Subcontracting for Project

Dear SAP Guru,
In my organization, the business requirement is to use subcontracting process for project.
I maintain the movement type 311 Q for subcontracting process, but at the time of reconciliation of subcontracting Challan, the system does not refer the stock transfer material docuement.
Movement type 541 (for subcontracting) does refer the project stock.

Hi,
Subcontracting for Project Stock: -
Purpose: - Subcontracting is also possible in conjunction with Project stocks. The subcontracting orders are account-assigned to a Project. Thus, the components are not transferred (using a transfer posting) to the "stock of material provided to vendor" but are directly withdrawn from the Project stock the time of the goods receipt. The material manufactured is also posted to the Project stock.
The cost of subcontracting is then debited to the Project.
Since the components are not transferred to the "stock of material provided to vendor", it is recommend that you use a transfer posting to transfer the provided components to a new storage location (for example, 9999). This enables you to obtain an overview of those stocks that are physically located at the subcontractor. This information is particularly important when you carry out a physical inventory of the Project stocks.
Features: -
Withdrawal from Stock of Mat. Provided or Project: -
For components that are managed in Project stock, you can define whether the components are to be withdrawn directly from each Project or from the stock of material provided to vendor. You manage this via the dependent requirements indicator for individual customer requirements and collective requirements (MARC-SBDKZ).
You can maintain this indicator in the following places:
In the MRP view of the material master record (MRP 4)
In the explosion types for the BOM item (in Customizing for Production in the step Basic Data -> Bill of Material -> Item Data -> Define explosion types)
Configuring the explosion types has priority over the configuration in Inventory Management.
If the indicator is set at Collective requirements only (2), the materials are withdrawn from the stock of material provided to vendor. If this indicator is set any other way, the system withdraws materials from Project stock.
Here all the processes will remain same except; MB1B - Do Transfer Posting of material from RM Warehouse to this Storage Location via movement type "311 Q" (Instead of doing 541)

Similar Messages

  • Subcontracting with project stock

    Hi All,
    When using project stock as we cannot issue components to the subcontractor in the subcontracting process we have created a new storage location for the subcontractor. So when the components will be sent to the subcontractor we will move the components from one storage location to the subcontractor's storage location using movement 311 Q.
    But how do I get the delivery document that should be sent with these components. Is there a SAP standard way of triggering the delivery documents in this case?
    Regards,
    V S

    Hi,
    In case of subcontracting PO with account assignment for Project, components are directly withdrawn from the project stock at the time of the goods receipt. But if you want to withdraw the components from the stock of material provided to vendor then you can set the collective requirement field in Material Master MRP4 view as Collective requirements only (2), then you can use ME2O.
    The collective requirement field has to be set for the components to be provided.
    If you work with this setting then you don't need any seperatestorage location the process will behve as normal subcontracting process.
    Regards
    Chandra Shekhar
    Edited by: Chandra Shekhar Singh on Jul 14, 2011 6:48 PM

  • How to find next number range for project definition in tcode CJ20N

    Hai Experts,
          Please help me 'How to find next number range for project definition in tcode "CJ20N". I was trying in function module NUMBER_GET_NEXT. Is it right function module? If its right what input i need to give for this tcode and for the field project definition?
    Note: I searched in forum before posting, but couldn't find the solution.
    Thanks
    Regards,
    Prabu S.

    Hi,
    For project defination internal number is assigned by system.
    When you saves's project then system allocate one number to project defination, you can view it,
    SE11 >>> table  PROJ >> Click on contents >>> execute,
    here you will get your project defination & number is assigned to project defination.
    kapil

  • Production Order For Project with plant stock

    Hi,
    We have a scenario where in we are required to create a production order for a project.
    But the material(raw material) is in a storage location and is a stock item. Even the header material is also a stock item and it to stored in the storage location.
    But the order is to be created for Project and to be settled to the Project. Now the system is not allowing me to create the order.
    The error is :
    "Project  does not allow make-to-order stock
    Message no. CO746
    Diagnosis
    There is no project stock for the project.
    To create a production order with reference to a WBS element the project must allow project stock to be maintained.
    Procedure
    You should select a project that allows project stock."
    Now,
    I don't want to have a project stock. How to go forward...
    Regards
    Pavan

    Hi,
    What is the strategy you are using. If you are using strategy 20, then chnage it to 40.
    Also maintain individual/collective indicator to "1" - individual in MRP-4 view. So that when the order is created, the stock will be reserved as Q-project stock.
    thanks and regards
    Murugesan

  • Opening Balances for Project Costing in R12

    Hi All,
    What are the Open transactions should be migrated as Opening Balance in Project Costing (R12) for Projects and Tasks. Here at client place cost will come from Inv, PO, AP and OTL to Project costing (R12). Can you please explain in detail (Opening Balances & Historical Cost - How to Migrate)?
    Waiting for replies...

