging etc).
2.  In the material master MRP 4 view there is one field in which you can mention that this material is not relevant to MRP planning, use this field for subcontracting material so that it will not be planned in MRP runs ( generally use this field for re-order point planning).
3.  In the BOM for the subcontracting material put the special procurement key as Subcontracting and do not keep relevance for costing.
4.  If you're using packaging material of your company and want to capture the cost of these materials in the subcontracting production order then put relevance for cost.
5.  Define alternate BOMs for each customer.
6.   Generally the routing will be the same but materials will change, define different prodcution versions for each alternate BOM and assign to the routing.
7.   Define the activite types for packing and mixing in the work center and assign them to the cost center, use these for your routing. 
8.  Whenever you recive a sub-contracting order, use the relevant production version depending on the customer.
http://sap.ittoolbox.com/groups/technical-functional/sap-log-mm/how-to-include-alternative-2-of-the-bom-in-sub-contract-po-917575
http://www.sapfans.com/forums/viewtopic.php?f=6&p=969446
regards
SAP Learner

Similar Messages

  • Error for open process order when BOM alternative is not found

    Dear colleagues,
    When I open process order. BOM alternative is selected according to the production version. But when  BOM alternative is not found system gives only information message and I can open process order, I want to prevent open process order when there is no BOM alternative according to the production version. Because the Bom can be deleted after creation production version.
    Thanks for your helping,

    Hi,
    U need to use an enhancement at the creation of order to check the active status of the bom and restricting the order creation when BOM status is inactive.
    see whether following enhancement is useful for your scenario:
    PPCO0006 Enhancement & EXIT_SAPLCOZF_003
    Please confirm.
    Regards
    Suri

  • Function module to get the valid Subcontract BOM and components for Pur doc

    Hello Gurus,
    I need help to create a z report of subcontracting bom and their components exploded in Schedule agreement. Seems like there is no standard report which can give the boms from purcashing doc.  Can someone please tell me the name of the function module for it? any help will be highly appreciated.
    Regards,
    Owais

    hi
    u can use
    STPO BOM - item
    STAS BOMs - Item Selection
    STZU Permanent BOM data
    also check stko or mast or stpo
    or
    Perhaps you can run ST05 while run some transaction for display the
    BOM.
    Once the transaction for display the BOM gets finished, you need to stop the
    trace on ST05 and then display it, you will see tables readden in the
    transaction,
    not tried plz check*
    reward if helpful
    regards
    kunal
    Edited by: kunal ingale on Jul 22, 2008 6:21 AM

  • BOM Alternative Check on CS01 screen

    Dear All,
    Right now i need to implement a user exit for the BOM alternative in CS01 screen. For a particular BOM Usage we should not allow the user to create alternative other than '1'. So before getting the automatic alternative i need to implement the user exit/Badi for the checking on the alternative.
    thanks,
    rajesh.

    Hi,
    There is a standard customzing for alternative BOM in CS01...
    SAP Customizing Implementation Guide --> Production --> Basic Data --> Bill of Material --> Control Data for Bills of Material --> Define Modification Parameters. If you tick the " Multiple BOM inactive" then nobody should be able to create other alternatives then 1.

  • Routing link to BOM alternative

    Hi all,
    In our current SAP solution (SAP R/2) each routing alternative stores a link to an associated Bill of Material alternative.  We have noticed that in mySAP ERP the routing alternatives can store BOM alternatives in the Component Allocation tab, but if you look at the header table for routing PLKO there is a field for associated BOM alternative (STLAL).  If we select a BOM alternative this field is still not populated. 
    Does anyone know where this link is stored?  Does the new system assume that production versions are created to store this combination of Routing and BOM?  We would appreciate the insight.  Thanks!
    Sincerely,
    Justin

    Hi Justin,
    Suppose you have two BOMs ,alternative 1 & 2. T.code cs01
    To change T.code cs02.
    A routing is created for the header material. T.code ca01.
    To change T.code ca02.
    In the routing, if you click the component allocation tab, you can see both the alt BOMs. From here you can select the BOM you want & then save. All the material will be allocated to the first operation by default.
    Reg. Prod version:
    You can create eg version 1 Routing + Alt BOM1
                                version 2 Routing + Alt Bom2.
    In the material master, mrp view 4 check the options Bom selection , here if you give as selection only by prod version, during prodn order creation, the system will inform that there are two prodn versions & which one to select. This selection of pron version can be made manual or automatic. Given in T.code opl8
    Regards,
    SDS

