Subcontracting Extra Material Return From Vendor

Dear Sir,
We have a following scenario :
We had made a Subcontract Challan for a Material of quantity 50 nos . Vendor processed the Material and GR was made for 45 nos Processed Items .
The 5 nos pieces are now left with the Vendor .  Vendor need to return these 5 nos items as it is (Un-Processed) . Kindly guide us as what steps need to be followed to receive back these 5 nos and reconciliation of the subcontract challan .
I would be highly grateful for the suggested solution pl .
Rgds
Sania Agarwal

Hi
in subcontracting configuration for CIN you need to give list of movement types for material issue and reversal or consumption. In that you need to add 542 also. Then during reconcillation system will consider 542 documents also along with 543 documents.
Hope you are clear.
Regards
Antony

Similar Messages

  • Material Return from 542 movement type without purchase order

    HI Expert
    I have a problem regaring material return from vendor through 542 mov type against purchase order.
    when i transfer material to vendor with mov type 541. and after grv if we return material from vendor against purchase order.
    system doesnot allow to return material against purchase order. it allows mov type 542 for returning material from venodr without pruchase order.
    Suppose we have 10 quality for a component to transfer vendor we take grv and issue 5 qty through 543 move type automatically. if we want to take return 5 remaining qty from vendor against purchase order .
    system doesnot allow to return component from vendor against purchase order.
    but allow  to return component from vendor without purchase order.
    vendor stocks becomes less but purchase order still open for open quantity.
    how we could control vendor's returing material with the reference of purchase order after grv.
    with regards
    sanjay agrawal

    HI,
    Are you creating return Po for subcontracting vendor with item category L.?
    we used movement type 541 to send material to vendor ,now you want movement type 542 in system means take back from vendor?
    I don't think so it will make work and make any sense
    why you are not adjust your component with subcontracting adjustment in sap mm
    check following link
    [http://help.sap.com/saphelp_470/helpdata/en/4d/2b908943ad11d189410000e829fbbd/content.htm]
    Regards
    Kailas Ugale

  • Returns from vendor special stock O

    Hi, all.
    Does anyone know, how can I make a returns from vendor, special stock O?
    Thanks in advance.
    HAL

    Hi, Vivek.
    I can not do MB04, because I don´t know always de PO that originates the stock "O" and this movement creates a FI document, with isn´t correct, because the 541O (that puts stock in vendor)   does not create a FI document.
    Any other idea? I mus say that I have WM, so I need to create an transfer order to store that sock in my warehouse.
    HAL

  • Return Material back from Vendor without PO

    We are having problems returning material back from a Vendor without a PO. We had sent some of our product to a Vendor to have them restack the pallets. Now we cannot bring the material back in without referecning the PO. (RGA) (VA01). We are allowed to do this on the sales side of our business when we are dealing with customers but not with a regular Vendor. Is there some flag on the Vendor that I need to check? Please let me k now.

    Hi
    You could do a goods receipt with movement type 501 whish is Goods receipt without a Purchase Order but be careful has this has the effect of making stock appear from nowhere.
    This can be done with transaction MB1C
    I hope that this helps

  • Raw material - Returned to vendor

    Hai,
    I was purchase a raw material from vendor, I have put the GRPO for the corresponding material.
    This item has the following tick in the Item Master Data: 1) Inventory Item
    2) Purchase Item and 3)Quality required.
    After purchasing this I have checked quality and then only I can able to  Issue a raw material into production.
    In quality checking We found this material has some crack. because of this reason I want to return a material to vendor.
    What are the documents I want prepare except Goods Return.
    My colleague are said to prepare the  Sales Invoice for the respective Item. First I was create the vendor as Customer.        
    But in  Item Master data there is no tick in the following check box i) sales Item.
    Because of this Issue I can't choose the respective item in Sales Invoice.
    Can any one give me the solution for this.
    Regards
    Pushpa Damodaran

    Hai,
    Is there any other option to return a material to vendor( to reduce stock in the corresponding warehouse)
    and also I want to know Now I can tick in this Item as sales Item
    Regards,
    Pushpa Damodaran
    Edited by: Pushpa Damodaran on Mar 2, 2012 11:02 AM
    Edited by: Pushpa Damodaran on Mar 2, 2012 11:04 AM

  • Material return to vendor ( line rejection)

    Dear MM gurus,
    i have a scenario where material received is accepted at the time of Quality inspection. Same material issued to production but if found faulty has to be returned to vendor. Such line rejection occur daily and at the end of the weak rejection quantity are enough to be sent back to vendor.
    we are using two step process for GR i.e 103 followed by 105. following process does not allow material return through purchase return order i.e 161. creating return delivery via migo with movement type 122 against GRs is not viable as such returns will need reference to around 30 goods receipt for single return delivery creation.
    kindly suggest a solution were return delivery can be created  without reference of GR. Please ask for clarification if information here is insufficient.
    regards
    Avinash

    Hi Avinash,
    Please check the link
    http://help.sap.com/saphelp_470/helpdata/en/a5/63351643a211d189410000e829fbbd/frameset.htm
    Regards,
    Bijoy Kumar

  • Reg material return from subcontractor

    Dear all,
    We send material to subcontractor using movement type-541, but due to some problem the subcontractor has not completed the job and we need to take stock back from him and we will take with 542 mvmt, our requirement is can we generate an inspection lot for this mvmt type( we need to test material coming from subcontractor)
    Thanks i n  advance
    Madhav