    Hi
    Usually on implementation of Projects, people are migrating total historical costs per project.
    Depend on your current system, you may convert the historical data summarized by project, task, expenditure organization and expenditure type. There is an option to summarize costs into the latest period, just before starting the future transactions import into Projects. Otherwise, consider summarizing cost data per period, per quarter or per year.
    The summarized data may be loaded as miscellaneous expenditures into Projects.
    Be aware that for converted expenditures you should setup a Transaction Source which is costed and accounted.
    Dina

  • Moving avergae price updation in material master for project stock

    Dear All,
    My query is pertaining to updation of MAP( moving average price) for project specific procurement ( as project stock) for valuated project stock.
    As  definelty the cost of procurement gets consumed by project .but i want to know does the project stock procurement still updates the moving avergae price or not.
    Ex:-Suppose MAP in material master is 10 USD ( with qty 1)and i procure the same material ( qty 1)for project with account assignment Q for 9 USD . now will the MAP in material master becomes 9.5 USD or it remains 10 usd.?
    Please reply urgently
    Regards
    Amit

    Hi Amit,
    If your Project Stock is valuated, then, the valuation data for it is stored in a different table: QBEW.
    The normal, anonymus warehouse stock (the unrestricted use stock which is not assigned to any project or to any sales order) has its valuation data stored in MBEW.
    The "Accounting 1" view in the Material Master MM03 ONLY displays the data of MBEW.
    In the material master you will never see the valuation data of the valuated project stock (table QBEW) or the valuated sales order stock (valuation indicator "M" - table EBEW).
    The valuation data for the tables QBEW and EBEW can be seen in SE16 or in the transaction MBBS.
    Also note that these valuated special stocks are managed independently of the normal stock. If, for example, you change the Moving Average Price of your normal stock in MBEW, this will not have any influence on your project stock, as the data is under a totally diferent table QBEW.
    I hope this helps you,
    Esther.

  • COGS Value showing as null for Projects

    Hi All,
    We have a report called Revenue Report. In this report we track the revenue and cogs value for both OM orders and Projects. We are able to see th cogs value for OM order(i.e. sales order)but not for projects. We are using OOTB out of box mapping(i.e.SDE_ORA_GLCOGS) for populating cogs value.So we have approached oracle team to address this issue. Please find the below reply from Oracle. Can somebody help me how to calculate COGS value for projects.
    BIApps 7.9.6.x do not support the integration of Project and COGS out of the box. If you have cogs trx from Projects and would like to extract these trx, you can customize the SDE sql.
    [OOTB sql in SDE_ORA_GLCOGS]
    WHERE
    MMT.TRANSACTION_TYPE_ID IN (15, 33, 10008) AND
    (MMT.TRANSACTION_ACTION_ID,MTA.ACCOUNTING_LINE_TYPE ) IN
    ((27, 2), (1, 36), (36, 35))
    MMT : MTL_MATERIAL_TRANSACTIONS
    MTA : MTL_TRANSACTION_ACCOUNTS
    15 = RMA Receipt (Return Material Authorization)
    33 = Sales order issue (Ship Confirm external Sales Order)
    10008 = COGS Recognition
    (27, 2) = (Receipt into stores, Account)
    (1, 36) = (Issue from stores, Deferred Cost of Goods Sold)
    (36, 35) = (COGS Recognition, Cost of Goods Sold)
    These are OOTB default values to extract the cogs trx for sales order etc. These are configurable. You can add/modify these values as needed. You can check the OLTP MTL module for the meaning of each values

    Please do not post duplicates -- COGS Value showing up as null Projects

  • Trying to dynamically load CSS for project at compile time via config XML file to select CSS file.