  • Bom alternative item group

    Hello Experts,
    I have one issue in BOM alternative item group I have made the settings as below.
    Material 1     AltItemGroup         01
                         Priority                                  1
                         Strategy             2 100% check
                       Usage prob.         100
    Material 2     AltItemGroup                      01
                          Priority                                  2
                          Strategy             2 100% check
                          Usage prob.         100
    For Material 1 required bill of material quantity is 65 MT
    For Material 2 required bill of material quantity is 65 MT
    Now I am creating the process order for quantity 1000 MT. When the material availability check done it proposing as below in process order.
    Material 1 = 65 MT    (Available Stock 807.109 MT)
    Material 2 = 0 MT      (Available Stock 5.850 MT)
    And again Material 2 = 32.5 MT
    My question is as per above settings and stock situation of the material it should propose only Material 1 = 65 MT.  But here system is also proposing Material 2 = 32.5 MT. Can any one tell what I am doing wrong?
    Any settings are missing or what will be output for the above settings.
    Please explain in detail.
    Thanks in Advance
    Regards,
    Ganesh

    Hi Ganesh,
    Pl. make the following settings:
    Material 1 AltItemGroup 01
    Priority 1
    Strategy 2 100% check
    Usage prob. 100
    Material 2 AltItemGroup 01
    Priority 2
    Strategy 2 100% check
    Usage prob. 0
    The strategy 2 will automatically handle the situation when Material 1 is not available and 2 is available.
    Pl. test & revert. It will work as per your requirements
    Regards,
    HKV...

  • BOM explosion where first BOM alternative has deletion flag

    Hi,
    I got the following very basic scenario:
    One FERT material has two BOM alternatives (alternative 1 and 2). Both of them are valid in terms of date, status and lot size. When a production order is created by CO01 the system will pick automatically alternative 1 (which is ok for me). BUT if this BOM alternative 1 gets a deletion flag (on BOM alternative header) I would expect that the system would automatically pick alternative 2 (it is the "next" suitable alternative). But the systems says there is no valid BOM available.
    Only if I really delete alternative 1 (so I cannot see it anymore in CS02), the system would pick alternative 2 (because it is now the really first one available - no version in front with only deletion flag). But in terms of documentation I cannot delete the alternatives.
    Maybe somebody could explain that to me or had a similar problem...
    BR and thanks in advance.
    Christian

    Hi Guys,
    many thanks for your suggestions. Setting the status to inactive did the trick. Obviously the deletion flag is not enough at this point.
    Just to clarify - production version of course would be an option but that did not work with the following:
    I have 6 different routings for this FERT and the user has to choose when the production order is created. That works basically fine when the order is created with CO01 (popup for selection of production version based on MRP4 setting). BUT when a planned order is converted directly from MD04 into a production order the system would automatically pick production version 1 (no matter what setting in MRP4 view). If there are no production version the user would get at least a popup for choosing a routing. But this would maybe an additional thread in the forum
    Thanks
    Christian

  • SD-PP integration:  BOM alternative

    hello, friends.  i wish to ask you about transfer of requirements from SD to PP.
    when processing the sales order, the user can manually select the BOM alternative via a dialog box.  in standard, BOM with usage 3 (universal) and 5 (SD) are supported.
    i notice that after we run MRP, in the planned order the BOM usage is 1 and alternative is defaulted to the first in the order sequence.  this is true if the BOM selection method in the material master MRP 4 view is either for production version or blank.
    if the selection method is by key date, then the BOM in the planned order will be the first in sequence for alternatives by key date.
    in variant configuration, the specific requirements are transferred.  but for a simple BOM, in neither situation is the alternative selected in the sales order transferred.  why is this so?  are there missing settings?
    hoping for your valued inputs.
    many thanks.