    Hi,
    I would suggest to post this query in QM forum to get a better help.
    However based on my little knowledge on this, you can manually create an inspection lot via QA01. The inspection type would be 08. Maintain this inspection type in the QM view of the material master. Check with your QM personnel if this can meet your need.
    Regards,
    Vivek

  • MM Subcontracting with material applied by vendor

    Dear all ,
    I have to input into Subcontrating Purchase order a new line to represent the material applied by vendor. The problem of this scenario is that I must put the value of this material applied(second line of PO) as part of costs of main item.
    I could not use condition at pricing to simulate this into the MIRO.
    Does anyone know this scenario ? How could I do that in this way ?
    best regards,
    Ale

    Hi dear  Charlie  !
    thx for your reply !
    Well I could not use delivery costs conditions at pricing because after that I must use by one brazilian fiscal requirement use the  additional item at PO to open at "Nota fiscal" that is a fiscal document valid here in Brazil , and I use it on MIRO.
    Thx for your quick reply.
    best regards,
    Ale

  • SAP Report for Material purchased from Vendors

    Can anyone tell me if there is a report in SAP that we can use to list all suppliers for a given material?   We are operating in SAP ECC6.0 and need a report that will list all  vendors that the company has used for a given part.   Is there a standard report in SAP that pulls information from purchasing info records?
    Also does anybody know of any SAP consultants that can help us create custom reports?
    Edited by: TonyMart on Oct 20, 2011 2:46 PM
    Edited by: TonyMart on Oct 20, 2011 2:47 PM

    Hi,
         There is not standard report for ageing... You have to develop a custom one if you are talking in terms of GR/IR...
    Raghav

  • Scrap material management from vendor

    Hi All,
    In our project scenario, We are developing project stocks on various WBSes by movement type 412 Q but the material is actually lying with contractors. I post this material to the network activity when I get a Consuption bill from contractor and raise actual costs and accordingly settle these costs to various AUCs by amount, for that period. But out of that whole material, contractors scraps some of the materials and they return it back to us. Obviously we don't keep it with us, we rather sell it. How do I monitor this in my project? how do I show it in my project?
    How do i manage the scap / waste material from the contractor in my project?
    Your early response will be rewarded..
    Thanking you all in advance..
    Vishal.

    Hi AP,
    But in my scenario the project stock is actually the contractor stock, it is not issued to them through the movement type in standard SAP.
    As the material is issued to the contractor, he will consume it and send a consumption bill and I will consume the material in project by issuing it to the internal NWA.But some material is scraped and will be returned back to us. We will only post the material that is actually consumed so in the end some stock will be present in the WBSes..which will create problem during settlement.
    Kindly reply..
    VIshal.

  • Return from Vendor in Refurbishment Process

    Hi
    Need help in understanding the below Steps Refurbishment Scenario u2013
    We want to send the defective Material to a external Vendor for Repair, we can Issue the Material under valuation class u201CDEFECTu201D Thro MB1B Mvt Type 541 . However while taking back thro Mvt type 542 it is not possible to take it in valuation class u201CREFURu201D .
    Kindly guide how to map the process.
    Regards
    Sameer

    Hi
    Thanks for providing the links for subcontracting process .
    I have two Queries pls guide -
    1) Is standard SAP PM Refurbishment Process is not supporting the process of external repair of spares ( Which is a common industry practise ) . Due to this we need to have two processes for repair one for internal repair Refurbishment Process & another for external repair Subcontracting Process.
    2) As this "Subcontracting indicator " in PM Order Process is available for ECC6 - EHP4 --- we are not in that so how we can map the process of external repair in SAP PM .
    Reagrds
    Sameer
    Edited by: Saxena Sameer on Oct 13, 2011 1:36 PM

  • EXTRA MATERIAL RETURN

    hi
      when a material is issued to production from stores with ref to a production order,some times there may be a chance that  some material may be unused.this material has to be returned to stores. please give me a suggestion as how this is managed in SAP.
    Thanks & Regards,
    nagraj.s

    hi,
    If the scenerio is to be faced again n again there its better to for BACKFLUSH.....
    Or
    If you wanna be with the same, then you can get back the material via "Return" process from MIGO itself...
    Regards
    Priyanka.P

  • Material return to vendor with Nota fiscal

    Hi,
    Could any one suggest me the process of return materials to vendor with nota fiscal document.
    Thanks,

    pls reply

  • Excisable material return from subcontrator as it is

    Hi SAP Expert,
    I have a question which need to be addressed?
    I have sent a material ( recursive or BOM component) to subcotracter with 57F4 challan of qty 1000.
    Due to some reason qty 200 to be withdraw  using 542 movt .type.
    I want the transaction flow wrt Excise treatment for 542 movt type also for the qty of 200.
    Please help me to resolve the issue.
    With best regards,
    Manoj

    You need to recieve material using 542 mvmt with reference to p.o,reconcile matl doc. using J1IFQ.
    If all quantities were recieved from subcontractor,then you can complete challan using J1IF13

  • Service Order+Service tax with Consumption of material(Vatable) from vendor

    Dear All ,
               We have a service scenario at my client . My client is sending some material for service work.The vendor during service work adds some conponents(vatable) and sends it back to client .
               What I suggest is to create a Material with material type non stock NLAG . Then create a service PO with 2 lines . First with cost centre/service assignment and with tax code service tax. Second with this non stock line item with tax code VAT .
               I am making it nonstock as this is consumed immediately at vendor end .
              Is this the right approach to do it ?
              Anybody kindly Reply .
    Regards
    Abhijit Das