    I'm using the same code base to compile different versions of a project. Each project has different base fonts. I've created multiple css files that use the same style names. The idea being that in the code I reference the style names, then the loaded CSS determines which font (and size, color, etc) is used for each style name.
    The CSS files are compiling to SWFs, and those SWFs are referenced in config.xml files. Before compiling, I select the config file to use.
    I am loading the CSS SWF files via the StyleManager in the Application.mxml, like so:
      styleManager.loadStyleDeclarations( _contentData.elements( 'cssPath' ).@path )
    The path traces out correctly as:
    assets_embed/styles/project2.swf
    For some reasone I must include an fx:Style line in the Application.mxml file or no fonts are recognized. Example:
      <fx:Style source="assets_embed/styles/project1.css"/>
    If I reference the css for project one (as done above) then most, but not all, styles work. Some styles reference the fonts from the project 1 css, others properly use fonts from project 2 swf. If I point to the CSS for the project I'm compiling in the <fx:Style > tag then all fonts work, but that defeats the goal of using XML rather than code to identify the styles.
    So, why do I need the fx:Style line if the css is being loaded via StyleManager?
    Why is there "cross talk" between style definitions?
    Is there a better way to select styles at compile time?

    I read this quickly so I might have missed a detail.  I think your describing an issue with recent Flex releases that is described in the fine print somewhere.  If you don't have any fonts embedded in the main app and are only bringing in fonts embedded in CSS SWFs, you have to force-link the EmbeddedFontRegistry by adding something like this to the main app's script block.
    import mx.core.EmbeddedFontRegistry; EmbeddedFontRegistry;
    (Yes, "EmbeddedFontRegistry" is in there twice, once to define the fully qualified name, the other to create a class dependency to force the linking).

  • Error while mantain budget  for project

    Hi,
    I maintained budget for project CJ30 in IDES as follows:
    1. Sellect all Item --> copy view --> choose planned total
    2. Entry: Percentage = 100%, Overwrite option
    2. All values is copied from Column Planned Total  to column Budget
    3. Save
    4. Error message:
    Item WBS element A-60000 budget exceeded
    Message no. BP604
    Diagnosis
    In document item WBS element A-60000, budget  for fiscal year 2008 was exceeded by 2.763,26 EUR.
    can anybody help me to solve the problem?
    Thank you
    Long

    Hai Long,
    For getting BCWS , you should maintain Progress version. DO following in config settings..
    1) Project Sys -
    Progress -
    Progress analysis -
    Maintain Progress version.
    2) Select Progress version 100 and copy the same and give new name.
    3) Go to details.
    4) Select option 3 ( if basis for Progress is Budget) 4 ( If it is planned cost) for Earned Value Basis.
    5) Select option 2 ( if basis for Progress is Budget) 7 ( If it is planned cost) for POC weighting.
    6) Save it.
    7) In your project select Progress tab in detail screen of WBSE and Activity and select above Progress version, select select cost propotional ( Or as suitable for ur requirement) plan and actual ( it is adviseable to have plan and actual same always to have clarity in results)
    8) Schedule and see report in CN41N.
    Please post your observations
    Thanks
    Saikishore Ganga.

  • Error running Execution plan for 'Project Analytics in PeopleSoft 9.0 '

    Hi ,
    I am running execution plan for Projects Peoplesoft 9.0 (BI Apps version 7.9.6)
    The issue is the file type data source went thru the database (data warehouse)
    the tasks that were completed SUCCESS were from the File source only from (SrcFiles).
    error as below.
    ANOMALY INFO::: Error while executing : INFORMATICA TASK:SDE_PSFT_90_Adaptor:SDE_PSFT_ExchangeRateDimension_Full:(Source : FULL Target : FULL)
    MESSAGE:::
    Irrecoverable Error
    Error while contacting Informatica server for getting workflow status for SDE_PSFT_ExchangeRateDimension_Full
    Error Code = 36331:Unknown reason for error code 36331
    Pmcmd output :
    one more info,if this helps
    values defined in the Parameters of the execution plan.
    1     DATASOURCE     ,DBConnection_OLAP     is 'DataWarehouse'
    1 DATASOURCE     ,DBConnection_OLTP     is 'PSFT_9_0_FINSCM'
    1     DATASOURCE     ,FlatFileConnection     is 'PSFT_9_0_FlatFile'
    The 'Relational Connection' In Informatica Repository Manager is currently pointing to only 'PSFT_9_0_FINSCM'
    & 'DataWarehouse'
    Please let me know what is wrong?
    Regards,
    JK

    Hi ,
    I created the PSFT connection in 'Applicaiton connection' of Repository manager.
    Also the Informatica server's tnsnames.ora should have entry for the source( PSFT database) and that of the datawarehouse.
    thanks,
    JK