    Hi
    In case of Variant configuration(VC) , the BOM Selection will be based on Dependencies assigned to the  Components. In VC there is no alternative BOM Concept. There will be one Simple BOM called Super BOM which contain all the components which is required to make all the variants of K-mat.
    In the sales order , the user will configure the requirements and based on the requirements selected in SO , the system will pick respective Components from Super BOM during MRP
    Regards
    Brahmaji

  • The BOM alternative 1,2

    Hi,
    We have created one BOM (alternative 1) with date (valid from10.01.2008) and 2 Months later we kept the same BOM and created (alternative 2) with date (valid from 10.03.2008). We will always (re)create the same BOM with new alternative every 2 Months.
    Now we want to display the  BOM (from the last valid from date) only when we give a date and not a alternative number (because in one year we will not remenber the alternative number.)
    How can I customize the System so that it shows the right BOM through the date (valid from or the last valid from date). for exp. if I give 10.03.2008>Display only BOM(alternativ 2) and 17.03.2008>Display only BOM(alternativ 2) because it is the last valid from date
    Thanks

    Dear Dede,
    Kindly read this and revert back what more you need.
    1.When you create a BOM for a material (First Alternative) as on today using an ECN,then in the header of the BOM,the valid from
    date will be 28.03.2008 & valid To Date will be 31.12.9999.
    2.For its BOM components the valid from date will be 28.03.2008 & valid To Date will be 31.12.9999.
    3.If create a Change that's valid from tomorrow(29.03.2008),and using this if i'm changing the First Alternative BOM's components say
    i'm deleting one component and saving the datas.
    4.If i go in display mode of the BOM removing the valid from & To date in the input screen,then for the deleted item or component,the
    valid from date will be 28.03.2008 & valid to date will be 29.03.2008.But in the header of the BOm,there wont be any change,the valid
    from date will be 28.03.2008 & valid to date will be 31.12.9999.
    5.Now if I decide to delete the entire BOM(alternative 01) on 05.04.2008,then i create an ECN that's valid from 05.04.2008,and using
    this,I go in Change mode and then from the top menu,BOm Material --->Delete,and save.
    6.Now go in display mode of the BOM and check in the header of the BOM,there now you can see the valid from date will be
    28.03.2008 & valid to date will be 05.04.2008.
    So this valid to date of the BOM header will be changed,only if the entire BOM is deleted.
    I hope the above explanation will clear all your doubts.
    Reward points if satisfied with the answer and close this thread.
    Regards
    Mangalraj.S

  • Create BOM alternative via BAPI

    How can we create a BOM alternative via BAPI?
    I now use CSAP_MAT_BOM_MAINTAIN but then I get the following error:
    BOM already exists for 1234 W041 9
    I do not want to use batch input.
    Kind regards,
    Lieselot

    Hi,
    U can use the  following BAPI'S
    BAPI_MATERIAL_BOM_GROUP_CREAT
    BAPI_MAT_BOM_EXISTENCE_CHECK
    i hope they solve your purpose!!
    thanks

  • Need an extra BOM Alternative Text

    Hi experts,
         In standard SAP we have a provision to write BOM alternative text like the same way I need another BOM Alternative text1 to be included is there any way to do this. and also it should be displayed when you go to item overview 9I.e. new field to be created and it should capture the data from BOM alternative Text1. Is there will be any exit for this.
    Thanks in advance
    Regards
    Venkat

    Hi,
    Thanks for the valuable inputs
    Regards
    Ramana

  • BOM Alternative Selection

    Dear All,
    While creating a production order (CO01) I want to be able to select which BOM Alternative I'll be using. Is this possible?
    Where do I select the usage of BOM Alternative 2?
    Thank you

    Hi,
    For BOM Alternative Selection you need to maintain any of the following settings in Material Master --->
    MRP-4 View->BOM Explosion / Dependent Requirements->Selection Method :
    Method for Selecting Alternative Bills of Material
    Indicator determining the selection of the alternative BOM when requirements are exploded in material requirements planning.
    Use
    With Selection by order quantity, the system chooses the alternative BOM into whose lot size range the order quantity falls. The lot size range and area of validity of the BOM apply.
    With Selection by explosion date, the system chooses the alternative BOM into whose area of validity the date falls according to the setting BOM via dates.
    With Selection by production version, the system chooses the alternative BOM defined in the valid production version. The lot size range and area of validity of the production version apply.
    With Selection only by production version, the system chooses the alternative BOM defined in the valid production version. The lot size range and area of validity of the production version apply.
    If no production version is found, no production orders or process orders can be created.
    Hope this helps.
    Revert if any doubt.
    Regards,
    Tejas