  • Error:The grouping element could not be determined for project

    Hi,
    When I am trying to issue goods for a project,I am getting the following error
    "The grouping element could not be determined for project 1., plant 2., and MRP group 3.."
    what may be the reason for this reason.
    Regards,
    Raju

    Hi,
    You are using Automatic Requirement Grouping in your project and there is some issue with the Material Master,please check the Material Master Views.
    Muzamil

  • Send email is not working in share point desinger 2013 for project server 2013 workflow

    Hi,
      How to configure email for project server 2013. i have created workflow where i am sending email. It is not sending it.
     i have set outgoing mail setting. Tasks are created in my workflow but mail is not sending.
    Thank you for helping us.
    Thank You
    Vinay

    Hi,
      How to configure email for project server 2013. i have created workflow where i am sending email. It is not sending it.
     i have set outgoing mail setting. Tasks are created in my workflow but mail is not sending.
    Thank you for helping us.
    Thank You
    Vinay

  • In case of Non Stock Material - Different GL for projects from WRX

    Hi Gurus,
    While doing MIGO for non stock material in case of projects, system is crediting account from WRX in OBYC with blank valuation class. but how can we give different GL for projects in this case.
    Please revert asap.
    Thank you

    >
    sapmm99 wrote:
    > For non valuated material, material  master is required or?
    >
    > As per my knowledge material master is mandatory only for stock materials. not for not valuated and non stock materials usually we never maintain master data for non stock and non valuated materials
    >
    > if i am wrong please advise me
    Its upto you if you want maintain material master record or not for non valuated material. With material master you have a material code to input in the field of PO, without material master you put in short text.

  • Account determination for project stock delivery (for movement type 281Q)

    Hello
    We are trying to carry out delivery for project stock (CNS0) using  movement type 281Q.
    We notice that there is no account modifier availalbe for this scenario resulting in error during PGI. However, we can do PGI after changing the config of account determination without account modifier.
    Since working without an account modifier is not acceptable for various business reasons, we must have an account modifier defined. We are wondering why SAP has not provided a standard solution for dealing with project stock delivery.
    Can any one please suggest how to deal this situation.
    Thanks and warm regards,
    Jagadeeesh

    We have business requirement as stated below:
    We need to procure materials for specific Projects but also want to track the stock for the Project by value in the invnetory. In other words, the encumbrance of the procurement needs to take place against the Project but we want to be able to take it into inventory as a valuated stock and issue to the WBS whenever it is required.
    Is this possible?  What we know is that as soon as we give reference of the WBS for the Procurement, it gets expensed to the Project and we cannot value manage in inventory.
    The reason for this requirement is there is a long time between when the item is procured and when it is used for the project. Till such time we have to track the Project items in the inventory as any other stock but its still tagged for the project and encumbrance would need to have happened
    Any ideas on how to deal with this will be appreciated
    Thanks
    Noornie

  • Changing the data in DataSource in R/3 System for Project System

    Can we change the data of DataSource which is extracted from R/3 sYSTEM for Project System Module?

    Hello Rajesh,
    You can modify it in PSA. Or write the routines or rules logic as per your requirement.
    Could you please elaborate more on what kind of changes you are interested for.
    San.

Maybe you are looking for

  • Best way to convert iPhone app to widget?

    hiya was wondering if there is a way to convert an iPhone app to a widget if not.. what is best approach? TIA

  • Build for solaris 8 on solaris 10 - possible?

    I want to build/compile an application for solaris 8, but I only have access to a machine running solaris 10. Can I compile for solaris 8 on a solaris 10 machine, and if so, what do I have to do to make it work?

  • Dual Monitor Out of Frequency

    I am reposting this from another area to see if get a response here. I have a G5 Dual 1.8 machine with a GeForce FX 5200 DVI-VGA and ADC-VGA adapters. It drives to 17in Daewoo LCD monitors. It all worked fine with dual monitors until I upgraded to 10

  • Find if thesaurus file is loaded or not

    Is there a way to find out if a thesaurus file is loaded in database or not ? also to find the name of the file if we don't know the name. Also when using the following command : ctxload -user <username/password> -thes -name <thesaurus name> -thescas

  • Recommendations for non-headphone microphones for the 6th generation Nano?

    Does anyone have recommendations for a microphone for the 6th generation nano that is NOT part of a headphone set? (Think of things like the older third-party products for past nanos or ipods). Thank you!