  • Subcontracting -BOM issue

    Hi
    When i was creating sucontract .P.O..for finishedmaterial.
    this finished material having 3 alternatives BOM s
    in .P.O  ..syatem automacially taken altnative 1 BOM, 
    but some times .i was using altnative 2.. but does not ask the  which bom u want..but  i entered components manually which i want
    for this issue any solution is there..pls guide me..or can we use any userexits..
    i found one user exit...but how much for it is useful. 
    userexit:"CNEX0011- BOM explosion in network on component overview"

    Hi:
    There is no such standard SAP functionality which could suggest you option to select the alternative BOM while explosion in PO, however we could check the user exit or some implicit enhancements but that depnds whether it is aacceptable to client to implement exits or any enhancement. I am not sure the exit you have found would work up to the expectation please get it check  from the ABAPer.....however the other solution to do this which we suggested to one of our client (was not agree to Enhancement) :
    1. Create a Production Versions for the different alternative BOMs.
    2.Assign the relavant production Version in Subcontracting Info Record.
    Now, based on the production version assigned in Info Record system suggests the BOM while BOM explosion in Subcon Purchase Order.
    Please let me know if it suits you and request you to award the points if it suits you.
    Cheers

  • Subcontracting BOM

    Dear Guru's,
    I have a scenario where one FERT can be produced in house and can be subcontracted,both have different BOMs for in house production and subcontracting.For Sub-con i have one vendor and scheduling agreement and maintaining schedulines manually in ME38.
    Problem i am facing is whenever i am putting new schedule line system is not picking up the correct bom which is meant for Sub-con.Some time it is picking up in house production BOM.Is there any way to fix this thing that every time it will pick up correct BOM
    for Sub con only.
    With Regards.

    Hi SAPPPKID,
    Well for the two BOM's(means alternative BOM's OK) i hope you have ROUTINGS. Then in each routing maintain the LOT SIZE or You have to Customize in SPRO -
    > Production -
    > Basic Data -
    > Bill Of Material OK (you have to do customize all the relevant and required customization OK ). Then you have to maintain the Material Master Procurement Type should be X and Special Procurement Type should be 30. Then try i hope it works.
    Regards,
    Madhu.G

  • Subcontracting BOM determination

    Hi all,
      We only have  "2-engineering" BOM,but we do have the scenarial of subcontracting.So I make changes to BOM determination in inventory management from BEST to PP02,I've also changed application PP02 to make it MRP related.
    But when I create subcontracting PO,still have no componenets from the u201C2u201D BOM.
    If I copy the "2" BOM to "1" BOM,then the PO is OK.
    Is there anything I missed? Thank you...
    BTW,the item category and valid date is OK...

    Dear Leo,
    Check by creating a production version and assigning the BOM with BOM usage 2 which you have created an Engineering
    BOM for sub-contracting purpose and assign the value 2 - under BOM selection method in MRP4 view.
    Check whether the BOM selection id in the MRP settings in OPPQ has some priority value assigned with BOM usage 2.
    Check this link to explore more,
    http://help.sap.com/saphelperp60_sp/helpdata/EN/b2/fa1ed4d51d11d1a69e0000e83235d4/content.htm_
    Check and revert back.
    Regards
    Mangalraj.S

Maybe you are looking for

  • Search results in new tab

    How to display results typed to my search bar in new tab? It's probably changing something in about:config but what should I be looking for?

  • When I move the cursor over sidebar items they toggle becoming underlined?

    When I move the cursor over sidebar bookmarks lines, it toggles underline on or off. Very annoying. Happens in Firefox 3.6, too.

  • Service Contract Billing

    Hi, I am trying to bill a service contract with periodic billing plan. but when it is executing it is showing all the dates based on the period(monthly). But after saving it, its showing me only last date. I am not getting whats wrong?? I want to bil

  • Oracle Drive Problem

    I am having a strange problem with Oracle Drive (v10.2.0.0.5 WinXP) I am connecting to Portal on AS10g R2 10.1.2 SEOne (SLES 9.3) http://myportal.com:7779/dav_portal/portal The installation went smoothly, and I can connect to the portal, login, and s

  • Advantages and disadvantages of having broker dataguard

    Hello all, The dataguard can work perfectly without the broker, am I right? Do you recommend to use the broker in the Dataguard solution? Thank you ;)